1 5.0 Wall Applications

2 5.1 Below Grade Walls Properly reinforced Arxx ICFs with a nominal concrete core width of 6 (150 mm) are demonstrably more resistant to lateral earth pressures than 8 (200 mm) plain or lightly reinforced cast-in-place concrete basement walls or reinforced concrete masonry walls. Codes dictate that all below grade walls, with habitable space on the interior side of the wall, shall have waterproofing or damp-proofing systems installed to the height of the finished grade level. Waterproofing or damp-proofing is optional for below grade walls that have earth on both sides and are not habitable space. Refer to 5.2 Below Grade Moisture Protection Below grade walls require floor anchor connections, such as anchor bolts or ICF ledger connectors, installed either in the top of the wall or in the side of the wall forms. It is not recommended to backfill against a below grade wall until the wall is laterally supported at the top with a floor system. In addition, the concrete should be allowed to cure a minimum of 7 days prior to backfilling. Foam plastic insulation needs to be separated from the interior of a building by an approved thermal barrier of ½ (12.7 mm) gypsum board or an equivalent thermal barrier material. Check local codes for approved materials and exceptions. Check local building codes for anchorage or design requirements regarding connecting the top of the walls to the floor or roof systems. Depending on the building code, a variety of anchors and straps will be required be inserted into the concrete Below Grade Walls

3 5.2 Below Grade Moisture Protection Overview For all below grade applications, building codes require that walls that have retained earth and enclosed interior space must be waterproofed or damp-proofed. It is recommended that any waterproofing product used must be EPS compatible. There are many waterproofing products available that have been developed for application on ICFs and are EPS compatible. The types of waterproofing developed for ICF walls are: peel and stick membrane, liquid applications that are sprayed, rolled or troweled on the wall, and dimple type drainage mats, which are fastened to the wall. All applications must follow the manufacturer s installation specifications and recommendations. Waterproofing works best when the waterproofed wall is backfilled with free draining backfill material such as sand and gravel. The use of backfill protection board is also strongly recommended to protect the membrane from being punctured by any deleterious material such as rocks, etc., which may be present in the backfill. It is recommended to follow the waterproofing system manufacturer s recommendations for the application of a protection board over the waterproofing system. Solvent based products are not recommended, as they damage the EPS Preparation for Below Grade Moisture Protection Installation of a waterproofing membrane works best when the site is dry and temperatures are between 40 and 80 F (5 and 27 C). In temperatures below and above these conditions, refer to the manufacturer s installation instructions. The wall and footing surfaces should be smooth, clean and dry, free of dirt, loose aggregate or other foreign materials, voids, sharp protrusions and contaminants such as wax, oil, silicone or pigments. Any yellow dusting of EPS foam as a result of exposure to UV, must also be cleaned off before any adhesive type product can be applied. In addition, concrete footing surfaces should be cured for 7 days minimum before installation takes place to promote maximum adhesion of the product to the footing surface. If the walls have been exposed to heavy rains, adequate drying time should be allowed before the application of a waterproofing membrane. The manufacturer s specifications should be referred to. For certain conditions, some products recommend a primer material be applied to the wall. Primers must also be compatible with EPS. The manufacturer s specifications should be referred to Installation of Below Grade Moisture Protection Waterproofing systems are typically installed from the final grade level, around the perimeter of the building, down to the top level of the footing, and if possible, over the flat surface of the footing, which will direct any water draining down the face of the system into the building s perimeter drainage system. Any service penetrations, below grade windows in window wells, or other penetrations in the concrete, must be sealed adequately to be watertight. 5.2 Below Grade Moisture Protection 99

