STORMWATER MANAGEMENT CHECKLIST



Similar documents
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Stormwater/Wetland Pond Construction Inspection Checklist

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

URBAN DRAINAGE CRITERIA

Annual Standards and Specifications. Erosion and Sediment Control

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

Emergency Spillways (Sediment basins)

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Low Impact Development Checklist

City of West Linn Public Works Design Standards Table of Contents

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

City of Shelbyville Site Inspection Checklist

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

Outlet stabilization structure

OAKLAND COUNTY WATER RESOURCES COMMISSIONER ENGINEERING DESIGN STANDARDS FOR STORM WATER FACILITIES

Storm Water Technology Fact Sheet Wet Detention Ponds

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Post Construction Stormwater Management Checklist Program

DESIGN & TECHNICAL CRITERIA STORM DRAINAGE JEFFERSON COUNTY, COLORADO PLANNING & ZONING DIVISION

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

Chapter 5.0. Stormwater Credits for Innovative Site Planning

CHAPTER II - STORM DRAINAGE

Storm Drain Inlet Protection

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

Post Construction Stormwater Management Inspection & Maintenance PROGRAM MANUAL

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Appendix B.1. NRCS-MD Code No. 378 Pond Standards/Specifications

SECTION 5. Sediment Control Measures

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

1.7.0 Floodplain Modification Criteria

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Table 4.9 Storm Drain Inlet Protetion Applicable for

STORM DRAINAGE DESIGN CRITERIA. City of Sheridan, Wyoming

SE-10 STORM DRAIN INLET PROTECTION. Objectives

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Storm Drainage Design and Technical Criteria Manual. City of Brookings, SD

Design Templates Stormwater Calculation Summary

STORM DRAINS CHAPTER 7

ARTICLE II STORM DRAINAGE. (From Ordinance No ; August 4, 1987; Sections III through VIII)

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

GRAND COUNTY STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA MANUAL. OFFICIALLY ADOPTED: August 1 st, 2006

CHAPTER 7 STORM WATER DESIGN

Storm Drain Inlet Protection

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

CITY UTILITIES DESIGN STANDARDS MANUAL

Stormwater Management Functional Servicing Report

Permeable Pavement Treatment Capacity

SECTION 5 DRAFTING STANDARDS

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist

ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER

Shooks Run Drainage Study Basic Terminology

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

February 4, Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth

Activity Yes No N/A Notes

SECTION 7- STORM SEWER

Catchment Scale Processes and River Restoration. Dr Jenny Mant The River Restoration Centre therrc.co.uk

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills

CLIFTY CREEK PLANT MADISON, INDIANA

STORM DRAINAGE GENERAL INFORMATION Drainage Systems VDOT Requirements Metric Plan Preparation...

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

Storm Drain Inlet Protection - IP

VA DEQ STORMWATER DESIGN SPECIFICATION NO. 14 WET POND. VERSION 1.9 March 1, 2011 SECTION 1: DESCRIPTION

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow

Riprap-lined Swale (RS)

Homeowner s Guide to Drainage

Storm Water Management Requirements for Construction Projects Less than One Acre

BMP #: Dry Wells / French Drains

PART V BEST MANAGEMENT PRACTICES

STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY

CHAPTER 5. Storm Sewer

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Drainage Design and Stormwater Pollution Prevention Manual

Prattsville Berm Removal Project. 1.0 Project Location

Block and Gravel Inlet Protection (BIP)

Preliminary Plan Application and Checklist

CHAPTER 3 STORM DRAINAGE SYSTEMS

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Mosquito Control Guidelines

Computing Stormwater Runoff Rates and Volumes

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CITY OF AURORA STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Transcription:

STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative describing storm water management strategy including all assumptions made in the design. A. Drainage Area Map Site and drainage area boundaries Off-site drainage areas Pre- and post-developed land uses with corresponding acreage Pre- and post-developed time of concentration flow paths Existing and proposed topographic features Drainage area appropriate for BMP B. Soils Investigation Soils map with site and drainage area outlined Geotechnical report with recommendations and earthwork specifications Boring locations Borrow area Basin pool area Embankment area: centerline principal spillway, emergency spillway, abutments Boring logs with Unified Soils Classifications, soil descriptions, depth to seasonal high groundwater table, depth to bedrock, etc. Compaction requirements specified Additional geophysical investigation and recommendations in Karst environment II. COMPUTATIONS A. Hydrology Runoff curve number determinations: pre- and post-developed conditions, with worksheets. Time of concentration: pre- and post-developed conditions, with worksheets. Hydrograph generation: pre- and post-developed condition for appropriate design and safety storms (SCS methods or modified rational-critical storm duration method) B. Hydraulics Specify assumptions and coefficients used. Stage-storage table and curve Riser structure and barrel Weir/orifice control analysis for riser structure discharge openings Weir/orifice control analysis for riser crest Barrel: inlet/outlet control analysis 1

