Siemens Gasification Project Update and Lessons Learned

Similar documents
Siemens Fuel Gasification Technology at a Glance

Siemens Fuel Gasification Technology Stoffliche Nutzung der Braunkohle

Development of Coal Gasification System for Producing Chemical Synthesis Source Gas

SKI Coal Gasification Technology. Feb. 23, 2012

February Service Division. Unrestricted Siemens AG All rights reserved.

Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013

How To Run A Power Plant

Steam Turbine Concepts for the Future Volatile Power Market

SHELL-WISON BOTTOM QUENCH COAL GASIFICATION TECHNOLOGY

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

An Update on RTI s Warm Syngas Cleanup Demonstration Project

Fact Sheet: Siemens Energy in the US

MHI Air-Blown IGCC Technology & Application to Chinese Project

From solid fuels to substitute natural gas (SNG) using TREMP

SGT5-4000F Trusted Operational Excellence

Big Data and Diagnostics

How To Understand And Understand The History Of The Sumanisiemens Gasification Group

Simulation of a base case for future IGCC concepts with CO 2 capture

Siemens Hybrid Power Solutions. Cost and emission reduction by integrating renewables into diesel plants

(205) (205)

Praxair, Inc. Ray Roberge Sr. VP and Chief Technology Officer

Evolving Gasification technology to provide Innovative Low Carbon Solutions for the European Market

Making Coal Use Compatible with Measures to Counter Global Warming

6.3 Structured identification of business improvement opportunities using Life Cycle Assessment: A case study in the gas turbine industry

Reliability of IGCC Power Plants

Options for tar reforming in biomass gasification. Klas J. Andersson, Poul Erik Højlund Nielsen - IFC 2012

How To Develop A Coal To Chemicals

COAL GASIFICATION AND CO 2 CAPTURE

Senoko Power Station CCP2 performance increase with focus on efficiency. Answers for energy.

SIEMENS technologies compatible with environmental requirements like reduction of CO 2 emissions. ISBF conference. Bratislava, 9-10 February 2009

Hydrogen Production via Steam Reforming with CO 2 Capture

Scale-Up of High-Temperature Syngas Cleanup Technology

Jarad Daniels U.S. Department of Energy Office of Fossil Energy

Biomass gasification development of attractive business cases

3D printing at Siemens Power Service

Thermochemical Upgrading Workshop Coal to Liquids (F-T) Via Gasification

Hybrid Power Generations Systems, LLC

2nd IEA Oxyfuel Combustion Conference

Assignment 8: Comparison of gasification, pyrolysis and combustion

Viresco Energy s Advanced Gasification Technology

Syngas Purification Units

John Bøgild Hansen, Haldor Topsøe. Energinet.dk s VE gas dag 2011 En industriaktørs synspunkter

Olefins from Syngas Potential for bio-based applications Dr. Thomas Wurzel, Lurgi GmbH. New Biofuels rd-24th June 2010, Berlin, Germany

Sixth Annual Conference on Carbon Capture & Sequestration

Development of large-scale H 2 storage and transportation technology with Liquid Organic Hydrogen Carrier (LOHC)

Kawasaki PC Boiler (Pulverized Coal Fired Boiler) 2013 Kawasaki Heavy Industries, Ltd. All Rights Reserved

Michael Williams Gasification Technologies Council, 28 th October Smaller scale Fischer-Tropsch enables biomass-to-liquids

Siemens Transportation Systems Siemens Media Summit

Eric D. Larson Energy Systems Analysis Group, Princeton Environmental Institute, Princeton University, USA

The Effect of EPA s Proposed NSPS on. Carbon Capture and Storage Technology

Power Island. Industrial Power Plants. / energy

Coal waste slurries as a fuel for integrated gasification combined cycle plants

GENERATION TECHNOLOGY ASSESSMENT

Thermo Conversions Gasification (TCG) Technology

How To Develop Energy Resources In China

Gasification of Biomass for Syngas generation at ETC

Gasförmige und flüssige synthetische Energieträger aus Biomasse Stand der Entwicklungen an der TU Wien. Hermann HOFBAUER, TU Wien

GT GT

Sixth Annual Conference on Carbon Capture & Sequestration

From forest to gas in the transmission system. Ulf Molén,

OROT RABIN POWER STATION UNITS x 350 MW

Impact of coal quality and gasifier technology on IGCC performance

Application of Synthetic Diesel Fuels

Morris Argyle Assistant Professor Department of Chemical and Petroleum Engineering. School of Energy Resources Symposium Casper, WY February 28, 2007

