FY15 Gravity Sewer and Manhole Rehabilitation



Similar documents
Storm Sewer Trenchless Upgrade Alternatives and Recommendations

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

STANDARD SPECIFICATIONS SECTION CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

SEWER CLEANING, INSPECTION AND ASSESSMENT

STANDARD SPECIFICATIONS SECTION CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

INSTALLATION OF INSITUFORM LINER

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

FY08 SEWER POINT REPAIRS BID TABULATION

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

Rehabilitation or Replacement? That Is The Question

SANITARY SEWER SPECIFICATIONS

SECTION 810 SEWER LINE CLEANING

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

Special Specification 7021 Water Main and Sewer Line Replacements

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

STANDARD SANITARY SEWER REHABILITATION SPECIFICATIONS

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

CLEANING, INSPECTION, AND TESTING OF SEWERS

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING

SCOPE OF WORK SEWER LINE CLEANING FOR CITY OF THE OF HUNTINGTON BEACH PROPERTY

812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.

Sewer Rehabilitation Design Requirements

DRAFT Public Outreach Document for What s an SSMP?

SECTION GRAVITY SANITARY SEWERS

CHAPTER 6 - SANITARY SEWER

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

DESCRIPTION OF WORK:

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

See Appendix A for additional information, or contact ASTM directly.

LS 2540 SEWER LATERALS AND INSPECTION TEES

Construction Specification for Sewer Bypass Flow Pumping

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

First in Service First in Safety

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS

STANDARD SPECIFICATIONS SECTION SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

City of Mill Valley Sewer Capital Improvement Plan

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:

SECTION ABANDONMENT OF SEWER MAINS

SEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

SECTION STORM DRAIN SYSTEM

Number September 2014 SEWER LIABILITY

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

Sanitary Sewer Smoke Testing

SANITARY SEWER BACKUP. Causes & Prevention

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

City of Mebane Wastewater Collection and Treatment Facility

Waste Collection Systems

SECTION 3 SANITARY SEWER DESIGN

Section 402. STORM SEWERS

SANITARY GRAVITY SEWER LINE TESTING. B. Section CCTV Inspection of Gravity Sewer Lines

Sewer Pipe & Manhole Rehab. Jack Keys Collection System & Inspection Services Supervisor Southern Clinton County Municipal Utilities Authority

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.

Routine Maintenance and Inspection

SECTION 7 UNDERDRAIN SERVICE

Beechmont Park Project

OVER-HEAD SEWER ASSISTANCE GRANT

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

Transcription:

Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE FORKS GANTT SIMPSONVILLE PIEDMONT FOUNTAIN INN List of Sheets G-1 General Notes and Details C-1 Project Location Map and Sheet Key Plan Basin 700A Tables C-2 Basin 700A Tables C-3 Basin 700A Tables C-4 Basin 700A Plans C-5 Basin 700A Plans C-6 Basin 700A Plans C-7 Basin 700A Plans C-8 Basin 700A Plans C-9 C-10 Basin 700A Plans C-11 Basin 700A Plans C-12 Basin 700A Plans C-13 Basin 700B Tables C-14 Basin 700B Plans C-15 Basin 700B Plans C-16 Basin 850 Tables C-17 Basin 850 Plans C-18 Basin 850 Plans

