Ohio Energy. Workshop JJ

Size: px
Start display at page:

Download "Ohio Energy. Workshop JJ"

Transcription

1 Ohio Energy Workshop JJ Dayton Power & Light (DPL): New ESP and the Impacts on Customer Rates and Tariffs (Effective 1/1/14), Energy Efficiency Projects & Renewable Energy Portfolio Requirements and Impacts of New Legislation, and Shopping & Demand Response Opportunities for Customers Wednesday, February 19, :00 p.m. to 3:15 p.m.

2 Biographical Information J. Edward Hess, Technical Specialist, McNees Walace and Nurick, LLC. 21 East State Street, 17th Floor Columbus, OH Direct Telephone: Fax: Ed is a Technical Specialist with McNees Wallace & Nurick s Energy, Communications, and Utility Law Practice Group. Ed uses his extensive experience and knowledge to help the firm s clients address issues that affect the price and availability of utility services. Prior to joining McNees Walace and Nurick in October 2009, Ed worked for the Public Utilities Commission of Ohio for over thirty years. He served as the chief accounting officer and was primarily responsible for the staff s policies and recommendations to the Commission for the operating income and rate base portions of utility base rates. This included preparation of the Staff Reports of Investigation, preparing and presenting testimony, and counseling the Commission on its final Order. After the State of Ohio passed its electric restructuring law in 1999, Ed oversaw the staff s recommendations to the Commission for compliance with the statute. He developed new rules required by the law and he was primarily responsible for processing and negotiating electric utility transition plans. He is a certified public accountant. Dona R. Seger-Lawson, Director, Regulatory Operations The Dayton Power and Light Company 1065 Woodman Drive, Dayton, OH (937) dona.seger-lawson@aes.com Dona R. Seger-Lawson is the Director of Regulatory Operations for The Dayton Power and Light Company (DP&L). Ms. Seger-Lawson s responsibilities in her present position are to direct the activities of the Company s areas dealing with pricing and regulation. Ms. Seger-Lawson joined DP&L in 1992 and has held various positions in the pricing and regulatory areas of the Company. She has been an active participant in the legislative process on behalf of DP&L, evaluating impacts Ohio SB 3 and SB 221 on DP&L and the retail electric industry in Ohio. She took one of the lead roles in the development and negotiation of the Company s Electric Security Plan I (ESP I) case before the Public Utilities Commission of Ohio (PUCO), and provided expert testimony on behalf of the Company in its ESP II case that established standard service offer rates through December She was the lead in the development and negotiation of the Company s first Open Access Transmission Tariff (OATT) before the Federal Energy Regulatory Commission (FERC) that established the price, terms and conditions for transmission and ancillary services. Dona has provided expert testimony at both the FERC and the PUCO on such matters as environmental cost recovery, unbundled retail rate structures, cost of service, cost allocation mechanisms, transition cost recovery, billing system cost recovery, retail service terms and conditions, and a variety of key operational support matters necessary for the development of retail electric customer choice in the Company s service territory. Ms. Seger-Lawson holds a Bachelor of Science degree in Business Administration as well as a Master s in Business Administration with a Finance concentration from Wright State University (WSU) in Dayton, Ohio. She is currently serving a four year term on City Council for the City of Bellbrook. Dona resides in Bellbrook, Ohio with her husband Mike, son Zach, and daughter Emma.

3 Dayton Power & Light ( DP&L ): Energy Efficiency Projects & Renewable Energy Portfolio Requirements and Impacts of New Legislation, and Shopping and Demand Response Opportunities for Customers 18 th Annual Ohio Energy Management Conference February 18 19, 2014 Ed Hess Technical Specialist ehess@mwncmh.com 1

4 Presentation Overview Shopping Opportunities Value Available from RTO Programs Opportunities to Help Satisfy Ohio s Portfolio Mandates and Avoid Riders 2

5 Shopping Opportunities 3

6 PUCO s Quarterly Switching Report as of September 30, 2013 (MWH) Cleveland Electric Illuminating Dayton Power & Light Toledo Duke Energy Class Ohio Edison Edison AEP Ohio Ohio Residential 71.45% 76.20% 71.66% 27.10% 51.20% 41.18% Commercial 90.98% 91.62% 90.20% 78.77% 84.38% 82.92% Industrial 80.42% 90.35% 77.40% 73.46% 97.54% 97.89%

7 5 Customer Opportunities Shopping Price to Compare (Current Rates) Distribution Rates are Non bypassable Transmission Rates are Non bypassable and Bypassable Generation Rates are Non bypassable and Bypassable DP&L Tariff Website service/dplpolicies/electric choice overview/comparing energy prices/ DP&L s Ohio Electric Choice Website What to Consider Registered Electric Generation Suppliers with Phone Numbers Comparing Energy Prices including Price to Compare Calculator Common Questions Website Address service/dplpolicies/electric choice overview/ PUCO s Website Address (Residential Offers) to apples/dpl electricapples to apples chart/

8 Value Available from RTO Programs 6

9 PJM Capacity Market Background PJM is a regional transmission organization ("RTO") that coordinates the movement of wholesale electricity PJM coordinates the continuous buying, selling and delivery of wholesale electricity through competitive spot markets On line tools enable participants to submit bids and offers and to monitor continuous real time data PJM runs markets for day ahead energy, real time energy, generation capacity, and associated ancillary services PJM establishes market prices by matching supply with demand Cost of last needed supply resource determines the clearing price for the markets 7

10 PJM Capacity Market Overview Within PJM, Capacity is a product that load must buy Insures that PJM has enough installed resources to serve load and cover needed reserves on the highest of high demand days so that the lights stay on PJM obtains its needed capacity and reserve requirements through a series of Reliability Pricing Model (RPM) auctions Base Residual Auctions ("BRA") are held annually for each delivery year (DY), three years in advance of the DY Up to three subsequent incremental auctions held to adjust the capacity quantities and obtain a portion of the overall capacity requirement Demand Resources and Energy Efficiency Resources may participate in the auctions 8

11 PJM Capacity Market Demand Response and Energy Efficiency Demand Resources (Participation in Capacity Auctions) On par with generation resources Three year advance commitment Base Residual Auctions & Incremental Auctions each year prior to Delivery Year ("DY") Must plan ahead to capitalize on capacity value Participant is obligated to reduce load when requested by PJM Energy Efficiency Resources Cost consequences for non performance Compensation depends on participation level and may depend on location 9

