Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales



Similar documents
Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

42U/45U 28" Wide Rack Installation & Service Guide

Remote Head REMO ONE. Code Manual

INSTALLATION INSTRUCTIONS

Installation Instructions

EZ-Steer Assisted Steering System

39HQ Airovision Air Handling Units

Installation Instructions For Slider Casement Air Conditioners

MGB Chrome Bumper Conversion

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

ATS Overhead Table Shelf System INSTRUCTION MANUAL

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

Operating Instructions Parts List Manual Scissor Lift Pallet Truck

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

Installation Instructions

I BEAM TRACK INSTALLATION

Express5800/120Ed. Rack Mount Kit Installation Procedures PN:

Telescoping Post Indicator Wall Post KENNEDY VALVE ISO 9000 ISO 14001

INSTRUCTIONS: LocknCharge Laptop Carts

RadianceRail Installation Guide

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions

2006 HEADSHOK Service Video #1

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

DCF Optimized Rack System

UPLIFT Height Adjustable Standing Desk (T-Frame) DIRECTIONS FOR ASSEMBLY AND USE - - ALSO - - Watch our assembly video

SD. Flat roof. Rack Mounting. Installation instructions (2010/11) AU

AZEK Rail Install Guide

Packaged Terminal Air Conditioner Wall Sleeve Installation

DIAMOND Retractable Rodding Robot Model SPRAYROD-R

Subminiature Load Cell Model 8417

GEH6290. Mechanism Circuit Breaker. Handle Operating Mechanism Cat. No. Type NEMA 1, 3R, 12, 13 NEMA 4/4X Cat. No. Cat. No. Series Instruction

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS

MEASURING WHEEL ALIGNMENT

Rack installation instructions

SELF-STEERING AXLE TABLE OF CONTENTS

Section A. GENERAL INFORMATION

6 inch A-Arm Lift Kit WARNING: / installation instructions. will fit CLUB CAR DS. included:

EZ-Steer Assisted Steering System

Chapter 10 - Scaffolding Systems

All-Season Sunroom Sliding Glass Door Installation Instructions

Roll-Up Door Maintenance Guide

INSTALLATION MANUAL. Contents JAPANESE ENGLISH GERMAN FRENCH ITALIAN SPANISH. To the installing technician: CEILING BRACKET

Saferand easierinstallation

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

B098N USERS: MACHINE MANUFACTURERS DRAUGHTSMEN OPERATORS MAINTENANCE WORKERS ANY OTHERS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

OWNER S MANUAL Table Tennis Table Patent Pending

Installation Instructions

Model No: VS SAFETY INSTRUCTIONS VS INTRODUCTION & APPLICATIONS VS CONTENTS. 2.1 Introduction. 2.

To Purchase This Item, Visit BMI Gaming

Front axle components, overview

Vision Engravers and Routers PRE-Installation Guide Vision Engraving & Routing Systems

DETACHABLE WINDSHIELD AND DOCKING HARDWARE KIT

RL HW / RL HW+ / RL HGW / RL HV / RL HVPW/RL HVPW-G

Owner s Manual Gantry Cranes

Installation Instructions

Rack Installation. Unpacking the System. Choosing a Setup Location. General Server Precautions. Barracuda Appliances

Operating Instructions

GAERTNER SCIENTIFIC CORPORATION 3650 Jarvis Ave. Skokie, Illinois U.S.A. tel: fax: @gaertnerscientific.

REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)

Page 1. Description

PLM series Permanent load lifting magnets

Structural Holding System

Speed-Mat Rectangle Cutter

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification

Resharpening Companion

Moving and Handling Techniques

Rack Installation Instructions

ASSEMBLY MANUAL SE-4S35

C O N V E Y O R C O M P O N E N T S C H A I N S B E L T S B E A R I N G S

Ceiling Mounted Folding Attic Ladders Installation Instructions

TERMINATION EQUIPMENT INSTRUCTION MANUAL TELE-PIERCE P/N

LIEBERT VNSA Installation Sheet

S OUNTING INSTRUCTION M M o u n t i n g k i t 2 &

2100 AD Mirror Elevator Ball Nut Replacement Procedure

EZ-Steer Assisted Steering System Installation Instructions Platform Kit P/N

Accessories SUNNY REMOTE CONTROL

Uninterruptible Power Supply. 500 kva kva

SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

Integral Kit Instructions

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model NOTICE TO USER

Installation. Smart-UPS VT MGE Galaxy Maintenance Bypass Panel kva 400 V

Arctic Leash Instruction Manual Alaskan Products Company LLC.

BUSINESS. Elektronisches Türschloss. Installation and User Manual. Ingeniously safe. Ingeniously simple.

