chain, a Rotterdam experience

Similar documents
The Dutch Railway System. Logistics & Railway Infrastructure Forum NL Indonesia April 30 th 2015

ACTION PLAN

Cefic Position on Intermodal Transport Network Development

Priority decision. High-Frequency Rail Transport Programme

Network Statement 2015 Betuwe Line Based on the Railways Act Period of validity: 2015 timetable Sunday 14 December 2014 to Saturday 12 December 2015

Trade & Transport Corridors. European Projects & Initiatives

European Gateway Services. Paul Ham, Managing Director European Gateway Services, 6 September 2012

IQ-C Action plan for rail freight corridor Rotterdam-Genoa

EUROPE CONTAINER TERMINALS

Reporting»»

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

The logistics sector s view on the infrastructure in Central-Eastern European Member States Dr László Mosóczi Chairman of HUNGRAIL

ECT, shaping your gateway to Europe Opening Euromax Terminal and Delta Barge Feeder Terminal

Fit for the European Rail Market Training Competence - Certification

Directive 2001/16 - Interoperability of the trans- European conventional rail system

het goederenvervoer De toekomst van The future of freight transport en betrouwbaar Europees transport De visie van ECT op duurzaam

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Supply chain event management - enhancing planning and monitoring of intermodal chains

ETIHAD RAIL. Corporate Presentation

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Innovation in Traffic Management

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

- WHERE DID WE COME FROM? -

Third Quarter 2015 Marketing Overview. Alan H. Shaw Executive Vice President and Chief Marketing Officer

Application Form Part A

Multi-Modal Logistics Hub (MMLH) in Yanbu

Transumo Knowledge Day. Innovating Logistic Networks in the Port of Rotterdam

PRESS KIT OFFICIAL OPENING HUB TERMINAL POZNAN 27. September Hamburger Hafen und Logistik AG

GIS-based location analyses for intermodal terminal landscape in Belgium

Performance Measures. First Quarter 2012

Cloud computing platform in the Bologna hub

Marco Polo Project. NePol Express

Analysis One Code Desc. Transaction Amount. Fiscal Period

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

HAMBURGER HAFEN UND LOGISTIK AG

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

APP - Portuguese Ports Association Vítor Caldeirinha Lisbon,

ROADMAP SUMMARY LONG- DISTANCE FREIGHT

STAFFORDSHIRE COUNTY COUNCIL ROAD CASUALTY REVIEW

RailML use in the project

A comprehensive information system for railway networks

How To Analyse And Evaluate The Weastflows Project

Path to success rail freight carrier vs. integrated rail solution provider

Industry Outlook One Year Later. Presenter: Derek J. Leathers President & Chief Operating Officer Werner Enterprises

PPP in Practice High Speed Line Netherlands. Infraspeed Maintenance. Ruud Schellekens. Goal

The train-path pricing system. Who pays how much to rail infrastructure?

Trans-European Transport Network

PXE Event Prague 14 July Illiquid power markets, TA can it be used at all? Frank O. Brannvoll

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION

USB Folder Name Date Description Key Words Source

Carbon Capture & Storage Reliable cost effective CO 2 shipping through statistical modelling

Certification Case: Locomotives for Corridor A (and more)

Ordinance on Railway Infrastructure. General provisions. Article 1

Performance Measures for RIDOT s Traffic Management Center

North American Freight Rail Industry. Transportation Research Board Washington, DC March 14, 2014

Intermodal transport of marble from Bulgaria to Italy

Leading in the development of multimodal chain management

The Ministry of Transport, Public Works and Water Management of the Netherlands

A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport

INTERFERENCE AVOIDANCE IN INTERMODAL SUPPLY CHAIN OF SOUTH- EASTERN FINNISH PORTS

DaGoB Meeting Helsinki. Telematics Solutions for the Finnish Railways

How To Make Money From Shipping

The port of Rotterdam and the use of intermodal transportation

Rail safety statistics August 2014

The Moses Bridge A (day) trip to the Moses Bridge in Halsteren (near "Bergen Op Zoom")

Empowering Logistics with Intelligence

P/T 2B: 2 nd Half of Term (8 weeks) Start: 24-AUG-2015 End: 18-OCT-2015 Start: 19-OCT-2015 End: 13-DEC-2015

Container Tracking System Dwell Time and Transit Time Management at the Port of Halifax

GNSS for Train Control Systems

How To Use A Dynamic Passenger Information System (Dpi)

Canadian Rail: Gearing Up in the West

BOSTON CRASH REPORT.

