LIST OF DAMS AND HYDROELECTRIC POWER PLANTS WHICH SU-YAPI HAS PARTICIPATED SINCE 1975



Similar documents
TEB 31 December 2014

Summary Balance Sheet. Source: TEB BRSA Consolidated Financials

Privatisation Agenda for Energy Assets

TURKEY WHAT S HOT WHAT S NOT

Analysis of variable-base heating and cooling degree-days for Turkey

Fibabanka Overview September 2013

Monitoring data and existing information Country Presentation from Turkey

YAPI KREDİ: A New Bank is Born. İstanbul, 2 October 2006

As of

CATTLE SECTOR IN TURKEY

THE INNOVATION INDEX OF CITIES OF TURKEY: AN EMPIRICAL ANALYSIS FOR DETERMINING FACTORS OF INNOVATION

NATURAL GAS MARKET TARIFFS REGULATION

Privatisation Update

INVESTOR PRESENTATION. BRSA Unconsolidated Financial Statements Highlights

INVESTOR PRESENTATION. BRSA Unconsolidated Financial Statements Highlights

TEASER. Privatization of Turkey s Electricity Distribution Industry

Zeitschrift für die Welt der Türken Journal of World of Turks THE IMPACT OF ECONOMIC DEVELOPMENT ON REGIONAL MIGRATION IN TURKEY

NEWSPAPER ADVERTISING RATES

Modeling Solar Energy Potential In Turkey

INVESTOR PRESENTATION. BRSA Unconsolidated Financial Statements Highlights

VISITOR SURVEY EXECUTIVE SUMMARY

General Directorate of Turkish Electromechanics Industry

RATIO ESTIMATORS IN POST-STRATIFICATION

REPUBLIC OF TURKEY MINISTRY OF ECONOMY NEW INVESTMENT INCENTIVES PROGRAM

Individual Pension System Progress Report

RESULT SUMMARY OF THE VISITOR SURVEY

A. Sinan Türkyılmaz, Attila Hancıoğlu and İsmet Koç

FMD SITUATION IN TURKEY. -Country Report- FMD SITUATION IN TURKEY. - Country Report- Dr Nihat Pakdil Deputy Secretary of M.A.R.A.

DIMENSION OF WATER LOSS THROUGH DISTRIBUTION SYSTEM AND REDUCTION METHODS IN TURKEY

Applied Energy 84 (2007) Simple model for the generation of daily global solar-radiation data in Turkey

ww. fhot els e. ls c. om

Poverty and Social Stratification at the Regional Levels in Turkey

FACTS & FIGURES: TEDU (as of May 31st, 2015)

Relationship between GDP per Capita and Gender Parity in Primary Education: Evidence from Provinces of Turkey 1. Sedat Gümüş a2

REFERENCES LİST VAN 500 BEDS STATE HOSPITAL

SHEEP AND GOAT MEAT Non-exhaustive list of issues and questions to facilitate preparations for bilateral meetings TURKEY

İŞİMİ INTRODUCTION. at the crossroads between East and West, overlapping Europe and Asia geographically.


TRADE EXHIBITION ISSUE REPORT

RENEWABLE INTEGRATION IN TURKISH POWER SYSTEM

TURKISH ECONOMIC ASSOCIATION. DISCUSSION PAPER 2011/4 http :// org.tr PRIVATIZATION AND REGIONAL DISTRIBUTION OF MANUFACTURING IN TURKEY

Chart Alert !! URGENT!!

The Impacts of Internal Migration on Urban and Work Life in Istanbul

TURKISH NUCLEAR POWER PROGRAMME NUCLEAR ENERGY PROJECT IMPLEMENTATION DEPARTMENT

Session FT5.22: Integrated Risk Management in Mediterranean Towns: Experience Sharing. Expert Panel

Intangible Cultural Heritage Safeguarding Efforts

TABAR ENGINEERING CONSTRUCTION AND TRADING LIMITED. : Hüseyin TABAK

Renewable Energy Solutions

Universal health coverage in Turkey: enhancement of equity

The point where technique meets with experience. REPAIR WELDING SERVICE. Services for Cement Manufacturer, Iron & Steel Works, Mining Industry.