GENERAL NOTES 1. GENERAL PROJECT INFORMATION: THE SEWERS, MANHOLES AND OTHER FEATURES SHOWN ON THE DRAWINGS ARE TO BE CONSIDERED APPROXIMATE LOCATIONS AND ARE FOR GENERAL INFORMATION ONLY. THE DRAWINGS DO NOT SHOW ALL OF THE HOMES AND BUSINESSES IN THE AREA OR OTHER EXISTING UTILITIES- THE CONTRACTOR IS ADVISED THAT THE AREA IS CONGESTED WITH HOMES, BUSINESSES AND UTILITIES. IN ADDITION, ALL CURRENT ROADS AND CONNECTING SEWERS MAY NOT BE SHOWN. THE CONTRACTOR SHALL MAKE NECESSARY SITE INVESTIGATIONS TO DETERMINE ACTUAL LOCATIONS PRIOR TO BIDDING. THE DRAWINGS ARE BASED ON THE OWNER'S GEOGRAPHIC INFORMATION SYSTEM (GIS). THE SEWERS IN THIS PROJECT ARE OLD AND IN POOR CONDITION. THE CONTRACTOR SHOULD EXPECT DISCREPANCIES BETWEEN THE DRAWINGS AND THE ACTUAL SEWER CONFIGURATIONS AND LOCATIONS. THESE DISCREPANCIES WILL BE FOUND THROUGHOUT THE WORK AND SHALL BE COORDINATED/ADDRESSED IN THE FIELD WITH THE ENGINEER/OWNER AND SHALL BE DOCUMENTED ON THE RECORD DRAWINGS. THE WORK UNDER THIS CONTRACT INCLUDES CLEANING AND TELEVISING EXISTING SEWERS, DYE TESTING ALL SERVICE LATERAL CONNECTIONS TO DETERMINE IF THE SERVICE IS ACTIVE, INSTALLING CIPP, AND REHABILITATING MANHOLES. THE EXISTING SEWER INFORMATION AND REHABILITATION REQUIREMENTS SHOWN ON THE TABLES ARE BASED ON CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION AND PHYSICAL INFORMATION PERFORMED BY OVER THE LAST 10 OR MORE YEARS. IN SOME INSTANCES, INFORMATION ON EXISTING SEWERS IS NOT AVAILABLE-INDICATED WITH A NA ON THE TABLES. THE CONTRACTOR SHALL MAKE FIELD INVESTIGATIONS AND/OR ASSUMPTIONS FOR THE UNAVAILABLE INFORMATION AS DEEMED NECESSARY WHEN DEVELOPING HIS BID. THE SEWER SEGMENTS ARE DEFINED ON THE TABLES BY A START MH AND AN END MH. THE START AND END MANHOLES REPRESENT THE DIRECTION IN WHICH THE SEWER SEGMENT WAS TELEVISED AND NOT NECESSARILY THE DIRECTION OF FLOW. THE DISTANCES LISTED IN THE TABLES ARE FROM THE CENTER OF THE START MH. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING LOCATIONS AND POSITIONS OF SERVICE LATERALS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR DETERMINING ACCURATE SEWER DIAMETERS. 2. SCOPE OF WORK AND PROJECT IMPLEMENTATION: THIS CONTRACT WILL BE USED TO REHABILITATE EXISTING SANITARY SEWERS AND MANHOLES THROUGHOUT THE OWNER'S SERVICE AREA AS SHOWN ON THE PLAN SHEETS. DETAILS FOR THE WORK ARE SHOWN ON THIS SHEET. THE CONTRACTOR IS ADVISED THAT ADDITIONAL SEWERS AND MANHOLES MAY BE ADDED TO THIS CONTRACT FOR REHABILITATION TO USE THE QUANTITIES IN THE BID, TO SPEND THE OWNER'S AVAILABLE BUDGET/FUNDING, AND/OR TO ADDRESS ADDITIONAL SEWER OR MANHOLE PROBLEMS THAT ARE IDENTIFIED. THE ADDED SEWERS AND MANHOLES MAY BE LOCATED ANYWHERE WITHIN THE OWNER'S SERVICE AREA. THE UNIT PRICES BID SHALL INCLUDE REHABILITATING ANY ADDED SEWERS AND MANHOLES REGARDLESS OF LOCATION, QUANTITY OR LAYOUT. 