MAR Sincerely,
|
|
|
- Anastasia Walker
- 10 years ago
- Views:
Transcription
1 MAR Mr. Terry Gottberg President Merit Energy Company, LLC 1327 Noel Road, Suite 500 Dallas, TX Re: CPF No Dear Mr. Gottberg: Enclosed please find the Final Order issued in the above-referenced case. It makes findings of violation and finds that Merit Energy Company, LLC, has completed the actions specified in the Notice to comply with the pipeline safety regulations. Therefore, this case is now closed. Service of the Final Order by certified mail is deemed effective upon the date of mailing, or as otherwise provided under 49 C.F.R Thank you for your cooperation in this matter. Sincerely, Jeffrey D. Wiese Associate Administrator for Pipeline Safety Enclosure cc: Mr. Jay Prudhomme, Vice President Northern Rockies, Merit Energy Company, LLC Mr. Bill Ellsworth, PSM/DOT Coordinator, Merit Energy Company, LLC Mr. Chris Hoidal, Director, Western Region, OPS Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, OPS CERTIFIED MAIL - RETURN RECEIPT REQUESTED [ ]
2 U.S. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION OFFICE OF PIPELINE SAFETY WASHINGTON, D.C ) In the Matter of ) ) Merit Energy Company, LLC, ) CPF No ) Respondent. ) ) FINAL ORDER On May 4-5, 2010, pursuant to 49 U.S.C , a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), conducted an on-site pipeline safety inspection of the facilities and records of Merit Energy Company, LLC s (Merit Energy or Respondent) Bairoil CO 2 pipeline between Bairoil, Wyoming, and Jeffrey City Wyoming. Merit Energy operates the 19.8-mile Bairoil CO 2 Pipeline (Bairoil Pipeline) in the high plains of Central Wyoming. 1 As a result of the inspection, the Director, Western Region, OPS (Director), issued to Respondent, by letter dated January 6, 2011, a Notice of Probable Violation and Proposed Compliance Order (Notice), which also included a warning pursuant to 49 C.F.R In accordance with 49 C.F.R , the Notice proposed finding that Merit Energy had committed various violations of 49 C.F.R. Part 195 and proposed ordering the company to take certain measures to correct the alleged violations. The warning items required no further action, but warned the operator to correct the probable violation or face possible enforcement action. Merit Energy responded to the Notice by letter dated February 16, 2011 (Response). The company did not contest the allegations of violation but provided information concerning the corrective actions it had taken. Respondent did not request a hearing and therefore has waived its right to one. FINDINGS OF VIOLATION In its Response, Merit Energy did not contest the allegations in the Notice that it violated 49 C.F.R. Part 195, as follows: Item 1: The Notice alleged that Respondent violated 49 C.F.R (b)(9), which states: 1 (last accessed 9/30/2011)
3 Records. (a) A record must be made of each pressure test required by this subpart, and the record of the latest test must be retained as long as the facility is in use. (b) The record required by paragraph (a) of this section must include: (1) (9) Where elevation differences in the section under test exceed 100 feet (30 meters), a profile of the pipeline that shows the elevation and test sites over the entire length of the test section;. The Notice alleged that Respondent violated 49 C.F.R (b)(9) by failing to retain complete records of each pressure test required under Subpart E of 49 C.F.R. Part 195 for the Bairoil Pipeline. Specifically, the Notice alleged that Merit Energy s September 9, 1986 pressure test records did not include a profile of the pipeline showing the elevation and test sites over the entire length of the test section, where elevation differences in the section under test exceeded 100 feet. Although the elevation differences along the pipeline range between 6985 feet above mean sea level (MSL) to 7575 feet MSL, the company s hydrostatic test records did not include a profile of the pipeline showing such elevation differences. Respondent did not contest this allegation of violation. Accordingly, based upon a review of all of the evidence, I find that Merit Energy violated 49 C.F.R (b)(9) by