Presentation Agenda 2012 WORLD ENERGY ENGINEERING CONGRESS



Similar documents
Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX

Minimizing Impact of Electric Utility Outages with Backup Generation

Leveraging Controls for a Smarter Grid. Turning Assets Into Revenue in HVAC

EPA s Air Quality Regulations for Stationary Engines

Columbia University Master Planning & Optimization

FAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations

NEW JERSEY CENTER OF EXCELLENCE

Ohio Energy. Workshop JJ

Demand Response in Utility EE Programs for India

We Energies Electric Rates

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

New Directions for Demand Response

Load Participation in Ancillary Services

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

ABSTRACT DCMCCT PROJECT OVERVIEW

Distributed Energy Resource Services and Pricing Caltech Resnick Ins;tute Grid 2020 Seminar

Guideline for Energy Efficient Electrical systems for building. Presentation by TERI

Load Management Wiring Guide

Wind-Diesel Hybrid System Options for Alaska. Steve Drouilhet National Renewable Energy Laboratory Golden, CO

Q Utility Rebate Report. Houston, TX

Electric Rate Book Revision: 13 ( ) Page No. 1 Effective date: SMALL COMMERCIAL

Princeton University Microgrid

Metering for today s systems

10 Strategic Steps to Reducing Your Energy Costs AEE Regional Chapter Meeting February 2, 2005

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013

The Benefits of Demand Response

Utility Recovery and Continuous Energy Oversight of the Chilled Water Generation for New York Presbyterian

STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing

Electric Energy Storage. Opportunities and Challenges in New York

POLICY & PROCEDURES PHYSICAL PLANT. Generator Fueling Boca Campus

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

SCHEDULE OF RATES FOR ELECTRIC SERVICE

SCHEDULE OF RATES FOR ELECTRIC SERVICE

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

Jemena Electricity Networks (VIC) Ltd - Network Tariffs For The 2015 Calendar Year (Exclusive of GST)

Network Price List (excludes GST)

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, C arastro & A ssociates, C&A# 5747

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.

Statement of Basis SCA Tissue North America, LLC

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

Benefits of Water-Cooled Systems vs. Air-Cooled Systems for Air-Conditioning Applications

Q Utility Rebate Report. Fort Worth, TX

Peak Shaving - A Method to Reduce Utility Costs

Building a Real Data Center During the Great Recession

Hines Property Management, NYC

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations

Demand Response Programs

Agenda. Part I: Introduction to OptimumHVAC. Part II: Initial Energy Savings Analysis for MCO Main Terminal. Part III: Case Studies & Conclusion

Schedule OLM-AS OPTIONAL LOAD MANAGEMENT AND AUTOMATION SERVICES RIDER

GENERATOR RATINGS AND THE IMPLICATIONS FOR DATA CENTERS

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

Ohio Energy. Workshop HH. Understanding & Managing Your Risks A Real Time Approach for Long-Term Power Purchases

NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM

Workshop B. 11:15 a.m. to 12:30 p.m.

water is cooled in a secondary cooling control tasks: use of seawater. Treatment of the seawater formation of algal vegetation.

Denver International Airport Total Facility Optimization. Josh Foerschler Aurom Mahobian

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

Demand Response, Dynamic Pricing, and the Smart Grid in New York

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE

Paralleling Switchgear

urning A Bank Of California (EFCE)

EPA s Air Quality Regulations. Melanie King U.S. Environmental Protection Agency

RISH EM 3490 DS Dual Source Energy Meter RISH EM 3490 DS. Application : Product Features:

Reducing Energy Costs with Peak Shaving in Industrial Environments

Smart Storage and Control Electric Water Heaters. Greg Flege, Supervisor, Load Management Midwest Rural Energy Conference March 3, 2011

Enclosed are the General Permits issued pursuant to our review of your applications (General Permit No. GPEG-101, GPEG-102 and GPEG-103).

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

1 March Al Dussinger Embrace Home Loans 25 Enterprise Center Middletown, RI Dear Mr. Dussinger,

Protecting Our Information, Protecting Our Resources

COMMODITIZING THE DATA CENTER MARKET

Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.

