CHANGE MANAGEMENT PLAN TEMPLATE

<name of project> Software Project Management Plan

Organization. Project Name. Project Overview Plan Version # Date

Introduction Purpose... 4 Scope... 4 Manitoba ehealth Change Management... 4 Icons RFC Procedures... 5

Add page numbers and headers and footers by using the gallery, or create a custom page number, header, or footer.

HOW TO PAGE A DOCUMENT IN MICROSOFT WORD

Creating a Table of Contents in Microsoft Word 2011

PROJECT PLAN FOR. Project Name Here

Page Numbering for a Thesis or Dissertation

Maximizing the Use of Slide Masters to Make Global Changes in PowerPoint

Getting Started 2. Inserting a Digital Signature Field without Signing 3. Signing an Unsigned Digital Signature Field 3

Operating Level Agreement (OLA) Template

Page Create and Manage a Presentation 1.1 Create a Presentation Pages Where Covered

Styles, Tables of Contents, and Tables of Authorities in Microsoft Word 2010

Planning and Managing Projects with Microsoft Project Professional 2013

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

SCOPE MANAGEMENT PLAN <PROJECT NAME>

MS WORD 2007 (PC) Macros and Track Changes Please note the latest Macintosh version of MS Word does not have Macros.

Outlook Tips & Tricks. Training For Current & New Employees

Building A Very Simple Web Site

Creating Accessible Word Forms. Contents. Introduction

BUSINESS OBJECTS XI WEB INTELLIGENCE

Open Workbench Warrior. Beginner's Guide to Open Workbench

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

Enterprise Support Solution. Remedy Help Desk. User s Guide

University of Rochester

ELECTRO-MECHANICAL PROJECT MANAGEMENT

MCCG PowerChart. Message Center Complete Manual. Hold the Ctrl key down & then left click on a link below to navigate to it:

Change Management for Rational DOORS User s Guide

Microsoft Outlook Tips & Tricks

Using the Thesis and Dissertation Templates

INTERNATIONAL SERVICES CONTRACT TEMPLATE INTERNATIONAL SERVICES CONTRACT

Capital Works Construction Project. [Insert Project Title] [Insert Sponsoring Agency]

Technical Bulletin. SQL Express Backup Utility

General Walkthrough Training Documentation. Office of Communications and Marketing. Drupal CMS

To install the SMTP service:

Configuration Management Plan (CMP) Template

CyberSource Business Center

HP Quality Center. Software Version: Version Control Add-in Guide

An Employee s Guide to Kronos Workforce Timekeeper

Microsoft Project Activity

HOW TO CREATE AN HTML5 JEOPARDY- STYLE GAME IN CAPTIVATE

Project Management Guidelines

ing a large amount of recipients

Basic Microsoft Excel 2007

Bank Account 1 September 2015

Microsoft Office PowerPoint Creating a new presentation from a design template. Creating a new presentation from a design template

Aras Corporation Aras Corporation. All rights reserved. Notice of Rights. Notice of Liability

QUALITY MANAGEMENT PLAN

WORD ADVANCED CLASS- MAC HANDOUT

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Exam Name: Excel 2010 Exam Type: Microsoft Exam Code: Certification Microsoft Office Specialist (MOS) Total Questions: 26

Microsoft Outlook 2010

3 What s New in Excel 2007

Chapter 15: Forms. User Guide. 1 P a g e

INTERNATIONAL COMMERCIAL AGENCY AGREEMENT TEMPLATE

Create a New Database in Access 2010

CMS INFORMATION SECURITY (IS) CERTIFICATION & ACCREDITATION (C&A) PACKAGE GUIDE

ImageNow Cluster Resource Monitor

Estimating and Vendor Quotes An Estimating and Vendor Quote Workflow Guide

Word 2010: Mail Merge to with Attachments

Microsoft Word 2011: Create a Table of Contents

The Center for Teaching, Learning, & Technology

Attachment M Explore IRP Change Control Process

INTERNATIONAL CONSULTING CONTRACT TEMPLATE INTERNATIONAL CONSULTING CONTRACT

HireTouch Sending Applicant Correspondences ( s)

REUTERS/TIM WIMBORNE SCHOLARONE MANUSCRIPTS COGNOS REPORTS

AppShore Premium Edition Campaigns How to Guide. Release 2.1

Project Management Plan for

MWA Project. Configuration Management Plan

Advanced Presentation Features and Animation

Non-Profit Solution for Microsoft Dynamics CRM

Lab 1 Introduction to Microsoft Project

Drip Marketing Campaign Manual

XMailer Reference Guide

Microsoft Access Creating Filters and Tables

Font and color choices are all made from the Message or Format Text tab on the ribbon.

