Pipeline Engineering. Natural Gas Distribution

Program Design and Engineering Key to Infrastructure Replacement and Cost Containment

ALASKA NATURAL GAS PIPELINE PROJECT

Regulation of Natural Gas Pipelines. June 23, 2008

Frequently Asked Transmission Pipeline Questions

Compliance Inspections of Natural Gas Systems

PROJECT EXPERIENCE Development/Transaction Support United States MANAGING DIRECTOR

FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY

Risk Based Asset Management

PIPELINE FUNDAMENTALS. texaspipelines.com

Operations and Maintenance Procedures for Natural Gas Systems

SOCALGAS APROACH TO PIPELINE INTEGRITY

California Public Utilities Commission Risk Assessment Unit Hazard Database Project Report on Status and Initial Recommendations

TECHNICAL INFORMATION ABOUT NATURAL GAS TRANSPORT

Slides prepared by the Northeast Gas Association

Exhibit DS-1 David A. Schramm Page 1 of 6 VP, Corrosion Control and Integrity Field Services, Integrity rev

SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM

Guidance 1 for Strengthening Pipeline Safety Through Rigorous Program Evaluation and Meaningful Metrics

Railroad Commission of Texas Page 1 of TAC Chapter 8-Pipeline Safety Regulations

SDG&E DIRECT TESTIMONY OF MARIA T. MARTINEZ (PIPELINE INTEGRITY FOR TRANSMISSION AND DISTRIBUTION) November 2014

A Solution to MOP/MAOP Data Management in PODS

Recently Completed Projects - Storage Projects

S Y S T E M M O D E R N I Z A T I O N

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

ENERGY TRANSFER PARTNERS, L.P. PHMSA CRM and SCADA. Joe Schmid & Anil Pinto. Tuesday, April 29th, 2014

Tres Palacios Natural Gas Storage Acquisition Overview. September 7, 2010

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

Frequently Asked Questions About PennEast Pipeline Project

MAR Sincerely,

The State of Natural Gas Pipelines in Fort Worth

Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems

New Technologies for Gas Transmission and Distribution

Kennebec Valley Expansion. 442 Civic Center Dr., Suite 100 * Augusta, Maine

ELECTRICAL ENGINEERING ASSOCIATE, 7525

Distribution Planning. Justin Cook Gord Dillon

Pipeline Engineering and Field Services

COMPARISON OF INTEGRITY

Rebuilding the World s Pipeline Infrastructure

Ohio RCAP Methodology for Asset Management / CMOM Demonstration Projects

STS Federal Government Consulting Practice IV&V Offering

49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards

Managing the integrity of pipeline assets

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Emergency Plans

Integrity Management Products and Services Rehabilitation and Maintenance Services and Project Services


APGA SECURITY & INTEGRITY FOUNDATION OPERATIONS CONFERENCE

REQUEST FOR PROPOSALS For Natural Gas Pipeline Infrastructure and Transportation Services

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

Township of Enniskillen. Asset Management Plan

THE STATE OF THE NATIONAL PIPELINE INFRASTRUCTURE

APPENDIX J GAS DISTRIBUTION

Re: INGAA s Comments to OSHA s Request for Information concerning Process Safety Management

Portable Natural Gas Supply Solutions

Measurement Services Inspectorate America Corporation

CAPITAL IMPROVEMENT PROGRAM (CIP) MANAGEMENT & TRACKING PROCESS, SYSTEMS, & PEOPLE APPROACH

STRATEGIC CONSULTING AND INDUSTRY ADVISORY SERVICES Merger and Acquisition Support

Water Transmission & Sewer Force Main Renewal 16 through 60

DEPARTMENT OF ENVIRONMENTAL CONSERVATION

Industrial Engineering Roles In Industry. (Institute of Industrial Engineers Industry Advisory Board)

Title: Contract Management Software Solutions (CMS) and Procurement Front-End System

OIL POLLUTION PREVENTION REGULATIONS

DOMINION EAST OHIO APRIL 2013 THROUGH MARCH 2014 STANDARD SERVICE OFFER AND STANDARD CHOICE OFFER ISOLATED DELIVERY POINTS

Project driven supply chain in complex MRO services Oracle e-business suite

May 27, Version

Market Intelligence as a Strategic Weapon

Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.

FINAL UPDATES TO REQUIREMENTS FOR STORAGE TANKS USED IN OIL AND NATURAL GAS PRODUCTION AND TRANSMISSION

METERS Data Collection CONTROL. Dialog3G. AMR/AMI Solutions

ALL UST SYSTEMS. MOTOR FUEL, USED OIL, BULK HEATING OIL STORAGE (Federal/State Regulated Systems)

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

Drafters Notes for Use With the Comcast Franchise Agreement Template

List of Frequently Utilized Storage Tank Standards and Practices

Shop Fabricated Aboveground Tank Construction Standards

GUIDELINES AND PROCEDURE FOR THE CONSTRUCTION, OPERATION AND MAINTENANCE OF OIL AND GAS PIPELINES AND THEIR ANCILLARY FACILITIES.

Tennessee Gas Association

Foundation of Supply Management Certified Professional in Supplier Diversity (CPSD )

ASMECourseCatalog.

