Power System. Supply Reliability and Performance Pledges. Tariff. Why talk to CLP? How Can CLP Help? Contact Us FAQ



Similar documents
INFORMATION NOTE. Electricity Market in Hong Kong

16 Cheung Kong Infrastructure Holdings Limited

FIXED CHARGE: This is a cost that goes towards making the service available, including

23 Jan 2015 Hong Kong Electricity Market A Review & The Way Forward

International Telecommunications Market Regulation Inquiry

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

SP Energy Networks Business Plan

CONGESTION MANAGEMENT POLICY

Hong Kong, China. 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments. (1) Building Energy Codes

Office of the Communications Authority

COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE

Brochure Introducing HVDC

Totally Integrated Power (TIP) for the oil and gas industry

End Point Devices to be Deployed for Each. AC Independence

To learn more about Berkshire Hathaway Energy s commitment, please visit their website.

Managed WAN Service Level Agreement ( SLA ) Version: Managed WAN 26NOV2008

CB(1)401/12-13(01) Natural Gas Supply to CAPCO/CLP

LAW ON ELECTRICITY MARKET

Western Canadian Place the corporate headquarters of Husky Oil.

Power products and systems. Intelligent solutions for power distribution Zone concept

T5 CHARLOTTE REGION WEST DATA CENTER PARK

Weather-readiness assessment model for Utilities. Shy Muralidharan Global Product Manager Energy Solutions Schneider Electric

Design of electrical power system for a 1000MW nuclear power generating station

TELECOMMUNICATIONS ORDINANCE (Chapter 106) SERVICES-BASED OPERATOR LICENCE. [Name of Licensee]...

China Environmental Energy Investment Limited CLARIFICATION ANNOUNCEMENT RELATING TO THE ANNUAL RESULTS ANNOUNCEMENT FOR THE YEAR ENDED 31 MARCH 2013

Data Center Infrastructure & Managed Services Outline

TELECOMMUNICATIONS ORDINANCE (Chapter 106) SERVICES-BASED OPERATOR LICENCE

FACT SHEET INTERNATIONAL DATA SERVICES GLOBAL IP VPN

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

Chapter 1. Network Structures

Methodology for Merit Order Dispatch. Version 1.0

Specific Terms and Conditions for International Satellite Television Occasional Service

Japan. Nagahide Sato and Sadayuki Matsudaira Nishimura & Asahi

NERC Cyber Security Standards

climate change is happening. This April produced the record for the first month in human history

Accident Bulletin 2/2012 (An update to Accident Bulletin 3/2011) Aerospatiale SA 315B LAMA helicopter

The Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)

Electricity Service Standards

Security of electricity supply

Nuclear Power Plant Electrical Power Supply System Requirements

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

Energex Customer Charter. For residential and small business customers

A Decade of Fruitful Network Asset Management in CLP Power Chris Cheung & Chi-Pui Ng, CLP Power Hong Kong

ROMA GROUP LIMITED. (Incorporated in the Cayman Islands with limited liability) (Stock code: 8072)

EASYNET CHANNEL PARTNERS LIMITED PARTNER MASTER SERVICES AGREEMENT SIP TRUNKING SERVICE PRODUCT TERMS

National Fund for Environmental Protection and Water Management. activities in climate protection

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

Morris S. Stover, P.E. Sponsor, Transmission Area

Syed Ahmed Richard Krause Southern California Edison

red zone management white paper Making the most of Distribution Use of System (DUoS) Charges

Network Consulting for Power Grid Optimization

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

Skyrocketing Electricity Cost in Denmark

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

Electric Field Operations Organization

This seeks to define Contracts for Difference (CfDs) and their relevance to energy related development in Copeland.

CHAPTER 13 TELECOMMUNICATIONS. commercial mobile services means public telecommunications services supplied through mobile wireless means;

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

ABB PSPS Erich Steinmann; Generator control-2013

NPCC Regional Reliability Reference Directory # 8 System Restoration

Off-grid Hybrid Solar: Market Overview, Business Case & Technical Considerations

SUMMARY. Capitalised terms are defined in the section headed Definitions.

Consultation Conclusions to the Consultation Paper on the Regulation of Sponsors and Compliance Advisers

ENA Customer Guide to Electricity Supply

Electricity Regulation in Australia

MAINTAINING SYSTEM BLACKSTART IN COMPETITIVE BULK-POWER MARKETS

Competition in EU Electricity Markets The Role of Antitrust Policy

CLP Kicks Off Hong Kong's First EV Parade and Exhibition CLP Leads the Way in Low Carbon Mobility with 50 EVs joining

Bank of China (Hong Kong) Launches ibond Subscription Service with Promotional Offers

ENERGY ADVISORY COMMITTEE. Electricity Market Review : Electricity Tariff

Net Energy Metering Southern California Edison

Transcription:

Power System Supply Reliability and Performance Pledges Tariff Why talk to CLP? How Can CLP Help? Contact Us FAQ

Power System Generation CLP has 3 generation plants located in the New Territories and 2 located on the Mainland. CLP and Hong Kong Electric s (HEC) networks are interconnected to back up each other in cases of emergency. This means that there are no less than 6 supply sources to the CLP network at any point in time.

