ISMI Risk Screening Tool



Similar documents
RISK MANAGEMENT FOR INFRASTRUCTURE

Risk management + Strategic planning IT TAKES AN ENTIRE ORGANIZATION

Quality Risk Management The Pharmaceutical Experience Ann O Mahony Quality Assurance Specialist Pfizer Biotech Grange Castle

Step 4. Monitor / Review Control Measures

Nova Scotia EMO. Hazard Risk Vulnerability Assessment (HRVA) Model. Guidelines for Use. October, 2010

AFTRS Health and Safety Risk Management Policy

The Lowitja Institute Risk Management Plan

PROJECT RISK MANAGEMENT

Aon Risk Solutions Aon Crisis Management. Crisis Management Consulting Terrorism Probable Maximum Loss (PML) Studies

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Hazard Analysis and Critical Control Points (HACCP) 1 Overview

Project Risk Management

Guidance for Industry: Quality Risk Management

Performing Effective Risk Assessments Dos and Don ts

The Role of Information Technology Studies in Software Product Quality Improvement

ADVANCED EXCEL FOR ENERGY EFFICIENCY PROFESSIONALS

SECTION I: OVERVIEW AND INTRODUCTION. Emergency Response Management Plan 5

Develop Project Charter. Develop Project Management Plan

Quick Reference Guide Interactive PDF Project Management Processes for a Project

Title: OHS Risk Management Procedure

Bedfordshire Fire and Rescue Authority Human Resources Policy and Challenge Group 5 March 2015 Item No. 10 HEAD OF SAFETY AND STRATEGIC PROJECTS

DIT HEALTH AND SAFETY OFFICE

Risk Assessment / Risk Management Protocol

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD

MINISTRY OF THE ENVIRONMENT DRINKING WATER QUALITY MANAGEMENT STANDARD

RISK MANAGEMENT STRATEGY

WHS-02 Safety Management System Procedure

Federal Bureau of Investigation s Integrity and Compliance Program

Improved Utilization of Self-Inspection Programs within the GMP Environment A Quality Risk Management Approach

Software testing. Objectives

Core Infrastructure Risk Management Plan

Principles of Execution. Tips and Techniques for Effective Project Portfolio Management

3.0 Risk Assessment and Analysis Techniques and Tools

Risk Management Strategy EEA & Norway Grants Adopted by the Financial Mechanism Committee on 27 February 2013.

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD

Project Management Plan Template

The 10 Knowledge Areas & ITTOs

FSW QA Testing Levels Definitions

Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)

Quality Assurance. Ministry of Community Development and Ministry of Tourism, Culture and the Arts

User Role Analysis of the travel expense report

Discipline: Technical Services Category: Procedure. Risk Management RM Applicability. ARTC Network Wide. Interstate Network.

RISK BASED AUDITING: A VALUE ADD PROPOSITION. Participant Guide

Information Technology

Rail Asset Management. Rail

Risk Management approach for Cultural Heritage Projects Based on Project Management Body of Knowledge

Case Study: ICICI BANK INTERNAL AUDIT DEPARTMENT PENTANA AUDIT WORK SYSTEM IMPLEMENTATION

Healthcare risk assessment made easy

Designing an Effective Risk Matrix

Effective Independent Safety Assessment

ARE YOU READY FOR THIS RISK ASSESSMENT IN THE CODES?

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN. April 2009 SLAC I

Project Risk Identification. IH 635 Managed Lanes Project Exhibit A to Project Development Plan 1

Wellness Program SOP 5-14

Civil & Environmental Engineering

Transforming risk management into a competitive advantage kpmg.com

QA GLP audits. Alain Piton. Antipolis,, France.

ERP Test Plan. Revised 7/5/10. SYSTEM TEST PLAN and PEOPLESOFT FMS TEST SCRIPTS SpearMC Consulting. Page 1 of 15

UNIVERSITY BOARD SKILLS REVIEW MATRIX Page 1 of 5

Clinical Risk Management: Agile Development Implementation Guidance

Information Technology Project Oversight Framework

Balanced Scorecard Put strategies into practice. CP-BSC is a module of the Corporate Planning Suite.

CalMod Design-Build Electrification Services

10 Critical Steps to Create a Project Plan

Bedford Group of Drainage Boards

FIRE RISK ASSESSMENT SW13 0HA

Failure Analysis Methods What, Why and How. MEEG 466 Special Topics in Design Jim Glancey Spring, 2006

FINAL. Internal Audit Report. Data Centre Operations and Security


Checklist for Operational Risk Management

Risk Management: Coordinated activities to direct and control an organisation with regard to risk.

Shell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.