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

Transcription:

Nicor Gas Corrosion Control, Cathodic Protection & Integrity Management Illinois USA Multi-year contract providing corrosion control, cathodic protection and integrity management services since 2001. Primary responsibilities are corrosion services and system integrity programming for NICOR s transmission and underground storage system facilities. Other responsibilities include ECDA and ICDA work; providing integrity management regulatory support; and cathodic protection design, troubleshooting, and construction coordination and oversight on distribution system facilities. CONSP-1 United States Gypsum (USG) System Integrity and Management USA Provide system integrity support including development of standards, procedures, forms and IMP documents. Performed an ECDA assessment. Provided complete support of all aspects of DOT 49 CFR Part 192. Developed and implemented an Operator Qualification program which included providing OQ training, and data management of their employee training records and recertification documentation. Perform faculty audits and mock emergency exercises. CONSP-2 Negev Natural Gas Distribution System Negev Region, Israel Engineering Consultant providing engineering and design support for the development of the first natural gas system in Israel. Services include guidance with the development of specifications and standards for engineering and construction. Feasibility studies, hydraulic modeling, and system forecasting for the regions planned growth were completed. Detailed engineering design plans were reviewed and completed. Construction field support of the distribution system was provided. CONSP-3

Alvord, Burdick & Howson Cathodic Protection Analysis & Design Water Pipeline Illinois USA Performed a multi-year contract to provide cathodic protection analysis and design for large diameter water pipeline transmission mains. The contract included corrosion control monitoring and testing including test point readings, continuity testing, Panhandle Eastern Testing and close-interval survey. Testing was performed after installation at 6 months and 12 months. CONSP-4 GE Energy External Corrosion & Direct Assessment Oil Pipeline Villahermosa, Mexico Provided field and engineering assistance to Mexico's oil company (PEMEX Company) for the completion of external corrosion direct assessment (ECDA) and customized training services related to indirect inspection equipment for client's personnel. CONSP-5 Midwest Energy Association (MEA) DIMP Guidance Plan MidWest USA Worked with the Midwest Energy Association to develop a sample Distribution Integrity Management Program. Leveraging ENE s experience and participation in the GPTC DIMP Guidance work, the Sample Program is intended to be used as a template to create a client- specific integrity plan that will be required for gas distribution companies in order to conform to new regulations. CONSP-6 Texas A&M University Natural Gas Pipeline Selection & Routing Texas, USA Project involved the review of alternate gas supply laterals from three potential shippers to provide fuel to a new high pressure combustion turbine/generator. Work involved selecting pipeline routes, designing facilities to meet increased delivery pressure requirements, estimating cost to construct, negotiating with suppliers to procure an advantageous long-term gas supply contract, and completing an economic evaluation of the best alternative for the campus. CONSP- 7

Transmission Integrity Management Program Review ENE was retained by the Client to complete an internal audit of the companies Transmission Integrity Management Program in their efforts to ensure compliance with 49 CFR Part 192 Subpart O. The project involved the review of specific aspects of the clients existing practices, tools and procedures for compliance with Subpart O, and industry best practice. ENE considered 49 CFR Part 192 Subpart O, ASME B31.8S, NACE RP0502, PHMSA Frequently Asked Questions, PHMSA Protocol documents, best practices, information learned during public meetings, along with ENE s extensive experience during the review. ENE also reviewed the internal TRIMP organizational structure to determine project management effectiveness. As a deliverable, ENE provided a written report with specific recommendations on actions to improve compliance. CONSP-8 Due Diligence Interstate Pipeline Acquisition Assisted private equity investor with the review of operating and maintenance practices and forecast capital expenditures related to expansion of a major interstate transmission pipeline holding company and its subsidiaries. Facilities were located in the United States east of the Rocky Mountains. CONSP-9 Due Diligence Gathering System Acquisition Assisted private equity investor with the review of natural gas gathering and transmission system. Activities included assessment of attached production, evaluation of system capacity, market assessment and pipeline integrity evaluation. CONSP-10

Automatic Shut Off and Remote Control Valve Assessment Performed a review of the use of Automatic Shut-off Valves (ASV) and Remote Control Valves (RCV) including industry nest practice, alternatives and merits of available technologies. In addition to reviewing pertinent industry literature and regulations, conducted a survey of natural gas transmission and distribution companies regarding their experiences with ASVs and RCVs. Reviewed client s historical, current, and proposed deployment of ASV and RCV equipment. Identified individual valve segments within the transmission system and prioritized based on factors including but not limited to population density, potential impact radius and blowdown time. CONSP-11 ASV/RCV Valve Estimating Developed unit cost approach to create project estimates for installation, replacement, or automation of existing valves in support of system upgrade initiative. Selected optimal valve locations based on defined program scope. Identified scope of work required to isolate each line segment and developed estimates for approximately eighty valve automation projects. Provided work scope and cost estimate documentation as basis for engineering design work as well as inclusion in Public Utility Commission rate case filing. CONSP-12 Cathodic Protection Record Stabilization Managed cathodic protection record stabilization team centralizing over 30,000 test points into single SAP database from paper records. Managed a team building Pipeline Feature Lists for MAOP Validation program. This team focused on customer and regulator meter sets, crossovers, blowdowns, and other non-mainline pipe segments. CONSP-13

Corrosion Control Monitoring Program Transmission Line Assessment Classified Performed preliminary review of construction data and operating information including leak history for water transmission mains. Work included field testing and data gathering in order to design a cathodic protection system for the steel portions of each line. Tests conducted included current requirement testing, soil resistivity testing, and continuity testing along the pipeline right of way. Specific ground bed locations utilizing the existing easements were identified. ENE s preliminary design report included test results, data analysis, written description of proposed cathodic protection system, bill of materials, and cost estimate for construction phase. ENE s design drawings included ground bed locations, installation details, and typicals. Additionally, provided assistance to Client in obtaining permits, development of technical specifications for bidding, construction contract documents, and bid evaluations/recommendations. CONSP-14