EXPLORE 4-Leg Teaming Table with Screen Share Assembly Instructions

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

2&3 SECTION LOFT LADDER

BLADE S-MAX Cabinet for Blade Server

Micro Cart User's Guide

Chelsea Loft Bed WARNING:

Original Assembly Guide

Cooktop Low-Profile Ventilation Hoods

Transcription:

Installation information METTLER TOLEDO MultiRange Floor scales / Pit scales KC300/KCS300 KC600/KCS600 KD600/KD1500 KE1500/KE3000 KES1500/KES3000 KG3000/KG6000 KN1500

Floor scales / Pit scales Contents Contents Page 1 Installation... 2 1.1 Preparatory work... 2 1.2 Setting up and levelling... 3 1.3 Installing connection cable... 8 1.4 Pit installation... 10 2 Configuration possibilities... 12 2.1 General information... 12 2.2 Configuration data... 13 3 Planning assemblies... 15 3.1 Notes on planning... 15 3.2 Preload range... 16 3.3 Mounting possibilities... 17 3.4 Opening possibilities... 24 4 Dimensions... 30 Installation information 22007227 02/05 1

Installation Floor scales / Pit scales 1 Installation 1.1 Preparatory work 1.1.1 Selecting installation location The explosion-protected overhead-rail weighing platform is approved for operation in Zone 2 (gases) and Zone 22 (dusts) hazardous areas. There is an increased danger of injuries and damage when using the overhead-rail weighing platform in hazardous areas! Special care must be taken when working in such hazardous areas. The rules for behaviour are based on the concept of "Safe Distribution" established by METTLER TOLEDO. Any protective foils present in the explosion-protected area, e.g. on the load plate, must always be removed. The foundation at the installation location must be capable of safely support the weight of the weighing platform at its support points when it carries the maximum load. At the same time, it should be so stable that no vibrations occur during weighing operations. These requirements also apply when the weighing platform is integrated in conveying systems and the like. Ensure that vibrations due to machines near the installation site are kept to a minimum. 1.1.2 Ambient conditions Use powder-coated/enamelled weighing platforms only in a dry environment. In a damp environment, in wet operation or when working with chemicals: Use stainless-steel weighing platforms. 1.1.3 Accessories Completely unpack the accessories provided with the weighing platform. 1 Identcard 1 Set of signs for selectable configurations additionally provided for KD..., KE..., KES...: 4 Eye bolts in bag additionally provided for KE...sk, KES...sk: 2 Eye bolts in bag 1 Special key 1 Universal oil additionally provided for KN...: 2 Eye bolts with nuts 1 Set of mounting parts for screwing on the floor 2 Installation information 22007227 02/05

Floor scales / Pit scales Installation 2 1 1.2 Setting up and levelling 1.2.1 Setting up and levelling KC.../KCS... 1. To reduce weight, first lift off the load carrier (1). Fold out the lift-off locks (2) on both faces of the load carrier to use as handles. 2. Lift the weighing platform off the transport pallet and set down at the installation location. Be careful when lifting it off the pallet to prevent the lever mechanism open at the bottom from being damaged. 3 4 Releasing transport lock 1. Unscrew and remove the yellow locking screw (3). 2. Unscrew the yellow angled locking bracket (4). Keep the locking elements for use when transporting the weighing platform in the future. 5 6 Levelling 1. Level the weighing platform with the four foot bolts (6) using the level indicator (5): The air bubble of the level indicator must come to rest in the centre of the ring marking. 2. Ensure even contact of the foot bolts. Check the stability of the weighing platform by pressing down on or rocking it at the corners. 1.2.2 Setting up and levelling KD.../KE.../KE...sk/KES.../KES...sk 2 3 1 Setting up KD.../KE.../KES... 1. Lift off the load plate (1) after unscrewing the 6 or 8 screws (2). The eye bolts (3) can be screwed into the threads after removing the blind screws as lifting aid. Depending on the shipping warehouse or the model ordered, the load plate may also be included in separate packing. Then the mounting screws and the blind screws are supplied in the accessories bag. 2. Lift the weighing platform off the transport pallet. To do this, screw the four eye bolts (4) provided into the threads at the corners of the load plate mounting device and lift off the weighing platform with a crane, block and tackle or similar equipment and set it down at the installation location. 4 4 CAUTION Danger of damage to the lever mechanism open at the bottom when using forklift trucks. Move up the load forks of the forklift truck and hang the weighing platform on them as described. Installation information 22007227 02/05 3

Installation Floor scales / Pit scales 1 Setting up KE...sk/KES...sk 1. Open the two quick release locks with the special key and fold up the load plate (special key is used as a aid when lifting off). 2. Lift the weighing platform off the transport pallet. To do this, screw the two eye bolts (1) provided (they are located on the inside on the level indicator side) into the threads of the load frame and lift off the weighing platform with a crane, block and tackle or similar equipment and set it down at the installation location. 3. Remove the eye bolts. CAUTION Danger of damage to the lever mechanism open at the bottom when using forklift trucks. Move up the load forks of the forklift truck and hang the weighing platform on them as described. Releasing the lift-off locks: KD.../KE.../KE...sk/KES.../KES...sk 1. Loosen the nuts (1) at all four corners. Screw up the locking screws (2) and adjust evenly to approx. 1 mm clearance at all four corners. 2. Retighten the nuts (1). 2 1 1 mm 1 2 Levelling KD.../KE.../KE...sk/KES.../KES...sk Level the weighing platform with the 4 levelling feet (2) using the level indicator (1): The air bubble of the levelling indicator must be located within the ring marking. The levelling feet can be adjusted with a 30 mm open-end spanner. Ensure even contact of the levelling feet. 4 Installation information 22007227 02/05