4 If applying below grade moisture protection in cold temperatures, i.e. below freezing and up to 50 degrees F (below 0 and up to 10 degrees C), walls should be checked for frost and temporary tenting and heating may be required. In these conditions, the application steps should be confirmed with the manufacturer of the materials. If applying moisture protection in extremely hot temperatures, temporary shading may be required. Before performing the backfill, it is recommended to inspect and confirm that the waterproofing system is ready. Care should be taken to ensure all below grade service penetrations are sealed properly. It is not recommended to leave waterproofing materials exposed to the ultraviolet rays of the sun for extended periods. The manufacturer s recommendations should be checked to confirm exposure details. Some waterproofing systems are recognized as termite resistant barriers, and they are recommended for use in areas at risk for termite infestation. Refer to Appendix B: Termite Section. All waterproofing/damp-proofing systems must be compatible with ARXX ICFs and EPS foam. All warranties for waterproofing/damp-proofing are provided by the respective manufacturer of the waterproofing/ damp-proofing system Parging or Cementitious Coating The below grade waterproofing system typically terminates around the building at the finished grade level, and per the building code, the start of the exterior finish may be between 6 to 16 (150 to 406 mm) above the finished grade. Since long-term exposure to ultraviolet rays oxidizes the EPS, it is recommended to provide coverage for this exposed portion of the ARXX wall. This area of the wall is most often covered with a directly applied transition material or parging. Transition materials are designed specifically for this application. They may be peel and stick membranes, pre-finished sheet goods, cement board, etc. Typically, parging is a cementitious or acrylic stucco material, directly applied to the ARXX form. There are a number of materials available for this purpose that may be directly applied to ARXX walls. It is recommended to follow the manufacturer s installation specifications and recommendations, including confirming that the materials are compatible with EPS. The application of this transition material must maintain the drainage plane for moisture from the above grade wall cavity or face of the EPS behind the exterior finishing material, to the exterior face of the below grade waterproofing system. To accomplish this there may be an overlap of materials Below Grade Moisture Protection

5 Figure Parging Before applying a cementitious or stucco type parge coat, the EPS wall surface must be free of any dirt, debris, or UV oxidation, to allow proper adhesion of the parge coat material. In addition to the requirements identified in this section, the material and application selected should have the ability to withstand abrasive contact from landscaping equipment, i.e lawnmowers and edge trimmers. Damage may allow moisture to penetrate the wall system. A building envelope is designed to resist and prevent moisture intrusion. The parging and the below grade waterproofing systems are integral parts of the design; they must work together successfully as part of the overall moisture protection and drainage systems. All parging or coating systems must be compatible with ARXX forms and EPS foam. 5.2 Below Grade Moisture Protection 101

6 5.3 Grade Beams Due to soil conditions in some North American geographical regions, it is necessary to provide a foundation system that can withstand the forces imposed by shifting soils. Traditional footings require the soils below them to have a bearing capacity sufficient to support the loading conditions of the building, but some upper zone soils cannot support such loads, making it necessary to transfer the loads to the soils or rock below, which can provide the appropriate support. This can be accomplished by placing piles through the weaker soils to rest on either bedrock or soil with a greater bearing capacity. When installing piles, the ICF walls must be designed to span, or bridge, from pile to pile. Installing void forms between the piles is the simplest method to support a wall that spans piles. The ARXX forms are placed on top of the void forms, allowing the soil beneath it to expand without moving the foundation wall. ARXX ICFs may typically be designed as a two course grade beam that spans between the piles, but in some applications may require multiple courses or may incorporate these beams into the full wall design. Grade beams should be designed by design professionals. Similarly, two course bond beams can be installed on raised piles in flood zones or coastal areas. Bond beams require convention forming systems between the piles under the ICF wall. Figure Typical Grade Beam on Piles Grade Beams

7 5.4 Shallow Foundations Generally, footings are installed below the frost line, as determined by national and local building codes. However, the building code also provides an alternative solution with shallow footings and foundations. ARXX ICFs contribute to the design of shallow foundations by insulating the foundation wall from the top of the footing, restricting cold and frost through the foundation wall, and protecting the floor slab. In addition, the installation of below grade rigid insulation that is parallel to the finished grade, protects the footings from frost. The design parameters of the thickness, width and depth below grade of the insulation depend on the climate zone. Figure Shallow Foundation 5.4 Shallow Foundations 103

8 5.5 Stem Walls Stem walls are foundation walls that are typically two or three courses with unbalanced fill that can be on either side of the wall. ARXX forms are recommended for the construction of stem walls Stem Walls for Concrete Slabs A concrete floor slab may either bear on top of the stem wall or integrate into the stem wall. In both cases, the concrete slab is connected to the ICF wall with rebar dowels, which provide lateral support for the top of the stem wall. It is recommended to provide temporary support or bracings for the outside of stem walls prior to the placement of the concrete floor slab Stem Walls for a Crawl Space ARXX ICFs provide insulated foundation walls for crawl space applications. Provisions in the building code allow ARXX ICF crawl spaces to be left unfinished, without the application of a thermal barrier, if the following applies: Entry to the crawl space is only to service utilities and there are no heat producing appliances. There are no interconnected basement areas. Air in the crawl space is not circulated to other parts of the building. ARXX ICFs can easily accommodate the installation of crawl space vents and flood vents, which can be manufactured specifically for ICF walls. The floor system bearing on top of and connected to the ARXX ICF stem wall provides the required lateral support for the wall. The construction of a pony wall installed on top of an ARXX ICF stem wall does not provide lateral support for the foundation wall. In order to design the foundation wall as a retaining wall, additional structural design is required, typically requiring a minimum 8 (200 mm) flat wall ICF concrete core. Foundation walls that do not have habitable space on one side, do not require waterproofing/dampproofing Stem Walls