Reliability Modeling Software Defined

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

4 th EU Sout Africa Clean Coal Working Group Meeting

Concepts in Syngas Manufacture

What Coal Technologies Can Do to Reduce Global CO2 Emission

CHEMSYSTEMS. Report Abstract. Ammonia and Urea Strategic Business Analysis. SBA PROGRAM SBA Methanol

Fischer-Tropsch Diesel from Solid Biomass

Objectives. Use IGCC dynamic simulator and operator training system (OTS) to: o o

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA

How To Make A Carbon Capture Plant Workable

Gasification of Solid Waste: Is this the recipe for trash to treasure?

Gasification of Biomass, Waste and Coal

For Immediate Release TSX - NRG OTCQX - ANRGF

Optimal Power Plant Integration of Post-Combustion CO 2 Capture. Dr. Tobias Jockenhövel Dr. Rüdiger Schneider Michael Sandell Lars Schlüter

MODERN TECHNOLOGIES FOR ENERGY AND MATERIAL RECOVERY FROM WASTE. Tomáš Rohal, Business Development CEEI 10-Oct-2013

UNIVERSITA DEGLI STUDI DI ROMA LA SAPIENZA DIPARTIMENTO INGEGNERIA CHIMICA MATERIALI AMBIENTE

ON-LINE MONITORING OF POWER PLANTS

Hydrothermal Upgrading of Lignite and Biomass. Dr Bill Rowlands Chief Scientist Ignite Energy Resources & Licella

CO 2 Conversion to Methane Project

Application of the Biomass, OxyFuel, and Flameless Combustion for the utilisation of pulverised coals for electricity generation

CO2 enhanced coal gasification and BlueCoal new Clean Coal Technologies proposals from Poland

B0401 Abstract 029 Oral Presentation Session B04 Innovative Applications and Designs - Tuesday, July 1, :00 h

NITROGEN OXIDES FORMATION in combustion processes COMBUSTION AND FUELS

Biomass gasification technologies for advanced power systems and synfuels - Status and Present R&D activities in Finland

Energieffektivitet og bærekraft ved 2. generasjons biodrivstoff. Teknisk Direktør Gjermund Røkke

Steam Power Plants as Partners for Renewable Energy Systems

Protection notice / Copyright notice

Calculate Available Heat for Natural Gas Fuel For Industrial Heating Equipment and Boilers

Transcription:

Siemens Gasification Project Update and Lessons Learned Harry Morehead Director, Gasification and IGCC Sales and Marketing, Americas Gasification Technologies 2012 Washington, DC October 29, 2012 Copyright Siemens Energy, Inc. 2012. All rights reserved.

Agenda Gasification Project Update and Lessons Learned Shenhua Ningxia Coal Group, NCPP I Project Shanxi Lanhua, Jincheng Project CPI, Coal to SNG Project Shenhua, CTL Project MidAmerica C2L, Coal to Methanol Project IGCC Project Update Huaneng GreenGen Co. Ltd., Tianjin IGCC Project Mississippi Power, Plant Ratcliffe Summit Power, Texas Clean Energy Project Siemens Technology Update Conclusions Page 2 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Siemens Gasification Landscape MidAmerica C2L Methanol Schwarze Pumpe Syngas for Chemical Industry 1984-2007 Orlando Shenhua Ningxia Coal Group CTL COD 2016 CPI Xinjiang Energy Co. SNG COD 2015 GSP China Beijing Shenhua Ningxia Coal Group Polypropylene COD 2011 Huludao Siemens Project Implementation and R&D Office Beijing Shanghai Summit Power Power + Ammonia/Urea HQ Freiberg Test Facility Vresova Power COD 2008 JinCheng Coal to Ammonia COD 2015 Siemens Offices Operating Units Current Projects Technology Selected 9 SFG-500 gasifiers shipped or installed for 3 projects, 32 SFG-500 gasifiers on order Page 3 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

NCPP Project: Ningxia Coal to Polypropylene 5 x SFG-500 / 540,000 Nm 3 /h (H 2 +CO) / dry coal capacity 5 x 85 t/h Start Erection (SIEMENS Proprietary Equipment) January 2009 Mechanical Completion August 2010 Commissioning period for all 5 gasifiers October 10 April 11 Pre-commercial operation Start April 2011 Performance tests completed September 2011 Sub-bituminous Coal Ash: 7-28 wt% Moisture: < 6 wt% Power Station Air Separation Units Methanol to Polypropylene Site area: 192 hectares or 474 acres Page 4 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

