2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY



Similar documents
Imperial Oil & Gas Environment Plan Summary EP184 Wells: BCF SC 05, BCF SC 04, BCF SC 03 and BCF SC 02

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

Exploration for natural gas

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Dysart Road and Associated Services Infrastructure Project Compliance Report Environment Protection and Biodiversity Conservation Act 1999

Increasing water availability through juniper control.

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

TRAFFIC MANAGEMENT PLAN

Tiger Brennan Drive Extension Stage 2. Project Environmental Management Plan

Waterway Technote Drains

Outlet stabilization structure

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

Professional Resumé of Geoffrey Hokin

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

Traffic Management Issue 1.0 Revision: v2 October 2014

WILLOCHRA BASIN GROUNDWATER STATUS REPORT

1.7.0 Floodplain Modification Criteria

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

Basements and Deep Building Construction Policy 2014

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa

SECTION SITE PREPARATION

Repair of Fences Damaged by Bushfire and Fire Control Line Rehabilitation Policy

Proposed Terms of Reference for EIA studies

Appendix C. Re-vegetation and Rehabilitation Sub-Plan

APPENDIX 4. Risk Tables

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

326 H. I. JIMOH. Aims and Objectives of the Study

3. Design Procedures. Design Procedures. Introduction

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

SECTION 7 LANDSCAPE RESTORATION

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

Rural Flooding: The Potential Role of Forestry

Beseck Switching Station Inspection

San Jacinto County Appraisal District PO Box 1170 Coldspring, Texas (Fax)

Emergency Spillways (Sediment basins)

PROPOSED TERMS OF REFERENCE

This plan forms one part of a suite of Asset Management Plans that have been developed:

NASA Stennis Space Center Environmental Resources Document

SE-10 STORM DRAIN INLET PROTECTION. Objectives

Basic Hydrology. Time of Concentration Methodology

Tree Management Guidelines

ENERGY, MINES AND RESOURCES (EMR) ASSESSMENT REGULATORY GUIDE:

Susan Hoey Lees Aug, 2013

SOILS AND AGRICULTURAL POTENTIAL FOR THE PROPOSED P166 ROAD, NEAR MBOMBELA, MPUMALANGA PROVINCE

Alphington sewer replacement

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

2.1 Environmental Responsibility & Land Capability

SOUTH AUSTRALIAN FIREBREAKS, FIRE ACCESS TRACK AND SIGN STANDARDS GUIDELINES

OSU Extension FACT SHEET

How To Plan A Buffer Zone

Frequently asked questions July 2014

PROPOSED TERMS OF REFERENCE

Appendix C. Municipal Planning and Site Restoration Considerations

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Role of the Environmental Management Representative (EMR)

Development proposals will require to demonstrate, according to scale, type and location, that they:-

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

CITY UTILITIES DESIGN STANDARDS MANUAL

Gas to the West INFORMATION LEAFLET. gastothewest.com. www

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$ %3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?

A SEISMIC OIL AND GAS PRIMER by Kevin B. Hill

What Is Rehabilitation?

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Department of Natural Resources and Mines. Offset Area Management Plan Template December Offset Area Management Plan - Inderi

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

Monitoring Hydrological Changes Related to Western Juniper Removal: A Paired Watershed Approach

FPICOT2221A Trim and cross cut felled trees

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

EDUCATION * ENERGY * ENVIRONMENT GUIDELINES AND PROCEDURES FOR CONSTRUCTION OF SCHOOL LANDSCAPE PROJECTS

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S

Point Boston Native Vegetation Management Plan 2014/15

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Off-road Vehicle Regulation. discussion paper

Removal of Trees and Vegetation in New York

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Fireline Rehabilitation on Donnelly Flats fire (B222) Summary: 7/1/99 R.R. Jandt

ENVIRONMENT MANAGEMENT PLAN

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Project Details- Minor Minerals (Other Than Sand)

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

WEATHERING, EROSION, AND DEPOSITION PRACTICE TEST. Which graph best shows the relative stream velocities across the stream from A to B?