9 Figure Slab on Stem Wall Figure Slab Poured into Top Edge 5.5 Stem Walls 105

10 Figure Slab into Side of Stem Wall Figure Crawl Space Stem Walls

11 5.6 Columns and Pilasters Depending on the engineered size of a column or a pilaster in a wall, they can be formed easily in a number of ways. It is recommended that columns and pilasters are formed so that they integrate with the wall design. Ideally, they should have their concrete placed at the same time as the ARXX wall Internal Columns and Pilasters An internal column or pilaster is an enlargement of the concrete core, built to meet structural requirements, but minimizing the projections either to the interior or the exterior of the wall. By removing sections of EPS from the ARXX form on either one or both sides, the overall concrete core can increase respectively by a 2½ or 5 (63.5 mm to 125 mm). This equates to having a column or pilaster available to any width with a nominal concrete core thickness as follows: Table Columns and Pilasters Thickness Form Concrete Core One Side Two Sides 6 (150 mm) 8 1/2 (216 mm) 11 (279 mm) 8 (200 mm) 10 1/2 (267 mm) 13 (330 mm) 10 (250 mm) 12 1/2 (317 mm) 15 (381 mm) When cutting only one side of ICF to create a pilaster, it is recommended to cut the interior face of the form, which keeps the insulation value on the exterior and maintains a continuous substrate for exterior finishes. Individual columns or pilasters may be designed to support point loads on the wall from a beam. 5.6 Columns and Pilasters 107

12 5.6.2 Installation Method for Columns and Pilasters Once the wall is built, the block in the designated area should be cut vertically to the design width of the column or pilaster. When only cutting one side of the form, any webs should be cut back so that they are not in the way but enough of the web should be left to use to fasten ties, if required. ¾ (19 mm) plywood should be installed across the opening, as this will hold each side of the wall in place and restrain the concrete. Strapping and bracing should then be installed as required to ensure the two wall sections remain in line and are plumb. Once the concrete has been placed and cured, insulation may be glued to the exposed concrete. Figure Internal Pilaster Details Figure Column Detail Columns and Pilasters

13 5.6.3 Larger Columns and Pilasters When larger columns or pilasters are required, modified corner forms or ARXX Edge panels can be used to form the column or pilaster. ARXX Prime and ARXX Steel corner forms can have their interior panels cut off to form a column or pilaster. Care should be taken to leave enough of the web on the panel to fasten ties. Figure Edge Corner Column Figure Edge Panel Column ARXX Edge panels can be used with any ARXX form to create a column or pilaster. Rather than building a column or pilaster with corner forms, ARXX Edge panel connectors can be used on all the corners to connect standard form panels and provide space for columns or pilasters. When possible, it is recommended to use ARXX Edge tie anchors to tie the panels together. Due to the additional concrete placed in a column or pilaster, more pressure is applied to the forms, so adequate strapping and bracing is required at all corners and joints. Depending on the width of the column or pilaster, conventional concrete forming at the column or pilaster may be required to withstand the concrete pressure. Column and pilaster sizes and footing depth must be designed, engineered, and constructed in accordance with all applicable building codes and regulations. Columns or pilasters may require additional vertical rebar and/or cage stirrups. 5.6 Columns and Pilasters 109

