FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING



Similar documents
COMMERCIAL BUILDING APPLICATIONS

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

FOAMULAR LT40, 400 and 600 insulations with minimum compressive strengths of

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Foundation. Foundation

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

Renovating Your Basement

Low-slope reroofing guidelines

Exterior Elevated Elements Inspection Guidelines

DRAFT TERMITE PROTECTION IN BUILDINGS

Nondestructive Evaluation of. Outback Steakhouse/Bertucci s Building at Forest Drive, Annapolis, MD. Provided by: HurleyIR

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

Termites: How to Reduce Your Home's Risk of Infestation

Certification: Building Plans Examiner. Exam ID: B3

Insulating Basements: Part 3 Basement Wall Systems

Comment Form on Proposed Gut Rehabilitation Alternatives

Common Problems with Walls

Building Owners Guide to a Duro-Last System!

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

CHAPTER 7: Building Systems ROOFING SYSTEMS

FAST FACTS ADVANTAGES OF MULTI PLY BUILT-UP ROOFING. Asphalt Roofing Manufacturers Association

Basements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure

Basement Moisture Problems

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

State of Connecticut Department of Public Health RADON PROGRAM

Best Practices for Crawl Space Insulation

Water Damage & Repair

5.0 wall ApplicAtions

Bituminous Sheet Flat Roofs: Their repair and maintenance

Roof insulations must perform the basic function of helping to control fluctuations in building interior temperature

Home inspectors are not mold inspectors, however they do inspect for defects that

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

Fiberglas, Exterior Wall Thermal Insulation

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

SECTION PRE-ENGINEERED BUILDING BLANKET INSULATION

October 5, 2015 Dear Client,

Residential Foundations and Basements

BLACK JACK ALL WEATHER ROOF COATING

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

RECOATING AND RENEWING SPF ROOFING SYSTEMS

Self-Home Inspection Checklist

Basement Window Installation Guide Hopper and Sliding

DELTA Premium Moisture Management Systems for Foundations.

Durapax Coal Tar BUR Application Guide

Excerpts from the Canadian National Building Code (NBC)

Presented by: Jennifer Doyle, P.E., RRC, LEED AP

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

The Optimum Basement Wall

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

FIRESTOPPING & SMOKE SEALS

Preventing Ice Dams on Roofs

What s Wrong with this Project? Report

Roofing Systems. New Applications / Re-Roofing / Maintenance

Building Condition Assessment Report

Asphalt Shingle Application Requirements

Residential Roofing Guide

Best Basement Water Management Practices

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

SECTION SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

Proposed Minimum Subterranean Termite Treatment Standards

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

GYPSUM AREA SEPARATION FIREWALLS GA

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

United States. Why You Should Insulate Foundations. There is a science to adding value.

s ation lic app ntial Foamular sideor RE uide F Ily G am ation F sul In

What you need to know about. Termite management

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

BEST 2 WB 3 4 SIX WAYS FOR CONDENSATION IN BUILDINGS. Wagdy Anis, FAIA, LEED ap*

Water Vapor Permeance of Wood Structural Panels and Wood Wall Construction

EcoTouch Insulation with PureFiber Technology

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

ISO Types 1-6: Construction Code Descriptions

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!

LAYING BLOCK AND BRICK

R E S I D E N T I A L H O U S I N G

Prestige Home Inspection LLC

BITUMINOUS ROOF COATINGS, CEMENTS, PRIMERS AND ADHESIVES

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

bout your HOUSE before you start Renovating Your Basement Moisture Problems

GreenGuard Housewrap Installation Guide

CLOSED CRAWLSPACES. Have you ever been in your crawlspace? If not, have you ever even

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, RBA Project No

ROOFS, SNOW AND ICE DAMS

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue

2014 British Columbia Building Code Changes

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year.