HYDROPOWER. Purpose Builts

HYDROPOWER. Purpose Builts

Zeynep ÖZLER Melih ÖZSÖZ Economic Development Foundation - TURKEY. Visa Situation in Turkey

MAKRO ENVIRONMENTAL PROTECTION AND INDUSTRIAL PLANTS

SOLID WASTE MANAGEMENT IN TURKEY Current Status and Developments

Mother Child Education Foundation

Rumeli Cement Group Plants Preliminary Information. September 2004

2016 DHMİ AIRPORT CHARGES

DENİZBANK FINANCIAL SERVICES GROUP ANNUAL REPORT 2013

ELDER ELECTRICITY DISTRIBUTION SYSTEM OPERATORS OF TURKEY

Mediterranean region. Contents WATER FOOTPRINT OF TOURISM AND AGRICULTURAL PRODUCTION IN TURKEY

DIN EN ISO 9001:2008 DIN EN ISO 14001:2004 OHSAS 18001:2007

Educational Inequality in Turkey: An Evaluation by Gini Index* Türkiye de Eğitim Eşitsizliği: Gini İndeksine Göre Değerlendirme

PİRAMİT ENGINEERING& CONSULTING LTD. COM.

NEWSLETTER. GROUP LAW Law Firm Hukuk Bürosu GROUP LAW FIRM UPDATES

Mühendislik Danışmanlık Sanayi ve Ticaret Ltd. Şti.

A Perspective of Turkey Nuclear Power Plant Projects

ISSN: / Received: October 2013 NWSA ID: A0066 Accepted: April 2014 E-Journal of New World Sciences Academy

ADDITIONAL QUESTIONS FOR TURKEY

RANKING OF TURKISH UNIVERSITIES BY ACADEMIC PERFORMANCE (JANUARY 2010)

INFORMATION CONCERNING CERTIFICATION OF ORIGIN. Addendum. Notification by Turkey

MONTHLY REPORT MAY 2011

Transcription:

LIST OF DAMS AND HYDROELECTRIC S 1 GÜZELHİSAR DAM 2 DOĞANCI DAM (Selahattin Saygı) 3 KÜLTEPE DAM 4 İVRİZ DAM 5 SEVİŞLER DAM 6 KALECİK DAM 7 KIZILDERE DAM & KÖKLÜCE HEPP İzmir Bursa Kırşehir Konya Manisa Osmaniye Tokat EARTH 89-1975-1978 Entire Dam Except the Body, Contractor 82-1975-1978 Entire Dam Except the Body, Contractor EARTH FILL 42.7-1976-1978 Entire Dam Except the Body, Contractor EARTH FILL 45-1976-1978 Entire Dam Except the Body, Contractor EARTH FILL 65-1977-1978 Entire Dam Except the Body, Contractor 80-1977-1978 Entire Dam Except the Body, Contractor EARTH 50 90 1975-1978 Diversion-Bottom Outlet, Spillway, Energy Water Intake Structure, Energy Tunnel Excavation, Shoring and Partial Coating, Surge Tank, Contractor 8 KAYABOĞAZI DAM ALTINKAYA DAM 9 DERBENT DAM 10 11 KOVALI DAM 12 OYMAPINAR DAM 13 KOÇKÖPRÜ DAM & HEPP 14 ALTINKAYA DAM & HEPP Kütahya Samsun Samsun Kayseri Antalya Van Samsun EARTH 45-1976-1979 Entire Dam Except the Body, Contractor 195 700 Cofferdams, Diversion Structures EPDC, SU-İŞ, 1976-1979 (including Gate) TMB 37 56 Spillway, Diversion and Energy EPDC, SU-İŞ, 1976-1979 Water Intake Structure TMB EARTH FILL 48.5-1977-1979 Entire Dam Except the Body, Contractor CONCRETE ARCH 185 540 1979-1981 60 8.5 (2) (1) (1) 1979-1981 (2) 1986-1987 Dam Crest, Tail Water Outlet Structure Switchyard (Const.) (1) Entire Dam Except the Body (2) Energy Structures, Contractor, Contractor 195 700 1979-1981 Diversion Structures, Contractor - Su-Yapı has been working on Dams and HEPP since 1964. This list includes the services that have been performed after year 1975. - The explanation on the items with () for detail design services is given on page 16/16. 04.09.2014 Page: 1/16