3. SEWER REHABILITATION AND SEQUENCE OF CONSTRUCTION: IT IS THE INTENT OF THIS CONTRACT TO LINE ALL OF THE SEWERS IDENTIFIED ON THE DRAWINGS WITH CURED-IN-PLACE PIPE LINING (CIPP). THE CONTRACTOR'S TELEVISION INSPECTIONS PERFORMED UNDER THIS CONTRACT WILL BE USED TO CONFIRM THAT THE SEWERS CAN BE LINED. IT IS POSSIBLE THAT SOME SEWERS CAN NOT BE LINED UNTIL POINT REPAIRS ARE PERFORMED. ANY SUCH POINT REPAIRS WILL BE NEGOTIATED WITH THE CONTRACTOR AND PAID OUT OF THE CONTINGENCY ITEM OR THE SEWERS WILL BE DELETED FROM THE CONTRACT. IT IS ALSO POSSIBLE THAT SOME OF THE SEWERS WILL NOT REQUIRE LINING. THE WORK MAY BE PERFORMED IN ANY ORDER. THE CONTRACTOR SHALL DETERMINE THE SCHEDULE AND SEQUENCE FOR CONSTRUCTION. 4.SEWER CLEANING AND CCTV INSPECTION: THE CONTRACTOR'S UNIT PRICE FOR CLEANING AND TELEVISING THE EXISTING SEWERS SHALL INCLUDE COSTS FOR COMPLETE CLEANING, ROOT AND GREASE REMOVAL, SILT/SAND REMOVAL AND TUBERCULATION REMOVAL, REGARDLESS OF THE SEVERITY. CONTRACTOR SHALL USE EXTREME CAUTION WHEN CLEANING SEWERS TO PREVENT STRUCTURALLY DAMAGED SEWERS AND THE OLDER SEWERS FROM COLLAPSING. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ANY CLEANING OR TELEVISION INSPECTION EQUIPMENT TRAPPED BY COLLAPSED SEWERS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING OF ANY CONCERNS PRIOR TO CLEANING SEWERS. CONTRACTOR IS FURTHER ADVISED THAT THE SEWERS AND NEIGHBORHOODS IN THE PROJECT AREA ARE OLD. MANY OF THE HOUSES MAY HAVE FAULTY TRAPS WHICH MAY ALLOW WASTEWATER TO BACK UP INTO THE HOMES DURING HIGH PRESSURE CLEANING OPERATIONS. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN CLEANING SEWERS AND SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING HOMES CAUSED BY CLEANING OPERATIONS. ANY SPILLS SHALL BE CLEANED UP IMMEDIATELY. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. THE CONTRACTOR SHALL HAVE A LOCAL CLEANING SERVICE UNDER CONTRACT PRIOR TO STARTING THE SEWER CLEANING TO CLEAN UP ANY SPILLS OR BACKUPS. REFER TO THE TECHNICAL SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 5.CIPP INSTALLATION: ALL SEWERS SHOWN ON THE PLANS AND LISTED IN THE TABLES SHALL BE LINED WITH CURED-IN-PLACE PIPE LINING (CIPP) AS SPECIFIED UNLESS DIRECTED OTHERWISE BY THE ENGINEER. THE CIPP SHALL BE ONE OF THE APPROVED PRODUCTS SPECIFIED. EVERY LOCATION THAT THE CIPP WILL REMAIN IN THE MANHOLES. THE ENGINEER/OWNER MAY ALSO REQUIRE THAT CIPP BE LEFT IN CERTAIN MANHOLES EVEN THOUGH NOT PLANNED BY THE CONTRACTOR. THE MAJORITY OF THESE SITUATIONS WILL LIKELY OCCUR ON THE LARGER DIAMETER PIPES. ALL ACTIVE SERVICE LATERALS SHALL BE RECONNECTED TO THE CIPP VIA AN INTERNAL REMOTE CUTTER AFTER LINER INSTALLATION. OPENINGS FOR SERVICES SHALL BE 100% OF THE EXISTING LATERAL PIPE DIAMETER. THE ENTIRE SERVICE LATERAL OPENING SHALL BE SMOOTH AND FREE OF BURRS. THERE MAY BE MANHOLES THAT ARE NOT CALLED OUT IN THE TABLES THAT ARE DROP MANHOLES. EXISTING DROPS SHALL NOT BE LINED BUT SHALL BE FULLY OPENED AND BRUSHED SMOOTHLY AFTER LINER INSTALLATION. THE COST OF THE OPENING DROP CONNECTIONS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR CIPP. REFER TO THE TECHNICAL SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 6.: ALL MANHOLES SHOWN ON THE PLANS AND LISTED IN THE TABLES SHALL BE SPRAYED WITH A CEMENTITIOUS MATERIAL AS SPECIFIED UNLESS DIRECTED OTHERWISE BY THE ENGINEER. NO OTHER WORK IS ANTICIPATED. IF ADDITIONAL WORK IS IDENTIFIED, THE CONTRACTOR SHALL SUBMIT A PRICE FOR THE WORK TO THE OWNER FOR REVIEW, AND IF ACCEPTABLE, THE WORK WILL BE PERFORMED AND PAID FOR OUT OF