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Moisture Control. System Solutions to Prevent Mold

COMMONLY USED RESIDENTIAL BUILDING CODES

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: TEC-WOOD ( )

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

Roof Inspection. Summary Report

Transcription:

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam insulation installed on the outside of masonry foundation walls or on All Weather Wood Foundations complies with the model cod requirements. Basements or half basements are typically considered part of the building "interior". Foam insulation installed on interior walls in these applications must be properly separated form the building interior with a thermal barrier. Code accepted thermal barriers include 1/2" gypsum drywall, equivalent plaster on lath, 1" masonry or other materials that meet the performance requirements prescribed in Section 2603 of the model building codes. Thermal barriers must be mechanically fastened, or installed in a manner to remain in position for the code specified time period, typically 15 minutes. Compliance with local codes must be verified. In certain foundation applications, such as crawl spaces, the model building codes only require that foam insulation is covered with an ignition barrier. Typical ignition barriers include: mineral fiber insulation, plywood or sheet metal. These applications do not require a thermal barrier. Where a crawl space is not connected with a basement or half basement, Foamular insulation may be installed on crawl space walls without a cover material. Contact Owens Corning for model building code evaluation reports. WATER AND MOISTURE CONTROL Foundation walls with moisture from exterior sources on the interior surface should not be insulated on the inside with Foamular insulation until the water entry is stopped. Surrounding grade and concrete slabs should slope to drain surface water away from the building foundation. Before installing foam insulation on the interior surface of foundation walls with excessive condensation, steps should be taken to dehumidify the space. Assemblies should be evaluated for effectiveness and location of vapor retarders to avoid condensation. See the ASHRAE Handbook of Fundamentals. CHEMICAL COMPATIBILITY 1

Solvent based waterproofing / damp proofing materials can deteriorate polystyrene insulation. Water based emulsion materials are not harmful to polystyrene insulation. Determine waterproofing / damp proofing type. Contact manufacturer if necessary. Compatibility can also be field checked by placing a layer of the waterproofing / damp proofing material between 2 12" x 12" pieces of Foamular. After 24 hours, separate the foam pieces and examine for damage. Compatible materials will not deteriorate or cavitate the polystyrene foam surface. Foamular insulation can be used with incompatible waterproofing / damp proofing as long as the material cures for approximately 48 hrs before installing insulation. Membrane should be nearly fully cured, slightly "tacky", before placing the polystyrene insulation. SERVICE TEMPERATURE Foam insulation is not recommended for use where sustained temperatures exceed 165 F. Do not use foam insulation in contact with chimneys, heater vents, pipes, or other surfaces with temperatures over 150 F. In applications where Foamular insulation will be exposed to hot bitumen, the bitumen must cool to 225 250 F before applying insulation. JOBSITE STORAGE AND INSTALLATION Protect insulation stored on the jobsite from physical damage and direct sunlight. Insulation should be stored off the ground and covered with a light color polyethylene film. Make sure the covered insulation is well ventilated to prevent excessive temperature build up. Install only as much insulation as can be covered, at least temporarily, during the same day. INSECT INFESTATION In areas with potentially heavy termite infestation, check local building codes regarding the below grade use of foam insulation. Foamular insulation does not attract insects or provide nutritional value. Infestation is a random event. Foam insulation may provide a soft media that conceals insect tunneling. In areas of infestation, the following preventative measures may be appropriate: pre and post construction treatment of the soil, termite shields, and wrapping EIFS around the foal insulation edges to reduce exposed insulation surfaces. It may be appropriate to terminate EIFS 6 above grade, providing a gap in the insulation to inspect for termite tunneling. Termite baiting systems in conjunction with regular professional inspection have also been proven effective at eliminating termite colonies. HORIZONTAL AND VERTICAL APPLICATIONS 2