14 5.7 Above Grade Walls ICFs are recognized as a concrete forming system for above grade walls and have been adopted in national and local building codes as a viable alternative to conventional framing or masonry construction for all building types. The installation of ARXX forms for above grade applications is essentially the same as it is for below grade applications; however, due to different loading conditions, the reinforcing patterns and the form size may be somewhat different. Generally, above grade walls contain more window and door openings than below grade walls, or foundation walls, and the design must incorporate the distribution of loads at these openings with specific lintel designs. Above grade wall design is also subject to seismic loads, wind loads, snow loads and superimposed loads from the roofing, additional floors, etc. It is recommended that care be taken to identify and address all of the load conditions that may have an impact on the wall design, as these conditions influence form size, wall height, and the appropriate reinforcements around all the openings and under point load items, including beams, girder trusses, etc. Above grade walls may have smaller form sizes than below grade walls, which will call for a transition in form sizes. Form size transitions are accommodated in the floor intersection detail. Typically, concrete is placed in the below grade walls first with a cold joint connection to the above grade walls. Cold joints are also between each story in above grade multi story applications. Refer to Section for details on cold joint reinforcing between the foundation wall and the above grade wall. All openings greater than 24 (610 mm) in width will require additional reinforcing at the sides and below and over the opening (refer to Appendix A - A.6 Lintel Design). Reinforcement in above grade walls is placed in the center of the concrete core. The placement of the horizontal rebar should be alternated to allow the vertical rebar to interlace between the horizontal bars. It is recommended that the first course of the above grade wall be secured to the top course of the below grade wall with tie-wire, zip-ties or ARXX hooks. When a wall is to be continued for further stages, it is recommended to leave the concrete approximately 8 (203 mm) from the top of the wall, so that the top half of the web is exposed above the concrete. Leaving the web exposed will allow the installer to tie down the first course of the next stage the wall. To support and fasten alignment bracing systems for above grade walls, it is recommended that sub-floors be installed first, in order to provide a suitable substrate. Concrete walls cannot be supported on wood framing Above Grade Walls

15 Refer to local building codes for regulations on reinforcement for above grade walls. Foam plastic insulation needs to be separated from the interior of a building by an approved thermal barrier of ½ (12.7mm) gypsum board or an equivalent thermal barrier material. Check local codes for approved equivalent materials and exceptions. Check local building codes for anchorage or design requirements to connect the top of the walls to the floor or roof systems. Depending on the building code, a variety of anchors and straps will be required to inserted into the concrete. 5.8 T-walls or Intersecting Walls T-walls are walls that intersect each other, typically at a 90 angle. Although these walls are generally an interior wall intersecting with an exterior wall, they can be any two walls. T-wall intersections can be anywhere in the run of the main wall, requiring that a web be cut out at the intersection location. T-walls can be the same or different concrete core sizes. T-walls are easy and efficient to build. They are typically constructed as vertical joints, butting the forms together and then fastening them together. Each of ARXX s form product lines, Edge, Prime and Steel, has slightly different application to create a T-wall intersection, but in all cases, the following design and construction issues must be addressed: Providing for additional concrete pressure on the exterior wall panels. Securing each form to the main wall. Ensuring that the horizontal rebar lap joint is through the intersection. Maintaining a square inside corner. Ensuring support on the vertical joint for concrete placement. The following installation steps apply to all T-walls that have an interior wall intersecting an exterior wall: 1. The intersection must be located and then the intersecting form placed against the exterior wall and two cut lines marked, for core size, against the exterior wall. 2. The exterior form is cut along the cut lines. If the cut exposes a web, most of the web is removed, but leaving enough web in the wall to fasten the intersecting forms with tie-wire or zip-ties. The ARXX Edge panel connector is compatible with all ARXX forms, and it can be used for T-wall applications for any ARXX form products. Due to concrete pressure, external bracing is recommended for T-walls. 2 x 6 (38 mm x 140 mm) or larger dimension lumber or plywood should be used to vertically support the forms at the T intersection. If vertical bracing support cannot be applied, then horizontal strapping across each form should be installed. When placing concrete in the intersecting walls, the pressure can be minimized by placing the concrete on the straight wall and allowing the concrete to flow into the T-wall. 5.8 T-walls or Intersecting Walls 111

16 5.8.1 ARXX Edge T-walls The construction of a T-wall with ARXX Edge panels uses ARXX Edge tie anchors and ARXX Edge panel connectors. The constructions steps are as follows: 1. The two ARXX Edge panel connectors are installed and the standard panels are inserted. 2. If the web in the exterior panel lines up within the intersecting core, ARXX Edge tie anchors are inserted in the first, third and fifth tees in the web of the exterior wall panel. 3. If the web in the exterior panel is offset by more than 3 (75 mm) from the centerline of the intersecting wall, then a 36 (915 mm) long piece of rebar is attached to the top and bottom connectors using tie-wire, in the outside notch of the exterior wall panel. The two web connectors of the intersecting forms are tied around the rebar and the forms pulled together. 4. If the web in the exterior panel lines up near the center of the intersecting wall, the spacing of the first row of web connectors in the intersecting form should be revised so that there are three connectors, at the first, third and fifth tees. 5. Using tie-wire or zip-ties in each of the three tie anchors, the ties are run around the web connectors in the intersecting form. The ties can be used to evenly pull the forms together. It is not recommended to overly tighten the ties, as they will deflect the wall panels. 6. The horizontal rebar can be installed as required. Figure ARXX Edge T-wall Above Grade Walls