THE CONTINGENCY. THE MATERIALS AND METHODS SHALL BE AS SPECIFIED. ALL CEMENTITIOUS MATERIAL SPRAYED ON THIS PROJECT SHALL BE THE STANDARD SPECIFIED MATERIAL. IF ADDITIONAL HYDROGEN SULFIDE CORROSION PROTECTION IS DEEMED NECESSARY, THE ENGINEER WILL DIRECT THE CONTRACTOR TO INSTALL 100% CALCIUM ALUMINATE MATERIAL. THE CONTRACTOR SHALL CLEAN EACH MANHOLE TO BE COATED AND SHALL DISPOSE OF ANY RESULTING MATERIAL. THE CLEANING SHALL BE PERFORMED USING A HIGH POWER JET WASH AT A MINIMUM OF 3,500 PSI. THE NOZZLE OF THE POWER WASHER SHALL BE A MAXIMUM OF 4 INCHES FROM THE WALL DURING CLEANING. ALL DUST, BIOLOGICAL GROWTHS, GREASE, OIL, PAINT OR ANY OTHER SURFACE CONTAMINANTS SHALL BE REMOVED. ROOTS SHALL BE REMOVED MANUALLY BY CUTTING THE ROOTS FROM INSIDE THE MANHOLE. THE CONTRACTOR SHALL CONDUCT A VISUAL INSPECTION OF EACH MANHOLE AFTER IT IS CLEANED. ALL ACTIVE HYDROSTATIC LEAKS SHALL BE PLUGGED OR SEALED WITH AN APPROVED GROUT COMPATIBLE WITH CEMENTITIOUS LINING. INJECTION GROUTING MAY BE REQUIRED TO SEAL ACTIVE LEAKS. CONTRACTOR SHALL SMOOTH OUT ANY ROUGH UNEVEN AREAS ON WALLS, BENCHES OR INVERTS WHERE NEEDED PRIOR TO SPRAY APPLICATION. THE CONTRACTOR SHALL NOTIFY ALL HOMEOWNERS THAT DISCHARGE DIRECTLY TO THE MANHOLE BEING REHABILITATED 72 HOURS IN ADVANCE, GIVING THE DATE, START TIME, AND ESTIMATED COMPLETION TIME. THE CONTRACTOR SHALL BYPASS SEWAGE FLOWS DURING THE WORK AS SPECIFIED. THE CONTRACTOR SHALL FURNISH AND PLACE CEMENTITIOUS LINING IN EACH MANHOLE AS SHOWN ON THE STANDARD DETAIL ON THIS SHEET. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING ALL ADDITIONAL REQUIREMENTS. ALL SPECIFIED ACCEPTANCE TESTING (VACUUM TESTING MANHOLES COATED WITH CEMENTITIOUS MORTAR) SHALL BE COMPLETE PRIOR TO PAYMENT. CUBE TESTS OF CEMENTITIOUS MORTAR SHALL BE SUBMITTED WITHIN 30 DAYS OF TAKING THE SAMPLE WITH ALL RESULTS REQUIRED PRIOR TO FINAL PAYMENT. REFER TO THE TECHNICAL SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 7. SERVICE LATERAL REHABILITATION: THE REQUIRED SERVICE LATERAL REHABILITATION INCLUDES DYE TESTING ALL SERVICE LATERALS IN THE PROJECT AREA TO DETERMINE WHICH ONES ARE ACTIVE AND RECONNECTING THE ACTIVE SERVICE LATERALS TO THE CIPP VIA AN INTERNAL CUTTER AS SPECIFIED. NO OTHER SERVICE LATERAL REHABILITATION IS PLANNED. IF ADDITIONAL LATERAL REHABILITATION (SUCH AS REPLACEMENT) IS IDENTIFIED DURING THE PRE-REHAB CCTV INSPECTIONS, THE CONTRACTOR SHALL SUBMIT A PRICE FOR THE WORK TO THE OWNER FOR REVIEW, AND IF ACCEPTABLE, THE WORK WILL BE PERFORMED AND PAID FOR OUT OF THE CONTINGENCY. ONLY ACTIVE SERVICES SHALL BE RECONNECTED TO THE CIPP UNLESS DIRECTED OTHERWISE BY THE ENGINEER/OWNER. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE WHICH SERVICES ARE ACTIVE. THE CONTRACTOR SHALL PERFORM DYE TESTS AND/OR FLUSH TESTS WHILE THE TELEVISION INSPECTION IS BEING PERFORMED TO VIEW EACH LATERAL CONNECTION DURING THE TESTS. ALL COSTS ASSOCIATED WITH THE DYE AND FLUSH TESTS SHALL BE INCLUDED IN THE UNIT PRICES FOR CLEANING AND TELEVISING EXISTING SEWERS. THE CONTRACTOR SHALL DYE TEST ALL SERVICE LATERALS AND SHALL CONFIRM WHETHER EACH LATERAL IS ACTIVE OR INACTIVE. THERE SHALL BE NO EXCEPTIONS TO THIS REQUIREMENT. THE CONTRACTOR SHALL SCHEDULE THE WORK WHEN PROPERTY OWNERS ARE HOME SO THAT THE DYE TEST CAN BE PERFORMED. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY REHABILITATION PERFORMED TO INACTIVE SEWERS AND SHALL PAY ALL COSTS ASSOCIATED WITH REMOVING AND/OR REPAIRING WORK TO INACTIVE SERVICES. THE CONTRACTOR SHALL IDENTIFY THE ACTIVE SERVICES ON THE PRE-REHABILITATION INSPECTION VIDEOS AND LOGS. THE CONTRACTOR IS ADVISED THAT SOME HOUSES MAY BE COMBINED INTO A SINGLE LATERAL. THE CONTRACTOR IS FURTHER ADVISED THAT ALL HOUSES MUST BE ACCOUNTED FOR. INACTIVE OR ABANDONED SERVICE LATERALS THAT CONNECT TO SEWERS SHALL NOT BE RECONNECTED TO THE CIPP. THE SERVICE LATERAL LOCATIONS SHOWN IN THE TABLES ARE PROVIDED FOR GENERAL INFORMATION ONLY. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING LATERALS TO PERFORM THE WORK. IF THE EXISTING LATERAL ENTERS THE TOP OF THE SEWER, THE CONTRACTOR SHALL DETERMINE THE DIRECTION. ALL COSTS ASSOCIATED WITH LOCATING SERVICE LATERALS SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. WITH PROPERTY OWNERS SHALL BE IN WRITING, AND COPIES OF THE AGREEMENTS SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO USING THE ACCESS. THE CONTRACTOR SHALL SUBMIT HIS/HER PROPOSED PLAN FOR ACCESSING THE SEWERS AND MANHOLES AS REQUESTED BY THE ENGINEER. THE PROPOSED PLAN SHALL BE DETAILED AND SHALL DEFINE EACH ACCESS POINT. THE CONTRACTOR SHALL MODIFY THE PLAN AS REQUIRED BY THE ENGINEER. THE COSTS FOR ACCESSING THE SEWER SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. THE UNIT COSTS SHALL INCLUDE ANY AND ALL ACCESS TO THE SEWER. 10. MAINTENANCE OF FLOW IN EXISTING SEWERS: THE CONTRACTOR IS RESPONSIBLE FOR HANDLING AND ACCOMMODATING ALL EXISTING WASTEWATER FLOWS DURING THE WORK. THE CONTRACTOR WILL BE REQUIRED TO SUBMIT, FOR APPROVAL BY THE ENGINEER, A DETAILED PLAN OF THE METHOD THE CONTRACTOR PROPOSES TO MAINTAIN THE EXISTING FLOW DURING CONSTRUCTION. THE PLAN MUST INCLUDE A PROVISION FOR HANDLING THE EXISTING PEAK FLOW BY PUMPING - THE PEAK FLOW SHALL BE CONSIDERED THE EXISTING PIPE FLOWING FULL, WHICH IS HIGHLY POSSIBLE DURING RAIN EVENTS. WHEN PUMPING IS USED, AN IDENTICAL STANDBY PUMP(S) SHALL BE ON SITE IN THE EVENT OF FAILURE OF THE PRIMARY PUMP(S). PAYMENT FOR THIS WORK SHALL BE INCLUDED IN THE INDIVIDUAL UNIT PRICES BID. IF, AT ANY TIME DURING CONSTRUCTION, EFFLUENT FROM THE EXISTING SEWER IS NOT FULLY CONTAINED BY THE BYPASS SYSTEM, GRAVITY SERVICE WILL BE RESTORED AND WORK SHALL BE SUSPENDED UNTIL THE PROBLEM IS RESOLVED TO THE SATISFACTION OF THE ENGINEER. THIS INCLUDES WASTEWATER FLOWING INTO TRENCHES DURING EXCAVATION WORK. SEWER SYSTEM OVERFLOWS WILL NOT BE TOLERATED. ALL FINES IMPOSED ON THE OWNER AND ASSOCIATED WITH OVERFLOWS CAUSED BY THE CONTRACTOR'S WORK SHALL BE PAID BY THE CONTRACTOR. 