Frequently building surfaces require the use of waterproofing or damp proofing membranes to protect the building from moisture intrusion. Foamular insulation products are applied over the membrane to enhance the performance of both horizontal and vertical applications. Foamular insulation products are designed to improve thermal performance, prevent condensation on interior surfaces and enhance drainage. Foamular also protects the membrane from backfill damage, and traffic loads on horizontal decks. In horizontal applications, Foamular insulation helps extend the waterproofing / damp proofing membrane's life by reducing stress on the membrane caused by temperature cycles. insulation installed in waterproofing / damp proofing systems must be separated from the building interior in accordance with building code requirements. The concrete substrates, over which waterproofing / damp proofing is typically installed, provide an adequate thermal barrier. See Section 2603 of the model building codes for more information. Compliance with local code requirements must be verified. FIRE RESISTANCE RATINGS Owens Corning Foamular insulation can be used in many fire rated waterproofing assemblies. See the Underwriters Laboratories Fire Resistance Directly for hourly fire resistance rated roof assemblies; or, the Underwriters Laboratories Roofing Materials and Systems Directly for Class A, B, or C rated roof covering system. CHEMICAL COMPATIBILITY Solvent based waterproofing / damp proofing materials can deteriorate polystyrene insulation. Water based emulsion materials are not harmful to polystyrene insulation. Determine waterproofing / damp proofing type. Contact manufacturer if necessary. Compatibility can also be field checked by placing a layer of the waterproofing / damp proofing material between 2 12" x 12" pieces of Foamular. After 24 hours, separate the foam pieces and examine for damage. Compatible materials will not deteriorate or Foamular insulation can be used with incompatible waterproofing / damp proofing as long as the material cures for approximately 48 hrs before installing insulation. Membrane should be nearly fully cured, slightly "tacky", before placing the polystyrene insulation. Foamular should not be installed directly over new coal tar pitch, or similarly incompatible waterproofing systems. 3

cavitate the polystyrene foam surface. CHEMICAL DISCHARGE Waterproofing systems exposed to chemical discharge require special consideration. Waste products (petroleum, grease, oil, solvents, vegetable or mineral oil, animal fat, etc.) or vented steam must not come in contact with the waterproofing / insulation / ballast system. Contact Owens Corning or the waterproofing membrane manufacturer for information. SERVICE TEMPERATURE Foam insulation is not recommended for use where sustained temperatures exceed 165 F. Do not use foam insulation in contact with chimneys, heater vents, pipes, or other surfaces with temperatures over 150 F. In applications where Foamular insulation will be exposed to hot bitumen, the bitumen must cool to 225 250 F before applying insulation. JOBSITE STORAGE AND INSTALLATION Protect insulation stored on the jobsite from physical damage and direct sunlight. Insulation should be stored off the ground and covered with a light color polyethylene film. Make sure the covered insulation is well ventilated to prevent excessive temperature build up. Install only as much insulation as can be covered, at least temporarily, during the same day. FOR WATERPROOFING AND DAMPPROOFING ONLY HORIZONTAL AND VERTICAL APPLICATIONS Frequently building surfaces require the use of waterproofing or damp proofing membranes to protect the building from moisture intrusion. Foamular insulation products are applied over the membrane to enhance the performance of both horizontal and vertical applications. Foamular insulation products are designed to improve thermal performance, prevent condensation on interior surfaces and enhance drainage. Foamular also protects the membrane from backfill damage, and traffic loads on horizontal decks. In horizontal applications, Foamular insulation helps extend the waterproofing / damp proofing insulation installed in waterproofing / damp proofing systems must be separated from the thermal barrier. See Section 2603 of the model building codes for more information. Compliance with local code requirements must be verified. 4

building interior in accordance with building code requirements. The concrete substrates, over which waterproofing / damp proofing is typically installed, provide an adequate FIRE RESISTANCE RATINGS Owens Corning Foamular insulation can be used in many fire rated waterproofing assemblies. See the Underwriters Laboratories Fire Resistance Directly for hourly fire resistance rated roof assemblies; or, the Underwriters Laboratories Roofing Materials and Systems Directly for Class A, B, or C rated roof covering system. CHEMICAL DISCHARGE Waterproofing systems exposed to chemical discharge require special consideration. Waste products (petroleum, grease, oil, solvents, vegetable or mineral oil, animal fat, etc.) or vented steam must not come in contact with the waterproofing / insulation / ballast system. Contact Owens Corning or the waterproofing membrane manufacturer for information. 1996 2002 by Owens Corning 5