NCPP I Project Gasifier Performance Operational Highlights 4 lines in stable, parallel operation More than 1,500,000 tons of coal gasified More than 5,000 t/d methanol production Has accommodated coals with a ash content that typically varies between 10% and 20% All gasifier performance guarantees achieved and exceeded Entire gasification unit with gasifier building, CO shift and black water treatment plant Performance Summary Gasification Temperature Range: 1350 C to 1750 C (2,462 F to 3,182 F) Carbon conversion 99% CH 4 < 0.1% (Vol) H 2 +CO > 90% No heavy hydrocarbon produced Cold gas efficiency ~ 80% (depends on coal) Low oxygen and coal consumption 4 hours Main Burner Operation Gasifier Train 1 (2012-08-12) Page 5 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Shanxi Lanhua Coal Chemical Co., Ltd. Jincheng Project, PR China Plant Output 300,000 t/yr Ammonia 520,000 t/yr Urea Coal Tangan Coal (Anthracite) (FT ~ 1530 C, ash content ~16%) Gasification Island Configuration 1 gasifier in operation 1 gasifier standby Gasifier Operating Pressure 4.0 MPa(g) (580 psig) Siemens Scope Engineering and Gasification Testing Equipment Supply Internals for Lock Hoppers Feeder Vessels 2 x SFG-500 gasifiers Burners Gasifier Control System Dust Measurement Technical Field Assistance Gasification Island Process License Status Agreement with customer extended Commissioning mid 2015 Project located near Jincheng City, in the southern part of province Shanxi Page 6 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

CPI Yinan Coal to SNG Project Client & Project Client: CPI - China Power Investment Corporation One of first major utilities in China to build coal to SNG Project: First phase (2 bill Nm 3 /a) of a 6 bill Nm 3 /a SNG project Location: Yili City Xinjiang Province, PR China Siemens Scope PDP / BEDP (supported by Design Institute ECEC) 8 x SFG-500 standard gasifier and burners 8 x Feeder vessels I&C system for burner management Dense flow coal measurement devices and feeding internals Training, Technical Field Assistance Yili City Schedule Contract signed July 2011 BEDP delivered April 2012 Gasifier manufacturing started June 2012 Expected COD Late 2015 Page 7 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Shenhua, CTL Project Status 24 SFG-500 gasifiers ordered Project will produce 4 million metric t/y of Diesel & Naphtha Siemens engineering completed Signing ceremony January 2012 Siemens equipment on order Start of commissioning expected late 2016 Page 8 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

MidAmerica C2L, KY Coal to Methanol Project Status Selected a more profitable product, Methanol Moved project to new site outside of Paducah, KY Worked with SK E&C to confirm EPC price for plant Cycle Diagram (provided by MidAmerica C2L) Currently seeking equity and debt financing for project Feeder Vessels and Gasifiers in Storage, Decatur, IL Page 9 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Agenda Gasification Project Update and Lessons Learned Shenhua Ningxia Coal Group, NCPP I Project Shanxi Lanhua, Jincheng Project CPI, Coal to SNG Project MidAmerica C2L, Coal to Methanol Project IGCC Project Update Huaneng Greengen Co. Ltd., Tianjin IGCC Project Mississippi Power, Plant Ratcliffe Summit Power, Texas Clean Energy Project Siemens Technology Update Conclusions Page 10 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Huaneng Greengen Co. Ltd. Tianjin IGCC Project Plant Output 250 MWe Siemens scope 1 x SGT5-2000E gas turbine and auxiliaries Gas turbine main fuel: Coal-based syngas diluted with N 2 Gas turbine secondary fuel: Fuel oil GT-G Status Gas turbine first fire on secondary fuel in October 2011 GT-G successfully reached first syngas operation in September 2012, commission of the plant continues as planned Page 11 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Mississippi Power Plant Ratcliffe IGCC Project Siemens shipped 2 SGT6-5000F Gas Turbine Generators to site in 2012 Gas turbines will operate on high H 2 syngas as the primary fuel and natural gas as the backup/startup fuel Gas turbines include capability to extract air for integration with the air-blown gasifier Gas Turbine Generators currently being installed at site Gas Turbine at Site Gas Turbine at Charlotte Factory Site pictures courtesy of Mississippi Power Gas Turbine Generator at Site Page 12 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Summit Power Group Texas Clean Energy Project Plant Output 400 MW e 710,000 t/y Ammonia/Urea 2.5 M t/y CO 2 for EOR Siemens Scope 2 X SFG-500 gasifiers SGCC6-5000F 1X1 power block operating on high H 2 syngas with natural gas as the startup/backup fuel Various plant compression solutions: CO 2, O 2, N 2, others Plant operation and maintenance services (JV with Linde) Siemens SGCC6-5000F 1x1 Power Block Siemens SFG-500 Gasifier Siemens OEM Service Support Page 13 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Agenda Gasification Project Update and Lessons Learned Shenhua Ningxia Coal Group, NCPP I Project Shanxi Lanhua, Jincheng Project CPI, Coal to SNG Project MidAmerica C2L, Coal to Methanol Project IGCC Project Update Huaneng Greengen Co. Ltd., Tianjin IGCC Project Mississippi Power, Plant Ratcliffe Summit Power, Texas Clean Energy Project Siemens Technology Update Conclusions Page 14 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