11. TRAFFIC CONTROL: THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A DETAILED TRAFFIC CONTROL PLAN FOR PERFORMING ALL WORK IN ROADS AS REQUIRED BY THE SCDOT AND/OR CITY/COUNTY. THE TRAFFIC CONTROL PLAN SHALL BE SPECIFIC TO EACH ROAD AND EACH SEWER AND MANHOLE. THE TRAFFIC CONTROL PLAN SHALL BE MODIFIED AS NECESSARY IN THE FIELD TO ACCOMMODATE UNFORESEEN TRAFFIC CONTROL ISSUES AND PROBLEMS AND SAFETY CONCERNS. NO WORK SHALL BEGIN UNTIL THE TRAFFIC CONTROL PLAN IS REVIEWED AND APPROVED BY THE ENGINEER, THE CITY/COUNTY AND/OR SCDOT. WARNING SIGNS, BARRICADES AND FLAGMEN MUST BE PROVIDED IN ACCORDANCE WITH SCDOT'S "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD). ACCESS SHALL BE MAINTAINED TO HOMES, RESIDENCES, AND BUSINESSES IN THE AREA AT ALL TIMES. THE COSTS FOR PROVIDING TRAFFIC CONTROL FOR THE SEWERS AND MANHOLES SHOWN ON THESE DRAWINGS SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. THE UNIT COSTS SHALL INCLUDE ANY AND ALL REQUIRED TRAFFIC CONTROL. IF SEWERS IN MAJOR THOROUGHFARES ARE ADDED TO THE CONTRACT THAT REQUIRE SUBSTANTIAL TRAFFIC CONTROL, ROAD CLOSURES AND DETOURS, SUCH TRAFFIC CONTROL WILL BE CONSIDERED AN ADD-ON COST TO THE CONTRACT AS AGREED TO BY THE ENGINEER/OWNER. 12. PRECONSTRUCTION VIDEO INSPECTIONS AND PHOTOGRAPHY: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING VIDEO INSPECTIONS AND TAKING PHOTOGRAPHS OF THE ENTIRE PROJECT AREA PRIOR TO PERFORMING ANY WORK AS THE CONTRACTOR DEEMS NECESSARY. THE INSPECTIONS SHALL BE NARRATED TO DOCUMENT LOCATIONS AND DATES OF THE VIDEO INSPECTIONS. THE PHOTOGRAPHS SHALL BE DATE STAMPED. THE PURPOSE OF THE INSPECTIONS AND PHOTOGRAPHS SHALL BE TO DOCUMENT THE PRE-CONSTRUCTION CONDITIONS FOR COMPARISON WITH THE FINAL RESTORATION WORK AND WITH ANY IMPACTS TO PROPERTY/ROADS THAT OCCUR DURING THE CONSTRUCTION. IF THE CONTRACTOR FAILS TO PERFORM THOROUGH AND COMPLETE INSPECTIONS AND PHOTOGRAPHS, AND THE OWNER OR ENGINEER RECEIVES COMPLAINTS ON THE FINAL RESTORATION OR IMPACTS TO ROADS OR PROPERTY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL ADDITIONAL RESTORATION AND REPAIRS AS NECESSARY TO COMPLETELY RESOLVE THE COMPLAINT/ISSUE AT NO ADDITIONAL COST TO THE OWNER. 13. CLEANUP WORK: THE CONTRACTOR SHALL COMPLETELY CLEAN UP THE WORK SITE AT THE END OF EACH DAY. THE CONTRACTOR SHALL IDENTIFY ANY REQUIRED POINT REPAIRS NEEDED PRIOR TO CIPP INSTALLATION DURING THE PRE-REHAB CCTV INSPECTION AND SUBMIT RECOMMENDATIONS TO THE ENGINEER FOR REVIEW AS SPECIFIED. THE COST FOR ANY POINT REPAIRS SHALL BE NEGOTIATED WITH THE CONTRACTOR AND ADDED TO THE PROJECT VIA A CHANGE ORDER, AS AN ITEM TO BE PAID FOR OUT OF THE CONTINGENCY OR THE SEWERS WILL BE DELETED FROM THE CONTRACT. NO POINT REPAIRS HAVE BEEN IDENTIFIED BY THE ENGINEER/OWNER PRIOR TO BIDDING. CONTRACTOR SHOULD USE EXTREME CARE WHEN INSTALLING LINERS THROUGH OLD MANHOLES. ANY DAMAGE CAUSED SHALL BE PAID FOR BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. IF THE CONTRACTOR HAS TO REMOVE THE FRAME AND COVER IN ORDER TO INSTALL THE LINER, THE FRAME SHALL BE RESET IN ACCORDANCE WITH THE OWNER'S STANDARD DETAILS AND REQUIREMENTS AT NO ADDITIONAL COST TO OWNER. LINER PIPES SHALL BE TERMINATED IN THE MANHOLES PER THE STANDARD DETAIL ON THIS SHEET. THE INVERT OF EACH MANHOLE SHALL BE COATED WITH AN APPROVED GROUT TO RAISE THE INVERT ELEVATION TO MATCH THE LINED PIPES AND TO PROVIDE A SMOOTH UNIFORM FLOW CHANNEL THROUGH THE MANHOLE. A CONSTANT SLOPE SHALL BE PROVIDED FROM THE INLET TO OUTLET SEWERS. THE COST FOR COATING THE INVERT CHANNELS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE CIPP. THE