LIST OF DAMS AND HYDROELECTRIC S 15 KAYRAKTEPE 16 AĞCAŞAR DAM 17 MANAVGAT 18 BÜYÜKÇEKMECE DAM 19 ÇATÖREN DAM 20 SEKKÖY DAM LAMAS III & IV 21 HYDROELECTRICITY STAGES 22 BOYABAT 23 KAPULUKAYA 24 KILIÇKAYA 25 MENZELET 26 ALTINKAYA 27 ADIGÜZEL 28 KARACAÖREN 29 YAHYASARAY DAM Mersin Kayseri Antalya İstanbul Eskişehir Muğla Mersin Sinop Kırıkkale Tokat K.Maraş Samsun Denizli Burdur Yozgat 196 420 1980-1982 Cofferdams, Diversion-Bottom Outlet Structures, Body, Spillway, Energy Water Intake Structure, Switchyard EPDC, SU-İŞ, TMB EARTH FILL 30-1977-1985 Entire Dam Except the Body, Contractor EARTH FILL 31 40 1983-1986 Entire Dam Except the Body and Hydromechanica EİEİ KEPEZ Elec. Inc., Contractor EARTH FILL 11.4-1984-1986 Spillway, Contractor EARTH FILL 45-1984-1986 Entire Dam Except the Body, Contractor EARTH FILL 40-1985-1986 Entire Dam TEK, Contractor - The explanation on the items with () for detail design services is given on page 16/16. 40 IIIA 9.35 IIIB 9.35 IV 22.95 1986-1987 Entire Dam TGT CONCRETE Power Plant Building, Control EPDC, SU-İŞ, 195 510 1985-1987 GRAVITY Building and Roads TMB Diversion-Bottom Outlet, Spillway EARTH FILL 63 51 1979-1987 Energy Structure, Contractor 140 120 1980-1987 Entire Dam Except the Body, Contractor 150.5 120 1980-1987 195 700 1982-1988 Entire Dam (A revis.project has been submitted for the body) Consultancy, Supervision Services EPDC, SUİŞ, TMB, Contractor 145 61 1982-1987 Energy Structures and HEPP, Müteahhit EARTH FILL 95 32 1982-1987 Energy Structures and HEPP, Contractor EARTH FILL 51-1984-1987 Entire Dam Except the Body, Contractor 04.09.2014 Page: 2/16

LIST OF DAMS AND HYDROELECTRIC S 30 ÇAVDARHİSAR DAM Kütahya EARTH FILL 51-1985-1987 Entire Dam Except the Body, Contractor 31 POLAT DAM Malatya 56-1985-1987 Entire Dam Except the Body, Contractor 32 EĞREKKAYA DAM Ankara EARTH FILL 100-1985-1987 Entire Dam Except the Body, Contractor 33 ÜRKMEZ DAM İzmir EARTH FILL 38-1985-1987 Entire Dam Except the Body, Contractor 34 ÇAT DAM EARTH Adıyaman 74-1985-1987 Entire Dam Except the Body, Contractor 35 AHMETLER DAM EARTH Muğla 52-1985-1987 Entire Dam TEK, Contractor 36 HANAY KÜL DAM Muğla 65-1985-1987 Entire Dam TEK, Contractor 37 SARIMEHMET DAM Van EARTH FILL 62.5-1987-1991 Entire Dam Except the Body, Contractor 38 KÜRE-ÇATAK DAM 35-1990-1991 Entire Dam, Contractor 39 GAYT DAM Bingöl EARTH FILL 36.5-1990-1991 Spillway, Contractor 40 ÇAMGAZİ DAM Adıyaman EARTH FILL 45-1990-1991 Entire Dam Except the Body, Contractor 41 KARACAÖREN II HEPP CONCRETE Entire Dam Except the Body, KEPEZ Elec. Inc., 49 47 1989-1991 Burdur GRAVITY Switchyard and Mechanica Contractor 42 ÇAMALAN DAM Entire Dam EARTH FILL 42.5-1991-1992 Ankara Feasibility Report for BOT, Contractor 43 KOVADA III HEPP Isparta - 5 1991-1992 Feasibility & Final Design for BOT GÖKDERE Inc. 44 ARMAĞAN DAM EARTH Kırklareli 57.25-1986-1993 Entire Dam Except the Body, Contractor 45 BOYABAT DAM & EARTH HEPP Sinop 195 510 1991-1993 Diversion Tunnels, Contractor - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model 04.09.2014 Page: 3/16