Floor scales / Pit scales Installation 1.2.3 Setting up and levelling KG... 2 1 Setting up KG... 1. Lift off the load plate (1) after unscrewing the 12 screws (2). Depending on the shipping warehouse or the model ordered, the load plate may also be included in separate packing. If this is the case, the mounting screws and the blind screws are supplied in the accessories bag. 2. Lift the weighing platform off the transport pallet. For this purpose, fasten a rope or chain to the load frame (3) and lift the weighing platform off the transport pallet with a crane, block and tackle or similar equipment, and set it down at the setup location. 3 CAUTION Danger of damage to the lever mechanism open at the bottom when using forklift trucks. Move up the load forks of the forklift truck and hang the weighing platform as described. 1 5 2 1mm 3 Loosening KG... transport locks 1. Unscrew the yellow load-frame fastening nuts (1) at all four corners. Adjust to 1 mm clearance by screwing upward and then lock. 2. Loosen both locked yellow locking nuts (2) and screw upward approx. 2 mm. 3. Unscrew the yellow locked locking nuts (3) at the stop. First screw the lower one downward until the knife edge (4) at the lever rests in the suspended bearing. Then set the upper and lower locking nuts (3) to approx. 1 mm clearance from the stop pin (5) and lock. 4. Set both locking nuts (2) to approx. 1 mm clearance and lock. 5. Perform final inspection: All levers must have 0.2 mm to 0.3 mm clearance in the axial direction. Readjust the stops if necessary. 3 1mm 1mm 5 4 Installation information 22007227 02/05 5

Installation Floor scales / Pit scales Levelling KG... 2 1. Evenly screw out the four foot bolts (1) at the corners approx. 3 turns. 2. Unscrew the inner support bolts (2) completely. 3. Place the bubble level on the long side with the level indicator, and level this side with the foot bolts (1) on the left and on the right. 1 4. Place the bubble level on both short sides alternately and level these sides with the other two foot bolts until the level indicator (3) and the bubble level match. 1 3 4 5. Perform final inspection: When the levelling is correct, the load frame (4) must rest snugly in the bases at all four corners. Ensure even contact of the foot bolts. Check the stability of the weighing platform by pressing down on it or rocking it at the corners. 6. Screw both support bolts (2) downward until they touch the surface, tighten with approx. 1/2 turn and lock. 3 1 1.2.4 Setting up and levelling KN... Setting up KN... 1 2 4 1. Unscrew the four screws (2) and remove the cover hood (1). 2. Remove the accessories. 4 3 6 3. Unscrew the screws (3) and remove both covering angled sections (4). 4. Lift the weighing platform off the transport pallet. For this purpose, insert the two supplied eye bolts (6) through the holes (5) in the base frame and tighten with the nuts from inside. Fasten ropes or chains to the eye bolts and lift up the weighing platform from the transport pallet with a crane, block and tackle or similar equipment and set it down at the setup location. 5 CAUTION Danger of damage to the lever mechanism open at the bottom when using forklift trucks. Move up the load forks of the forklift truck and hang the weighing platform as described. 6 Installation information 22007227 02/05

Floor scales / Pit scales Installation 1mm 1 2 2 Loosening KN... transport locks 1. Unscrew the yellow load-frame fastening nuts (1) at all four corners. 2. Adjust to 1 mm clearance by screwing upward and then lock. 3. Completely remove both yellow locking bolts (2) in the cabinet. Keep these screws for use when transporting in the future. 4. Unscrew the yellow locking nuts (4) at the stop (3). First screw the lower one downward until the knife edge rests in the suspended bearing (5). Then set the upper and lower locking nuts to approx. 1 mm clearance from the stop pin and lock. 5 4 3 2 6 B 5 b a 4 1 A 3 Levelling KN... 1. Evenly screw out the four foot bolts (2 5) at the corners approx. 3 turns. 2. Place the bubble level on the right-hand cheek of the load carrier (a) and level in direction A with foot bolts (2) and (3). 3. Level using the foot bolt (4) and the level indicator (1). 4. Place the bubble level on the left-hand cheek of the load carrier (b), and level with the foot bolt (5) in direction B. 5. Perform final inspection: The levelling is correct when the air bubble of the level indicator (1) lies in the centre of the ring marking and the bubble level matches in directions A and B. The load carrier (6) must rest snugly in the bases at all four corners. Press down or rock the corners for this. Make corrections at the front corners (foot bolts 2 and 5) if necessary. Installation information 22007227 02/05 7