Demand Response Programs: Lessons from the Northeast

Benefits. Air-Cooled Systems

Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup

Demand Response FAQs

Texas State University Utility Analysis. Sheri Lara, CEM, CEFP Texas State University Morgan Stinson, PE, LEED AP - EEA Todd Schmitt, PE, LEED AP EEA

NEW COMMERCIAL Rates. Understanding the. Commercial Customers

Philadelphia Navy Yard Microgrid Modernization. Will Agate LEED AP Senior Vice President Philadelphia Industrial Development Corporation (PIDC)

This presentation is posted for public use. ACEEE does not endorse any product or service.

Rules of Thumb Energy Efficiency in Buildings

Understanding Tier 4 Interim and Tier 4 Final EPA regulations for generator set applications

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED

WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) Wärtsilä

Energy Audits Waste Water Treatment Plants

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS

Daily Daily Network Network Network Energy Rates Step Rates Capacity. Price Rates Rates

Case Study - University at Buffalo State University of New York. Lower Energy Usage Costs with Real Time Monitoring, Campus-wide

Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

How To Build A Power Line From A Single Campus To A Power Plant

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

Power Generation generator sets kva to 15 MW

Business Energy Efficiency. Webinar August 29, 2012

Overview of Reliability Demand Response Resource

Demand Response in Capacity and Electricity Markets: What Role Can and Should It Play?

ATTACHMENT B California Energy Commission Air Quality Self-Certification Checklist for Simple-Cycle Gas Turbine Generation Units

Drives and motors. A guide to using variable-speed drives and motors in data centres

Data Center Combined Heat and Power Benefits and Implementation. Justin Grau, Google Inc. Sam Brewer, GEM Energy

Demand Response Market Overview. Glossary of Demand Response Services

Transcription:

2012 WORLD ENERGY ENGINEERING CONGRESS Demand Response Programs Reduce Energy Costs at Armstrong s Main Campus October 31 to November 2, 2012 Georgia World Congress Center, Atlanta, GA Central PA Chapter AEE, Lancaster, September 27, 2012 David Eberly, P.E., CEM, CEA, CSDP Principal Engineer 35TH WORLD ENERGY ENGINEERING CONGRESS As Of: 05/15/12 10/31/2012-11/2/2012 Georgia World Congress Center, Atlanta, GA Thursday, November 01, 2012-2:30:00 PM - 4:30:00 PM Track G: Energy Services & Demand Response Session G3: Demand Response CHAIR ID: 17117 Laurie Wiegand-Jackson, C.E.P. 9812 President North America Power Partners LLC 308 Harper Drive, Suite 320 Moorestown, NJ 08057 (856) 439-0800 Email: lwj@nappartners.com; Jgilmartin@nappartners.com 2:30-3:00PM On-Site Generation, Demand Response & Energy Management Technologies Achieve Energy Cost Savings at Corporate Headquarters ID: 2850David A. Eberly, P.E., C.E.M., GBE, CSDP, CEA 9860Principal Engineer, Corporate Facilities Management Armstrong World Industries 2500 Columbia Ave, PO Box 3001 Lancaster, PA 17604-3001 (717) 396-5666 Email: daeberly@armstrong.com 3:00-3:30PM Practical Strategies for Maximizing the Value of Demand Response ID: 49163 Gregg M. Dixon, CEM, CDSM, CSDP 9862 Senior Vice President, Marketing & Sales EnerNOC, Inc. 101 Federal Street, Suite 1100 Boston, MA 02110 (617) 692-2523 Email: gdixon@enernoc.com; lbolwin@enernoc.com 3:30-4:00PM Maximizing Demand Response Opportunities ID: 47 Lindsay P. Audin, C.E.M., C.E.P., LEED AP 9861 President Energywiz, Inc. 221 Cleveland Drive Croton, NY 10520 (914) 271-6501 Email: Energywiz@aol.com Demand Response Case Study Presentation Agenda Armstrong Corporate Campus DR Programs History, background Review PJM, PPL DR Programs Campus Energy Management Implementing DR Events Achieved Benefits and Results Review and Questions Corporate Campus Corporate Campus The Place 600 acre site, about 200 acres developed w/roads, buildings 28 buildings, 1,000,000 sf conditioned space, for 900 employees buildings constructed between 1950 and 1998 LEED EB Platinum Certification at Corporate Headquarters, 2007 Energy Star Labels, 2006, 2008, 2009, 2010, and 2011 1

