SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST



Similar documents
Stormwater/Wetland Pond Construction Inspection Checklist

STORMWATER MANAGEMENT CHECKLIST

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION STORM DRAINAGE TABLE OF CONTENTS

Construction Site Inspection Checklist for OHC By making use of some simple Best Management Practices (BMPs) a construction site operator can

City of Shelbyville Site Inspection Checklist

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Table 4.9 Storm Drain Inlet Protetion Applicable for

Outlet stabilization structure

SECTION STORM DRAINAGE SYSTEM

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Section 600 Incidental Construction

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Appendix B.1. NRCS-MD Code No. 378 Pond Standards/Specifications

Section 2100-Trenching and Tunneling

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Emergency Spillways (Sediment basins)

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

SECTION 7- STORM SEWER

SECTION EARTH MOVING

Construction Specification for Concrete Curb and Concrete Curb and Gutter

CHAPTER 5. Storm Sewer

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SECTION PRECAST CONCRETE UTILITY STRUCTURES

STORM DRAINS CHAPTER 7

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Storm Drain Inlet Protection - IP

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

Unit Price Averages Reports

CHAPTER 7 DRAINAGE OF PAVEMENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

FY08 SEWER POINT REPAIRS BID TABULATION

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SECTION G SEWERS (STORM, SANITARY AND FDC)

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

SECTION 600 INCIDENTAL CONSTRUCTION

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

CW GRAVITY SEWERS TABLE OF CONTENTS

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS

SECTION 5. Sediment Control Measures

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

BMP #: Dry Wells / French Drains

CHAPTER 6 - SANITARY SEWER

City of West Linn Public Works Standard Construction Specifications. Table of Contents

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

Section 402. STORM SEWERS

Constructing Cistern Installations

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

SECTION 5 DRAFTING STANDARDS

CLIFTY CREEK PLANT MADISON, INDIANA

SECTION STORM DRAIN SYSTEM

SECTION SITE PREPARATION

DIVISION 4300 STORM DRAINAGE

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.

SECTION GROUND WATER STORAGE TANKS

900 SEWERAGE WORK ITEM PIPE SEWERS COMPLETE IN PLACE

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Storm Drain Inlet Protection

SECTION PRECAST CONCRETE STRUCTURES

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Town House Center Highway North Huntingdon, PA 15642

Section SEWER PIPE INSTALLATION AND TESTING

Moving Small Mountains Vesuvius Dam Rehab

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

Beacon Hill Sewer District Standard Specifications

RECENT FAILURES OF LARGE CORRUGATED METAL PIPE SPILLWAYS

Chapter 9 Storm Sewers

DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST

SECTION GRAVITY SANITARY SEWERS

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

VDOT 2001 Road and Bridge Standards Section Drainage Items

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

Vehicle Tracking Pad

Transcription:

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard Project ID:_ X Item not acceptable Contractor:_ N/A Item not applicable Inspector: _ C Item requires engineer s cert. Date(s): _ I. Materials and equipment. Pipe and appurtenances on-site prior to construction and dimensions checked. 1) Material (including protective coating, if specified). 2) Diameter 3) Dimensions of metal riser or pre-cast concrete outlet structure. 4) Required dimensions between water control structures (orifices, weirs, etc.) are in accordance with plans. 5) Barrel stub for prefabricated pipe structures at proper angle for design barrel slope. 6) Number and dimensions of prefabricated anti-seep collars. 7) Watertight connectors and gaskets. 8) Outlet drain valve. Appropriate compaction equipment available, including hand and small power tamps. Project benchmark near pond site. Equipment for temporary de-watering. II. Subgrade preparation. Area beneath embankment stripped of all vegetation, topsoil and organic matter. Cut-off trench excavated a minimum of 4 FT below subgrade and minimum 4 FT below proposed pipe invert, with side slopes no steeper than 1:1. Impervious material used to backfill cut-off trench. III. Pipe spillway installation. Method of installation detailed on plans.