Installation Floor scales / Pit scales Installing approach ramp KN... 1. Screw off one of the two angle brackets (2). 2. Insert approach ramp (1) and screw on angle bracket again. 3. Screw support bolt (3) downward and tighten lightly. 2 3 1 4 4 4 4 Fastening KN... to floor The KN1500 weighing platform can be used free-standing. If it is to be used on a smooth floor, however, we recommend that you fasten it to the floor. The base frame has four holes (4) for this purpose. Drill dowel holes matching the holes in the base frame (4) and screw down the weighing platform with the supplied fastening hardware. 1.3 Installing connection cable Note The connection cable may be lengthened to a maximum of 100 m. Route the connection cable to the terminal so that it is protected from possible damage. 1.3.1 KC.../KCS... The connection cable is stored inside the weighing platform during transport for 1 protection. 1. Route out the connection cable under the base frame. 2. Remount the load carrier (1) so that the symbol O is located above the level indicator. Make sure that the load supports (2) in the corners of the weighing platform are vertical. 2 3. Fold out the lift-off locks (3) on both faces of the load carrier for lifting. 3 The lift-off locks are used both to lift off the load carrier (Pos. A) and to prevent lifting off and tilting (Pos. B) during weighing. A 3 B 8 Installation information 22007227 02/05

Floor scales / Pit scales Installation 3 2 1.3.2 KD.../KE.../KE...sk/KES.../KES...sk The connection cable (1) is stored inside the weighing platform during transport for protection. Depending on the conditions at the installation location, the connection cable can be routed out as follows: Below the weighing platform on the floor: Ideal with the recessing installation of the weighing platform. In the case of abovefloor installation protective cable bridges can be laid up to under the weighing platform. Through the base frame: Remove the rubber grommet (2) from the hole (3) in the base frame and pull through the connection cable (1). Push the slotted rubber grommet (2) over the cable and insert it in the hole (3). 1. Lay on the load plate (4) (fold down) and mount it with the screws (5) (quickrelease locks). 2. Screw the blind screws into the threads. 1 4 5 2 1.3.3 KG... The connection cable is stored inside the weighing platform during transport for 1 protection. 1. At the setup location, route out the cable below the weighing platform on the floor. In the case of above-floor installation, protective cable bridges can be laid up to just under the weighing platform. 2. Place the load plate (1) on the load frame and fasten with the screws (2). 3 2 1.3.4 KN... The connection cable (1) is stored inside the cabinet during transport for protection. Depending on the conditions at the setup location, the connection cable can be routed out as follows: Below the weighing platform on the floor: Ideal if cover strips have been provided as cable bridges. These can then be laid below the weighing platform. Through the base frame: Remove the rubber grommet (2) from the hole (3) in the base frame and pull the connection cable (1) through. Push the slotted rubber grommet (2) over the cable 5 4 and insert it in the hole (3). 1. Remove the eye bolts and screw on both covering angle sections (4) with the screws (5). 2. Mount the cover hood (6) and fasten with the screws (7). 1 6 7 Installation information 22007227 02/05 9

Installation Floor scales / Pit scales 2 5 90 1.4 Pit installation 1.4.1 Producing pit The mounting material and detailed instructions for constructing the pit are included with the pit-frame installation kit. The proper construction of the pit according to these instructions is a requirement. 1.4.2 Installing the KC.../KCS... weighing platform 1. Lay the drawing provided in the pit as a drilling template. Centre the template in all directions and secure with adhesive tape. Drill the four holes at the points d = 14 marked and insert the plugs. 2. Measure the pit depth at the corners. 3. Roughly adjust the weighing platform to the height of or flushness with the floor outside the pit using the foot bolts. 4. Lift off the load carrier, see Section 1.2.1. 5. Place the weighing platform in the pit and align. When doing so, also pull the 1 cable into the empty pipe or cable conduit. For details on routing the empty pipe to the terminal, see the instructions on pit construction. 6. Adjust flushness to the floor. To do this, lay a 6 mm spacer on the load supports (1) and check with a ruler from the upper edge of the pit frame. Adjust the height with the foot bolts while ensuring even contact of the support feet, see Section 1.2.1. 7. Mount the weighing platform on the pit floor on the four foot bolts (2) with the screws (3) and lugs (4). Before tightening, check the distance to the pit edge. 8. Release the transport locks, see Section 1.2.1. 4 9. Fit the load carrier (5). The swivelled-out lifting and tilting locks (6) on both faces of the weighing platform serve as lifting aids. 3 10. Lay the left and right cover strips (7) in the pit frame. 11. Final inspection: Make sure that the distance between the load carrier and the pit frame is equal on all sides. 6 7 10 Installation information 22007227 02/05