Knowledge Base for Electronic Editing Tools

Create a report with formatting, headings, page numbers and table of contents

This is a training module for Maximo Asset Management V7.1. It demonstrates how to use the E-Audit function.

Service Desk R11.2 Upgrade Procedure - How to export data from USD into MS Excel

How to use Microsoft Project? Basic Training to Help You during the BYI challenge

HP ThinShell. Administrator Guide

Scheduling Document Creation

RESOURCE AND PATIENT MANAGEMENT SYSTEM. Patient Goals. User Manual. Version 1.0 July 2012

Administrator s Plus. Backup Process. A Get Started Guide

Transcription:

Change Management Plan Template Project Name: U.S. Department of Housing and Urban Development October, 2010 Change Management Plan Template (V1.0)

Notes to the Author [This document is a template of a Change Management Plan document for a project. The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values specific to the project. Blue italicized text enclosed in square brackets ([text]) provides instructions to the document author, or describes the intent, assumptions and context for content included in this document. Blue italicized text enclosed in angle brackets (<text>) indicates a field that should be replaced with information specific to a particular project. Text and tables in black are provided as boilerplate examples of wording and formats that may be used or modified as appropriate to a specific project. These are offered only as suggestions to assist in developing project documents; they are not mandatory formats. When using this template, the following steps are recommended: 1. Replace all text enclosed in angle brackets (e.g., <Project Name>) with the correct field document values. These angle brackets appear in both the body of the document and in headers and footers. To customize fields in Microsoft Word (which display a gray background when selected) select File->Properties->Summary and fill in the appropriate fields within the Summary and Custom tabs. After clicking OK to close the dialog box, update all fields throughout the document selecting Edit>Select All (or Ctrl-A) and pressing F9. Or you can update each field individually by clicking on it and pressing F9. These actions must be done separately for any fields contained with the document s Header and Footer. 2. Modify boilerplate text as appropriate for the specific project. 3. To add any new sections to the document, ensure that the appropriate header and body text styles are maintained. Styles used for the Section Headings are Heading 1, Heading 2 and Heading 3. Style used for boilerplate text is Body Text. 4. To update the Table of Contents, right-click on it and select Update field and choose the option - Update entire table. 5. Before submission of the first draft of this document, delete this instruction section Notes to the Author and all instructions to the author throughout the entire document. Configuration Management Plan (v 1.0) Page 2 of 10

VERSION HISTORY [Provide information on how the development and distribution of the Change Management Plan will be controlled and tracked. Use the table below to provide the version number, the author implementing the version, the date of the version, the name of the person approving the version, the date that particular version was approved, and a brief description of the reason for creating the revised version.] Version Number Implemented By Revision Date Approved By Approval Date of Change 1.0 <Author name> <mm/dd/yy> <name> <mm/dd/yy> <description of change> Configuration Management Plan (v 1.0) Page 3 of 10

TABLE OF CONTENTS 1... Introduction 5 1.1... Purpose of The Change Management Plan 5 2... Change management Process 5 2.1... Change Request Process Flow Requirements 5 2.2... Change Request Form and Change Management Log 6 2.3... Evaluating and Authorizing Change Requests 6 2.3.1... Change Control Board 7 3... Responsibilities 7 Appendix A: Change Management Plan Approval... 8 APPENDIX B: REFERENCES... 9 APPENDIX C: KEY TERMS... 10 Configuration Management Plan (v 1.0) Page 4 of 10

1.0 INTRODUCTION Purpose of The Change Management Plan [Provide the purpose of the Change Management Plan. This document should be tailored to fit the particular project needs.] The Change Management Plan documents and tacks the necessary information required to effectively manage project change from project inception to delivery. The Change Management Plan is created during the Planning Phase of the project. Its intended audience is the project manager, project team, project sponsor and any senior leaders whose support is needed to carry out the plan. 2.0 CHANGE MANAGEMENT PROCESS The Change Management process establishes an orderly and effective procedure for tracking the submission, coordination, review, evaluation, categorization, and approval for release of all changes to the project s baselines. Change Request Process Flow Requirements [Outline the project team s agreed upon change request (CR) process flow. The following outlines a generic change request process flow.] Step Generate CR Log CR Status Evaluate CR Authorize Implement A submitter completes a CR Form and sends the completed form to the Change Manager The Change Manager enters the CR into the CR Log. The CR s status is updated throughout the CR process as needed. Project personnel review the CR and provide an estimated level of effort to process, and develop a proposed solution for the suggested change Approval to move forward with incorporating the suggested change into the project/product If approved, make the necessary adjustments to carry out the requested change and communicate CR status to the submitter and other stakeholders Generate CR Evaluate CR Authorize CR Implement CR Log Updated Status Report Status Configuration Management Plan (v 1.0) Page 5 of 10