12 PJM Capacity Market Demand Side Response (DSR) End use customers with Demand Side Response ("DSR") capability can participate in the PJM markets Effectively competing against generation suppliers by selling their capacity to PJM DSR reduces stress on the grid during times of high electric demand DSR can lower wholesale prices by replacing the need for moreexpensive generating units DSR participants receives payment for shifting or reducing electricity consumption during times of high demand or high prices Presently, participation in PJM's Capacity Market (RPM) provides the most value to DSR participants 10

13 PJM Capacity Market Emergency DSR Participation Limited DSR 1 year commitment: June 1 May 31 ("Delivery Year") PJM has the right to request up to 10 separate curtailments, each lasting no more than 6 hrs. Participant is provided at least 2 hr. advance notification of curtailment Curtailment can only occur during non holiday weekdays between 12 p.m. 8 p.m. May September and 2 p.m. 10 p.m. October April Compliance is verified for any June Sept. Curtailment events 1 hour Test curtailment required if no curtailment events occur 11

14 PJM Capacity Market New Emergency DR Options Implemented by PJM Effective with delivery year Two new DR Programs to go with the current 10 x 6 product (Limited DR Program): Extended Summer DR available June thru October, and the following May. Provides for unlimited interruptions of up to 10 hours each, between the hours of 10:00 a.m. and 10:00 p.m. Annual DR available any day of the year for unlimited interruptions of up to 10 hours each, between the hours of 10:00 a.m. and 10:00 p.m. for June thru October, and the following May; and between the hours of 6:00 a.m. and 9:00 p.m. for November thru April 12

15 PJM Capacity Market Other PJM DR Programs Economic DR Under PJM s Economic DR Program (ELRP), two programs: (compensation is based on real time or day ahead LMP prices) I. Real Time (RT) Dispatchable Participant submits offer price/quantity, minimum downtime, and notification period No non compliance charges PJM provides notification to curtail load 1 or 2 hours in advance II. Day Ahead (DA) Participant submits offer price/quantity and notification period by noon the day prior to the intended curtailment Price certainty, financially guaranteed market Know by 4:00 p.m. day before curtailment, if offer cleared Must perform or there are non performance charges 13

16 PJM Capacity Market Energy Efficiency (EE) Resources EE Resources may participate in RPM auctions EE Resources are projects involving installation of more efficient devices or equipment, or implementation of more efficient processes/systems that exceed then current building codes, appliance standards, or other relevant standards An EE resource is used as a capacity resource in the auction and is paid the resource clearing price times the MW amount cleared Be scheduled for completion prior to the delivery year Not be reflected in the peak load forecast posted for the BRA auction for the delivery year initially offered Achieve load reduction during defined EE performance hours (weekdays from June 1 through August 31, between 2:00 p.m. and 6:00 p.m. EPT) Not be dispatchable (dispatchable demand may be offered as a DR in RPM) 14

17 Examples of EE Resources Efficient lighting installation Efficient appliance installation Efficient air conditioning installation Building insulation Process improvements Permanent load shifts that are not dispatched based on price or other factors 15

18 To Participate in PJM Capacity Market Contact your Curtailment Service Provider McNees Wallace & Nurick will continue to offer Curtailment Services to facilitate our clients participation in PJM's DR Programs: Joe Bowser: Kevin Murray: 16

19 Opportunities to Help Satisfy Ohio s Portfolio Mandates and Avoid Riders 17

20 Energy Efficiency and Peak Demand Reduction Benchmarks SB 221 Energy Efficiency Beginning in 2009, an electric distribution utility shall implement energy efficiency programs that achieve energy savings equivalent to at least 3/10 of 1% of the total kilowatt hour sales of the electric distribution utility. The savings requirement increases to an additional 5/10 of 1% in 2010, 7/10 of 1% in 2011, 8/10 of 1% in 2012, 9/10 of 1% in 2013, 1% from 2014 to 2018, and 2% each year through The cumulative, annual energy savings are to be 22% by the end of (Per Ohio Revised Code Section (A)(1)(a)) 18

21 Energy Efficiency and Peak Demand Reduction Benchmarks SB 221 Peak Demand Reduction Programs Beginning in 2009, an electric distribution utility shall implement peak demand reduction programs designed to achieve a 1% reduction in peak demand in 2009 and an additional 75/100 of 1% reduction each year through In 2018, the standing committees in the Ohio House of Representatives and the Senate primarily dealing with energy issues shall make recommendations to the general assembly regarding future peak demand reduction targets. 19 (Per Ohio Revised Code Section (A)(1)(b))

22 20 Energy Efficiency and Peak Demand Reduction Benchmarks SB 221 Energy Efficiency Peak Demand Reductions % 1.00% % 1.75% % 2.50% % 3.25% % 4.00% % 4.75% % 5.50% % 6.25% % 7.00% % 7.75% % % % % % % %

23 21 Energy Efficiency and Peak Demand Reduction Benchmarks SB 221 Energy Efficiency Annual Increase Peak Demand Reductions Annual Increase % 1.00% % 0.75% % 0.75% % 0.75% % 0.75% % 0.75% % 0.75% % 0.75% % 0.75% % 0.75% % % % % % % %

24 DP&L s Energy Efficiency Rider (Rider EER as of 1/1/14) $/kwh Secondary $ Primary $ Primary Substation $ High Voltage $ Schools $ Street Lighting $ Adjusted annually 22

25 DP&L s Energy Efficiency Rider (Rider EER Proposed) $/kwh Secondary $ Primary $ Primary Substation $ High Voltage $ Schools $ Street Lighting $ Adjusted annually 23

26 Energy Efficiency and Peak Demand Reduction DP&L EE/PDR Programs 24 Energy Efficiency and Peak Demand Portfolio Filing (POR Filing) Filed 4/15/2013 Settlement filed 10/2/2013 PUCO approved Settlement 12/4/2013 Settlement Included Extended Programs through 2015 Expanded the Government Audit Program to include all Commercial and Industrial Customers Shared Savings mechanism included (Caped at $4.5 million per year) Continues to Collect Lost Distribution Revenues DP&L will bid EE/PDR savings into the PJM Capacity Market. Proceeds are used to reduce costs of Programs. Large Customer Self Direct Applications retain the rights to their EE/PDR for bidding into PJM markets

27 DP&L s Business & Government Energy Efficiency and Peak Demand Rebates Rapid Rebates for Business To be eligible for a Rapid Rebate, your equipment must: Be included on the list of eligible equipment at the time the application is submitted Use electricity as the fuel source and be installed in the DP&L service area Be comprised of new equipment purchased from a manufacturer, distributor or contractor Rapid Rebate web site money/businessgovernment/rapid rebates/ 25