THE CAM-I PERFORMANCE MANAGEMENT FRAMEWORK: A HOLISTIC APPROACH TO IMPROVING BUSINESS PERFORMANCE

Safe and Healthy Workplace Environments using Effective Industrial Hygiene Management Systems. By Matt Noth

Basic Fundamentals Of Safety Instrumented Systems

Sensitivity of an Environmental Risk Ranking System

Ligature Risk Assessment Policy

Maintaining the Relevance of the Uniform CPA Examination

Scoring. AIB Consolidated Standards for Inspection. The scoring described in this booklet supersedes. all previous scoring methods used in all AIB

Input, Output and Tools of all Processes

Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

University of Nottingham Emergency Procedures and Recovery Policy

Project Risk Management. Presented by Stephen Smith

Negative Risk. Risk Can Be Positive. The Importance of Project Risk Management

Project Integration Management

Hydraulic Safety Program

HS307 Hazard & Incident Reporting Procedure

Transcription:

ISMI Risk Screening Tool SESHA Hill Country Chapter 2010 Symposium February 12, 2010 Brett Jay Davis, PE Zephyr Environmental Corporation bdavis@zephyrenv.com, 512 879-6628

Presentation Outline 1. Project Background 2. Risk Assessment Primer 3. Description of the Risk Screening Tool 4. Demonstration of the Risk Screening Tool

Project Background ISMI Project # ESH1006M, ESH Technology Deliverable #20: Develop a site risk screening assessment method / tool for use in evaluation of site hazards and auditing Project Concept: Identify/develop a method which can be used to evaluate high level ESH / facility risks Method should be more of a risk screening tool rather than a deep dive risk analysis Method should be usable for evaluation of risks at the site level and/or used as an audit tool Method must be intuitive enough such that minimal training is required

Risk Assessment Primer Scoring Risk: R = SxFxC, x where: R = (Typically Qualitative) Risk Score S = Severity of Outcome (worse is higher number) F = Frequency of Initiating C = Quality of Risk Controls (worse is higher number) Risk controls generally composed of a combination of detection and response systems. Hierarchy of controls is prevention, prediction, automatic and manual. (Manual considered unreliable, at best.) Rigorous maintenance of detections required or should be expected to fail upon demand. Residual risk is reduced by lowering S, F or C.

Severity and Frequency Relationship Constant Risk Assessed Risk Increasing Frequency Residual Risk with Controls Applied Severity Increasing Controls Are Used to Reduce Frequency enc and/or Severityerit

Risk Assessment Approaches Bottom-Up Method Undesirable Reduced Outcome Severity or Frequency Evaluate Controls Investigate Possible Combinations Evaluate Each Risk Scenario Very Thorough Very Time Consuming Requires Experienced Analysts Results Can Be Inconsistent

Risk Assessment Approaches Top Down Method Undesirable Outcome Reduced Severity or Frequency Evaluate Controls Focuses on Known, High Risk Issues Assessments are Relatively Quick Expertise in Risk Analysis Not Required Consistent Results Site to Site Start with Known Undesirable Outcome and Relevant Risk Scenarios

Intended Use Description of Tool Allow broad, uniform top down EHS risk screening of sites, for only high risk concerns, in a format usable by non-risk management specialists. Provide, typically annual, reports useful for further risk reduction activities and tracking of these activities. Allow user additions of risk scenarios and risk controls. Intended Users Site EHS personnel and/or corporate auditors Tool Availability Public version of tool is available directly from ISMI. Software Requirements Microsoft Excel 2003, with macros enabled

Description of Tool What High Risks Are Covered = Very Undesirable Outcomes Resulting In Loss of Personnel Loss of Utilities/Materials Loss of Structures/Property Loss of fcompliance What Types of High Risks Are Not Covered Security, including cyber, product and personnel Financial, such as from rising utility costs or interest rates Important Assumptions Initiating events realistic (therefore F not small). Residual risk rankings assume that detections are being adequately maintained. Facility has obtained all required credits, licenses and permits, and compliance with all conditions is achievable. Facility has access to at least one acceptable provider of all necessary utilities and raw materials.

Description of Tool User Definition i i of Site Specific Scenarios Very Undesirable Outcome System/Subsystem Cause of Outcome - Not Functioning i - Service Interrupted - Release from Containment - Quality Corrupted -Fire - Not Available - Injury or Death Subsystem Effect Initiating s All from drop down lists!

Description of Tool User Definition of Site Specific Controls Detection Example Detection Type - Manual-Post Failure - Automatic-Post Failure - Manual-Predictive All from drop down lists! - Automatic-Predictive - Preventive Maintenance Performed? Maintenance Type - None - Not Required, Routine Replacement or Inspection, Continuous Monitoring Response Example Response Type - Not Required - Manual-Hands On - Manual-Remote Automatic

Description of Tool Tool Outputs Residual Risk Ranking From matrix created especially for this project (see next slide) Risk Reduction Opportunities Possibilities for improved controls Possibilities for reduction of severity or frequency

Description of Tool Residual Risk Ranking Matrix

Description of Tool Sample Scenarios from Tool Corresponding Controls from Tool

Features Description of Tool Features and Standardized di d Reports Add detection choices Add response choices Add risk scenarios Add prevention or improvement options Standard Reports Risk Screening Summary Risk Screening Completion Status Risk Ranking Improvement Options Systems with No Maintenance Scenarios Re-Assessed (i.e. original controls changed to reduce residual risk ranking) Added Scenarios and Controls

Description of Tool Using Tool to Modify Residual Risk Typically, residual risk is reduced by: Modifying the severity of outcome or Modifying the frequency of an initiating event The ISMI Risk Screening Tool is more controls focused Risk scenarios are laid out to the point of an initiating event Subsystems that are not applicable at a site can be recorded as NA Risk scenarios that are not applicable at a site are simply not recorded The user selects as implemented controls Reducing risk for an applicable risk scenario involves improving the controls Replacing manual detection with automatic Replacing manual response with automatic Replacing automatic detection with predictive Instituting a prevention is recorded here

Demonstration of ISMI Risk Screening Tool