Floor scales / Pit scales Installation 2 1 3 1.4.3 Installing weighing platform KD.../KE.../KE...sk/KES.../KES...sk 1. Lift off the load plate and route out the connection cable under the weighing platform, see Section 1.2.2. 2. Slowly lower the weighing platform into the pit by the eye bolts. When doing so, also pull the cable into the empty pipe or cable conduit. 3. Release the lift-off lock, see Section 1.2.2. 4. Adjust flushness to the floor. To do this, lay spacers (KD/KE: 8 mm, KE...sk: 6 mm) on the load frame at the corners and adjust flush with the upper edge of the pit frame. Adjust the height of the support feet. To level, see section 1.2.2. 5. Level out, see Section 1.2.2. 6. Insert the clamping plates (2) provided in the installation kit between the pit wall and the clamping screw (1) so that they stand up on the pit floor. Centre the weighing platform in the pit with 6 or 8 clamping screws (1) and clamp firmly in place. Lock the bolts (1) on the inside of the base frame with the nuts (3). 7. Lay on the load plate and screw on firmly. 1.4.4 Installing KG... weighing platform 2 1 3 1. Measure the pit depth at the corners. 2. Roughly adjust the weighing platform flush with the floor outside the pit using the foot bolts. 3. Remove the load plate and route out the connection cable under the weighing platform. 4. Slowly lower the weighing platform into the pit. When doing so, pull the cable into the empty pipe or cable conduit. 5. Release transport locks. 6. Adjust flushness to the floor. For this purpose, place 6 mm spacers on the load carrier at the corners, and check with a ruler from the upper edge of the base frame. Adjust the height with the foot bolts while ensuring even contact of the support feet. 7. Level out, see section 1.2.3. 8. Insert clamping plates (2) between the pit wall and the clamping bolt (1) so that they stand up on the pit floor. 9. Clamp the weighing platform in the pit with eight clamping bolts (1) and centre it at the same time. 10. Lock the clamping bolts (1) on the inside of the base frame with the nuts (3). Installation information 22007227 02/05 11

Configuration possibilities Floor scales / Pit scales 2 Configuration possibilities 2.1 General information 2.1.1 MultiInterval MultiInterval precision means automatic switchover of the numerical increment (readability) in dependence on the applied load. Numerical increment 2.1.2 Single Range and High Resolution Single Range and High Resolution mean that the numerical increments (readability) remain the same across the entire weighing range. 0 Load weighed max. 2.1.3 Additional setting options All other adjustment variables (adjustment to the weighing process and vibrations, as well as adjustment of stability monitoring and the zero point correction) are adjusted to the usual user conditions, however can be changed in the master mode of the weighing terminal if necessary. The Identcard provided is labelled with the standard configuration. Mount the Identcard in accordance with the installation instructions of the weighing terminal concerned. If the standard configuration does not meet your needs, it is possible to reconfigure the weighing platform with the terminal. To do this, see the terminal operating instructions or the Service Manual for the TBrick Service Mode. A set of measuring data signs is provided with the weighing platform. Apply the selected configuration corresponding to the factory-mounted measuring data sign to the Identcard, and the Max-Min sign near the terminal display. When the configuration is changed, it is also possible to change the preload range in addition to the weighing range and the readability. 12 Installation information 22007227 02/05

Floor scales / Pit scales Configuration possibilities 2.2 Configuration data 2.2.1 Configuration data for KC.../KCS..., factory setting Standard configuration KC300 KCS300 KC600/KCS600 Maximum load 300 kg 300 kg 600 kg Readability 0... 300 kg 0.002 kg 0... 300 kg 0.002 kg 0... 600 kg 0.01 kg Tare range, subtractive 300 kg 300 kg 600 kg Preload range Zero-set range Zero-set range (typ.) ± 6 kg 105 kg ± 6 kg 120 kg ± 12 kg 255 kg Calibration data as per OIML Calibration class Calibration value Minimum load Temperature range III 0.05 kg 1.0 kg 10 C... +40 C III 0.05 kg 1.0 kg 10 C... +40 C II 0.1 kg 0.5 kg 0 C... +40 C 2.2.2 Configuration data for KD.../KE.../KE...sk/KES.../KES...sk, factory setting Standard configuration KD600 KD1500 KE1500/KE1500sk Maximum load 600 kg 1500 kg 1500 kg Readability 0... 600 kg 0.01 kg 0... 1500 kg 0.02 kg 0... 1500 kg 0.02 kg Tare range, subtractive 600 kg 1500 kg 1500 kg Preload range Zero-set range Zero-set range (typ.) ± 12 kg 200 kg ± 30 kg 640 kg ± 30 kg 600 kg Calibration data as per OIML Calibration class Calibration value Minimum load Temperature range III 0.1 kg 2 kg 10 C... +40 C III 0.2 kg 4 kg 10 C... +40 C III 0.2 kg 4 kg 10 C... +40 C Installation information 22007227 02/05 13