28 DP&L s Business & Government Energy Efficiency and Peak Demand Rebates Custom Rebates for Business To be eligible for a Custom Rebate, your equipment must: Be any of the following project types: An energy efficiency measure added to an existing system Early retirement of equipment and replacement with more efficient equipment Replacement of failed equipment or equipment at the end of its useful life with more efficient equipment Use electricity as the fuel source and be installed in the DP&L service area Be comprised of new equipment purchased from a manufacturer, distributor or contractor Exceed minimum federal and state mandated efficiency standards Have a maximum payback based on electricity cost savings of 7 years and demonstrate permanency or sustainability of savings over the payback period or a 5 year period, whichever is longer 26 Custom rebate web site money/business government/customrebates/

29 DP&L s Business & Government Energy Efficiency and Peak Demand Rebates New Construction Rebates for Business There are two new construction rebates. Customers can take advantage of either method of saving, but not both. Lighting Power Density (LPD) Reduction for Interior Lighting. The LPD reduction incentive encourages you to install lighting designs and equipment that provide quality lighting that uses less energy. Whole Building Energy Performance Baseline Improvements. The whole building baseline improvement incentive rewards you for designing your buildings to be more efficient than a baseline building constructed to ANSI/ASHRAE/IESNA Standard New Construction Rebate Web site government/new construction rebates/ 27

30 DP&L s Business & Government Energy Efficiency and Peak Demand Rebates Large Customer Self Direct Program One time rebate Ongoing exemption from Rider EER through the Public Utilities Commission of Ohio (PUCO) mercantile self direct pilot program for improvements made not only this year, but also during the three prior calendar years Baseline calculation used for the exemption period Must be a Mercantile Customer Large Customer Self Direct Program Web site money/business government/largecustomer self direct program/ 28

31 DP&L s Business & Government Energy Efficiency and Peak Demand Rebates Large Customer Self Direct Program A mercantile customer is a commercial or industrial customer (the electricity consumed is for non residential use) that consumes more than 700,000 kilowatt hours per year or is part of a national account involving multiple facilities in one or more states. Mercantile customer may file an Application to commit its demand reduction, demand response, or energy efficiency programs, for integration with the EDU s programs PUCO mercantile self direct pilot program applications forms/mercantilecustomer application to commit ee and pdr programs/ 29

32 DP&L s Business & Government Energy Efficiency and Peak Demand Rebates Business Energy Audit Program All commercial, industrial and government facilities may have 3 facility energy audits per calendar year. Federal and state owned facilities along with residential buildings are not eligible for energy audits at this time. The facility must be within DP&L's service territory. Audit work related to the feasibility or study of alternative generation, including renewable generation, is not eligible for program incentives. 30 Once the energy audit has been completed, DP&L will reimburse you 50% of the cost of the audit. DP&L will pay the remaining 50% if you implement identified electricity saving projects within 1 year of the audit, and the amount of your investment is equal to or greater than the cost of the audit. money/business government/businessenergy audit program/

33 Contact Information Ed Hess McNees Wallace & Nurick LLC 21 East State Street, 17th Floor Columbus, OH Direct Telephone: Fax:

34 The Dayton Power and Light Company New ESP Rates and Tariffs Dona Seger-Lawson

35 DP&L ESP II Order Term: January 1, 2014 May 31, 2017 Major elements: 1) Competitive Bid 2) A plan for divesting our generation assets 3) Non-bypassable charge 4) Transmission rate shift from bypassable to a portion being non-bypassable 5) Certain rates/riders will be adjusted on a seasonal quarter basis (Fuel, AER, TCRR-B, RPM, and CBT) 33

36 Industrial Transmission Charge Example *Difference in Standard Offer transmission charges are due to different forecasts and different distribution of costs, resulting in lower rates. 34

37 Competitive Bid - Generation Previously DP&L s Generation Rates were based on Historical Costs set based on a point in time Now DP&L s Generation Rates will be phased into a Market-based Price DP&L Load Bids through Auction Process Generation Provider A Generation Provider B Generation Provider C Generation Provider D 35

38 Competitive Bid - Schedule 10% 40% 70% 100% May 31,

39 DP&L s CBP auction schedule Auction 1 41 month 10 Auction 2 29 month 30 Auction 3 17 month 30 Total # of Tranches

40 Divesting Generation - Significant Impact to the Business from Operations to Financial Structure Today Vertically Integrated Tomorrow Generation Separated Distribution Distribution Transmission Transmission Divested from DP&L by May 31, 2017 Generation Generation 38

41 ESP Order Other elements Significantly Excessive Earnings Threshold of 12% Economic Development Fund - $2M annually New Competitive Retail Enhancements 1. Eliminate minimum stay and return to firm provisions 2. Web-based portal to facilitate information sharing with CRES providers 3. Implementation of an auto cancel feature 4. Remove enrollment verification that requires a CRES provider to have the first two digits of customer name in addition to the account number 5. EDI enhancements 6. Sync list so that CRES Providers and DP&L agree on what customers are served by whom 39

42 What Does This Mean For DP&L s SSO Rates? DP&L s SSO Generation Price will be phased out and replaced with results from the competitive bid auction Nonbypassable Charges Transmission Charges Other rate changes 40

43 A number of parties sought rehearing on various issues in DP&L s ESP case PUCO has issued two Entries on Rehearing addressing certain issues Many other issues remain open for reconsideration by the PUCO Timing of Rehearing final order is unknown It is possible additional changes could be ordered by the Commission 41

44 Potential Upcoming Issues or Changes Ohio SB 58 may be re-introduced Modifying energy efficiency and renewable mandates Potential economic development incentives DP&L was encouraged by the PUCO to file a distribution rate case, an AMI/Smart Grid plan, and a Billing system modernization plan PUCO Retail Markets Initiative (RMI) may result in billing and system changes some of which may be very expensive to implement DP&L has many energy efficiency and demand reduction programs 42

45 DP&L Business Rebate Programs The Dayton Power & Light Company 43

46 2014 Rebate Programs Rapid Custom New Construction 44

47 Rapid Rebates Prescriptive Rebates on 100+ Measures Rapid Lighting Fluorescent CFLs High-bays HVAC Air conditioning Air source heat pumps Chillers Motors VFDs Air Compressors Load/No Load Variable Speed Pre-approval is not required for most measures. Can apply for projects started after January 1,