failing to include on its latest pressure test record a profile of the Bairoil Pipeline showing the elevation and test sites over the entire length of the test section, where elevation differences in the section under test exceeded 100 feet. Item 2: The Notice alleged that Respondent violated 49 C.F.R (a)(4), which states: Maps and records. (a) Each operator shall maintain current maps and records of its pipeline systems that include at least the following information, (1) (4) The diameter, grade, type and nominal wall thickness of all pipe. The Notice alleged that Respondent violated 49 C.F.R (a)(4) by failing to maintain current maps of the Bairoil Pipeline showing the various wall thicknesses along the pipeline. According to the Notice, Respondent s Operations and Maintenance Manual showed that the wall thickness varied from to 0.64 inches, but that the company s maps did not show the location of each variance in wall thickness along the pipeline. Respondent did not contest this allegation of violation. Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49 C.F.R (a)(4) by failing to maintain current maps of its pipeline showing the nominal wall thickness of all pipe along the pipeline. Item 5: The Notice alleged that Respondent violated 49 C.F.R (a)(3), which states:
4 Maximum operating pressure. (a) Except for surge pressures and other variations from normal operations, no operator may operate a pipeline at a pressure that exceeds any of the following: (1) (3) Eighty percent of the test pressure for any part of the pipeline which has been pressure tested under subpart E of this part. The Notice alleged that Respondent violated 49 C.F.R (a)(3) by operating the Bairoil Pipeline at a pressure exceeding 80% of the lowest test pressure for any part of the pipeline that had been pressure tested under Subpart E. Specifically, the Notice alleged that the company s test pressure devices were located at an elevation of 6985 feet MSL and that Merit Energy had determined that the maximum operating pressure (MOP) was 3550 psig for the entire length of the pipeline without factoring in elevation differences along the pipeline. PHMSA s review of Respondent s test pressure documentation revealed that the highest elevation point along the pipeline was 7575 feet MSL, with a pressure of 3294 psig. 2 After considering the elevation differences between 6985 feet MSL and 7575 feet MSL, the minimum test pressure on the line should have been 3294 psig, 3 with a correct MOP of 2635 psig (80% of 3294 psig). Respondent did not contest this allegation of violation. Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49 C.F.R (a)(3) by operating the Bairoil Pipeline at a pressure exceeding 80% of the lowest test pressure for any part of the pipeline that had been pressure tested under Subpart E. Item 7: The Notice alleged that Respondent violated 49 C.F.R , which states: What are the qualifications for supervisors? You must require and verify that supervisors maintain a thorough knowledge of that portion of the corrosion control procedures established under (c)(3) for which they are responsible for insuring compliance. The Notice alleged that Respondent violated 49 C.F.R by failing to require and verify that supervisors maintained a thorough knowledge of that portion of the corrosion control procedures for which they were responsible for insuring compliance. Specifically, the Notice alleged that a review of Merit Energy s personnel records and interviews revealed that the company s supervisory personnel had relied solely on a contractor for all of its cathodic protection (CP) monitoring tasks and the reading of rectifiers and bonds. During the OPS inspection, Respondent s personnel acknowledged a lack of CP but argued that a working 2 Pipeline Safety Violation Report (January 5, 2011) (Violation Report): Attachment A - Hydrostatic pressure tests records; Attachment B - alignment sheets with high and low points along the line, and Attachment D - Merit Energy Company s O&M Manual. 3 Test pressure of 3350 psig at the Bairoil plant station [(7575 feet 6985 feet) x.433 psig/foot] = minimum test pressure of 3294 psig.
