Case Study 10 R/V WESTERN FLYER Chronic Cracking in an Aluminum SWATH Research Vessel



Similar documents
Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Fatigue Assessment. CSR Harmonisation. Content. Industry Presentation

National Transportation Safety Board

Design methodology and numerical analysis of a cable ferry

GUIDELINES FOR FLOODING DETECTION SYSTEMS ON PASSENGER SHIPS

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

OFFSHORE WIND Peter Robert

CLASSIFICATION NOTES

M/Y NAIA RV PEGASO. (ex. PEGASO) Isle of Man CLASSIFICATION: 14 knots (cruising) 3516C 2350 KW ( Total 4700 KW) GUESTS: 12 in 6 CONSTRUCTION:

VLCC Structural Design - Past, Present and Future

Ship Structure Committee Case Study. BULK CARRIERS: Design, Operation, and Maintenance Concerns for Structural Safety of Bulk Carriers

The Effects of Length on the Powering of Large Slender Hull Forms

NAUTICUS HULL USER MANUAL GETTING STARTED DET NORSKE VERITAS WITH NAUTICUS HULL RULE CHECK

ANNEX 5 RESOLUTION MEPC.127(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER MANAGEMENT AND DEVELOPMENT OF BALLAST WATER MANAGEMENT PLANS (G4)

Trends in the Development of Container Vessels

Loads Tools Checks Reports

National Transportation Safety Board Washington, D.C

Report of Investigation. into the Crew Fatality Caused. by a Deck Lifter Onboard. M.V. Dyvi Adriatic

Rule-Based Ship Design

Module Title: General Ship Knowledge

RESEARCH SHIP ELLEN KHUZWAYO

Overhang Bracket Loading. Deck Issues: Design Perspective

Metal Boat Building Structural Details

USNS Maury (T-AGS 66) Moon Pool Launch & Recovery System (MLARS)

ATL 10.2 R/V ATLANTIS MAINTENANCE OF CRITICAL SYSTEMS

Annex 4: FRP CONSTRUCTION STANDARDS*

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

MOBILE OFFSHORE UNITS

Notice to all Ship Owners and Operators; Masters, and Deck Officers of Merchant Ships; Manufacturers, and Suppliers of Voyage Data Recorders.

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

NAPA/MAESTRO Interface. Reducing the Level of Effort for Ship Structural Design

QBE BUILDER S RISK PROPOSAL FORM

BALLAST WATER EXCHANGE

MM 45 Charter Catamaran Subchapter "T" - 49 Passenger

Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above

Boat Launch and Recovery A Key Enabling Technology For Flexible Warships Andy Kimber, BMT Defence Services Limited, Bath UK Info@bmtdsl.co.

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

M/V Eleranta IMO Water Ballast Tank Inspection Report. China Shipping International Shipyard Co. Ltd (CSIS), Changxing Island, Shanghai

Corrosion protection of crude oil cargo tanks new IMO regulations

Reinforced Concrete Slab Design Using the Empirical Method

IMO. MSC/Circ October Ref. T1/2.04 GUIDANCE TO THE MASTER FOR AVOIDING DANGEROUS SITUATIONS IN FOLLOWING AND QUARTERING SEAS

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC October 27, 2015 Session 26

Dynamic Stability of Flared and Tumblehome Hull Forms in Waves

VICTORIA D. 103' (31.60m) CNB

Any Ocean, Anywhere, Anytime.

Detailing of Reinforcment in Concrete Structures

National Transportation Safety Board

Breakaway Walls

A MATTER OF STABILITY AND TRIM By Samuel Halpern

MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS. R U D O K O P & A T L A N T I C C o l l i s i o n o n 2 1 M a y

Emergency Response Plan. at sea also valid in case of Flooding, where applicable

Residential Deck Safety, Construction, and Repair

Optimum proportions for the design of suspension bridge

Thickness measurement and close-up survey guidance

SIMPLIFIED MEASUREMENT

APPENDIX H DESIGN CRITERIA FOR NCHRP PROJECT NEW BRIDGE DESIGNS

DOCKMASTER TRAINING MANUAL

ENJOY THE ELEMENTS MORE. ELAN IMPRESSION 444

Improving Hydrographic Rate of Effort

United States Coast Guard COMDTPUB NVIC 11-83, CH-1 7 JULY 1995

STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

Seakeeping Analysis of two Medium-speed Twin-hull Models

PT02_PDP1 Acquisition and Fitting of a Dynamic Position (DP) vessel equipped with marine surveying equipment. Nuno Lourenço (nuno.lourenco@ipma.