17 5.8.2 ARXX Prime T-walls 1. Two 24 (610 mm) long pieces of rebar should be inserted in the top and bottom of the outside triangle of the web of the exterior wall form. Ties around the rebar to the web in the intersecting form can be used to evenly pull the forms together. It is not recommended to overly tighten the ties, as they will deflect the wall panels. 2. The horizontal rebar can be installed, as required, in each course. 3. When the full wall is built, the vertical joints should be secured with glue or bracing prior to concrete placement and care taken to ensure that the vertical joints are plumb. Figure ARXX Prime T-wall Use panel connectors ARXX Steel T-walls 1. The vertical tongue and groove edge from the intersecting form should be removed to create a flat edge. 2. An 18 (457 mm) piece of rebar should be inserted through the web grid of the exterior form. This bar will be pulled tight against the form and should span over a minimum of four webs. 3. Tie-wire or zip-ties should be fastened around the rebar into the third or fourth web of the intersecting form and the forms pulled together evenly. Care should be taken to ensure that the ties are not overly tightened, as they will deflect the wall panels. 4. The horizontal rebar can be installed, as required, in each course. 5. When the full wall is built, the vertical joints should be secured with glue or bracing prior to concrete placement and care taken to ensure that the vertical joints are plumb. 5.8 T-walls or Intersecting Walls 113

18 Figure ARXX Steel T-wall ARXX Steel Waffle T-walls The same procedures in Section for ARXX Steel T-walls should be followed, with the following exception: 1. An opening should be cut in the wall and/or intersecting form in order to match the waffle grid profile. This opening allows for adequate concrete at the joint and an easier flow of concrete through the joint. Figure ARXX Steel Waffle T-wall T-walls or Intersecting Walls

19 5.9 Angled and Radius Walls Angled Walls Forms for walls that have angles other than 90º and 45º will require on-site cutting to create mitered vertical joints. It is recommended to attempt to set the form layout to accommodate cutting the forms without excessive interference with the webs. In most cases, there may be more than 4 (100 mm) from the web on the EPS panel at the outside corner. When constructing a vertical joint, the forms should be tied together with tie-wire or zip-ties, two per course, and the reinforcement bars should be bent to run continuously through the corner. Once the forms are set properly in the wall, the outside corner edge should be glued with low expansion spray foam and/or fiber tape installed with two strips per form, across the joint. Prior to concrete placement, continuous supplemental support is required up the entire wall Radius Walls The construction of radius or curved walls is an easy application using ARXX ICFs, but they do involve more labor to construct. There are two basic methods to build a curved wall: the double segment cut method and the single cut method. It is recommended to consult an ARXX technical representative for the best method to use for each individual radius wall application, as the method chosen is dependent on the curvature of the wall, the form type, and the concrete core size Small Radius Walls Small radius walls have a radius of less than 10 (3 m), and they typically use the double segment cut method. The forms are cut into 8 (203 mm) segments. Outside panels have a simple saw cut through the panel, however, inside panels must be reduced to allow for the tighter curvature. Refer to the ARXX Detail Library for cutting tables per radius. Lay out the curve and install wood blocking along the outside of the curve to hold the forms in place. The first course of cut block segments is then installed forcing them against the wood blocking. Once the first course is in place, the blocks should be glued together and secured to the concrete footings. Subsequent courses are placed exactly like the first course, without an overlap or running bond. Fiber tape or internal ties should be installed to pull the wall segment together, both vertically and horizontally. Prior to concrete placement, each course must be supported to withstand the concrete pressure. The simplest support method is to bend and install 8 to 12 (203 mm to 305 mm) wide plywood strips across the outside of the curve. The center of the plywood should be located on either the horizontal block joint or on the center of the course, and then the plywood strips fastened to the webs. It is recommended to install this temporary strapping on each course. As the curved wall is being built, care should be taken to ensure each course is level. 5.9 Angled and Radius Walls 115