Power System Transmission Network CLP s transmission system is connected to Hong Kong Electric s and to the China Southern Power Grid via transmission circuits. This connection safeguards CLP customers from any major power loss during cases of emergency.

Power System Distribution Network CLP s distribution network is based on 11kV Closed Ring supply system. This ensures that there is enhanced supply security. This arrangement also provides substantial cost saving for data center operators trying to achieve n+1 supply reliability through cost avoidance.

Supply Reliability and Performance Pledge Pledge Reliability of electricity supply 3 days advance notice of planned outage Average arrival time for loss of supply inspection Average supply restoration time after fault outage Connect and supply within same day after satisfactory installation inspection Answer emergency service hotline within 9 seconds Targets 2011 Results 2010 99.99 % 99 % 36 minutes 2 hrs 99.95% 90%

Tariff CLP s tariff is amongst the lowest in the world for its level of reliability. In addition to being one of the lowest cost our tariff has the following features : Simple Structure Data center operators have a choice of 3 simple tariff types, 2 of which are time of use based. Charges are based on actual demand and actual consumption. Transparent All components of the tariff are published. Stable CLP tariff is reviewed once per annum enabling customers budget certainty.

Why talk to CLP Power? Robust Network 99.99% reliability Dedicated staff with technical and business skills to provide your data center electricity solutions Stable Tariff Tariff is reviewed once per annum enabling customers certainty of budget Cares for the environment

Working with CLP Power CLP can help data center customers as follows Location selection Works interface your internal installation and CLP s installation Fast track power supply Project Management Asset purchase and installation Post installation asset maintenance Post installation energy management

Working with CLP Power CLP has a dedicated team to handle all data center electricity supply enquiries. You may reach the team at the address provided below. Address: 7/F Shumshuipo center, No. 215 Fuk Wa Street Or you may send in your enquiry email to accmgr@clp.com.hk

Frequently Asked Questions (FAQ) Q1: What is the supply lead time for the provision of electricity supply? Answer: The supply lead time will depend on the potential data center site and the requested electricity demand. It will also depend on CLP s works programmes and other customer projects. CLP can provide the estimated supply lead time within a few days of notification of the location and the loading. Q2: Can CLP fast track power supply? Answer : CLP will endeavour to fast track energisation and supply depending on load demand and commitments on uptake. We encourage you to speak to our team dedicated to handling all enquiries on data center power supply.

Frequently Asked Questions (FAQ) Q3: How can CLP maintain reliability levels at 99.99 % when it is the only supplier? Answer: It is not necessary for power supply to be sourced from two different generation companies for it to be more reliable. CLP strength lies in its network. With any electricity utility supply system, most power disturbances originate from the network i.e due to accidental cable damage, lightning etc. CLP s robust network is able to eliminate any disturbances before it affects customers. Q4: How does the interconnection between CLP, HEC and Guangdong Power Grid work? Answer: HEC supports CLP and vice versa in case of any power supply emergency. CLP purchases a portion of its power supply for its customers from Guangdong Daya Bay Nuclear Power Station.

Frequently Asked Questions (FAQ) Q5: Given CLP s system connectivity with Hong Kong and Guangdong can a data center operator claim to be a tier 4 data center? Answer: The data center "tier" definitions were developed by data center professionals. It is not for CLP to determine whether a data center operator can claim to be a tier 4 data center based on CLP s supply network. We can advise though, that CLP s network can obtain power from multiple supply sources, 3 from power stations located in the New Territories and 2 on the Mainland. In addition, CLP and HEC back-up each other through the interconnection in case of a power supply emergency. Whether the data center operators conclude the above as being a dual or multiple source will depend on their interpretation of a Tier 4 data center.

Frequently Asked Questions (FAQ) Q6: Are CLP electricity tariff rates negotiable? Answer: CLP s tariff rates are fixed and all components are transparent. Customers may apply for the rate that is appropriate to their actual consumption. CLP s tariff is amongst the most competitive in comparison with other world class cities. Our tariff table is available at https://www.clponline.com.hk/mybusiness/customerservice/tariffovervie w/pages/default.aspx Our dedicated data center team will be happy to advise you on the most appropriate tariff for your load.