48 Custom Rebates If it doesn t fit the Rapid Rebate program, DP&L will calculate a customized rebate Lighting $0.05 per kwh saved + $50 per KW saved Custom Heating, Ventilation & Air Conditioning $0.10 per kwh saved + $100 per KW saved Other $0.08 per kwh saved + $100 per KW saved Pre-approval is required. 46

49 New Construction Rebates 2 Types of Rebate Incentives: Lighting Power Density (LPD) Reduction Whole Building Energy Performance Baseline Improvements New Construction Application must be submitted while project is in design phase. 47

Ohio Retail Electric Choice. Jim Drummond Section Chief Reliability and Service Monitoring Dept. August 2012

Ohio Retail Electric Choice. Jim Drummond Section Chief Reliability and Service Monitoring Dept. August 2012 Ohio Retail Electric Choice Jim Drummond Section Chief Reliability and Service Monitoring Dept. August 2012 What is Retail Electric Choice? With retail electric choice in Ohio, you are able to choose the

More information

Workshop B. 11:15 a.m. to 12:30 p.m.

Workshop B. 11:15 a.m. to 12:30 p.m. Workshop B Advanced Energy Management Tools: Benefitting from the Competitive Electricity Marketplace Beyond the Fixed Rate & Key Issues to Understand when Comparing Electricity Quotes 11:15 a.m. to 12:30

More information

NEW COMMERCIAL Rates. Understanding the. Commercial Customers

NEW COMMERCIAL Rates. Understanding the. Commercial Customers Understanding the NEW COMMERCIAL Rates The Austin City Council increased Austin Energy s base rates, which pay for operations and maintenance, for the first time in 18 years. The new rates, which amount

More information

Prescriptive, Custom, New Construction and Data Center

Prescriptive, Custom, New Construction and Data Center Construction and Data Center Application Terms & Conditions and Final Payment Agreement Version: November 2014 TERMS AND CONDITIONS Program Effective Dates AEP Ohio Business Incentives Program offers incentives

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

Changes in FirstEnergy-Ohio Capacity Costs:

Changes in FirstEnergy-Ohio Capacity Costs: Changes in FirstEnergy-Ohio Capacity Costs: How Pricing, Contracting, and Consumption of Electricity Will Be Affected By Matt Brakey, President, Brakey Energy Now Updated with 2016/2017 Base Residual Auction

More information

Re: Great news Mahoning County s Aggregation Program supplied by FirstEnergy Solutions continues to offer savings!

Re: Great news Mahoning County s Aggregation Program supplied by FirstEnergy Solutions continues to offer savings! February 24, 2014 Re: Great news Mahoning County s Aggregation Program supplied by FirstEnergy Solutions continues to offer savings! Dear Business, Your community s aggregation program provides you the

More information

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group ed@cazalet.com www.cazalet.com 650-949-0560

More information

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England Business Models for Transactive Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England About ISO New England (ISO) Not-for-profit

More information

Electricity Markets in Ohio

Electricity Markets in Ohio Prepared for: OHIO MANUFACTURERS ASSOCIATION Electricity Markets in Ohio Prepared by: Andrew R. Thomas, J.D. Iryna Lendel, Ph.D. Sunjoo Park, Ph.D. Center for Economic Development and Energy Policy Center

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

The Role of State Commissions in Demand Response and Shared Savings

The Role of State Commissions in Demand Response and Shared Savings The Role of State Commissions in Demand Response and Shared Savings Mid-Atlantic Distributed Resource Initiative Working Group Meeting February 2, 2012 Douglas R. M. Nazarian Chairman Overview How Maryland

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF OHIO OHIO EDISON COMPANY THE CLEVELAND ELECTRIC ILLUMINATING COMPANY AND THE TOLEDO EDISON COMPANY

BEFORE THE PUBLIC UTILITIES COMMISSION OF OHIO OHIO EDISON COMPANY THE CLEVELAND ELECTRIC ILLUMINATING COMPANY AND THE TOLEDO EDISON COMPANY BEFORE THE PUBLIC UTILITIES COMMISSION OF OHIO OHIO EDISON COMPANY THE CLEVELAND ELECTRIC ILLUMINATING COMPANY AND THE TOLEDO EDISON COMPANY ALTERNATIVE ENERGY RESOURCE PLAN 2013 THROUGH 2023 APRIL 15,

More information

Energy Efficiency. Science, Technology and Telecommunications Committee July 19, 2010

Energy Efficiency. Science, Technology and Telecommunications Committee July 19, 2010 Energy Efficiency Science, Technology and Telecommunications Committee July 19, 2010 Energy Efficiency Programs Residential Commercial EUEA Requirements: 5% by 2014 10% by 2020 Residential Lighting Refrigerator-Recycling

More information

UNDERSTANDING YOUR UTILITY BILL A GUIDE FOR BUSINESSES IN OHIO

UNDERSTANDING YOUR UTILITY BILL A GUIDE FOR BUSINESSES IN OHIO UNDERSTANDING YOUR UTILITY BILL A GUIDE FOR BUSINESSES IN OHIO TABLE OF CONTENTS INTRODUCTION Introduction... 3 Basic Billing Concepts... 4 Customer Choice Programs... 4 Gas Consumption and Charges...

More information

CINCINNATI nterdepartment Correspondence Sheet

CINCINNATI nterdepartment Correspondence Sheet cityol CINCINNATI nterdepartment Correspondence Sheet Date: May2l,2012 FOR YOUR INFORMATION To: From: Subject: Mayor and Members of City Council Milton Dohoney, Jr., City Manager j4m~ Electric Aggregation

More information

Regulation of Competitive Retail Electric (CRES) Providers

Regulation of Competitive Retail Electric (CRES) Providers Regulation of Competitive Retail Electric (CRES) Providers Oversight of CRES Providers Discuss state development and enforcement of consumer protection standards as energy markets are restructured. The

More information

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response

Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response

More information

Energizing Indiana Commercial and Industrial Prescriptive Incentive Program

Energizing Indiana Commercial and Industrial Prescriptive Incentive Program Duke Energy Indiana Smart $aver Incentive Program 2012 Program Expansion Energizing Indiana Commercial and Industrial Prescriptive Incentive Program 2012 Program Introduction Overview of New Energy Efficiency

More information

We Energies Electric Rates

We Energies Electric Rates We Energies Electric Rates for Michigan customers July 2015 The rates in this brochure reflect the authorized base rates of Wisconsin Electric Power Company, doing business under the name of We Energies,