5 4 knowledge of external corrosion control was not required because CP services were the responsibility of its contractor. 4 Respondent did not contest this allegation of violation. Although Respondent s contractor may have been responsible for all CP monitoring services, Merit Energy, as operator of the pipeline, is still responsible for the company s compliance with the pipeline safety regulations. Respondent s reliance on a contractor does not negate this responsibility. 5 Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49 C.F.R by failing to require and verify that supervisors maintained a thorough knowledge of cathodic protection procedures for which they were responsible for insuring compliance. Item 8: The Notice alleged that Respondent violated 49 C.F.R (a), which states: What corrosion control information do I have to maintain? (a) You must maintain current records or maps to show the location of (1) Cathodically protected pipelines; (2) Cathodic protection facilities, including galvanic anodes, installed after January 28, 2002; and (3) Neighboring structures bonded to cathodic protection systems. The Notice alleged that Respondent violated 49 C.F.R (a) by failing to maintain current records or maps showing the location and details of its cathodic protection facilities that had been installed on the Bairoil Pipeline after Specifically, the Notice alleged that Merit Energy had failed to provide documentation showing the location of such cathodic protection facilities, including test stations, bonds, rectifiers, ground beds, and galvanic anodes. Respondent did not contest this allegation of violation. Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49 C.F.R (a) by failing to maintain current records or maps to show the location of its cathodic protection facilities, installed on the Bairoil Pipeline. Item 9: The Notice alleged that Respondent violated 49 C.F.R (a)-(b), which states: What corrosion control information do I have to maintain? (a) You must maintain current records or maps to show the location of- (1) Cathodically protect pipelines; (2) Cathodic protection facilities, including galvanic anodes, installed after January 28, 2002; and (3) Neighboring structures bonded to cathodic protection systems. (b) Records or maps showing a stated number of anodes, installed in a stated manner or spacing, need not show specific distances to each buried anode. 4 Violation Report, at See, e.g., In the Matter of Williams Gas Pipeline Transco, Final Order at 4, CPF No (July 30, 2007), 2007 WL ; In the Matter of Koch Pipelines, Inc., Final Order at 7, CPF No (April 28, 1998), 1998 WL
6 5 The Notice alleged that Respondent violated 49 C.F.R (a)-(b) by failing to maintain records or maps showing the company s cathodic protection facilities, including the number of galvanic anodes installed in a stated manner or spacing, on the Bairoil Pipeline. During the inspection, Merit Energy did not have maps or records to demonstrate compliance with the regulation. Respondent did not contest this allegation of violation. Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49 C.F.R (a)-(b) by failing to maintain records or maps showing the number of galvanic anodes installed in a stated manner or spacing on its pipeline. COMPLIANCE ORDER The Notice proposed a compliance order with respect to Items 1, 2, 5, 7, 8, and 9 in the Notice for violations of 49 C.F.R (b)(9), (a)(4), (a)(3), , (a), and (a)-(b), respectively. Under 49 U.S.C (a), each person who engages in the transportation of hazardous liquids or who owns or operates a pipeline facility is required to comply with the applicable safety standards established under chapter 601. The Director indicates that Respondent has taken the following actions specified in the proposed compliance order: 1. With respect to the violation of (b)(9) (Item 1), Respondent has developed a profile of the Bairoil Pipeline that shows the elevation over the entire length of the test section and the location of the test apparatus site. Merit Energy has submitted a copy of this profile to PHMSA. 2. With respect to the violation of (a)(4) (Item 2), Respondent has developed maps showing the locations of the diameter, grade, type and nominal wall thickness of all pipe sections on the Bairoil Pipeline. Merit Energy has submitted to PHMSA a copy of its Bairoil CO 2 Pipeline Construction Plan and alignment sheets that reflect wall thickness changes along the pipeline. 3. With respect to the violation of (a)(3) (Item 5), Respondent has established the correct MOP for the Bairoil Pipeline by using the test pressure at the highest elevation point at which the pipeline was tested during the 1986 pressure test. Merit Energy has submitted a copy of its MOP re-calculations to PHMSA. 4. With respect to the violation of (Item 7), Respondent has conducted corrosion control training for its supervisory employees who are responsible for pipeline operations on the Bairoil Pipeline. The training included (c)(3) qualifications for supervisors, evaluation and mitigation of external and internal corrosion, use of inhibitors & coupons, sulfate reducing bacteria, atmospheric corrosion, external coatings, cathodic protection systems and inspection and repair techniques. Merit Energy has submitted copies of its supervisors certificates of completion. 5. With respect to the violation of (a) (Item 8), Respondent has developed maps and records that accurately reflect the location of the Bairoil Pipeline cathodic protection facilities, including test stations, bonds, rectifiers, ground beds, and galvanic anodes installed after 2002.