Configuration possibilities Floor scales / Pit scales Standard configuration KES1500/KES1500sk KE3000/KE3000sk KES3000/KES3000sk Maximum load 1500 kg 3000 kg 3000 kg Readability 0... 1500 kg 0.02 kg 0... 3000 kg 0.05 kg 0... 3000 kg 0.05 kg Tare range, subtractive 1500 kg 3000 kg 3000 kg Preload range Zero-set range Zero-set range (typ.) ± 30 kg 600 kg ± 60 kg 1270 kg ± 60 kg 1270 kg Calibration data as per OIML Calibration class Calibration value Minimum load Temperature range III 0.2 kg 4 kg 10 C... +40 C III 0.5 kg 10 kg 10 C... +40 C III 0.5 kg 10 kg 10 C... +40 C 2.2.3 Configuration data for KG.../KN..., factory setting Standard configuration KG3000 KG6000 KN1500 Maximum load 3000 kg 6000 kg 1500 kg Readability 0... 600 kg 0.2 kg 600... 1500 kg 0.5 kg 1500...3000 kg 1.0 kg 0... 1500 kg 0.5 kg 1500... 3000 kg 1.0 kg 3000... 6000 kg 2.0 kg 0... 300 kg 0.1 kg 300... 600 kg 0.2 kg 600... 1500 kg 0.5 kg Tare range, subtractive 3000 kg 6000 kg 1500 kg Preload range Zero-set range Zero-set range (typ.) ± 60 kg 1270 kg ± 120 kg 2550 kg ± 30 kg 630 kg Calibration data as per OIML Calibration class Calibration value Minimum load Temperature range III 0.2 kg 4.0 kg 10 C... +40 C III 0.5 kg 10 kg 10 C... +40 C III 0.1 kg 2 kg 10 C... +40 C 14 Installation information 22007227 02/05

Floor scales / Pit scales Planning assemblies 3 Planning assemblies 3.1 Notes on planning Due to their design characteristics, the weighing platforms are suitable for installation in conveying systems. The following specifications and dimensional drawings form the basis for the design of the required assemblies. The weighing platform may only be supported by the support feet, and never by the frame or lever parts. The weighing platform may only be permanently installed on the support feet. Moving or rotating parts on the weighing platform must be designed so that they do not affect the weighing result. Balance rotating parts. The load plate must be free on all sides so that not connection between the load plate and permanently mounted parts is made, even by falling parts or dirt deposits. Lay cables or hoses between the weighing platform and other machine parts so that they do not exert any force on the weighing platform. CAUTION When mounting assemblies, make sure that no metal chips get into the weighing platform. Remove the load plate to machine the weighing platform. Installation information 22007227 02/05 15

Planning assemblies Floor scales / Pit scales 3.2 Preload range The weight of the structural parts permanently mounted on the weighing platform is referred to as "preload". The preload is electrically compensated in the weighing platform so that the full weighing range is available. The maximum preload (or the zero-set range) that can be compensated is dependent on the configured weighing range. CAUTION The assemblies must already be mounted when connecting the weighing platform. Model Weighing range Max. preload KC300 300 kg 105 kg KCS300 300 kg 120 kg KC600 600 kg 255 kg KCS600 600 kg 255 kg KD600 600 kg 200 kg KD1500 1500 kg 640 kg KE1500/KE1500sk 1500 kg 600 kg KES1500KES1500sk 1500 kg 600 kg KE3000/KE3000sk 3000 kg 1270 kg KES3000/KES3000sk 3000 kg 1270 kg KG3000 3000 kg 1270 kg KG6000 6000 kg 2550 kg KN1500 1500 kg 630 kg 16 Installation information 22007227 02/05

Floor scales / Pit scales Planning assemblies 3.3 Mounting possibilities 3.3.1 Mounting possibilities for KC... 800 787 800 662 630 487 420 289 310 230 139 160 13 0 0 0 24 44 127.5 237.5 390 610 762.5 872.5 956 1000 976 Dim. in mm Bridge assemblies can be mounted in the shaded or hatched areas. max. 10 mm Recommended mounting type: Bolting on. Remove the load plate and drill through for this purpose. Mounting parts (e.g. bolts and nuts) may extend a maximum of 10 mm beyond the underside of the load plate. Only for KC300 Only for KC600 For KC300 and KC600 Technical version: 08/2000 Installation information 22007227 02/05 17

Planning assemblies Floor scales / Pit scales 3.3.2 Mounting possibilities for KCS... 800 787 800 662 630 487 420 289 310 230 139 160 13 0 0 0 44 250 380 561 671 756 800 Dim. in mm 24 776 max. 10 mm Bridge assemblies can be mounted in the shaded areas. Recommended mounting type: Bolting on. Remove the load plate and drill through for this purpose. Mounting parts (e.g. bolts and nuts) may extend a maximum of 10 mm beyond the underside of the load plate. Only for KCS300 Only for KCS600 For KCS300 and KCS600 Technical version: 08/2000 18 Installation information 22007227 02/05