More information

Demand Response Programs

Demand Response Programs Southern California Edison Demand Response Programs Join thousands of businesses that work with us to reduce peak electricity use when California needs it most. By participating in Demand Response programs,

More information

The Toledo Edison Company Toledo, Ohio Page 1 of 1. P.U.C.O. No. 8 SCHEDULE OF RATES FOR ELECTRICITY SUPPLY

The Toledo Edison Company Toledo, Ohio Page 1 of 1. P.U.C.O. No. 8 SCHEDULE OF RATES FOR ELECTRICITY SUPPLY The Toledo Edison Company Toledo, Ohio Page 1 of 1 P.U.C.O. No. 8 SCHEDULE OF RATES FOR ELECTRICITY SUPPLY Filed pursuant to Order dated January 21, 2009, in Case No. 07-551-EL-AIR, before Issued by: Richard

More information

Demand Response and Energy Efficiency in the Midwest ISO. A Primer

Demand Response and Energy Efficiency in the Midwest ISO. A Primer Demand Response and Energy Efficiency in the Midwest ISO A Primer John Moore Bruce Campbell Kevin Murray September 28, 2010 1 Agenda Types of Midwest ISO Demand Response (DR). Products DR is eligible to

More information

Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits

Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause Table of Contents Direct Testimony and Exhibits David M. Wilkinson James D. Jackson, Jr. Paul B. Haynes Filing Schedule 46 Filing

More information

BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development

BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development Ruth C. Kiselewich, Director Demand Side Management Programs

More information

Switching Energy Providers and PECO Smart Ideas. March 23, 2011

Switching Energy Providers and PECO Smart Ideas. March 23, 2011 Switching Energy Providers and PECO Smart Ideas March 23, 2011 Agenda Market Changes Taking Advantage of Competition PECO Smart Ideas for your home Questions Market Changes Utility Functions Before deregulation,

More information

REPORT ON EFFORTS TO REDUCE ELECTRIC PEAK DEMAND

REPORT ON EFFORTS TO REDUCE ELECTRIC PEAK DEMAND REPORT ON EFFORTS TO REDUCE ELECTRIC PEAK DEMAND Orjiakor N. Isiogu, Chairman Monica Martinez, Commissioner Greg R. White, Commissioner MICHIGAN PUBLIC SERVICE COMMISSION Department of Energy, Labor &

More information

Program Overview. Free intelligent thermostat and gateway device ($150 - $200 value)

Program Overview. Free intelligent thermostat and gateway device ($150 - $200 value) Program Overview What is mpowered? mpowered is an energy conservation program that offers customers advanced technologies and tools to help lower their bills through automated and more strategic utilization

More information

Understanding Your New Energy Bill Duke Energy Ohio Webinar February 22, 2012 Vern Hackworth, Regional Mgr. Midwest BSC

Understanding Your New Energy Bill Duke Energy Ohio Webinar February 22, 2012 Vern Hackworth, Regional Mgr. Midwest BSC Understanding Your New Energy Bill Duke Energy Ohio Webinar February 22, 2012 Vern Hackworth, Regional Mgr. Midwest BSC Today's agenda: General terms and definitions Bill components Review sections of

More information

CRES Provider Workshop. May 8, 2013 Embassy Suites Hotel Airport-Columbus

CRES Provider Workshop. May 8, 2013 Embassy Suites Hotel Airport-Columbus CRES Provider Workshop May 8, 2013 Embassy Suites Hotel Airport-Columbus Agenda 8:30 AM Registration 8:50 AM Opening Remarks 9:15 AM Customer Usage Web Portal 10:15 AM Break 10:30 AM Missing Usage & Metered

More information

Response Of The COMPETE Coalition To Gov. Kasich s Call For Comments On Energy Policy

Response Of The COMPETE Coalition To Gov. Kasich s Call For Comments On Energy Policy Response Of The COMPETE Coalition To Gov. Kasich s Call For Comments On Energy Policy These comments are submitted on behalf of the COMPETE Coalition (COMPETE) in response to Governor Kasich s call for

More information

Presentation for The National Commission for Energy State Regulation of Ukraine

Presentation for The National Commission for Energy State Regulation of Ukraine Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection

More information

Closing the Gap Between Wholesale and Retail

Closing the Gap Between Wholesale and Retail Closing the Gap Between Wholesale and Retail Transactive Energy Workshop March 28-29 Robert B. Burke GWAC MEMBER & PRINCIPAL ANALYST ISO NEW ENGLAND INC. Disclaimer This presentation represents the thoughts

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. ) ) ) ) ) ) Docket No. EL14- -000 COMPLAINT AND MOTION TO CONSOLIDATE

More information

[ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014

[ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014 2015 Anthony Star Director [ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014 Illinois Power Agency 2015 Electricity

More information

Options for Trading of Electricity Savings in Shanghai

Options for Trading of Electricity Savings in Shanghai Options for Trading of Electricity Savings in Shanghai Shanghai Economic and Information Technology Commission 28 July 2014 Dr David Crossley, Senior Advisor The Regulatory Assistance Project 睿 博 能 源 智

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. ENERGY EFFICIENCY AND CUSTOMER-OWNED RESOURCES. 25.181. Energy Efficiency Goal. (a) (b) (c) Purpose. The purpose of this section is to ensure that: (1) electric utilities administer energy efficiency incentive programs in a market-neutral, nondiscriminatory

More information

ELECTRICITY PRICING INFORMATION. This list shows the terms that appear on electricity bills and what they mean:

ELECTRICITY PRICING INFORMATION. This list shows the terms that appear on electricity bills and what they mean: ELECTRICITY PRICING INFORMATION GLOSSARY OF BILLING TERMS: The Government of Ontario requires all electricity distributors to issue standardized bills to their low- volume consumers, such as residential

More information

Energy Efficiency and Demand Response Programs in the United States

Energy Efficiency and Demand Response Programs in the United States Energy Efficiency and Demand Response Programs in the United States Structure, Operations, Accomplishments, Lessons Learned Claude Godin Director Energy Data Analytics Overview Introduction - Definitions

More information

Fourth Quarter and Year End 2009 Investor Update

Fourth Quarter and Year End 2009 Investor Update Fourth Quarter and Year End 2009 Investor Update Kevin Evans, President & CEO Andrew Warner, CFO March 18 th, 2010 Forward Looking Statements THIS JOINT CONFERENCE CALL AND PRESENTATION MAY CONTAIN CERTAIN