Change Request Form and Change Management Log [List and define the data elements the project team needs to include on the Change Request Form and in the Change Management Log. At a minimum, the following data should be included on the project s Change Request Form and Change Management Log.] Element Date CR# Title Submitter Phone E-Mail Product Version Priority The date the CR was created Assigned by the Change Manager A brief description of the change request of the desired change, the impact, or benefits of a change should also be described Name of the person completing the CR Form and who can answer questions regarding the suggested change Phone number of the submitter Email of the submitter The product that the suggested change is for The product version that the suggested change is for A code that provides a recommended categorization of the urgency of the requested change (High, Medium, Low) Evaluating and Authorizing Change Requests [In order to evaluate and prioritize a change request, the priority and type of the change are taken into consideration. Use the first and second tables below to list and define the priority and type data elements that are applicable for the project. The third table provides examples of commonly used project status types. The list of elements is at the discretion of the project manager.] Change requests are evaluated using the following priority criteria: Priority High <Insert the definition the project assigns to a high priority CR> Medium <Insert the definition the project assigns to a medium priority CR> Low <Insert the definition the project assigns to a low priority CR> <priority> <Insert the definition the project assigns to this level of priority CR> Change requests are evaluated and assigned one or more of the following change types: Type Scope Change affecting scope Time Change affecting time Duration Change affecting duration Cost Change affecting cost Resources Change affecting resources Deliverables Change affecting deliverables Product Change affecting product Processes Change affecting process Quality Change affecting quality <change type> <define this change type> Change requests are evaluated and assigned one of the following status types: Status Open Entered/Open but not yet approved or assigned Work in CR approved, assigned, and work is progressing Progress In Review CR work is completed and in final review prior to testing Configuration Management Plan (v 1.0) Page 6 of 10

Testing Closed <status type> CR work has been reviewed and is being tested CR work is complete, has passed all tests, and updates have been released. <define this status type CR> Change Control Board [A Change Control Board (CCB) is a formally constituted group of stakeholders responsible for approving or rejecting changes to the project baselines. This group may meet on a predefined schedule or on an as needed basis. The table below provides a brief description of personnel acting as the Change Control Board (CCB) and their role/level of authority within that group.] Role Name Contact [Insert Role] [Insert Name] [Insert Contact #] [Insert Role ] 3.0 RESPONSIBILITIES [Provide a brief description of persons responsible for each step of the change management process for the project.] Role Name Contact Project Manager Change Manager [Insert Role] [Insert Name] [Insert Contact #] [Insert Role ] Configuration Management Plan (v 1.0) Page 7 of 10

Appendix A: Change Management Plan Approval The undersigned acknowledge that they have reviewed the <Project Name> Change Management Plan and agree with the information presented within this document. Changes to this Change Management Plan will be coordinated with, and approved by, the undersigned, or their designated representatives. [List the individuals whose signatures are desired. Examples of such individuals are Business Owner, Project Manager (if identified), and any appropriate stakeholders. Add additional lines for signature as necessary.] Signature: Print Name: Title: Role: Signature: Print Name: Title: Role: Signature: Print Name: Title: Role: Date: Date: Date: Configuration Management Plan (v 1.0) Page 8 of 10

APPENDIX B: REFERENCES [Insert the name, version number, description, and physical location of any documents referenced in this document. Add rows to the table as necessary.] The following table summarizes the documents referenced in this document. Document Name Location <Document Name and <Document description> <URL or Network path where document Version Number> is located> Configuration Management Plan (v 1.0) Page 9 of 10

APPENDIX C: KEY TERMS The following table provides definitions and explanations for terms and acronyms relevant to the content presented within this document. Term Definition [Insert Term] <Provide definition of term and acronyms used in this document.> Configuration Management Plan (v 1.0) Page 10 of 10