CIPP MANHOLE CONNECTION SHALL ALSO BE SEALED WITH A WATER-STOP AND NON-SHRINK GROUT AS SPECIFIED. THE ENTIRE AREA AND VOIDS BETWEEN AND AROUND THE CIPP MANHOLE CONNECTION SHALL BE COMPLETELY FILLED AND COATED WITH A NON-SHRINK GROUT TO PROVIDE A LEAK-TIGHT CONNECTION. IN SOME SITUATIONS, INJECTION GROUTING MAY BE REQUIRED TO COMPLETELY SEAL THE CONNECTION. THE COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE FOR CIPP. IN SOME SITUATIONS, WHERE SPECIFICALLY APPROVED BY THE ENGINEER/OWNER, WHEN THE CONTRACTOR LINES MULTIPLE SEGMENTS AT ONE TIME, THE CONTRACTOR SHALL LEAVE THE LINER THROUGH THE INTERMEDIATE MANHOLES TO SERVE AS THE INVERT CHANNEL. IN THESE INSTANCES, THE TOP ONE-HALF OF THE LINER SHALL BE NEATLY REMOVED, AND THE VOID BEHIND THE LINER PIPE SHALL BE INJECTED WITH AN APPROVED PUMPABLE GROUT AND THEN FURTHER FILLED AND CAPPED WITH NON-SHRINK GROUT. THE INJECTABLE GROUT WILL BE PAID AT THE UNIT PRICE BID PER GALLON OF GROUT PUMPED. THE NON-SHRINK GROUT SHALL BE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER/OWNER MUST APPROVE 8.EMERGENCY WORK: THE OWNER MAY HAVE EMERGENCY SITUATIONS (SUCH AS SEWER OVERFLOWS OR BACKUPS) THAT ARISE DURING THIS CONTRACT WHICH MAY REQUIRE IMMEDIATE SEWER REHABILITATION AND MAY BE ADDED TO THIS CONTRACT. THE CONTRACTOR WILL BE EXPECTED TO PROVIDE SERVICES TO REPAIR THESE EMERGENCY SITUATIONS. THE EMERGENCY SITUATIONS MAY BE IN AREAS INCLUDED IN THIS CONTRACT OR IN SEWERS NOT SHOWN ON THE DRAWINGS. THE EMERGENCY WORK MAY BE LOCATED ANYWHERE IN THE OWNER'S SERVICE AREA. THE ENGINEER WILL NOTIFY THE CONTRACTOR OF THE EMERGENCY SITUATIONS. THE CONTRACTOR SHALL IMMEDIATELY TERMINATE WORK ON THE CURRENT WORK AND PROCEED TO THE EMERGENCY WORK. THE CONTRACTOR SHALL NOT BE DUE ANY ADDITIONAL MONEY FOR MOBILIZING TO PERFORM THE EMERGENCY WORK BUT MAY BE GRANTED ADDITIONAL CONTRACT TIME IF SO REQUESTED BY THE CONTRACTOR IN WRITING AND APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL BE PAID FOR THE EMERGENCY WORK AT THE UNIT PRICES BID. THE CONTRACTOR SHALL BEGIN WORK ON THE EMERGENCY SITUATION WITHIN 2 WORKING DAYS FROM RECEIVING THE WORK, AND REHABILITATION SHALL BEGIN WITHIN 4 WORKING DAYS FROM RECEIVING THE WORK. 9. ACCESS TO THE PROJECT SITES: THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ACCESSING THE SEWERS AND MANHOLES TO PERFORM THE WORK, INCLUDING DETERMINING ACCESS REQUIREMENTS AND DEVELOPING ALTERNATE ACCESS POINTS AS REQUIRED, REMOVING AND REPLACING TO EQUAL CONDITIONS MOVEABLE OBSTACLES (SUCH AS FENCES), NEGOTIATING WITH PROPERTY OWNERS, AND RESTORING ALL AREAS DISTURBED BY THE WORK TO EQUAL OR EXCEED PRECONSTRUCTION CONDITIONS. ACCESS SHALL BE ALONG THE EXISTING 25-FOOT-WIDE SEWER EASEMENTS OR WITHIN THE EXISTING ROAD RIGHT-OF-WAYS AND WORK SHALL BE MAINTAINED WITHIN THE EASEMENTS AND RIGHT-OF-WAYS UNLESS OTHERWISE APPROVED BY THE INDIVIDUAL PROPERTY OWNERS AND/OR THE ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NEGOTIATING WITH PROPERTY OWNERS FOR SUCH ALTERNATE ACCESS AND SHALL PAY ANY AND ALL COSTS ASSOCIATED WITH SUCH ALTERNATE ACCESS AS SPECIFIED ABOVE. ALL SUCH NEGOTIATIONS REVISIONS -030 GENERAL NOTES AND DETAILS, ABBREVIATIONS AND LEGEND G-1

