API AIMM PHILADELPHIA INSTALLATIONS FURNITURE INSTALLATIONS RECONFIGURATION RELOCATION PROJECT MANAGEMENT WAREHOUSING



Similar documents

Modular Studios From small, standard Voice-Over booths to large, custom-designed TV production studios

Sapphire COMPANY PROFILE

Whatever your business move across the street, across town or across the world, the best moves are made with Grace.

Responsibility Due/Done Relocation Task Comments

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

OfficeMax Interiors and Gensler partner for a streamlined glass wall system relocation

Flexible Office Space Up to 66,240 Ft 2

WELLINGTON E. WEBB MUNICIPAL OFFICE BUILDING DIVISIONS OF FACILITIES MANAGEMENT AND REAL ESTATE. Space Allocation and Furniture Standards

REASONS. Like it never even happened. To Choose SERVPRO for Your Commercial Property s Fire or Water Damage Cleanup and Restoration.

+ OFFICE RELOCATION. BEST PRACTICES Moving Your Office

General Brainstorm Checklist for Relocation Preparations

Position Classification Flysheet for Exhibit Specialist Series, GS Table of Contents

Work Space and Office Furniture Standards December 2014

1. Emergency Services

We d like you to become our next raving fan.

Element Z General Design Requirements Owner Standards and other Requirements

MOVING OFFICE CHECKLIST

FREEMAN LABOR JURISDICTIONS

Polycom RealPresence Experience High Definition (RPX HD)

Logistics Solutions. Intimate Involvement for Personalized Solutions

PHASE VI INSTALLATION OF FURNISHING AND INTERIOR DECOR

IBM Global Services. IBM Relocation Services: Your single source for moving or upgrading critical IT resources safely and economically.

Furniture, Furnishings, and Equipment Services

BUSINESS MOVES. Moving Guide. for Office Moves. With Bournes, it s personal.

Office Move Checklist

T170 Interior Design Technology MTCU Code Program Learning Outcomes

SPACE LOCATION, ALLOCATION, LAYOUT AND MEASUREMENT STANDARDS POLICIES

AVIATION TRANSPORTATION SPECIALISTS WHATEVER IT TAKES. WHEREVER IT S GOING.

Office Space Standards and Guidelines

Segreti Design Scope of Interior Design Services

The Benefits of Real Presence Experience High Definition

You can do it all yourself. But you don t have to.

Interior Design IV Gary Leivers AIA, RIBA, LEED AP

together we can think beyond the box

The Training Material on Logistics Planning and Analysis has been produced under Project Sustainable Human Resource Development in Logistic Services

Introduction. Meeting Spaces. Hynes Audio Services

Shouldn t your moving company be more than just a mover?

Yale Business Continuity Program Emergency Response Guide

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Work Space and Office Furniture Standards

July 7 10, 2014 Philadelphia Convention Center Philadelphia, PA, USA glassconglobal.com. Exhibitor Service Kit

Office Relocation Planning Guide. The Department of Administrative Services (DAS) offers these guidelines to help plan office relocations.

Designing a point of purchase display (POP) that works for you

designed delivered installed

Free Examples of plant layout drawing

CONTACT: Rose Hudgens (703) Arlene Fitzpatrick (703)

Analytical Products and Solutions. Complete service and maintenance solutions for your analytical equipment. usa.siemens.com/analyticalproducts

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

2010 White Paper Report: Call Center Trends/Best Practice

INTERIOR DESIGN-BUILD

Around the Corner or Around the World

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Tech Data At a Glance

CEDIA Electronic Lifestyles Awards Program Home Technology Professional Categories Technical Criteria for Judging

Every insurance claim is different but with Rapid Recovery Services the outcomes are all the same. Insured Satisfaction.

IT Relocation Checklist

Section D: Logistics APICS All rights reserved Version 1.4 Draft 2

FURNITURE and MODULAR OFFICE SYSTEMS

AUSTIN PROPERTY SOLUTIONS

Thomas Properties Group CityWest MOVE-IN PACKAGE

11 Common Disaster Planning Mistakes

Your reliable source for barcode scanning solutions

Capital One Financial Data Center

Think Of Us First! When It s Time to Distribute Your Plans

Part 2 Definitions for this Policy 2.1. ADA / TAS the Americans with Disabilities Act / Texas Accessibility Standards.

Construction Technologies Career Field Pathways and Course Structure

Audio - Visual. Design USA OFFICE Savoy Drive, Suite 115 Houston, Texas Phone: (713) Fax: (713)

Response, Reliability and Results. for Managed Property

E-Fulfillment Trends Report

Takeoff and Estimating for Design-Build Contractors

Davos Collection...Classic Open Office

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Management Services. Optimum. Property Management Facility Management Construction Management Relocation Management NAI OPTIMUM

Transcription:

API AIMM PHILADELPHIA INSTALLATIONS FURNITURE INSTALLATIONS RECONFIGURATION RELOCATION PROJECT MANAGEMENT WAREHOUSING

API ABOUT US AIMM Philadelphia Installations Inc. is a furnishings installation, millwork, and warehousing service company dedicated to providing it s clients with cost effective services, resources, and solutions of the highest quality. Established in 1983, API has serviced a diverse and expansive client base that traverses a great number of industries. We have vast experience with all systems and furniture manufacturers, a skilled and multifaceted team of craftsmen, and familiarity with a wide range of industries and facility environments. We are confident that AIMM Philadelphia Installations is the right choice for all of your commercial interior needs. OUR MISSION To become an integrated and reliable resource partner to our clients while providing personalized service solutions that address their needs. API is there for its clients long after the project has been completed providing the resources to support their daily operational service, repair, and maintenance activities. We place a high value on being an integrated member of our clients facilities and project teams and on continuously supporting our clients current and future facilities and furniture objectives. API strives to fully understand it s clients operations and long term goals and then find solutions best suited to meeting those needs.