More information

SCHEDULE OF RATES FOR ELECTRIC SERVICE

SCHEDULE OF RATES FOR ELECTRIC SERVICE Colo. PUC No. 9 105 South Victoria Original Sheet No. 1 1-888-890-5554 www.blackhillscorp.com SCHEDULE OF RATES FOR SERVICE BLACK HILLS/COLORADO UTILITY COMPANY, LP d/b/a BLACK HILLS ENERGY Title: Director

More information

Jason B. Keyes Keyes & Fox, LLP Kansas Solar Round Table Topeka, Kansas March 3, 2009

Jason B. Keyes Keyes & Fox, LLP Kansas Solar Round Table Topeka, Kansas March 3, 2009 Net Metering and Interconnection of Solar Energy Facilities Jason B. Keyes Keyes & Fox, LLP Kansas Solar Round Table Topeka, Kansas March 3, 2009 What IREC Does Participate in state utility commission

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

SCHEDULE OF RATES FOR ELECTRIC SERVICE

SCHEDULE OF RATES FOR ELECTRIC SERVICE Colo. PUC No. 9 105 South Victoria Original Sheet No. 1 1-888-890-5554 www.blackhillscorp.com SCHEDULE OF RATES FOR SERVICE BLACK HILLS/COLORADO UTILITY COMPANY, LP d/b/a BLACK HILLS ENERGY Title: Director

More information

1 Customer and Contact Information

1 Customer and Contact Information Appalachian Power Commercial Program Rebate Application Before you start Review the eligibility detail requirements, and terms and conditions located at the end of the application to verify that you are

More information

Energy Management. Electric Procurement Strategies. August 27, 2007

Energy Management. Electric Procurement Strategies. August 27, 2007 Energy Management Electric Procurement Strategies August 27, 2007 1 Presentation Outline Purpose Background City of Dallas procurement goals Procurement term Environmental goals Energy products Energy

More information

Rules of Operation and Governance

Rules of Operation and Governance Rules of Operation and Governance Municipal Opt-Out Electricity Aggregation Program Insert Municipality Name Table of Contents 1) Background........Page 3 2) Municipal Opt-Out Aggregation..4 3) Eligible

More information

Ohio s Energy Efficiency Resource Standard: Impacts on the Ohio Wholesale Electricity Market and Benefits to the State

Ohio s Energy Efficiency Resource Standard: Impacts on the Ohio Wholesale Electricity Market and Benefits to the State Ohio s Energy Efficiency Resource Standard: Impacts on the Ohio Wholesale Electricity Market and Benefits to the State Max Neubauer, Ben Foster, R. Neal Elliott, David White, and Rick Hornby April 2013

More information

PG&E Demand Response Programs SVLG DR Workshop December 10, 2013. Peter Chan Pacific Gas and Electric

PG&E Demand Response Programs SVLG DR Workshop December 10, 2013. Peter Chan Pacific Gas and Electric 1 PG&E Demand Response Programs SVLG DR Workshop December 10, 2013 Peter Chan Pacific Gas and Electric 2 PG&E s Demand Response Programs Current Demand Response Programs Offer to Our Customers Programs

More information

Convergence Bidding Tutorial & Panel Discussion

Convergence Bidding Tutorial & Panel Discussion Convergence Bidding Tutorial & Panel Discussion CAISO June 13, 2006 Joe Bowring PJM Market Monitor www.pjm.com Convergence Basics Day-Ahead Market basics Day-Ahead and Real-Time Market interactions Increment

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing

More information

Demand Response in Utility EE Programs for India

Demand Response in Utility EE Programs for India Demand Response in Utility EE Programs for India Presented by Dr. Rahul Walawalkar CEM, CDSM Executive Director, India Energy Storage Alliance & VP, Emerging Technologies & Markets Customized Energy Solutions

More information

SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO

SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO Second Revision Sheet 90 I.P.U.C. No.28 First Revision Sheet 90 90 SCHEDULE 90 ELECTRIC ENERGY EFFICIENCY PROGRAMS IDAHO 1. Availability The services described herein are available to specified residential,

More information

Ohio Energy. Workshop HH. Understanding & Managing Your Risks A Real Time Approach for Long-Term Power Purchases

Ohio Energy. Workshop HH. Understanding & Managing Your Risks A Real Time Approach for Long-Term Power Purchases Ohio Energy Workshop HH Understanding & Managing Your Risks A Real Time Approach for Long-Term Power Purchases Thursday, February 26, 2015 2 p.m. to 3:15 p.m. Biographical Information Dave Laipple, Regional

More information

STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing

STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT Corporate Pricing For additional information, please call 602-236-5522 or 602-236-2950 TEMPORARY Prices Effective

More information

Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58300-E Schedule TOU-8-RBU Sheet 1 APPLICABILITY Applicable to the additional

More information

Access Code for Common Carrier Pipelines

Access Code for Common Carrier Pipelines Access Code for Common Carrier Pipelines Thomas Pearce Past Chair, NARUC Staff Subcommittee on Gas Chair, NARUC Staff Subcommittee on Critical Infrastructure NARUC/EWURA Technical Workshop on Natural Gas

More information

ELECTRIC SCHEDULE E-6 Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE

ELECTRIC SCHEDULE E-6 Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE Revised Cal. P.U.C. Sheet No. 27605-E* Cancelling Original Cal. P.U.C. Sheet No. 24801-E ELECTRIC SCHEDULE E-6 Sheet 1 APPLICABILITY: This voluntary schedule is available to customers for whom Schedule

More information

DATA CENTER INCENTIVES

DATA CENTER INCENTIVES DATA CENTER APPLICATION June 1, 2011 through May 31, 2012 DATA CENTER INCENTIVES HOW TO PARTICIPATE IN SMART IDEAS FOR YOUR BUSINESS 1. CHECK PROJECT AND EQUIPMENT ELIGIBILITY Project must be a new improvement

More information

IEA Workshop: Demand Response. 3 July, 2014

IEA Workshop: Demand Response. 3 July, 2014 IEA Workshop: Demand Response 3 July, 2014 EnerNOC 24 27GW of Peak Load under management ~9GW of Dispatchable Demand Response (DR) 10 Countries with DR operations 100+ Utilities / System Operator relationships

More information

Commercial and Industrial Electric Rates

Commercial and Industrial Electric Rates Commercial and Industrial Electric Rates INTERIM DAKOTA ELECTRIC ASSOCIATION SECTION: V 4300 220 th Street West SHEET: 4 Farmington, MN 55024 REVISION: 16 SCHEDULE 36 IRRIGATION SERVICE Availability Available

More information

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA DC Electric Supplier--P.S.C. of D.C. No. 1 ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA Date of Issue: May 2, 2014 Date Effective: June 1, 2014 DC Electric Supplier--P.S.C. of D.C.