Supply Chain Trends in Intermodal

HAMBURGER HAFEN UND LOGISTIK AG

Localisation and tracking solution of dangerous goods transport

Success with three networks: SBB Infrastructure. InnoTrans 2012.

Jan de Rijk Logistics Company Presentation

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE

European Strategy 2050 TEN-T Methodology: Italian TEN-T network proposal

Connecting Motorways of the Sea And Ten-T Corridors through Customs 4.0

Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre

ERTMS for a competitive railway

Next Stage of ITS Development in Taiwan

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager

Passenger Terminal Amsterdam

Transcription:

Integration of rail in the supply chain, a Rotterdam experience Guus de Mol, Manager Development & Logistic Solutions Kivi Niria, May 27 th 2011

Overview Keyrail and the Betuweroute Developments volume and market share Market share border crossings and A15 Volume growth Rotterdam Maasvlakte Chain management & punctuality Supply Chain Management Pilot 2007 2009 Intermodal shop chain management Punctuality Kijfhoek shunting yard 2

Keyrail BV Company goal: commercial exploitation of the Betuweroute break even within 5 years Importance of participation of ports: knowledge of the market and logistics partnerships for prospects & commercial leads 50% 35% 15% 3

Our core business Managing and allocating capacity Integral planning Development of logistic concepts and models Safe and punctual traffic control Focus on border crossings 24/7 Maintenance Workonthe railwaywithas littledisruptionas possible 4

Keyrail: Key to Europe Dutch connection: from sea up to Zevenaar A15 track (bundled with the A15 highway) Harbour line (rail tracks in the Port of Rotterdam) Including shunting yards and connections to port industries (e.g. container terminals) Amsterdam joins at Geldermalsen R dam A dam Zevenaar Duisburg Noordzee Europoort Maasvlakte Scope: van Rotterdamzee tot Zevenaar A15 tracé Geldermalsen Havenspoorlijn Giessen Tiel Emplacementen / raccordementen, bedrijfsaansluitingen Kijfhoek Gorinchem Waal Pannerdensch Kanaal Zevenaar Valburg Duitsland 5

Betuweroute: part of European corridors 6

Importance Betuweroute for The Netherlands Supports the Dutch modal shift policy Extra dedicated capacity in favor of freight trains Extra capacity for passenger trains on parallel routes Alternative to the transportation of dangerous goods Contributes to the ports of Rotterdam and Amsterdam improve competitive position Dutch ports better hinterland connection higher air quality facilitate growth 7

General characteristics Betuweroute Betuweroute = 160 km dedicated rail track for freight trains 48 km Harbour line (Rotterdam port area) 112 km A15-route 12 km crossings on separate levels 130 bridges / viaducts About 20 km underground 5 tunnels Electric tension of 25 kv on A15 route and Harbour line A15 route: ERTMS / ETCS level 2 Harbour Line: ERTMS / ETCS level 1 8

Innovations Betuweroute Electric tension A15 route + harbourline: European standard 25 kv (alternating current voltage) Existing railway network: 1500 V direct voltage -> insufficient for freight trains and high speed trains Train control system A15 route: ERTMS/ETCS Signals in the locomotive (board computer) Harbour line: ERTMS (signal poles) Existing railway network: ATB with signal poles alongside the track 9

Innovations Betuweroute Tunnel Technical Installations permanent detection and monitoring of the safety in the tunnels sprinkler and fire-extinguishing technology installations are automatically activated in case of an accident (such as fire or the release of hazardous or explosive chemicals) supporting regular train traffic 10

Volume & market share 11

Market share Betuweroute A15 2011 19% van/naar Emmerich via Betuweroute 2% 4% van/naar Emmerich via gemengd net van/naar Bentheim 75% van/naar Venlo (Brabantroute) 2010 shift from road to rail: attract new business 1% 34% van/naar Emmerich via Betuweroute van/naar Emmerich via gemengd net 70% 2% 2% 4% 60% van/naar Bentheim van/naar Venlo (Brabantroute) 2009 shift of the other international corridors to the Betuweroute 27% 32% 41% van/naar Emmerich via Betuweroute van/naar Emmerich via gemengd net van/naar Bentheim 5% van/naar Venlo (Brabantroute) 2010 - Q 4 22% new locomotives (ERTMS/25kV)