LIST OF DAMS AND HYDROELECTRIC S 46 SAZLIDERE DAM 47 YEDİGÖZE 48 BOYABAT 49 GEZENDE 50 KİRAZDERE DAM 51 YENİHAYAT DAM 52 ERFELEK DAM 53 KUZGUN 54 DİCLE 55 BATMAN İstanbul TURKİYE Sinop Karaman Kocaeli Çorum Sinop Erzurum Diyarbakır Diyarbakır 47-1991-1993 Entire Dam Except the Body, Contractor 131 300 1993 Feasibility Report for BOT ATA Cons. Inc. CONCRETE GRAVITY 195 510 1993 Feasibility Report for BOT ATA Cons. Inc. CONCRETE ARCH 72 150 1983-1994 Entire Dam Except the Body, Contractor 108.5-1987-1997 Entire Dam Except the Body, Contractor İzmit Water Inc. EARTH FILL 68.3-1991-1996 Entire Dam Except the Body, Contractor EARTH FILL 91.5-1993-1995 Entire Dam Except the Body, Contractor 120 22.7 1985-1997 Entire Dam Except the Body, Contractor 87 110 1993-2000 Switchyard and HEPP, Contractor EARTH 85.5 198 1986-2000 Entire Dam Except the Body, Contractor 56 KÜRTÜN Gümüşhane Covered by R.Concrete) 125 80 1986-2001 Entire Dam, Contractor (Final design has been revised, underground power plant and tunnel spillway and front face cover have been designed) 57 PALANDÖKEN DAM EARTH FILL 49-1994-2001 Entire Dam Except the Body, Contractor Erzurum EARTH 58 ADATEPE DAM 95-1995- Entire Dam Except the Body K.Maraş LİMAK Const. Inc. 59 ALAKIR I HEPP 49.5 3.2 1995 Feasibility Report for BOT KEPEZ Elec. Inc. Antalya - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model 04.09.2014 Page: 4/16

LIST OF DAMS AND HYDROELECTRIC S 60 TAŞOLUK DAM 61 ALARAHAN DAM & HEPP 62 GÖKTAŞ 63 KÖPRÜ 64 ERENLER HEPP 65 ÇİNE 66 AKKÖPRÜ 67 OBRUK 68 GÜLBAHAR DAM 69 DEMİRÖZÜ DAM 70 BERKE 71 OYRAK DAM 72 OBRUCAK DAM 73 KAVŞAKKAYA DAM Çanakkale Antalya Artvin Aydın Muğla Çorum 75-1995-2005 Entire Dam Except the Body, VİNSAN Inc. 190 110 1995-1996 Feasibility Report for BOT KEPEZ Elec. Inc. ARCH GRAVITY 148 270 1996 Feasibility Report for BOT 141 189 1996 Feasibility Report for BOT ROLLER COMPACTED CONCRETE (RCC) Regülatör 10 ÇUKUROVA ELECTRIC Inc. ÇUKUROVA ELECTRIC Inc. 19.2 1997 Feasibility Report for BOT ECETUR Inc. 136.5 47.2 1995-2010 Entire Dam, ÖZKAR Inc. 160 115 1995-2010 Entire Dam Except the Body EARTH FILL WITH CLAY CORE 125 202 1996-2009 Entire Dam Except the Body NTF Const. Inc. LİMAK Const. Inc. SAND GRAVEL 67-1996-2007 Entire Dam Except the Body Bingöl FILL ÖZCAN Inc. SAND GRAVEL 66-1996-1997 Entire Dam Except the Body Bayburt FILL ECETUR Inc. Construction Supervision and ELTEM-TEK ÇUKUROVA CONCRETE ARCH 201 510 1997-2001 Osmaniye Technical Consulting YAPI TEKNİK ELECTRIC Inc. ZONED 44-1997-1999 Entire Dam ZONED 76 3 1997-1999 Entire Dam Ankara WITH CLAY CORE 85-1998-2000 Entire Dam 74 BAĞIŞTAŞ II HEPP CONCRETE 30 45.6 1998 Feasibility Report for BOT EMT Inc. Erzincan CONCRETE 75 BOLASAN HEPP 43 82 1998 Feasibility Report for BOT ELTEM-TEK DEDEMAN UNIT Antalya GRAVITY WEIR - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model 04.09.2014 Page: 5/16