More information

California s Cap-and-Trade Voluntary Renewable Electricity Program

California s Cap-and-Trade Voluntary Renewable Electricity Program California s Cap-and-Trade Voluntary Renewable Electricity Program Cap-and-Trade Overview Outline Purpose of the Voluntary Renewable Electricity Account (VRE) Holding Account VRE Program Requirements Application

More information

Overview of Reliability Demand Response Resource

Overview of Reliability Demand Response Resource Overview of Reliability Demand Response Resource Radha Madrigal Customer Service Department May 8, 2014 Agenda Product overview and purpose Define Reliability Demand Response Resource Agreements & registration

More information

SENATE BILL No. 695. Introduced by Senator Kehoe (Coauthor: Senator Wright) February 27, 2009

SENATE BILL No. 695. Introduced by Senator Kehoe (Coauthor: Senator Wright) February 27, 2009 AMENDED IN ASSEMBLY AUGUST, 00 AMENDED IN ASSEMBLY JUNE, 00 AMENDED IN SENATE MAY, 00 AMENDED IN SENATE APRIL, 00 AMENDED IN SENATE APRIL, 00 SENATE BILL No. Introduced by Senator Kehoe (Coauthor: Senator

More information

What You Need to Know About 2014 Capacity Rates in PJM

What You Need to Know About 2014 Capacity Rates in PJM What You Need to Know About 2014 Capacity Rates in PJM You may have heard about capacity rates in PJM going up next year, beginning June 1, 2014, which is the first day of PJM s 2014-2015 capacity delivery

More information

Winter Impacts of Energy Efficiency In New England

Winter Impacts of Energy Efficiency In New England Winter Impacts of Energy Efficiency In New England April 2015 Investments in electric efficiency since 2000 reduced electric demand in New England by over 2 gigawatts. 1 These savings provide significant

More information

Energy Efficiency Program Overview

Energy Efficiency Program Overview Energy Efficiency Program Overview Clean Air Through Energy Efficiency CATEE Conference November 18-20, 2014 Dallas, TX General Overview State of Texas enacted legislation requiring Transmission and Distribution

More information

SAVING ENERGY AND MONEY: HOW TO START, EXPAND, OR REFINE MOU PROGRAMS

SAVING ENERGY AND MONEY: HOW TO START, EXPAND, OR REFINE MOU PROGRAMS SAVING ENERGY AND MONEY: HOW TO START, EXPAND, OR REFINE MOU PROGRAMS A Guide to Best Practices for Energy Efficiency in Locally Governed Electric Services Areas in the State February 21, 2012 AGENDA Project

More information

History of Electric Regulation in Ohio

History of Electric Regulation in Ohio History of Electric Regulation in Ohio Ohio s Electric Generation Resource Mix Renewables - 1% Petroleum - 1% Natural gas - 2% Nuclear - 10% Coal - 86% 2 Why Regulation? Electricity has historically been

More information

Massachusetts Saving Electricity:

Massachusetts Saving Electricity: Commonwealth of Massachusetts Massachusetts Saving Electricity: A Summary of the Performance of Electric Efficiency Programs Funded by Ratepayers Between 2003 and 2005 Executive Office of Energy and Environmental

More information

Supplier Services FAQ - Ohio

Supplier Services FAQ - Ohio Billing Q. What billing options are available? A. Dual, Rate Ready, and Bill Ready billing options are currently available. Q. How is a customer's due date set? A. CEI and TE due dates are set to 21 days

More information

Selling Renewable Energy in Michigan. Julie Baldwin Michigan Public Service Commission Michigan Wind Conference 2009 March 3, 2009

Selling Renewable Energy in Michigan. Julie Baldwin Michigan Public Service Commission Michigan Wind Conference 2009 March 3, 2009 Selling Renewable Energy in Michigan Julie Baldwin Michigan Public Service Commission Michigan Wind Conference 2009 March 3, 2009 Michigan Public Service Commission Three Governor-appointed Commissioners

More information

DVRPC Sustainable Skylines. January 31, 2011

DVRPC Sustainable Skylines. January 31, 2011 DVRPC Sustainable Skylines January 31, 2011 WELCOME! We put our energy into helping you save energy and money. Today s Agenda PEeo. An Exelon Company Market Changes PECO Smart Ideas for your business PECO

More information

PIPP Plus KNOW THE FACTS: FACT SHEET CONSUMERS. Consumers Counsel. Office of the Ohio

PIPP Plus KNOW THE FACTS: FACT SHEET CONSUMERS. Consumers Counsel. Office of the Ohio OFFICE OF THE OHIO CONSUMERS' COUNSEL Consumers Counsel Your Residential Utility Consumer Advocate KNOW THE S: monthly household income (before taxes) to the electric or natural gas utilities, or both.

More information

THE COMED RESIDENTIAL REAL-TIME PRICING PROGRAM GUIDE TO REAL-TIME PRICING

THE COMED RESIDENTIAL REAL-TIME PRICING PROGRAM GUIDE TO REAL-TIME PRICING THE COMED RESIDENTIAL REAL-TIME PRICING PROGRAM GUIDE TO REAL-TIME PRICING 2014-2015 COMED RESIDENTIAL REAL-TIME PRICING PROGRAM GUIDE TO REAL-TIME PRICING CONTENTS ComEd Residential Real-Time Pricing

More information

Kim M. Wissman Director, Department of Energy and Environment Public Utilities Commission of Ohio Executive Director, Ohio Power Siting Board

Kim M. Wissman Director, Department of Energy and Environment Public Utilities Commission of Ohio Executive Director, Ohio Power Siting Board National Association of Regulatory Utility Commissioners Energy Regulatory Partnership Program between The National Agency for Energy Regulation of Moldova and The Missouri Public Service Commission May

More information

Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209

Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209 Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209 by the Vermont Public Service Board April 14, 2014 In accordance with 30 V.S.A. 209, the Public Service

More information

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1 PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public