7 6 6. With respect to the violation of (a)-(b) (Item 9), Respondent has updated its Bairoil Operations and Maintenance Manual, Section 1.3.1, detailing the installation technique of the new deep-well ground bed installed on the Bairoil Pipeline in March Merit Energy has also updated its alignment sheets to depict the location of the ground bed. Accordingly, I find that compliance has been achieved with respect to these violations. Therefore, the compliance terms proposed in the Notice are not included in this Order. WARNING ITEMS With respect to Items 3, 4, and 6, the Notice alleged probable violations of Part 195 but did not propose a civil penalty or compliance order for these items. Therefore, these are considered to be warning items. The warnings were for: 49 C.F.R (b)(1) (Item 3) Respondent s alleged failure to review with its personnel their performance in meeting the objectives of the company s emergency response training program; 49 C.F.R (c) (Item 4) Respondent s alleged failure to verify that its supervisors maintained a thorough knowledge of that portion of the company s emergency response procedures for which they were responsible to ensure compliance under 49 C.F.R ; and 49 C.F.R (c) (Item 6) Respondent s alleged failure to follow the baseline and supplemental emergency official communications recommendations listed in Table 2.3 of the American Petroleum Institute s Recommended Practice Merit Energy presented information in its Response showing that it had taken certain actions to address the cited items. If OPS finds a violation of these provisions in a subsequent inspection, Respondent may be subject to future enforcement action. The terms and conditions of this Final Order are effective upon service in accordance with 49 C.F.R Jeffrey D. Wiese Associate Administrator for Pipeline Safety Date Issued
DECEMBER 21, 2012. Sincerely, Jeffrey D. Wiese Associate Administrator for Pipeline Safety
DECEMBER 21, 2012 Mr. Rolf A. Gafvert President Texas Gas Transmission, LLC 3800 Frederica Street Owensboro, KY 42301 Re: CPF No. 4-2012-1015 Dear Mr. Gafvert: Enclosed please find the Final Order issued
OCTOBER 23, 2013. Sincerely,
OCTOBER 23, 2013 Mr. C. Milton May, Jr. Chief Operating Officer Treetop Midstream Services, LLC 602 Crescent Place Suite 100 Ridgeland, MS 39157 Re: CPF No. 2-2013-6003 Dear Mr. May: Enclosed please find
Jeffrey D. Wiese Associate Administrator for Pipeline Safety
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NOV 1 Z 2015 1200 New Jersey Ave, 5.E. Washington, D.C. 20590 VIA CERTIFIED MAIL AND FAX TO: 713-646-4378 Mr. Troy
NOTICE OF AMENDMENT CERTIFIED MAIL - RETURN RECEIPT REQUESTED. November 28, 2012
NOTICE OF AMENDMENT CERTIFIED MAIL - RETURN RECEIPT REQUESTED November 28, 2012 Mr. Stan Wingate, Vice President Montana Dakota Utilities Co. 400 North Fourth St Bismarck, ND 58501 CPF 3-2012-1009M Dear
Underground Storage Tank Cathodic Protection Checklist
Underground Storage Tank Cathodic Protection Checklist The attached Underground Storage Tank (UST) checklist is required for the activity above. This checklist certifies the Cathodic Protection activities
Compliance Inspections of Natural Gas Systems
Compliance Inspections of Natural Gas Systems Safety Regulations Applicable to Natural Gas Systems Who are these people and why are they calling me? Where do they get their authority? USC Section 60117
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN
SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals
Operations and Maintenance Procedures for Natural Gas Systems
Operations and Maintenance Procedures for Natural Gas Systems Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Office
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks
NRG) #~-/dl~ Mr. Richard Kinch United States Environmental Protection Agency (5306P) 1200 Pennsylvania Avenue, NW Washington, DC 20460