REVISIONS -030 PROJECT LOCATION MAP AND SHEET KEY PLAN C-1

BASIN 700A REHABILITATION SUMMARY OF EXISTING SEWER INFORMATION REVISIONS -030 BASIN 700A TABLES C-2

BASIN 700A REHABILITATION SUMMARY OF EXISTING SEWER INFORMATION REVISIONS -030 BASIN 700A TABLES C-3

BASIN 700A REHABILITATION SUMMARY OF EXISTING MANHOLE INFORMATION REVISIONS -030 BASIN 700A TABLES C-4

-030 BASIN 700A PLANS C-5

-030 BASIN 700A PLANS C-6

-030 BASIN 700A PLANS C-7

-030 BASIN 700A PLANS C-8

-030 BASIN 700A PLANS C-9

-030 BASIN 700A PLANS C-10

-030 BASIN 700A PLANS C-11

-030 BASIN 700A PLANS C-12

BASIN 700B REHABILITATION SUMMARY OF EXISTING SEWER INFORMATION BASIN 700B REHABILITATION SUMMARY OF EXISTING MANHOLE INFORMATION REVISIONS -030 BASIN 700B TABLES C-13

-030 BASIN 700B PLANS C-14

-030 BASIN 700B PLANS C-15

BASIN 850 REHABILITATION SUMMARY OF EXISTING SEWER INFORMATION BASIN 850 REHABILITATION SUMMARY OF EXISTING MANHOLE INFORMATION REVISIONS -030 BASIN 850 TABLES C-16

-030 BASIN 850 PLANS C-17

-030 BASIN 850 PLANS C-18