20 Figure Radius Wall Large Radius Walls Large radius walls have a radius of over 10 (3 m), and they typically use the single segment cut method. Depending on the ARXX form type being used, it is recommended to test this procedure before cutting too many forms. The single segment cut method requires only the interior wall panel of the curve to be cut. A small pie shaped piece of foam between each web is removed (see figure ) in accordance with the ARXX Radius Wall Technical bulletin. The ends of the block are also cut accordingly. Once the entire block has been cut on the one side, the block can be slowly bent to fit the curve. Refer to Section Small Radius Walls for the procedure of how to set out the curve and install a wood blocking guide along the outside edge. The full form should be installed against the blocking and the forms secured in place. Once the first course is set, subsequent courses can be installed in a running bond pattern Angled and Radius Walls

21 Figure Panel Cuts Figure Hot Knife Figure Panel Cuts Refer to ARXX Technical Library for radius wall construction details and cutting tables. The wire cutter for the hot knife should be fabricated to the dimension that corresponds to the size of the foam strips being cut out of the inside panel. The wire should be bent to provide a slight angle cut along the foam, which will allow the panels to fit tightly together when curved (figure ). Bending the form produces a perfect radius wall on the outside of the curve for the direct application of stucco finishes. If the inside of the curve is going be a finished wall, the outside panel needs a simple saw cut between webs. Bending the form to suit the radius will open up the cuts on the outside face. The cuts should be filled with spray foam prior to concrete placement. The reinforcement bars should be pre-bent to suit the radius. Care should be taken so that the curved rebar does not act as a spring and alter the form layout. The intersection of a curved wall to the regular wall will create a vertical joint. The procedure for cold joints in Section vertical reinforcement cold joint should be followed image.doc 5.9 Angled and Radius Walls 117

22 Radius Cutting Block Segment Method 1. The radius on the footing or slab should be marked and an 8 (203 mm) segment measured to determine the cut angles. When cutting, the web is to be centered in the segment. Depending on the radius, the edges of each segment may need to be cut on an angle to allow the forms to fit tightly together when forming the curve. Figure Measuring Radius Angles Figure Marking Block for Radius Cuts 2. A block segment should be placed on the chalk lines and cut to the required angles. Figure Radius Block Segments Angled and Radius Walls

23 3. This cut block is used as a template to cut the rest of the block segments to complete the wall. Figure Setting Radius Block Segments 4. The block segments should be stacked, with care taken to align the webs vertically and to connect each segment with zip-ties. 5. As the curved wall is being stacked, care should be taken to ensure that it is level. 6. The forms can be glued into place and any gaps filled with spray foam. 7. Each course of the wall should then be strapped with bendable plywood strips that are 8 to 12 (203 mm to 305 mm) wide. (Refer to Figure ) Figure Tieing Radius Walls 5.9 Angled and Radius Walls 119

24 5.10 Demising Walls A demising wall, or party wall, is an interior wall that separates interior spaces. Depending on design requirements, these walls can be designed as load bearing or non-load bearing, and either with or without a fire resistance rating. ARXX ICF wall assemblies have been tested in accordance with ASTM E119 and CAN/ULC S101 and have attained a Fire Resistive Ratings (FRR) from 2 to 4 hours. This allows ARXX ICFs to be used as interior walls for corridor or demising walls, either as firewalls between fire zones or for individual rooms. Refer to ARXX Technical Library for documentation on fire resistive ratings. ARXX ICF wall assemblies have also been tested for sound attenuation and have achieved above average STC ratings for regular wall design and increased STC ratings for specific wall designs. Due to these increased ratings, the use of ARXX ICF wall assemblies as a sound partition or party wall is an advantage over conventional double stud type wall construction. Interior walls require T-wall connections to the exterior walls, see Section 5.8 T-walls or Intersecting Walls. In order to maintain the structural integrity of walls in a fire situation, ARXX has detailed floor connection requirements available for firewalls between units. Refer to the ARXX Detail Library Fire Resistance ARXX ICFs are certified by Intertek and bear the Warnock Hersey Certification Mark as evidence of compliance with the requirements of building code for flame spread, smoke development, and fire resistive rated assemblies Flame Spread Index (FSI) and Smoke Development Index (SDI) When evaluating building materials for fire safety, many factors are considered, including ignition temperature, smoke toxicity and flame spread index (FSI). The FSI is used to describe the surface burning characteristics of building materials. The testing for FSI is completed in accordance with ASTM E84 in the United States and CAN/ ULC S102.2 in Canada. The most commonly used flame-spread classifications are: Class I or A: 0-25 FSR inorganic materials, such as masonry or tile Class II or B: FSR whole wood materials (wood used in the same form as sawn from a tree) Class III or C: FSR reconstituted wood materials, such as plywood, particle board or hardboard In the United States the IBC requires that foam plastic insulation shall not have a flame spread index of more than 75 and a smoke-developed index of more than 450. ARXX ICFs are in compliance with this code provision having attained a flame spread index of less than 75 in accordance with ASTM E84. In Canada the NBCC requires that foam plastic insulation shall not have a flame spread index greater than 500. ARXX ICFs are in compliance with this code provision having attained a flame spread index of 200 in accordance with CAN/ULC S Demising Walls