~~ NRG) Mr. Richard Kinch United States Environmental Protection Agency (5306P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 SUBJECT: Request for Information Under Section 104(e) of the Comprehensive
NW Natural & Pipeline Safety
NW Natural & Pipeline Safety We Grew Up Here NW Natural is an Oregon-based utility company founded in 1859. The company purchases natural gas for its core market in western Oregon and southwestern Washington,
AUG 1 1 2611. Mr. Max Jameson Environmental/Regulatory Manager Sabco Oil and Gas Corporation 34 S. Wynden Drive Houston, TX 77056. Dear Mr.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Avenue, SE Washington, D.C. 20590 AUG 1 1 2611 Mr. Max Jameson Environmental/Regulatory Manager
Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems
Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of
ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES
ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES Jose L. Villalobos, P.E. 1 and Carl Perry 2 Abstract: This paper presents strategies for the control of external corrosion on municipal
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS Subpart G General Construction
SOCALGAS APROACH TO PIPELINE INTEGRITY
SUMMER 2011 SOCALGAS APROACH TO PIPELINE INTEGRITY Southern California Gas Company (SoCalGas ) is committed to providing clean, safe and reliable natural gas to its customers and takes important steps
Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems
Page 1 of 5 Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems New Hampshire Department of Environmental Services
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE
NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without
The Cost of a Pipeline Failure. Presented by Penn West
The Cost of a Pipeline Failure Presented by Penn West The Cost of a Pipeline Failure Failure Statistics Cost of a Failure Failure Causes Integrity Management Plan Risk Assessment 2 Annual Cumulative Pipeline
hereby submits for filing a report of its Operational Purchases and Sales for the thirteen-month period ending December 31, 2011.
April 26, 2012 Ms. Kimberly D. Bose Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Bison Pipeline LLC 717 Texas Street, Suite 2400 Houston, TX 77002 tel 832.320.5675
If you have questions regarding the submittal information, please contact Mr. Jeffrey Davis at (713)795-6207.
./'""~ NR~ CERTIFIED MAIL May 18,2009 Mr. Richard Kinch US Environmental Protection Agency (5306P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 SUBJECT: Request for Information Under Section 104(e)
April 15, 2011 VIA ELECTRONIC TRANSMISSION
Enbridge Pipelines (Lakehead) L.L.C. Shaun G. Kavajecz, Manager 119 N 25 th Street E Pipeline Compliance Superior, WI 54880 Tel 715 394 1445 www.enbridgepartners.com Fax 713 821 9428 [email protected]
Mary Heim, HPR Social Work Specialist. Kate JohnsTon, Program Specialist. Posted 10/27/2015 Co.
7 09/30 Mary Heim, HPR Social Work Specialist 30 Kate JohnsTon, Program Specialist 10/19 Posted 10/27/2015 Co. Protecting, Maintaining and Improving the Health of Minnesotans CMS Certification Number (CCN):
Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms
Safety, Health and Accessibility Design Guidelines For Architects, Engineers and Design Firms U.S. Department of the Interior Bureau of Indian Affairs Division of Safety and Risk Management Introduction
CHAPTER IV SPECIAL REGULATIONS - GAS UTILITIES ONLY. Records. Each gas utility shall maintain and keep the following records:
CHAPTER IV SPECIAL REGULATIONS - GAS UTILITIES ONLY Section 401. Records. Each gas utility shall maintain and keep the following records: (a) Monthly record of the heating value of gas produced or purchased
Section A SPCC Plan Implementation Checklist This section of the report addresses compliance with certain requirements of Federal Regulations 40 CFR 112. I. STATUS OF SPCC PLAN (40 CFR 112.3) YES NO A.