Volume growth 350 trains per week in 2010 2011: >500 trains per week To grow to max capacity available at German border crossing Long term ambition: 800-900 trains per week 6000 5000 4000 3000 2000 1000 0 # of trains on the A15-track per quarter 4600 3900 3800 3950 3000 1900 2350 2200 2300 1000 1200 1250 08 - Q1 08 - Q2 08 - Q3 08 - Q4 09 - Q1 09 - Q2 09 - Q3 09 - Q4 10 - Q1 10 - Q2 10 -Q3 10 -Q4 13

Intermodal traffic (containers) Weekly traffics per country (september 2010) 2 1 2 B 55 73 D 9 13 PL RU 6 11 1 29 4 CZ SK F CH A H 57 RO 4 I Bron: Railcargo Information Netherlands 14

Maasvlakte 2 Port of Rotterdam willgrowfrom11 to 38 mioteu! Bron: HbR Projectorganisatie MV2

Modal shift target intermodal Maasvlakte 2009 47% 2035 Road 35% 45% 40% Barge 20% 14% Rail 16

Atlas Maasvlakte 2 Growth hinterland modalities (x 1 mio TEU containers) mio TEU 8,0 x 4,5 6,0 4,0 2,0 0,0 x 3 x 5 2009 2035 2009 2035 2009 2035 road barge rail Containers via Maasvlakte Rotterdam 1) -2009 versus 2035 - Modal shift from road to barge and rail Total growth hinterland container volume x 4 New terminals: commitments by contract 1) Port of Rotterdam 17

Rotterdam Maasvlakte: development shunting yard Present situation: 2 shunting yards for intermodal and bulk (coal, iron) Development Maasvlakte 2: planned reservation for new shunting yard South with about 30 tracks Challenge for 2035: rail container volume x 5, number of shunting tracks x 3 Number of container tracks on shunting yard Name shunting yard At this moment (2011) New to build Future situation (2035) Maasvlakte East 2 tracks - 0 tracks Maasvlakte West 18 tracks 14 tracks 32 tracks Maasvlakte South - 30 tracks 30 tracks total 20 tracks 44 tracks 62 tracks West East South 18 Port of Rotterdam

Need for change Challenge for 2035: rail container volume x 5, number of shunting tracks x 3 EU Corridor regulation 913/2010 forces intensive cooperation between terminals and Infrastructure managers Integration off plans Working together for operations 19

Chain Management - pilot Chain Management Harbour Line - 2010: Keyrail as chain manager - 2011: start Intermodal Shop chain management 20

Supply Chain Management 2007: Start Supply Chain management => a joint effort with the market Purpose : Increase punctuality of rail freight transportation in the Rotterdam port area This has to lead to +22% punctuality improvement More efficient use of material Increased quality of rail products More capacity, without extra infrastructure Roll out in the Intermodal market Railoperator RU Punctuality Terminal 0-3 min Terminal planning (slots) Keyrail slots Cross border connection 21

Supply Chain Management -example - Example of analyzing and improving the supply chain (current issue) Joint effort with the market Replanning Operational rules Supply industry Distribution industry By ship / train Terminalslot Trainpath including bordercrossing Promised ATA 06:00-08:00 hrs 09:10 hrs (Rotterdam-Duisburg) Average delay +120 (border) Low reliability Incidents Punctuality Measure, Report, Analyse, Improve, Control Information /communication

Pilot Chain management harbour line 2007-2009 Background Logistic and industrial companies in Rotterdam complain about poor performance Pilot 2007 2009 Participants: ECT,RSC, Hupac, ICF, DBS, Veolia en ERS Increase punctuality of the rail freight transportation In order to: More efficient use of material (locs, rail tracks, train drivers, shunting yards, terminal capacity, etc.) More capacity without extra infrastructure Increased quality of rail products Results Operational rules Improvement of mutual communication Chanced Mindset and keeping the rules Integral planning Improved punctuality 82,00% 80,00% 78,00% 76,00% 74,00% 72,00% 70,00% Punctuality Port of Rotterdam Hinterland (eastwards) 72,60% 79,10% 80,10% 68,00% Jaar 2007 Jaar 2008 Jaar 2009 23