25 Fire Resistive Rating (FRR) ARXX ICF wall assemblies have been tested in accordance with ASTM E119 and CAN/ULC S101 and have attained a Fire Resistive Ratings (FRR) from 2 to 4 hours. ARXX ICFs are Certified by Intertek and bear the Warnock Hersey Certification Mark as evidence of compliance with the Fire Resistive Rated assembly listings. ARXX ICFs are also approved for use in non-combustible construction on all building types and for any building height. On an exterior wall with a horizontal fire separation distance of more than 5 (1.5 m) the exterior gypsum board may be omitted. Most fire resistance testing was done using either the 4 or 6 (100 mm or 150 mm) nominal concrete core ARXX forms. The results and certification apply for thicker concrete cores, as long as they follow the same assembly criteria. ARXX ICFs have been approved for use in the construction of an exposed building face (i.e. zero lot line) applications. ARXX has developed approved details with specific wall finishes in order to meet building code requirements for fire separation in non-combustible construction. To meet code, the interior of all ICF walls in habitable spaces must be separated from the building interior with an approved 15 minute thermal barrier, such as ½ (12.7 mm) gypsum board or a code-approved equivalent. ARXX fire resistant wall assemblies typically only require a single layer of regular ½ (12.7 mm) gypsum board to finish an interior wall. Refer to the ARXX Technical Library for documentation on the fire resistant assemblies Gable End Walls Certain building designs call for a pitched or cathedral ceiling. To maintain the insulation value and structural component of ARXX ICF walls, walls for pitched ceilings are continued to the roof ridge, rather than terminating horizontally at the eaves. Achieving this requires that the top of the walls be sloped to match the roof pitch. ICF gable walls typically go to the underside of the roof truss as a fire separation, then the wall passes above the roof line Typical Gable Form Placement To form the gable end, the forms should be laid up in a stepped fashion, and then the roof pitch marked with a caulk line on the wall, indicating a cut line for the top of the wall. When the forms are cut to the necessary angle, dimensional lumber can be attached to each side of the gable to act as supplemental supports for the wall. When preparing to place the concrete, pieces of plywood are cut, approximately 15 (380 mm) wide by 32 (813 mm) long, and fastened to the top edge of the dimensional lumber on each side of the wall. These plywood pieces can restrain the concrete for approximately two or two-and-one-half courses. Typically, concrete placed in gable walls has a lower slump 3 to 4 (75 mm to 100 mm)) than that used for the regular walls, which helps contain the concrete in the sloped wall. The concrete should be placed in smaller lifts, two courses high, and consolidated regularly, especially under the plywood restraining caps. This process is repeated until reaching the top of the gable. The plywood restraining caps and strips of lumber can be removed after the concrete has cured Fire Resistance 121

26 Figure Typical Gable End Care should be taken to allow for the installation of anchor bolts or roof connectors as the gable end is built. The gable end wall must be adequately braced and supported Alternate Gable Framing Alternatively, gable ends can be formed without cutting the forms on a slope. The wall forms can be stacked to create the general shape of a gable by inserting end caps and the concrete is prevented from spilling out the ends of the forms. After the concrete is completely placed, the top of the wall can be framed-in with lumber to match the roof trusses or rafters Gable End Walls

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS 2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS The LOGIX wall assembly has no need for an additional vapor barrier, the solid concrete core covered with the low permeance EPS (Type II) foam

More information

Built to Last. Built for Beauty. Good. Solid. Logix. TM

Built to Last. Built for Beauty. Good. Solid. Logix. TM Built to Last. Built for Beauty. Good. Solid. Logix. TM Quality, Value and Service Introducing LOGIX Insulated Concrete Forms. Based on the simple concept of interlocking blocks, LOGIX ICF gives you a

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

4. ANCHOR BOLTS AND STRAPS a. ½ anchor bolts shall be embedded 7 into concrete a maximum of 6' on center and 12 from corners and ends of plates. GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