Contingency Plan. Facility Name
Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes
CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES
CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES Adopted by Resolution No. 2012-132 Dated December 18, 2012 1 TABLE OF CONTENTS PURPOSE... 3 I. WHEN INSPECTION IS REQUIRED (PMC 13.20.050, 13.20.060,
TOWN OF BRENTWOOD 4300 39 TH PLACE BRENTWOOD, MD 20722 (301) 927-3344 FENCE PERMIT APPLICATION
TOWN OF BRENTWOOD 4300 39 TH PLACE BRENTWOOD, MD 20722 (301) 927-3344 BEFORE YOU DIG ANY WHERE CALL MISS UTILITY 1-800-257-7777 It s the Law FENCE PERMIT APPLICATION (To be completed by applicant. Application
Regulation of Natural Gas Pipelines. June 23, 2008
Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),
How To Implement An Anti-Drug And Alcohol Misuse Prevention Policy
U. S. DEPARTMENT OF TRANSPORTATION (DOT) PIPELINE & HAZARDOUS MATERIALS SAFETY ADMINISTRATION (PHMSA) 49 CFR PART 199 ANTI-DRUG and ALCOHOL MISUSE PREVENTION POLICY for Talisman Energy USA Inc. Talisman
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
v. OSHRC DOCKET ELGIN ROOFING COMPANY, NO. 99-1477 Administrative Law Judge Sidney J. Goldstein DECISION AND ORDER
SECRETARY OF LABOR, Complainant, v. OSHRC DOCKET ELGIN ROOFING COMPANY, NO. 99-1477 Respondent. APPEARANCES: Lisa R. Williams, Esq., Office of the Solicitor, U.S. Department of Labor, Chicago, Illinois
FLOOD DAMAGE PREVENTION ORDINANCE
FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated
Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions
Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Seth Anderson, GISP Management Consultant Celine Hyer, P.E. Associate Vice President Presentation Topics The Infrastructure
IAC 7/16/08 Labor Services[875] Ch 155, p.1. CHAPTER 155 ASBESTOS REMOVAL AND ENCAPSULATION [Prior to 10/18/00, see 875 Chs 81 and 82]
IAC 7/16/08 Labor Services[875] Ch 155, p.1 CHAPTER 155 ASBESTOS REMOVAL AND ENCAPSULATION [Prior to 10/18/00, see 875 Chs 81 and 82] 875 155.1(88B) Definitions. Asbestos means material containing at least
District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS
CHAPTER 55 UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS Section 5500 Compliance with Other District Laws 5501 Applicability of UST Regulations 5502 Partial Applicability of UST Regulations to Particular
Bulletin. Gerard D. Perry, Director of Accounts. DATE: August 2014. Sewer Rate Relief Fund FY2015
Massachusetts Department of Revenue Division of Local Services Amy A. Pitter, Commissioner Robert G. Nunes, Deputy Commissioner & Director of Municipal Affairs Bulletin TO: Mayors, City Managers, Selectmen,
Baseline Questionnaire
FEDERAL AGEC OCCUPATIOAL SAFET AD HEALTH PROGRAMS Baseline Questionnaire Instructions: Respond to each question below by circling "" or "" to indicate "yes" or "no." An explanation is required for each
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
FEDERAL DEPOSIT INSURANCE CORPORATION WASHINGTON, D.C. ) ) ) ) ) ) ) ) ) )
FEDERAL DEPOSIT INSURANCE CORPORATION WASHINGTON, D.C. In the Matter of WORLD S FOREMOST BANK SIDNEY, NEBRASKA (Insured State Nonmember Bank CONSENT ORDER AND ORDER TO PAY FDIC-10-775b FDIC-10-777k The
NEBRASKA ADMINISTRATIVE CODE TITLE 434 NEBRASKA COLLECTION AGENCY LICENSING ACT
Chapter 1 - DEFINITIONS 001. Solicitor shall mean anyone actively engaged in the solicitation of accounts for collection and/or collection of such accounts once referred or assigned to a licensed collection
Cellular Antenna Towers for Cellular Telecommunications Service or Personal Communications Services
ARTICLE XV CELL TOWER REGULATIONS Cellular Antenna Towers for Cellular Telecommunications Service or Personal Communications Services Sect. 1500 Purpose The purposes of these regulations are: to provide
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
Frequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF PENNSYLVANIA CONSENT DECREE. Introduction
IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF PENNSYLVANIA EQUAL EMPLOYMENT OPPORTUNITY ) COMMISSION, et al, ) ) Plaintiff, ) ) Case No. 04-4126 ) THE VANGUARD GROUP, INC. ) ) Defendant.