Ten operational rules have been agreed General 1 2 Integrated Planning (IP): time tables and terminal slot Terminalslot 3 The number of units for loading and unloading will be given in time 4 The wagon list and the AZ / ZA composition will be given in time Standard process Deviations Corrections 5 6 7 8 9 10 The (dynamic) expected time of departure (ETD) of the terminal will be announced as soon as possible Transport related information will be given in time Loc and loc driver are back in time in the terminal to realise the ETD Expected deviations of the planned ETA s and ETD s will be given as soon as possible Replanning in case of deviations Shunting of blocking trains (terminals and shunting yards) 24

2010: Keyrail as chain manager Keyrail as chain manager focuses on freight Pricing policy Entry Agreement : e.g.. Agreements about parking and rental of tracks Connections cross border Focus on punctuality With regard to original planning With regard to adjusted planning: Entry Agreement - punctuality > 89% Quality Integral planning Tuning terminal slots & time tables & engine drivers & locomotives Possibly more ICT solutions Intermodal Shop Chain Management Results: Railway undertakings reschedule assets and engine drivers Rail terminals focus on closing times terminal slot

Intermodal Shop Chain Management Results by mutual focus Each Monday: evaluation sessions with Keyrail, railway undertakings and ECT/RSC On Friday: tuning plans based on the original planning Carry trough improvements (eg: rescheduling the morning shift of a railway undertaking) Begin 2011: Intermodal export trains (RSC/ECT, HUSA, DBS, RRF, ERS, CTB) [may be later import also] Daily results via a cloud (webbased); Weekly performance report on the internet Internet access only for authorized members Twitter account #LoketIntermodal 26

Daily tracking of realisation Mutual focus for the best results 100,0 90,0 80,0 70,0 60,0 50,0 72 Aanvang terminalslot (trein op tijd op terminal 80 80 71 70 Week 10Week 11Week 12Week 13Week 14 100,0 90,0 80,0 70,0 60,0 50,0 Einde terminalslot 91,2 95,3 95,7 85,6 93,1 Week 10Week 11Week 12Week 13Week 14 100,0 90,0 80,0 70,0 60,0 50,0 65,0 Terminal uit (trein op tijd van terminal) 77,2 67,9 67,4 63,2 Week 10Week 11Week 12Week 13Week 14 100,0 90,0 80,0 70,0 60,0 50,0 Aankomst trein op interface met een marge van 0-3 minuten 67,2 78,0 78,6 75,0 77,1 Week 10Week 11Week 12Week 13Week 14

Increased quality through higher punctuality Increased quality Reliable product Attractive costs Example Started in 2007 with Pilot Chain Management Punctualiteit interfaces en grensovergangen mei 2010 -april 2011 100% 90% 91% 92% 91% 91% 92% 88% 89% 90% 89% 90% 89% 90% 80% 70% Increase punctuality of the rail freight transportation in the Rotterdam harbor area (target of improvement 20%). Result: More efficient use of material Increased quality of rail products More capacity, without extra infrastructure 60% 50% mei jun jul aug sep okt nov dec jan feb mrt apr Punctuality = deviation on planning < 3 minutes Performance agreement Keyrail: punctuality 89%

Kijfhoek Shunting yard 29

Characteristics Kijfhoek Opened in 1980 In 2009: area of over 500,000m 2 Sorting wagons by using gravity: Locomotive + stick + hill Gravity does the effort Shunting yard: 43 distribution tracks 5 departure tracks and 14 arrival tracks Length shunting tracks: > 700m Capacity shunting facility: 120 trains with an average of 33 to 34 wagons per day (4,000 wagons/day) 30

Infographic Kijfhoek 31

Kijfhoek: lynchpin in European network

Keyrail: Key to Europe 50 77 92 96 1000 1200 1250 146 1900 180 2350 169 2200 177 2300 230 3000 08-Q1 08 Q2 08-Q3 08-Q4 09-Q1 3900 4300 350 4550 09-Q2 09 Q3 09 Q4 10-Q1 400 4600 2010 2009 2008 dec. 2007 300 330 10 Q2 10 Q3 10 Q4 Average per week 33

Key to Europe www.keyrail.nl 34