GAS FLAWLESS - FORM C

How To Optimise A Boat'S Hull

CODES OF PRACTICE. What one needs to know concerning regulations REGULATION

GENERAL HULL FORM EQUATIONS

Optimising plate girder design

Planing Hulls How do Hydrodynamics relate to planing of a boat?

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2

Flood Rescue Emergency Services First Responders Coast Guard Police

CODECASA 35M. MATERIAL: Steel hull/ ASKING PRICE: Euro (ex VAT)

Regulation of 15 September 1992 No. 704 concerning operating arrangements on Norwegian ships

CALCULATING WHEEL-OVER POINT

Sperry Marine Fleet Management Enterprise Solution

Evaluating ship collision risks

Multipurpose Offshore Construction Vessel

CONTAINMENT BOOM OBJECTIVE & STRATEGY TACTIC DESCRIPTION. Mechanical Recovery Containment and Recovery

LOA: 23' 0" (7.01m) Beam: 8' 6" (2.59m) Max Draft: 1' 6" (0.46m)

Preliminary steel concrete composite bridge design charts for Eurocodes

Drettmann Explorer Yacht DEY 32

Rules for Classification and Construction Ship Technology

EFFECTS ON NUMBER OF CABLES FOR MODAL ANALYSIS OF CABLE-STAYED BRIDGES

In-situ Load Testing to Evaluate New Repair Techniques

Structural Design of Offshore Ships

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

Bridge Type Selection

Rudder and Rudder Horn Repair on the Bulk Freighter Sophia D

Accident Report. Injury Pacific Way. 26 November 2005 Class A

INSTALLATION. General. Important Note. Design. Transport

STATUTORY INSTRUMENT. No. of Merchant Shipping (Safe Ship Management Systems) Regulation ARRANGEMENT OF SECTIONS.

COMDTPUB P16721 NVIC August 25, Subj: GUIDELINES FOR QUALIFICATION FOR HIGH-SPEED CRAFT TYPE-RATING ENDORSEMENTS

AASHTOWare Bridge Design and Rating Training. STL8 Single Span Steel 3D Example (BrDR 6.6)

Residential Foundations and Basements

Transcription:

Case Study 10 R/V WESTERN FLYER Chronic Cracking in an Aluminum SWATH Research Vessel Vessel Particulars LOA: 117-3 5/8 Breadth: 53-0 Depth: 25-0 Draft: 12-0 Gross Tonnage: 499 Displacement: 419 LT Complement: 26 (10 crew, 16 science) Maximum Speed: 14.5 knots Endurance: 4000 NM at 8 knots Builder: SWATH Ocean Systems Year Built: 1996 ID No.: 1038571 Class: None, COI and Load Line Flag: US Owner/ Operator: Monterey Bay Aquarium Research Institute, Moss Landing, CA Vessel Type: SWATH (Small Waterplane Area Twin Hull), Diesel Electric Propulsion Hull Material: Aluminum

Figure 1. Profile of R/V WESTERN FLYER Summary of Structural Failure R/V Western Flyer has experienced localized cracking to its aluminum structure during typical operations during virtually all of its twelve year life span. Various modifications have been implemented in an attempt to solve this problem. Background Design R/V Western Flyer was designed and built by SWATH Ocean Systems in 1996 for Monterey Bay Aquarium Research Institute (MBARI). The design was based on successful SWATH Ocean Systems designs for smaller vessels. Although USCG was involved in the review of the design, extensive detailed structural analysis was not completed in the design phase. R/V Western Flyer s mission is to provide a stable platform for ROV operations for MBARI s Tiburon in water up to 4000m. Because of the extreme water depth and the rapid changes in weather encountered in the Monterey Basin area, it is necessary for the R/V Western Flyer to be able to operate up to Sea State 5. In order to facilitate ROV deployment and retrieval, especially in higher sea states, an internal moon pool is utilized. Figure 2 shows a typical transverse web frame. All structure is 5086 aluminum, except for isolated bulkhead and deckhouse framing that is 6061. Web frames are spaced every three feet, with transverse bulkheads every 15 feet.

Figure 2. Transverse Web Frame Events leading to failure During one of R/V Western Flyer s early voyages, the bilge alarm in the steering flat was activated. The crew discovered water seeping through cracks in the transom. Further investigation located cracking in several other locations throughout the vessel. Weather conditions had been moderate (Sea State 3-4) from the starboard beam. Detailed Description of Structural Failure While the cracking in the transom was the result of coincident plate seams, butts and corners, the majority of the cracking was in transverse frames and watertight bulkheads in way of the haunch girder notch. Cracking in the transverse frames was primarily in locations without adequate bracketing in way of the notch. Some side shell cracking was seen in way of the transverse bulkheads. See Figure 3.