COLORADO REGULATION 7
COLORADO REGULATION 7 Author: Jay Christopher, Business Unit Manager, Air & Process Services, Trihydro Corporation Jane Steere, QAQC Coordinator, Air & Process Services, Trihydro Corporation ABSTRACT The
Cathodic Protection. Remote Monitoring of Cathodic Protection on a Gas Distribution Network
Cathodic Protection Remote Monitoring of Cathodic Protection on a Gas Distribution Network Author: Martin Alderson Northern Gas Networks Issued for UKOPA members CP measurements are very labour intensive
U.S. OFFICE OF SPECIAL COUNSEL. 1730 M Street, N.W., Suite 300 Washington, D.C. 20036-4505. February II. 2014
U.S. OFFICE OF SPECIAL COUNSEL 1730 M Street, N.W., Suite 300 Washington, D.C. 20036-4505 The Special Counsel February II. 2014 The White House Washington. D.C. 20510 Re: OSC File No. DI-12-1783 Dear Mr.
June 13, 2012. Report Number: A-06-09-00107
June 13, 2012 OFFICE OF AUDIT SERVICES, REGION VI 1100 COMMERCE STREET, ROOM 632 DALLAS, TX 75242 Report Number: A-06-09-00107 Mr. Don Gregory Medicaid Director Louisiana Department of Health and Hospitals
SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM
Page 1 of 9 SUMMARY OF DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM Program Overview: The Distribution Integrity Management Program ( DIMP ) activities are focused on obtaining and evaluating information
Tennessee Gas Association
Environmental, Health, and Safety These courses promote sound work practices and are designed to satisfy many of the environmental, health, and safety regulations for initial and refresher employee training.
APPENDIX J GAS DISTRIBUTION
APPENDIX J GAS DISTRIBUTION Ji Jii APPENDIX J GAS DISTRIBUTION NEIL G. THOMPSON, PH.D. 1 SUMMARY The natural gas distribution system includes 2,785,000 km (1,730,000 mi) of relatively small-diameter, low-pressure
FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY
Operational Safety INTRODUCTION The Millennium Pipeline Company (Millennium) is proud of the key role it plays in New York s energy infrastructure. The Millennium Pipeline is a vital link in a system that
G O General Accounting Office
United States G O General Accounting Office Washington, D.C. 20548 Office of the General Counsel B-247348 June 22, 1992 Mr. John W. Rensbarger Inspector General The Library of Congress Washington, D.C.