Herringbone Pattern Flooring

Herringbone Pattern Flooring Herringbone Pattern Flooring If it s not marked NOFMA, it s not certified. Handling, Storage, Installation and Tips Herringbone is generally manufactured from 3/4 x 2 ¼ or ¾ x 1-1/2 standard tongue & groove

More information

CHAPTER 6 CONSTRUCTION TYPES

CHAPTER 6 CONSTRUCTION TYPES CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam

More information

8/18/14. Introduction to. Framing. Terminology and Concepts

8/18/14. Introduction to. Framing. Terminology and Concepts 8/18/14 Introduction to Framing Terminology and Concepts Terminology: Framing Level Two points on exactly the same horizontal plane. Square Intersecting lines or faces that form an exact 90 angle. Plumb

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A TechSpecs A builder s blueprint for construction technologies January 2013 The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A C B A E D H G F A. Wood Floor Framing - p. 2 B. Foundation

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

FORM DESIGN. easy to work with, and generally available.

FORM DESIGN. easy to work with, and generally available. Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods

More information

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS. Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION

More information

Electrical Wiring Technical Bulletin

Electrical Wiring Technical Bulletin Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

Post and Beam Construction

Post and Beam Construction Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year.

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year. ICC-ES Evaluation Report ESR-2270 Reissued September, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

Renovating Your Basement

Renovating Your Basement building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:

More information

What you need to know about concrete block basement construction.

What you need to know about concrete block basement construction. Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

Sample Drawing Package for One and Two Family Dwelling Applications

Sample Drawing Package for One and Two Family Dwelling Applications Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final

More information

THE DOW CHEMICAL COMPANY Issued: August 1, 2008 200 LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN 48674 (989) 638-8655 www.dowbuildingmaterials.

THE DOW CHEMICAL COMPANY Issued: August 1, 2008 200 LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN 48674 (989) 638-8655 www.dowbuildingmaterials. ICC EVALUATION SERVICE, INC. EvaluateP InformP Protect Los Angeles Business/Regional OfficeP 5360 Workman Mill RoadP Whittier, CA 90601 (562) 699-0543 phonep (562) 695-4694 fax DIVISION: Section: 6 WOOD

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

2.9 WINDOW & DOOR BUCKS

2.9 WINDOW & DOOR BUCKS 2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

Engineered Wood Foundations

Engineered Wood Foundations Engineered Wood Foundations Emeraldfoundations.com 1 EWF Planning and Installation manual This manual will serve as a guide to planning and installing an Emerald Foundation system. This system is comprised

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

Building Construction. Lightweight construction. Conventional Construction

Building Construction. Lightweight construction. Conventional Construction Ventilation 53 Building Construction The firefighter s ability to safely and efficiently ventilate a building through its roof will depend to some degree on the firefighter s understanding of roof construction.

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

Installation Manual for STANDING SEAM ROOFING

Installation Manual for STANDING SEAM ROOFING Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description

More information

GigaCrete Specification PlasterMax

GigaCrete Specification PlasterMax GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY

Re-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded

More information

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House COLLEGE OF AGRICULTURE AND HOME ECONOMICS BRINGING SCIENCE TO YOUR LIFE Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of

More information

Guide Specifications for Maple Flooring Systems

Guide Specifications for Maple Flooring Systems Guide Specifications for Maple Flooring Systems MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual

More information

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS Introduction This inspection guide is organized to follow the EIF System's Installation Guide.

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

Shower Walls and Tub Surrounds

Shower Walls and Tub Surrounds Reverso en español TEC Skill Set How-To Project Guide Shower Walls and Tub Surrounds 3 Steps to a Beautiful Tile Surface! 1. Prepare the surface 2. Set the tile 3. Grout and caulk H.B. Fuller Construction

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

DELTA Premium Moisture Management Systems for Foundations.

DELTA Premium Moisture Management Systems for Foundations. DELTA protects property. Saves energy. Creates comfort. DELTA Premium Moisture Management Systems for Foundations. DELTA Premium Moisture Management Systems provide the best protection for foundations.

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

Assembly Instructions MDM Products Party Tent

Assembly Instructions MDM Products Party Tent Assembly Instructions MDM Products Party Tent Congratulations! Congratulations on your purchase of a MDM Products Party Tent Shelter by MDM Products LLC. With proper installation, use, and maintenance,

More information

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional

More information

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation

Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation Bella Cera Engineered Hardwood Flooring Installation Instructions Check for Proper Color Selection Prior to Installation 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully

More information

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11

More information

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.

More information

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 - CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b

More information