Corporate Campus Energy Star Certifications Building 5B-- constructed in 1995 AFP, Corporate Purchasing Offices Building 5B achieved EPA s Energy Star Label in 2009, 2010, and 2011 Energy Star Certifications Demand Response Background Armstrong DR Programs Historical perspective IS Rates from 1998 to 2000 to PPL customers firm vs interruptible service savings potential, LP-4 tariff Rate Firm kw Savings Cost/kwh Firm 100 % 0% $.061 Interruptible 3,000 3.3% $.059 2,500 8.2% $.056 2,000 14.7% $.052 1,500 19.6% $.049 1,000 26.2% $.045 The 26% savings represented $300,000 annually Curtailment generation economic justification Demand Response Background Generator Project Justification Size generation to achieve 1,000 kw import target, estimated annual savings of $300,000 Total savings guaranteed through frozen rates by (PUC) until 2009 $2,500,000 000 Installed cost of generator less than $350/kW or $700,000 Annual operating costs (fuel, PM) at 200 hours, $30,000 ** ** Fuel Cost @ $2.00/gallon, Annual PM expense $2,500 Demand Response Background 2 MW Curtailment Generator Commissioned in 2001 # 1 substation, generator set, step-up transformer, and 20,000 gal fuel tank Substation voltages 460, 4,160, and 12,470 vac Cabling distance from revenue/distribution point is 1,800 feet (X2) Existing 250 MCM, 15kv cable to #3 substation 2

Demand Response Background Characteristics of Gen System 2,500 kva step up transformer, connects generator to 12,000 volt Campus utility distribution system 2,000 kw Standby, 1,850 kw Prime rating 3,000 hp Detroit Diesel, 16 cylinder engine, fuel injected, turbocharged Marathon, 4-pole alternator, 480 volt output Kohler PD-100 Integrated controller, LCD operator interface, automatic synchronism & parallel operation Water cooled, 150 gal glycol loop, 100 hp fan Fuel Consumption, 133 gal/hr at 100 % load PJM Demand Response Opportunities Emergency Demand Response Program Demand Resource (DR) in Capacity Market Economic Demand Response Program Day Ahead Dispatch Real Time Dispatch Ancillary Services Synchronous Reserves Regulation DA Scheduling Reserves PJM Emergency DSR Program The Emergency Program historically called during capacity shortfalls known Emergency Load Response Events DR provides capacity and energy during LM Events DR paid for capacity based on the PJM capacity market DRpaid for energy duringa LMEvent DR can be called on a sub zonal, zonal or regional basis at PJM s discretion Most popular DR Program High value (depending on location) Modest requirements for DR Annual Registration cycle PJM Emergency DSR Program (cont.) Current DR Qualifications: Must agree to up to ten interruptions per Delivery Year, of up to six hours in length each Must be interruptible with no more than two hours notification Load reduction measurement for capacity y( (Measurement & Verification) Based on load reduction capability or a minimum load requirement Performance test required if no event occurs Energy Payment (M&V) for load reductions during LM Events 3

S Demand Response Background Forecast Demand Response Capacity Payments in MACC Year $ MW per day Annual $ per MW 2012/2013 $133.31 $48,680 2013/2014 $226.15 $82,544 2014/2015 $136.50 $49,822 2015/2016 $167.46 $61,122 Total 4 yrs $242,168 PJM Ancillary Service Markets Demand Response resources in PJM can participate in the following Ancillary Service Markets since May 1, 2006: Synchronized (Spinning) Reserve Regulation (some participation to date, high value but difficult operational requirements) Day Ahead Scheduling Reserves (low value, little participation) i Resources are paid the applicable clearing price for providing the service Markets are cleared hourly throughout the day for Synch Reserves and Regulation; Day Ahead for Day Ahead Scheduling Reserves PJM Synch Reserve Market Capable of reducing load in less than 10 minutes upon automated signal One minute interval energy data Resources are paid the Synch Reserve market clearing price for providing the service Annual average value of about $35,000/MW yr based on 8760 hours of participation Synch Reserve Events Typically last about 10 minutes On Average events occur about twice per month SRMCP $/MW $12 $10 $8 $6 $4 $2 $ PJM SR Historical Pricing RFC SR Zone Southern SR Zone Mid Atlantic Sub Zone SRM Market Earnings, 2011 In 2012 PPL Electric Utilities partnered with EnerNOC to help reduce its peak demand All PA electric distribution companies required to reduce their peak electricity demand by 4.5% by May 2013 Mandated by Act 129, which was signed into law November 2008 To achieve this, PPL Electric Utilities is working with EnerNOC to create the E-power Demand Response Program for C&I customers C&I customers can choose how many hours per year they will participate (0-50 hours) Increased compensation is offered to customers who can participate for more hours 4