August 23, 2002. Critical Air Medicine, Inc. Corporate Headquarters Attn: Sagi Kfir, Esq. General Counsel 4141 Kearny Villa Road San Diego, CA 92123
August 23, 2002 Critical Air Medicine, Inc. Corporate Headquarters Attn: Sagi Kfir, Esq. General Counsel 4141 Kearny Villa Road San Diego, CA 92123 Re: City of Austin, Texas Ordinance - Cease and Desist
UNITED STATES OF AMERICA BEFORE THE DEPARTMENTAL APPEALS BOARD CIVIL REMEDIES DIVISION DEPARTMENT OF HEALTH AND HUMAN SERVICES
UNITED STATES OF AMERICA BEFORE THE DEPARTMENTAL APPEALS BOARD CIVIL REMEDIES DIVISION DEPARTMENT OF HEALTH AND HUMAN SERVICES In the Case of: Center for Tobacco Products, Complainant, v. J Triple B LLC
Customer Bill of Rights
Customer Bill of Rights Customer Service 800-700-2443 Emergencies 800-959-5325 Since 1929, the people at Texas Gas Service have been providing natural gas service to the citizens of Texas. We thank you
Conditional Approval #819 September 7, 2007 October 2007
O Comptroller of the Currency Administrator of National Banks Washington, DC 20219 Conditional Approval #819 September 7, 2007 October 2007 Martin F. Shea, Jr., Esq. Senior Vice President and Counsel First
Review of Medicaid Upper-Payment-Limit Requirements for Kansas Nursing Facility Reimbursement (A-07-03-02672)
DEPARTMENT OF HEALTH & HUMAN SERVICES Office of Inspector General '%..,- Washington, D.C. 20201 TO: Mark B. McClellan, M.D., Ph.D. Administrator Centers for Medicare & Medicaid Services FROM: Daniel R.
Small Business Enterprise Certification Application 49 CFR Part 26
Small Business Enterprise Certification Application 49 CFR Part 26 All firms wishing to be certified as a Small Business Enterprise (SBE) must complete this application and submit it to the Washington
SALISBURY ASSESSMENT SOLUTIONS
SALISBURY ASSESSMENT SOLUTIONS Electrical engineering services for a safe and compliant workplace Electrical Safety Program Assessment - Safety Training Arc Flash Hazard Analysis - Power Systems Engineering
Ohio Office of Criminal Justice Services (08-OCR-0392)
U.S. Department of Justice Office of Justice Programs Office for Civil Rights Via Certified Mail Washington, D.C. 20531 Karhlton F. Moore Executive Director 1970 West Broad Street Columbus, Ohio 43223
Special Permits Program Desk Guide
Special Permits Program Desk Guide Version 2.2 March 2016 Approvals Program Standard Operating Procedures Version 1.0 i Disclaimer The materials contained in this document consist of guidance and other
TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION
TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION April 25, 2014 DUE DATE/LOCATION: Friday, May 9, 2014 Bid forms and references are due by 9:30 A.M. at:
Transcontinental Gas Pipe Line Company, LLC Rate Schedule S-2 Tracking Filing
Gas Pipeline Transco 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713/215-4060 November 20, 2009 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT
--.--~.-------------------------------- STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean
Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.
Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 153-11686 First Significant Permit Modification to Part 70 No.: T153-5975-00006 Dear Ms. Frosch: Midwestern
IN THE UNITED STATES DISTRICT COURT FOR NORTHERN DISTRICT OF TEXAS DALLAS DIVISION
IN THE UNITED STATES DISTRICT COURT FOR NORTHERN DISTRICT OF TEXAS DALLAS DIVISION JPM NETWORKS, LLC, ) d/b/a KWIKBOOST ) ) Plaintiff, ) ) v. ) Civil Action No. ) 3:14-cv-1507 JCM FIRST VENTURE, LLC )
Department of Veterans Affairs VHA DIRECTIVE 7710. Washington, DC 20420 November 4, 2015
Department of Veterans Affairs VHA DIRECTIVE 7710 Veterans Health Administration Transmittal Sheet Washington, DC 20420 November 4, 2015 MANAGEMENT OF LEAD-BASED PAINT IN VHA HOUSING AND CHILD- OCCUPIED