Floor scales / Pit scales Planning assemblies 3.3.3 Mounting possibilities for KD... 25 0 55 418 675 388 862 1225 300 832 950 1195 975 945 915 1000 870 470 380 85 130 55 25 0 0 0 160 340 436 536 714 814 910 1090 1250 Dim. in mm max. 10 mm Bridge assemblies can be mounted in the shaded areas. Recommended mounting type: Bolting on. Remove the load plate and drill through for this purpose. Mounting parts (e.g. bolts and nuts) may extend a maximum of 10 mm beyond the underside of the load plate or load frame. Mounting possibilities on the load plate Mounting possibilities on the load frame Technical version: 08/2000 Installation information 22007227 02/05 19

Planning assemblies Floor scales / Pit scales 3.3.4 Mounting possibilities for KE... 350 966 442 990 466 1034 1445 510 1058 25 1475 0 55 534 1150 1500 1225 1195 1165 1250 1120 620 480 85 130 55 25 0 0 0 160 410 550 650 850 950 1090 1340 1500 700 Dim. in mm max. 10 mm Bridge assemblies can be mounted in the shaded areas. Recommended mounting type: Bolting on. Remove the load plate and drill through for this purpose. Mounting parts (e.g. bolts and nuts) may extend a maximum of 10 mm beyond the underside of the load plate or load frame. Mounting possibilities on the load plate Mounting possibilities on the load frame Technical version: 08/2000 20 Installation information 22007227 02/05

0 Floor scales / Pit scales Planning assemblies 3.3.5 Mounting possibilities for KE...sk 350 432 456 25 510 0 55 534 966 990 1044 1068 1150 1475 1445 1500 1250 1225 1195 1165 1250 1125 620 480 85 130 55 25 0 0 160 290 550 650 850 950 1210 1340 1500 700 Dim. in mm max. 10 mm Bridge assemblies can be mounted in the shaded areas. Recommended mounting type: Bolting on. Remove the load plate and drill through for this purpose. Mounting parts (e.g. bolts and nuts) may extend a maximum of 10 mm beyond the underside of the load plate or load frame. Mounting possibilities on the load plate Mounting possibilities on the load frame Technical version: 08/2000 Installation information 22007227 02/05 21

Planning assemblies Floor scales / Pit scales 3.3.6 Mounting possibilities for KES.../KES...sk 350 963 439 990 466 1034 510 1061 25 537 0 55 650 850 1150 1475 1445 1500 1475 1445 1415 1500 1370 770 630 85 130 55 25 0 0 0 160 290 550 700 950 1090 1340 1500 Dim. in mm max. 10 mm Bridge assemblies can be mounted in the shaded areas. Recommended mounting type: Bolting on. Remove the load plate and drill through for this purpose. Mounting parts (e.g. bolts and nuts) may extend a maximum of 10 mm beyond the underside of the load plate or load frame. Mounting possibilities on the load plate Mounting possibilities on the load frame Technical version: 08/2000 22 Installation information 22007227 02/05

Floor scales / Pit scales Planning assemblies 3.3.7 Mounting possibilities for KG... 1656 1290 820 454 100 1900 1546 1180 710 344 0 1399 1321 1211 1500 1409 1311 1221 977 867 967 877 633 523 623 533 289 179 101 0 279 189 91 0 1910 1556 1190 1055 720 354 0 2000 1646 1280 810 444 90 Dim. in mm max. 10 mm Bridge assemblies can be mounted in the shaded areas. Recommended mounting type: Bolting on. Remove the load plate and drill through for this purpose. Mounting parts (e.g. bolts and nuts) may extend a maximum of 10 mm beyond the underside of the load plate or load frame. Mounting possibilities on the load plate Mounting possibilities on the load frame Technical version: 08/2000 Installation information 22007227 02/05 23

0 Planning assemblies Floor scales / Pit scales 3.4 Opening possibilities 3.4.1 Opening possibilities for KC... 800 661.5 KC600 471.5 KC300 KC600 288.5 230 138.5 0 405 595 1000 Dim. in mm Openings, e.g. for emptying tank, can be made in the shaded areas. Remove the load plate to produce the opening. Technical version: 08/2000 24 Installation information 22007227 02/05

Floor scales / Pit scales Planning assemblies 3.4.2 Opening possibilities for KCS... 800 661.5 KCS600 471.5 KCS300 KCS600 288.5 230 138.5 0 0 240 420 800 Dim. in mm Openings, e.g. for emptying tank, can be made in the shaded areas. Remove the load plate to produce the opening. Technical version: 08/2000 Installation information 22007227 02/05 25

0 Planning assemblies Floor scales / Pit scales 3.4.3 Opening possibilities for KD... 1000 860 610 550 130 0 180 370 475 575 775 880 1070 1250 Dim. in mm 415 835 Openings, e.g. for emptying tank, can be made in the shaded areas. Remove the load plate to produce the opening. Technical version: 08/2000 26 Installation information 22007227 02/05