Demand Response Case Study E-power Demand Response Program Fast Facts Coverage: PPL Electric Utilities service territory Response types: curtailment and backup generation Timing: Summer 2012 (June 1 thru September 30) 10:00 am to 10 pm, with majority of dispatches between 12 pm and 7 pm; excludes weekends and holidays Advance Notice: 3 hours Event Duration: 1 hour minimum, 6 hour maximum Payment Structure -- $300/Mwh for first 10 Delivered Performance Hours (DPH) -- $400/Mwh for DPH, 11 through 30 -- $500/Mwh for all DPH greater than 30 Campus Energy Management Building Automation EMCS Johnson Controls Electrical Power Monitoring Square D PowerLogic Application of Best Energy Practices Johnson Controls Workstation and Installed Hardware Measure Measure -- Measure Demand Response Case Study Data Center Comms Chiller Plant, Bldg 501 Control Point to Initiate Capacity Curtailment 5

Power Monitoring at Armstrong Why we monitor electricity? Determine building, equipment usage and costs Benchmarking buildings and equipment Energy Star Data Requirement Manage total power system loading Measure / Evaluate power disturbances, events Implement Rate Savings Manage, monitor Utility Act 129 DR participation PJM ELRP and SR programs in 2012 To reduce usage and save $$$ Power Monitoring at Armstrong Power Monitoring at Armstrong What is Electrical Power Monitoring? Transforming Data Into Useful Information Switchboards & MCC s KWhr Amps PF Volts KW KVA Engineering Maintenance Trending Event Logging Harmonic Analysis Alarming % Loading Phase Balance Remote Metering Peak Demand High Voltage Switchgear KVAHr Average Demand Accounting Demand Allocation Energy Utilization Cost Allocation Cost Accounting Meters at Main Revenue (POC) Substation #3 4 devices Unit Substations Peak Demand Harmonics Logic Device Demand Control PF Correction Load Control Curtailments Power Monitoring at Armstrong Power Monitoring at Armstrong High Density metering, sub metering in Bldg 5B Data Center CM 4000 Bldg 5 PM 800 Campus Total 39 meters, 2 virtual meters 6

Power Monitoring at Armstrong 4,000.00 3,500.00 3,000.00 2,500.00 2,000.00 1,500.00 1,000.00 500.00 11 Sub 3 MAIN Feeder:Real Power Total Chiller Plant Total:Demand Real Power High Highest Low Lowest 0.00 8/31/2012 12:00AM 9/1/2012 12:00AM 9/2/2012 12:00AM 9/3/2012 12:00AM 9/3/2012 11:30PM 9/4/2012 10:45PM Labor Day Holiday Weekend, Campus and Chiller Plant Loads Implementing DR Events PPL Act 129 E-Power event Synchronized Reserve PJM ELRP Capacity event PPL Act 129 E-Power event Main Campus contracted for 60,000 mwh (30 hrs) for the 2012/2013 season Capacity is provided only using Campus curtailment generator Manual dispatch by site team EnerNOC provides 2 hour advance notifications by telephone and email Real time event monitoring HMI Devices and Generator Switchgear 7