R&D Improves Gasification Economics Developed optical 3-D high precision measurement of Vresova s refractory lined reactor to more accurately determine refractory remaining lifetime and outage planning Developed advanced CFD calculation tool for coal specific gasifier design work resulting in: Maximized throughput Lower operating cost by minimizing possible O 2 consumption Optimized gas cleaning and black water treatment systems design Velocity profile Temperature profile Page 15 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Combined Cycle ASU 1 ASU 2 BWS 1 BWS 2 BWS 3 Mill 1 Mill 2 Mill 3 Mill 4 Mill 5 Mill 6 Mill 7 Mill 8 H2 Ha Weight: 50% Weight: 50% Gasifier 1 Gasifier 2 Gasifier 3 Gasifier 4 Gasifier 5 Shift Rectisol MeOH MTO PolyPropylen OEM Service Programs Play a Key Role in Improving Long Term Gasification Plant Availability Project Development Plant Operation Header RAM Analysis Gasification Diagnostics Pulverized Coal Header Maximum Raw Gas Header Raw Gas Identification of possible failures with impacts on reliability and availability FMEA for single faults FTA for failure correlations Markov models to describe consecutive failures Simulative approaches for more complex scenarios and complete poly-generation sites Monitors, analyzes and diagnoses plant operating conditions for follow-up action Data acquisition / processing / analysis OEM expert knowledge network Quick user support by web-based expert knowledge software solution Includes development and implementation of condition-based strategies and optimization of plant operations Flame spectrometry for gasifier monitoring Reactor vessel shape measurements Helps improve reliability, availability, lifetime asset management, and proactive maintenance planning Page 16 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

OEM Support for Operating Gasification Plants Siemens Gasifier Component Service Facility opened in 2012 Located at Siemens turbine works in Huludao, China Supports operating and future Siemens gasifiers in China Page 17 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Siemens DOE Advanced H 2 Turbine Program Update PHASE 1 and PHASE 2 Program Goals: 3-5% pt. in CC efficiency; 2 ppm NO x ; 20-30% Plant Cost Program is On-Track Siemens DOE H 2 Program Update: Technology Development Path to 2ppm Goal Advanced High Temperature Combustor Novel Selective Catalytic Reduction System Advanced Emissions Sensors 2 PPM Higher Efficiency Cost Competitive Page 18 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Agenda Gasification Project Update and Lessons Learned Shenhua Ningxia Coal Group, NCPP I Project Shanxi Lanhua, Jincheng Project CPI, Coal to SNG Project MidAmerica C2L, Coal to Methanol Project IGCC Project Update Huaneng Greengen Co. Ltd., Tianjin IGCC Project Mississippi Power, Plant Ratcliffe Summit Power, Texas Clean Energy Project Siemens Technology Update Conclusions Page 19 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Conclusions Global demand for gasification is still strong in areas where natural gas prices are high Chemicals / SNG Transportation liquids Lessons learned are helping to improve operating flexibility and reliability Better technology will provide broader feedstock options and improved plant economics Better gasification technologies being developed based on lessons learned and R&D Today s F class turbines are ready for high H 2 syngas and new technologies are being developed for the next generation of IGCC gas turbines New services and technologies to optimize life cycle operating cost Page 20 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.

Disclaimer This document contains forward-looking statements and information that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as expects, anticipates, intends, plans, believes, seeks, estimates, will or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SEC s website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated. Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners. Page 21 10/29/12 2012 GTC Conference Copyright Siemens Energy, Inc. 2012. All rights reserved.