A. Bed preparation. B. Pipe placement. C. Backfilling Installation trench excavated with 1:1 side slopes. Stable, uniform, dry subgrade of relatively impervious material. (If subgrade is wet, contractor shall have defined steps before proceeding with installation.) Invert at proper elevation and grade. Metal/Plastic pipe 1) Watertight connectors and gaskets properly installed 2) Anti-seep collars properly spaced and having watertight connections to pipe. 3) Backfill placed and tamped by hand under haunches of pipe. 4) Remaining backfill placed in max. 8 lifts using small power tamping equipment until 2 cover over pipe is reached. Concrete pipe 1) Pipe set on blocks or concrete slab for pouring of low cradle. 2) Pipe installed with rubber gasket joints with no spalling in gasket interface area. 3) Excavation for lower half of anti-seep collar(s) with reinforcing steel set. 4) Entire area where anti-seep collar(s) will come in contact with pipe coated with mastic or other approved waterproof sealant. 5) Low cradle and bottom half of anti-seep collar installed as monolithic pour and of an approved mix. 6) Upper half of anti-seep collar(s) formed with reinforcing steel set. 7) Concrete for collar of an approved mix and vibrated into place. (Protected from freezing while curing, if necessary.) 8) Forms stripped and collar inspected for honeycomb prior to backfilling. Parge if necessary. Fill placed in maximum 8 lifts. Backfill taken minimum 2 above top of anti-seep collar elevation before traversing with heavy equipment.

IV. Riser/Outlet structure installation. A. Metal riser Riser base excavated or formed on stable subgrade to design dimensions. Embedded section of aluminum or aluminized pipe to be painted with zinc chromate or equivalent on inside and outside surfaces. Set on blocks to design elevations and plumbed. Reinforcing bars placed at right angles and projecting into sides of riser. Concrete poured so as to fill inside of riser to invert of barrel. B. Pre-cast concrete structure Dry and stable subgrade. Riser base set to design elevation. If more than one section, no spalling in gasket interface area; gasket or approved caulking material placed securely. Watertight and structurally sound collar or gasket joint where structure connects to pipe spillway. C. Poured concrete structure Footing excavated or formed on stable subgrade, to design dimensions with reinforcing steel set. V. Embankment construction. A. Fill material. B. Compaction. C. Embankment. Structure formed to design dimensions, with reinforcing steel set as per plan. Concrete of an approved mix and vibrated into place. (Protected from freezing while curing, if necessary.) Forms stripped and structure inspected for honeycomb prior to backfilling. Parge if necessary. Soil engineer s test. Visual test by inspector. Soil engineer s test. Visual test by inspector. Fill placed in max. 8 lifts and compacted with appropriate equipment. Constructed to design cross-section, side slopes and top width. Constructed to design elevation plus allowance for settlement.

VI. Impounded area construction. Excavated/graded to design contours and side slopes. Inlet pipes have adequate outfall protection. Forebay Wet pond requirements. 1) 10 FT reverse slope bench one foot above normal pool elevation. 2) 10 FT wide level bench one foot below normal pool elevation. VII. Earth emergency spillway construction. Spillway located in cut or structurally stabilized with riprap, gabions, concrete, etc. Excavated to proper cross-section, side slopes and bottom width. Entrance channel, crest, and exit channel constructed to design grades and elevations. VIII. Outlet protection. A. End section. Securely in place and properly backfilled. B. Endwall Footing excavated or formed on stable subgrade, to design dimensions and reinforcing steel set, if specified. IX. Endwall formed to design dimensions with reinforcing steel set as per plan. Concrete of an approved mix and vibrated into place. (Protected from freezing, if necessary.) Forms stripped and structure inspected for honeycomb prior to backfilling. Parge if necessary. C. Riprap apron/channel. Apron/channel excavated to design cross-section with proper transition to existing ground. Filter fabric in place. Stone sized as per plan and uniformly placed at the thickness specified. Vegetative stabilization. Approved seed mixture or sod. Proper surface preparation and required soil amendments. Excelsior mat or other stabilization materials, as per plan.

X. Miscellaneous Toe drain. Temporary dewatering device installed as per plan w/appropriate fabric, stone size and perforations if included. Drain for ponds having a permanent pool. Trash rack/anti-vortex device secured to outlet structure. Trash protection for low flow pipes, orifices, etc. Fencing (when required). Access road. Set aside area for clean-out and maintenance.