More information

ELECTRIC SCHEDULE AG-V Sheet 1 SHORT-PEAK TIME-OF-USE AGRICULTURAL POWER

ELECTRIC SCHEDULE AG-V Sheet 1 SHORT-PEAK TIME-OF-USE AGRICULTURAL POWER Revised Cal. P.U.C. Sheet No. 35786-E Cancelling Revised Cal. P.U.C. Sheet No. 35141-E ELECTRIC SCHEDULE AG-V Sheet 1 1. APPLICABILITY: This schedule is closed to new customers. Customers taking service

More information

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES Revised Cal. P.U.C. Sheet No. 35144-E Cancelling Revised Cal. P.U.C. Sheet No. 34679-E ELECTRIC SCHEDULE E-1 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

WEATHERIZATION WORKS PREPARED BY IN PARTNERSHIP WITH

WEATHERIZATION WORKS PREPARED BY IN PARTNERSHIP WITH WEATHERIZATION WORKS Energy efficiency investment in low-income housing will cut energy costs, reduce the need for payment assistance, and create jobs by Amanda K. Woodrum PREPARED BY IN PARTNERSHIP WITH

More information

The UK Electricity Market Reform and the Capacity Market

The UK Electricity Market Reform and the Capacity Market The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have

More information

Energy Efficiency Measurement & Verification

Energy Efficiency Measurement & Verification PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 02 Effective Date: 12/17/2015 Prepared by PJM Forward Market Operations PJM 2015 PJM 2008 Revision, Effective Date: i Table of Contents

More information

Action to opt-out required by June 15, 2012.

Action to opt-out required by June 15, 2012. 1221 Lamar Street Suite 750 Houston, TX 77010 Important information regarding your city s electricity aggregation program. Action to opt-out required by June 15, 2012. Evanston Opt-OutEnvelope_NewLogo.indd

More information

MASSACHUSETTS ELECTRIC COMPANY

MASSACHUSETTS ELECTRIC COMPANY MASSACHUSETTS ELECTRIC COMPANY Residential Regular R-1 Effective M.D.P.U. No.1119 March 1, 2008 Adjusted By: Transition Cost Adjustment March 1, 2008 Transmission Service Cost Adjustment March 1, 2008

More information

Texas Demand Response Programs Cirro Energy Services an NRG Energy Company

Texas Demand Response Programs Cirro Energy Services an NRG Energy Company Texas Demand Response Programs Cirro Energy Services an NRG Energy Company April 04, 2014 Fazil Shaikh, Sales Manager Melissa Karner, Energy Consultant Outline Introduction ERCOT Resource Adequacy and

More information

Opportunities for Biogas Digesters

Opportunities for Biogas Digesters Opportunities for Biogas Digesters Presented to the California Bioresources Alliance September 13, 2011 Jody S. London P.O. Box 3629 Oakland, California 94609 510/459-0667 jody_london_consulting@earthlink.net

More information

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES Revised Cal. P.U.C. Sheet No. 37050-E Cancelling Revised Cal. P.U.C. Sheet No. 36706-E ELECTRIC SCHEDULE E-1 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

Ohio s Electricity Usage Reduction Mandate: The Free Lunch Paid for by Ohio Consumers

Ohio s Electricity Usage Reduction Mandate: The Free Lunch Paid for by Ohio Consumers Ohio s Electricity Usage Reduction Mandate: The Free Lunch Paid for by Ohio Consumers Jonathan A. Lesser, PhD President, Continental Economics February 18, 2014 {C42863:3 } 6 Real Place Sandia Park, NM

More information

Updated SCER Demand Side Participation Program December 2013

Updated SCER Demand Side Participation Program December 2013 Updated SCER Demand Side Participation Program December 2013 The Standing Council on Energy and Resources (SCER) has adopted this framework to guide its demand side participation (DSP) work. The framework

More information

Quarterly Report to the Pennsylvania Public Utility Commission

Quarterly Report to the Pennsylvania Public Utility Commission Quarterly Report to the Pennsylvania Public Utility Commission For the Period June 1, 2014 through August 31, 2014 Program Year 6, Quarter 1 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation

More information

HVAC System Optimization Program Guidelines

HVAC System Optimization Program Guidelines HVAC System Optimization Program Guidelines Sponsored By: And Its Participating Wholesale Utility Customers HVAC System Optimization Program Guidelines The target of this program is HVAC systems in existing

More information

STATE OF IOWA BEFORE THE IOWA UTILITIES BOARD DIRECT TESTIMONY OF JEANINE A. PENTICOFF

STATE OF IOWA BEFORE THE IOWA UTILITIES BOARD DIRECT TESTIMONY OF JEANINE A. PENTICOFF STATE OF IOWA BEFORE THE IOWA UTILITIES BOARD IN RE: INTERSTATE POWER AND LIGHT COMPANY DOCKET NO. EEP-01-0001 DIRECT TESTIMONY OF JEANINE A. PENTICOFF 1 1 1 1 1 Q. Please state your name and business

More information

Residential Programs. May 22, 2014

Residential Programs. May 22, 2014 Residential Programs May 22, 2014 Residential Lighting (As of 4-30-14) 1,801,054 2014 YTD 2014 Filed Target 431,060 Bulbs Sold 2 Residential Lighting (As of 4-30-14) 6.5 55,180 2014 YTD 20,371 2.4 2014

More information

ELECTRIC UTILITY INTEGRATED RESOURCE PLAN (IRP)

ELECTRIC UTILITY INTEGRATED RESOURCE PLAN (IRP) ELECTRIC UTILITY INTEGRATED RESOURCE PLAN (IRP) Demand-Side Resources PRESENTED TO THAI ENERGY REGULATORY COMMISSION, OERC, AND UTILITIES DELEGATION Boston, Massachusetts PRESENTED BY ROMKAEW BROEHM MARIKO

More information

The State Energy Advisory Board. March, 2012

The State Energy Advisory Board. March, 2012 The State Energy Advisory Board March, 2012 How we move the Needle Our mission can be summed up in three words: IMPROVE ENERGY EFFICIENCY. Since 1977, we ve worked alongside more than 150 utilities and

More information

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS Revised Cal. P.U.C. Sheet No. 31575-E Cancelling Revised Cal. P.U.C. Sheet No. 29680-E ELECTRIC SCHEDULE E-9 APPLICABILITY: This optional experimental schedule applies to electric service to customers

More information

Vectren Commercial/Industrial New Construction Incentive Application

Vectren Commercial/Industrial New Construction Incentive Application Vectren Commercial/Industrial New Construction Application Completing and submitting this application is the first step to apply for incentives through Vectren s Commercial/Industrial New Construction

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information