EnerNOC DR Data from web site, PPL Act 129 Event Armstrong DR Data from PowerLogic, PPL Act 129 Event PJM Synchronized Reserve Event Market participation using only the Campus 2 MW curtailment generator Enrolled capacity is seasonal, time of day sensitive Generation remotely started and stopped by CSP Response time of 10 minutes, manual response not practical Dispatches by CSP automated telemetry SR events typically of short duration, < 15 minutes Dispatch and Alarming Telemetry installed at Curtailment Generator PJM ELRP Capacity Event Main Campus contracted for 700 kw Firm Service Level (FSL) level from PPL during ELRP dispatches Load curtailment process developed utilizing EMCS to implement Campus reductions Process encompasses reducing Chiller plant loads, equipment shutdowns, and Campus generation 80% of total Campus load can be shed in less than 2 hours with minimal noticeable change to employees 8

Generation Assets used for ELRP Data Center, 1 MW 2,500 ton Central Chiller Plant Bldg 701, 185 KW Bldg 402, 200 KW Replacement 1,000 ton chiller and ASD in same location PJM ELRP Capacity Event Implement 4 step curtailment process using EMCS Sub cool conditioned spaces no reheat Increase dew point temps, CW temps allowed to rise Limit capacity output on operating chillers to ~ 50% Limit primary and secondary CW pump flows, all VSD controlled Evaluate load reduction start on site generation about 1 hour before power target must be met Start Data Center generator, transfer loads, monitor contribution Start Curtailment generator last, monitor power performance Tweak loads if necessary Capacity Event Shed Contributions 9

Armstrong ELRP Data, August 28 th Capacity Test EnerNOC ELRP Data, August 28 th Capacity Test Summary Achieved Benefits and Results Synchronized Reserve PPL Act 129 E-Power events PJM ELRP Capacity Year SRM ELRP Capacity PPL Act 129 Totals 2008 $19,700 $40,850 N/A $60,550 2009 $48,733 $69,832 N/A $118,565 2010 $62,351 $83,164 N/A $145,515 2011 $85,277 $97,186 N/A $182,463 2012 $42,000 e $97,632 $32,000 e $171,632 ** TOTALS $258,061 $388,644 $32,000 $678,725 Demand Response Program Earnings 2012 earnings budgeted at $200,000 ** Forecast 2013 and Beyond Earnings potential Capital project to reduce FSL RICE NESHAP Regulations? Earnings Potential in Existing DR Programs Year Annual $/MW DR Forecast Campus $ at 700 kw FSL SRM Estimate Budgeted Savings 2012/2013 $48,680 $97,360 $70,000 $167,000 2013/2014 $82,544 $165,000 $70,000 $235,000 2014/2015 $49,822 $99,600 $70,000 $170,000 2015/2016 $61,122 $122,200 $70,000 $192,000 Totals 4 yrs $242,168 $484,000 $280,000 $764,000 10

DR Forecast Earnings Potential by reducing FSL Year Annual $/MW Campus $ at 200 kw FSL* SRM Estimate Budgeted Savings 2012/2013 $48,680 $97,360 N/A $70,000 $167,000 2013/2014 $82,544 2014/2015 $49,822 2015/2016 $61,122 Totals 4 yrs $242,168 $206,200200 ($41,200) $124,500 ($24,900) $152,700 ($30,500) $580,700 ($97,000 +) $70,000 $276,200 $70,000 $194,500 $70,000 $222,700 $280,000 $861,000 RICE NESHAP (National Emission Standards Hazardous Air Pollutants) Applies to existing, new, and reconstructed stationary engines (both CI and SI) Focus is air toxics (HAP) Established under CAA section 112 CI/SI ICE NSPS Applies to new, modified, and reconstructed stationary CI/SI engines Focus is criteria pollutants Established under CAA section 111 63 QUESTIONS? 40 CFR part 63 subpart ZZZZ Regulates HAP emissions from stationary RICE at both major and area sources of HAP All sizes of engines are covered Current NESHAP, effective May 2013, CI engine use in emergency DR is capped at 15 hours annually NOPR proposed June 7, EPA would allow: - 100 hours of emergency DR (includes testing and maint.) - 50 hours of non-emergency DR, peak shaving thru April 2017 ONLY EXEMPTION: existing emergency engines located at residential, institutional, or commercial area sources Decision due late November; required by Dec 14th 64 11