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

HOW TO IMPORT FOREIGN SOIL and HOW TO MOVE SOIL within the UNITED STATES

Possible ECHO Shelter Indicators (version 15/05/13) revised by EDB/MP & DH 13/06

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

Household waste & recycling storage requirements

NON-TECHNICAL SUMMARY OF ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE BAHCE WINDFARM PROJECT (135 MW)

ENVIRONMENTAL PLANNING REGIME: REGIONALITY IN THE FOREGROUND

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

Construction Traffic Management Plan

Transcription:

ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

TABLE OF CONTENTS 1. INTRODUCTION... 3 2. DESCRIPTION OF ACTIVITY... 4 3. DESCRIPTION OF THE ENVIRONMENT... 4 4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT... 5 5. ENVIRONMENTAL RISKS OF PROPOSED ACTIVITY AND CONTROL MEASURES... 5 6. CONSULTATION... 6 7. PANGAEA LIAISON PERSONNEL... 6 2

1. INTRODUCTION EP167 and EP168 are located approximately 350 km southeast of Darwin in the Northern Territory (NT) in the western McArthur Basin. The tenements fall within the Victoria-Daly, Roper-Gulf and Barkly Shires plus the Katherine Municipality. All activities described in this EMP Summary are in the Roper-Gulf Shire. Pangaea intends to acquire approximately 380km of 2D, Vibroseis-sourced seismic data in the area of operations during 2015. This survey, known as the 2015 Avago 2D Seismic Survey, will comprise ten (10) seismic lines and has been designed to minimise impacts on the environment by utilising existing roads, tracks, fire-breaks and fence lines wherever possible. A location map and coordinates of the activity are provided in Figure 1. Figure 1: Location of the Avago 2D Seismic Survey 3

2. DESCRIPTION OF ACTIVITY The overall objective of the seismic program is to image subsurface geological formations across the stated tenements to increase the understanding of hydrocarbon prospectively within the area. The survey has been designed to image from the surface down to 4,000m of the subsurface to delineate critical areas of geological interest while also avoiding areas of environmental, cultural or archaeological importance. 3. DESCRIPTION OF THE ENVIRONMENT The region s climate is semi-arid tropical, with rainfall concentrated in the wet season months between November and April. Though rainfall can be variable from year to year, there is a distinct gradient of decreasing mean annual falls from 850mm in the north to less than 500mm in southern areas of EP167 and EP168, with nearly all the rainfall occurring between November and April (see Williams et al. 1997 1, Hennessy et al. 2004 2 ). The mean maximum temperature varies from 27 C in July to 40 C and beyond in November. Condition is generally good across much of the bioregion. The portion of the seismic survey in EP-167 will intersect with the Forrest land system. The Forrest land system consists of gently sloping sandy surfaced plains with few indistinct drainage depressions on sandy red earth soils. Vegetation is dominated by eucalypt woodlands and perennial grasses, the systems are generally suitable for pasture improvement and have moderate to high grazing potential. The Forrest land system consists of vegetation that have a relatively low forage quality in the dry season but it can benefit from strategic burning to manage woody thickening (Northern Territory Government, no date 3 ). The portion of the seismic survey in EP-168 will intersect with the Banjo land system. The Banjo land system consists of almost level to gently undulating plains on the plateau surface that lack drainage lines. Consisting of variable depth red earth soils with or without gravel; mixed eucalypt woodlands and perennial grasses, the systems are generally suitable for pasture improvement and have moderate to high grazing potential. The Banjo land system consists of vegetation that has a relatively low forage quality in the dry season although can benefit from strategic burning to manage woody thickening (Northern Territory Government, no date 4 ). 1 Williams, R.J., Cook, G.D., Ludwig, J.L. and Tongway, D.L. (1997). Torch, trees, teeth and tussocks: disturbance in the tropical savannas of the Northern Territory (Australia). In: Frontiers in Ecology. Building the Links. Eds. N. Klomp and I. Lunt. Elsevier, Oxford: pp55-66. 2 Hennessy, K., Page, C., McInnes, K., Walsh, K., Pittock, B., Bathols, J, and Suppiah, R. (2004). Climate Change in the Northern Territory. Consultancy report for the Northern Territory Department of Infrastructure, Planning and Environment. CSIRO, Melbourne. 3 Northern Territory Government (no date) Land Condition Guide - Sturt Plateau District; Understanding the productivity of grazing lands. Produced in association with the Northern Territory Cattlemen s Association as part of the Caring for Our Country project Grazing Land Management Demonstration, Continuation and Evaluation. 4 Northern Territory Government (no date) Land Condition Guide - Sturt Plateau District, Understanding the productivity of grazing lands. Produced in association with the Northern Territory Cattlemen s Association as part of the Caring for Our Country project Grazing Land Management Demonstration, Continuation and Evaluation. 4