Floor scales / Pit scales Planning assemblies 3.4.4 Opening possibilities for KE.../KE...sk 1250 1120 740 680 130 0 0 180 270 700 1230 1320 1500 Dim. in mm Openings, e.g. for emptying tank, can be made in the shaded areas. Remove the load plate to produce the opening. Technical version: 08/2000 Installation information 22007227 02/05 27

Planning assemblies Floor scales / Pit scales 3.4.5 Opening possibilities for KES.../KES...sk 1500 1370 740 680 130 0 0 180 425 700 1075 1320 1500 Dim. in mm Openings, e.g. for emptying tank, can be made in the shaded areas. Remove the load plate to produce the opening. Technical version: 08/2000 28 Installation information 22007227 02/05

Floor scales / Pit scales Planning assemblies 3.4.6 Opening possibilities for KG... 1500 1210 980 864 634 520 290 0 2000 1850 1090 690 350 120 0 1880 1650 1055 860 460 150 Maße in mm Openings, e.g. for emptying tank, can be made in the shaded areas. Remove the load plate to produce the opening. Technical version: 08/2000 Installation information 22007227 02/05 29

Dimensions Floor scales / Pit scales 4 Dimensions Dimensions of KC... 1000 800 4 100 H 890 972 18 32 FS D 380 86 778 30 610 C1 C2 235 625 L 230 932 Dim. in mm H FS L C1 C2 Adjustable with 4 foot bolts Min. H = 115 mm Max. H = 140 mm Foot bolt Spanner size = 19 mm Required area D = 40 mm dia. Level indicator Cable connection of KC300 Cable connection of KC600 Technical version: 08/2000 30 Installation information 22007227 02/05

Floor scales / Pit scales Dimensions Dimensions of KCS... 800 800 4 100 H 692 772 18 32 FS D 380 86 778 30 507 C1 C2 230 625 L 230 732 Dim. in mm H FS L C1 C2 Adjustable with 4 foot bolts Min. H = 115 mm Max. H = 140 mm Foot bolt Spanner size = 19 mm Required area D = 40 mm dia. Level indicator Cable connection of KCS300 Cable connection of KCS600 Technical version: 08/2000 Installation information 22007227 02/05 31

Dimensions Floor scales / Pit scales Dimensions of KD... 575 1250 1000 G 166 60 H L 710 240 1190 1230 1110 FS D 940 980 30 20 32 890 455 C L Dim. in mm H FS G L C Adjustable with 4 foot bolts Min. H = 180 mm Max. H = 205 mm Foot bolt Spanner size = 30 mm Required area D = 60 x 60 mm Thread M12 Level indicator Cable connection Technical version: 08/2000 32 Installation information 22007227 02/05

Floor scales / Pit scales Dimensions Dimensions of KE.../KE...sk 700 1500 1250 G 168 60 H L 960 240 1440 1480 1360 FS D 1190 1230 30 20 32 1140 580 C L Dim. in mm H FS G L C Adjustable with 4 foot bolts Min. H = 182 mm Max. H = 207 mm Foot bolt Spanner size = 30 mm Required area D = 60 x 60 mm Thread M12 Level indicator Cable connection Technical version: 08/2000 Installation information 22007227 02/05 33

Dimensions Floor scales / Pit scales Dimensions of KES.../KES...sk 700 1500 1500 L 960 240 1440 1480 1360 G 30 FS D 960 1440 1480 183 75 H 20 32 1390 580 C L Dim. in mm H FS G L C Adjustable with 4 foot bolts H min. = 197 mm H max. = 222 mm Foot bolt Spanner size = 30 mm Required area D = 60 x 60 mm Thread M12 Level indicator Cable connection Technical version: 08/2000 34 Installation information 22007227 02/05

Floor scales / Pit scales Dimensions Dimensions of KG... 2000 1500 175 55 H 1965 1880 FS D 1470 24 20 330 915 1380 810 825 C 945 L Dim. in mm H FS L C Adjustable with 4 foot bolts H min. = 196 mm H max. = 246 mm Foot bolt Spanner size = 30 mm Required area D = 90 mm dia. Level indicator Cable connection Technical version: 08/2000 Installation information 22007227 02/05 35

Dimensions Floor scales / Pit scales Dimensions of KN... 1500 600 200 660 245 150 H 1880 FS 15 D 1125 825 L C 22 1380 1250 1995 410 1655 1790 1905 Dim. in mm H FS L C Adjustable with 4 foot bolts H min. = 55 mm H max. = 100 mm Foot bolt Spanner size = 36 mm Required area D = 90 mm dia. Level indicator Cable connection Technical version: 08/2000 36 Installation information 22007227 02/05

22007227 Subject to technical changes Mettler-Toledo (Albstadt) GmbH 02/05 Printed in Germany 22007227 Mettler-Toledo (Albstadt) GmbH D-72458 Albstadt Tel. ++49-7431-14 0, Fax ++49-7431-14 232 Internet: http://www.mt.com