Riser/Outlet Structure flotation analysis (factor of safety = 1.25 min.). Anti-seep collar or filter diaphragm design. Outlet protection per VE&SCH Std.. & Spec. 3.18. Provisions for use as a temporary sediment basin riser with clean out schedule & instructions for conversion to a permanent facility. Emergency spillway adequacy/capacity analysis with required embankment freeboard Stage - discharge table and curve (provide equations & cite references). Storm drainage & hydraulic grade line calculations. Reservoir routing of post-development hydrographs for appropriate design storms (2-yr., 10-yr., or as required by watershed conditions) & safety storms (100-yr. or as required). C. Downstream Impacts Danger reach study. 100 year floodplain impacts. Adequate channel" calculations for receiving channel Provide downstream hydrographs at critical study points. Storm drainage plans for site areas not draining to BMP Safe conveyance -MS-19 Areas compensated for in water quality performance-based criteria calculations D. Water Quality Impervious cover tabulation Technology-based criteria: proper selection of BMP based on impervious cover Performance-based criteria: pre- and post-developed pollutant load and pollutant removal requirement calculations (provide worksheets) Water quality volume for retention basin I, II, or III permanent pool Water quality volume for ext. detention and ext. detention enhanced with drawdown calculations Proper surface area/depth allocations for permanent pool/shallow marsh/constructed wetland Constructed storm water wetland/shallow marsh Adequate drainage area and/or base flow Adequate pool volume Adequate surface area Allocation of surface area to depth zones Maximum ponding depth over pool surface specified III. PLAN REQUIREMENTS A. General Items Plan view drawn at 1"=50' or less (40', 30', etc.) North arrow Legend Location plan and vicinity map Property lines Existing & proposed contours (2' contour interval min.) Existing features & proposed improvements (including utilities and protective measures) Locations of test borings 2

Earthwork specifications Construction sequence for SWM basin and E&S controls Temporary erosion & sediment control measures Conveyance of base flow during construction Temporary and permanent stabilization requirements Emergency spillway Basin side slopes Delineation of FEMA 100 year floodplain Plans sealed by a qualified licensed professional B. BMP Plan Views Dimensions of basin features: perm. Pool, sediment forebay, embankment, etc. Location of all conveyance system outfalls into basin Proper orientation to avoid short-circuiting Outlet protection per VE&SCH Top of bank & basin bottom elevations Elevations of permanent pool, water quality volume and max. design water surface elevations for all appropriate design storms and safety storms Side slope (H:V) of basin storage area and embankment (upstream and downstream slopes) Proper length-to-width ratio as specified in BMP design criteria Pervious low flow channel Sediment. forebay Basin bottom slope Maintenance access to sediment fore bay, riser structure, and one side of the basin ponding area Peripheral ledge for safety Aquatic Bench Shoreline protection Safety fence Riser and barrel materials and dimensions labeled Constructed storm water wetland/shallow marsh Basin liner specifications Pool depth zones identified on plan Pool geometry -wet/dry weather flow path C. BMP -Section Views & Related Details 1. Embankment (or dam) and Ponding Areas Elevations of permanent pool, water quality volume and max. design water surface elevations for all appropriate design storms and safety storms Top of dam elevations- constructed height and settled height (10% settlement). Adequate freeboard Top width labeled Elevation of crest of emergency spillway Emergency spillway w/side slopes labeled. Emergency spillway inlet, level, and outlet sections labeled Existing ground and proposed improvements profile along center line of embankment 3

Existing ground and proposed improvements profile along center line of principal spillway Typical grading section through pond including typical side slopes with aquatic bench, safety ledge shoreline protection, etc. Existing ground and proposed improvements along center line of emergency spillway Dimensions of zones for zoned embankment 2. Seepage Control Impervious lining Phreatic line (4: 1 slope measured from the principal spillway design high water). a. Anti-seep Collar Anti-seep collar (detail required..). Size (based upon 15% increase in seepage length). Spacing & location on barrel (at least 2' from pipe joint). b. Filter Diaphragm Design certified by a professional geotechnical engineer. 3. Foundation Cut Off Trench or Key Trench Materials labeled Bottom width (4' min. or greater per geotech. report). Side slopes labeled (1:1 max. steepness). Depth (4' min. or as specified in geotechnical report) 4. Multi Stage Riser and Barrel System Materials labeled Bedding or cradle details provided Gauge & corrugation size for metal pipes specified Barrel diameter, inverts, and slope (%) labeled Outlet protection per VESCH, Std. & Spec. 3.18, 3.19 w/filter cloth underlayment Crest elevation of riser structure shown Inverts and dimensions of control release orifices/weirs shown Structure dimensions shown Control orifice/weir dimensions shown Extended detention orifice protection (detail required for construction) Riser trash rack or screen (detail required for construction). Riser anti-vortex device (detail required for construction). Proper riser structure footing. Access to riser structure interior for maintenance. Basin drain pipe D. Landscape Plan Planting schedule and specifications (transport / storage / installation / maintenance) Plant selection for planting zones 1 thru 6 Preservation measures for existing vegetation Top soil/planting soil included in final grading 4

E. Maintenance Items Person or organization responsible for maintenance. Maintenance narrative which describes the long-term maintenance requirements of the facility and all components. Facility access from public R/W or roadway. Maintenance easement. COMMENTS: BY: DATE: III. CERTIFICATIONS Certification's from manufacturers for materials used Seeding tickets and specifications Certification statement and seal by licensed professional indicating the as-built drawing is accurate, complete and constructed per the approved plan 5