4. DESCRIPTION OF THE ACTIVITY IN RELATION TO THE ENVIRONMENT The Seismic Survey has been designed with due consideration of the surface and subsurface environments, and to minimise impacts on the environment by utilising existing roads, tracks, fire-breaks and fence lines wherever possible. The operations will utilise one centrally located camp site. Line preparation may include stick raking and vegetation management for technical, safety and visibility reasons. Stick raking displaces logs and large sticks from the chosen line that could create a hazard or barrier. Light grading may be required to smooth over very rough surfaces to make the line trafficable for the vibrator trucks and support vehicles. Bull-dozers may also be employed as a last resort in areas where the terrain is especially rough and inaccessible by grader or front end loader. In all cases, equipment is kept off the ground surface ensuring that root stock and tufted grasses remain in situ wherever possible (minimising potential soil loss through erosion). Tree clearing is minimised by meandering the lines through heavily wooded areas and savannah woodlands around trees (>200mm diameter at breast height), however some tree losses and trimming is to be expected. All alternative options will be considered, including practical rerouting, before this occurs. Where a line crosses a creek, watercourse or depression in the landscape, survey crews will search for naturally cleared crossings (in the immediate area) before the final lines are chosen in the field. Earthworks in riparian areas will be minimised at all times and rehabilitation is to follow immediately post data capture, or as soon as practically possible. The collection of seismic data involves deploying over 10km of individual seismic nodes spaced every 10m along the lines. Energy waves are sent from vibrator trucks, which reflect off underground rock formations before being recorded by the nodes at the ground surface for analysis. The vibrators advance along the line and vibrate over a period of approximately eight (8) seconds every 10m. The data is downloaded from the nodes and sent to a data processing centre where it is processed to produce images of the subsurface. 5. ENVIRONMENTAL RISKS OF PROPOSED ACTIVITY AND CONTROL MEASURES Fauna and flora The seismic lines have been designed to minimise clearing and associated impacts on important vegetation communities that may be proving important fauna habitat. The seismic survey would comprise a minor and temporary barrier to movement of fauna, however the small scale of vegetation modification is unlikely to isolate any wildlife corridors or otherwise affect the migration or dispersal ability of any fauna. Weed and pest inspections on all vehicles & personnel clothing will be undertaken prior to arrival at site and the use of signage and appropriate fencing. Noise and surface Speed limits will be enforced on access tracks to limit and minimise dust and noise generation. Vehicular movements to and from the work sites will be minimised by travel during daylight hours and be compliant with land access agreements. Soil erosion will be minimised by the use of existing tracks, deviating around creeks, river banks and naturally formed depressions and not accessing roads in wet conditions. Waste management Waste will be stored in suitable receptacles and disposed of accordingly at municipal managed locations. Hazardous material shall be transported, stored and handled in accordance with the requirements of the relevant legislation and guidelines. 5

6. CONSULTATION During the past several months Pangaea has consulted with stakeholders, which has included: A detailed cultural heritage assessment and sacred site clearance process with the Northern Land Council and Traditional Owners; The negotiation and signing of voluntary access agreements with directly-affected Pastoralists; Direct engagement with communities and representative groups at exhibition booths during district and agricultural shows e.g. Katherine District Shows. Notification to local government councils, police authorities and local businesses of exploration activities; and Compliance with legislation and guidelines from the NT Department of Mines and Energy and other regulatory agencies e.g. Department of Transport and Department of Infrastructure. Pangaea s engagement process is aimed to identify and address issues of concern, reach agreement and in general engage in goodwill communication. Pangaea will continue this process with stakeholders throughout the life of the project. 7. PANGAEA LIAISON PERSONNEL Sydney Office Executive Director Tim Radburn Phone: (02) 9017 9600 6