Figure 3. Haunch Girder Notch Initial Analysis and Repair In order to continue operating while extensive structural analysis was performed, the strategy of repair and monitoring was adopted. All cracks were repaired and brackets were installed on those frames without them previously. In order to assess the efficacy of the repair, operation was to proceed in worsening sea conditions with the possibility of altering course to minimize loading on the structure. In the first two months of limited operation and vessel monitoring, over 100 new cracks developed. All of these cracks were at the ends of welds in the haunch area. A stress monitoring program was installed on the vessel to provide a visual and audible alarm on the bridge to alert the crew of a need to change course. Two-dimensional finite element analysis was completed on a typical bulkhead and web frame. Loading on the models was determined based on beam seas in Sea States 3-5. The loading on the hull for a regular incident wave over a range of frequencies was calculated using MIT s wave analysis program (WAMIT). The response in regular waves was applied to a Bretschneider spectrum to determine the extreme loads for each mode (roll, heave, pitch, etc.). Because the extreme forces do not occur together, combinations were created maximizing one mode at a time. The results of this initial FEA showed that even with brackets in place the stress in the haunch girder notch was over 40,000psi in Sea State 5. See Figure 4.

Figure 4. Stress in Transverse Bulkhead, Beam Sea, Sea State 5 Detailed Analysis In order to understand more fully the response of the structure of the R/V Western Flyer, a global three dimensional finite element model of the entire hull and deckhouse was constructed. See Figure 5. Figure 5. Global 3-D Finite Element Model

A pressure distribution over the wetted surface of the hull was developed using an equivalent irregular wave. The resulting loading is a squeezing/prying moment acting on the pontoons. This analysis was repeated for the vessel with the proposed modifications to assess their effectiveness. The design load for the modified vessel is higher than the existing due to changes in the pontoons to counteract weight addition. Figure 6. Deflection Plot, Prying Condition Results of the global FEA confirmed failures experienced in several areas of the vessel. High stresses were shown in the haunch girder notch areas and at the corners of the deckhouse bulkhead and deck intersections. Panel buckling was calculated (and had occurred) in the transverse structure aft of the moonpool and in areas of the deckhouse. Modification The following modifications were accomplished at Bay Ship and Yacht in Alameda, CA between 1998 and 1999. Faired the notch between the strut and haunch. Added half frames in way of the haunch. Deepened existing haunch frames.

Added half frames aft of the moonpool. Increased stiffening in the deckhouse. Replaced aft bulkhead of house with thicker plate of stronger aluminum. Increased diameter of pontoons over a portion of their length to compensate for additional weight. Figure 7 shows the effect of the modification to the haunch girder notch on the stress distribution.

Figure 7. Haunch/Strut Stress with/without Fairing

End Result Unfortunately, the 1998 modifications were not sufficient to completely solve the cracking problem on R/V Western Flyer. She continued to experience cracking at the junction of the deckhouse and main deck. Because the deckhouse is stepped away from the side, the prying moment causes the deck to bend up around the house. In 2005, after various other attempts, a strut was added aft at Frame 28 to connect the hulls to resist prying. See Figures 8 and 9. Frame 28 was chosen because it coincides with transverse bulkheads above and below deck, specifically the aft house bulkhead. Because ROV operations are conducted through a moon pool, strut installation any further forward would interfere. The crew reports no adverse effects on performance due to either the aft strut or the increase in pontoon diameter. Continued crack monitoring shows no additional cracking in way of the haunch or pontoon joints. Figure 8. Global Model with Strut Installed Figure 9. Pontoon Strut

Design Observation In retrospect, there are certain features of the design of R/V Western Flyer that could have been improved in earlier phases. The first is the concave bracketing in way of the haunch joint. In theory this was done to reduce spray. The second is to have the deckhouse side inset from the hull side, especially without, adequate structural members below to help distribute the load where the house side crosses the below deck bulkhead. While earlier incorporation of the pontoon strut might have obviated some structural modifications, it was ruled out in the initial design due to the interference with ROV operations through the moon pool. It is not likely that the strut alone would have eliminated all cracking problems, particularly in way of the haunch. Acknowledgements References: [1] Dockter, M.E. and K. Schmidt, SWATH Research Vessel: The Building of RV Western Flyer, Marine Technology, July 1996. [2] Van Slyke, Morgan, Leach and Etchemendy, R/V Western Flyer Hull Strength Upgrade, SNAME Pacific Northwest Section, 17 April 1999. For More Information: For questions and comments, contact Timothy Leach at The Glosten Associates, Seattle, WA.