FURNITURE INSTALLATION The best way to protect your contract furniture investment is to work with a professional and experienced installation team. We begin working with you weeks, even months, ahead of time to precisely coordinate when, where, and how your product and furniture installation will take place. API s goal is to complete your furniture installation with efficiency, speed and professionalism to assure that there will be no downtime for your personnel. Our services include, but are not limited to, the receiving, staging, layout, and installation of various products. In addition, we can arrange for product storage if there is any postponement of site availability due to construction delays. We will also remove any packing materials and leave the area in move-in condition. Following the initial installation, we ll be there whenever the need arises. We have OSHA trained, fully-insured and bondable professionals to install all types of contract furniture we are considered the systems experts. Protect your investment, whether it s Panel Systems High Density Mobile Filing Free-standing Case Goods Demountable Partition Walls High-tech Computer Stations Talk to the professionals at API about your next furniture installation. It will be worth the phone call. FURNITURE INSTALLATION When it comes to furnishing requirements, we always know we can rely on API making it happen Peter Luukko, President Comcast-Spectacor WE INSTALL ALL PRIMARY, SECONDARY SYSTEMS & CASE GOODS PRODUCTS AVAILABLE IN TODAY'S MARKETPLACE AIMM PHILADELPHIA INSTALLATIONS 856-546-1212 www.aimmphilly.com

RECONFIGURATION API has the experts that will help you manage and implement the reconfiguration of your workstation or an entire work environment. We bring the skill to help transform your existing space into one that meets tomorrow's needs. Our project planning helps facilitate efficiency and ease, function and flow. Safety, comfort, aesthetics and day-to-day practicality are all addressed and the result is an office that works seamlessly. API has a thorough understanding of corporate clients cultures and practices that translates into effectively communicating and operating within that environment. Our supervisors and personnel will interpret plans and specifications, troubleshoot, and work quickly, unobtrusively, and independently, allowing our clients to focus their energies on running and managing their business with minimal interruption. RECONFIGURATION

RELOCATION API has always performed not only simple tasks, but the more difficult ones on schedule and to everyone s satisfaction. I would certainly recommend them Rosemary Espanol, Principal Interiors Environments, Inc. RELOCATION Moving office furniture and furniture systems to a new location is like reassembling an erector set that contains thousands of pieces: There is only one right way to piece the puzzle back together. That s where API steps in. While most moving companies are fine for transporting furniture from Point A to Point B, very few have the expertise to reassemble it, or take the time to make it plumb and level. Our professionals plan the most efficient and rapid method to disassemble and reassemble your working environment to protect your investment. API s relocation specialists begin by coordinating with your work schedule and your moving company, in order to relocate your office at the most convenient time possible with minimal disruption of personnel. We work 7 days a week, 24 hours a day, if necessary, to accommodate your project needs. So, whether your office is relocating, expanding, or simply moving across the hall, talk to API s relocation professionals about your particular installation needs. AIMM PHILADELPHIA INSTALLATIONS 856-546-1212 www.aimmphilly.com API

PROJECT MANAGEMENT & COORDINATION The assembly or disassembly of contract furniture can be a formidable and time consuming task that requires endless attention to detail. That s where API s Project Coordination team comes in they are masters in coordinating the task of planning, scheduling, and handling the relocation of contract furniture from start to finish. Whether moving from floor to floor, or building to building, total coordination is essential in the earliest stages of office planning. API s professionals begin by examining the project requirements. They then review your new office layout, and plan each stage of the job with all key tradespeople. From coordinating ceiling and carpet installers, to scheduling cleaning services and freight elevators, we arrange the sequencing of your furniture installation. API s years of experience in scheduling, timing, and troubleshooting have proven that project coordination is absolutely crucial to the success of the entire project. So, the next time you have a furniture installation need, talk to the project management specialists at API. I ve worked with most of the furniture installation companies in the United States and AIMM Philadelphia is one of the best Barry Coyle, Principal BEC Consulting PROJECT MANAGEMENT & COORDINATION OTHER INTERIOR INSTALLATION SERVICES Auditorium Seating Stadium Seating Custom Millwork Demountable Partition Systems High Density and Mobile Filing Systems Health Care Furnishings Library and Storage Shelving Systems Casino FF&E Projects Hotel FF&E Projects Lockers and Specialty Storage Systems Mezzanine Systems Fabric Wall Systems Acoustical Wall Panels & Wall Systems Pallet Rack Systems

WAREHOUSING WAREHOUSING API offers clean, secure, climate controlled storage capabilities in our 50,000 square foot main warehouse facility. We can receive, inspect, provide receipt notification and trucking services. In addition, our sophisticated tracking technology connects you to up-to-the-minute information on what s stored, whether you need to sell assets, have them delivered on-time or have them stored for the moment. API s furniture warehousing service gives you the control to manage your furnishings with complete clarity. API offers a variety of warehousing services for your short or long term needs including: Short Term Receiving and Storage Long Term Storage Transportation Furniture Inventory Management Shipping First 30 Day Storage at No Cost AIMM PHILADELPHIA INSTALLATIONS 856-546-1212 www.aimmphilly.com API

1250 Metropolitan Avenue West Deptford, NJ 08066 856-546-1212 fax: 856-546-0027 www.aimmphilly.com