LIST OF DAMS AND HYDROELECTRIC S 76 OTLUCA HEPP 77 ALAKÖPRÜ 78 KARAKUZ 79 ALKUMRU 80 PEMBELİK 81 ILICA HEPP 82 TOR 83 GÜNDOĞMUŞ 84 ALARAHAN I Mersin Mersin Siirt Tunceli Antalya Antalya Regülatör 16 39 1998 Feasibility Report for BOT 93 26 1998 Feasibility Report for BOT 70 100 1998 Feasibility Report for BOT 134 222 1998 Feasibility Report for BOT 85 108 1998 Feasibility Report for BOT Regulator 13 51.6 1998 Feasibility Report for BOT 86 125 1998 Feasibility Report for BOT ARCH GRAVITY 125 105 1998 Feasibility Report for BOT 120 73.4 1998 Feasibility Report for BOT EMT Inc. EMT Inc. EMT Inc. GÜNSAYIL Inc. AKSA Inc. POLAT YOLYAPI Inc. POLAT YOLYAPI Inc. EY Inc. EY Inc. 85 ALARAHAN II Antalya ROLLER COMPACTED CONCRETE (RCC) 65 66.6 1998 Feasibility Report for BOT EY Inc. 86 KÖPRÜBAŞI DAM 87 ÇAY 88 ANDIRAZ DAM 89 AKTAŞ 90 ARAÇ DAM 119 74 1999 105 35 1999 ZONED EARTH FILL ZONED EARTH FILL ZONED EARTH FILL - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model 145 34 1999 Planning Report and Revision of Master Plan Planning Report and Revision of Master Plan Planning Report and Revision of Master Plan 57 12.5 1999 Report of Revision Master Plan 58-1999 Report of Revision Master Plan 04.09.2014 Page: 6/16

LIST OF DAMS AND HYDROELECTRIC S 91 GİRME DAM 92 GÖKPINAR DAM 93 ÇAL HEPP 94 BAYIR DAM 95 PAMUK HEPP 96 SULAKYURT DAM 97 TORUL DAM 98 İKİZDERE DAM 99 URUŞ DAM 100 ELMALI DAM, TAŞOBA DAM & BÜYÜKDÜZ HEPP 101 EŞEN II HEPP 102 DAMLACIK HEPP 103 MARMARİS DAM ZONED 71.5-1999-2000 Entire Dam Muğla EARTH FILL 43.1-1999-2000 Eskişehir WITH CLAY CORE Entire Dam - 2.2 1999-2000 Entire Dam Denizli LİMAK 49-1999 -2007 Entire Dam Except the Body Muğla ÖZKAR Inc. Regulator 23 1999-2001 Entire Dam Mersin 12,5 LİMAK / BEST / ENDA ROLLER COMPACTED 91.5-1999-2001 Entire Dam Kırıkkale CONCRETE (RCC) 152 121 1999-2006 Entire Dam Gümüşhane BAYTUR / ÖZDEMİR Aydın Ankara Gümüşhane Muğla Kırşehir Muğla EARTH ROLLER COMPACTED CONCRETE (RCC) CONCRETE ARCH GRAVITY ROCK FILL 108-1999-2011 Entire Dam Except the Body, LİMSAN/LİMAK 104.6-1999-2001 Entire Dam 62 93 60 Regulator 35 Regulator 5 1999 Final Design Preliminary Report 43.4 1999-2002 Entire Dam 20.7 1999 Feasibility Report for BOT 58-1999-2001 Planning Report, Final and Detail Design AGE / CEYLAN GÖLTAŞ Energy Inc. EMT AKFEN MARİÇ-BELBİR 104 TAHTAKÖPRÜ DAM AZERBAYCAN Khachmaz ZONED EARTH FILL 25 120 1999-2000 Prefeasibility MITSUBISHI CO. (Japan) - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model 04.09.2014 Page: 7/16

LIST OF DAMS AND HYDROELECTRIC S 105 DÜZCE-AKSU HEPP Regulator 41.6 2000 Feasibility Report for BOT Düzce 5 TUBİN Inc. 106 GELİNGÜLLÜ HEPP Feasibility Report EARTH FILL 54 1.97 2000 Yozgat Auto Producer Mode SUTA Ltd. Co. 107 NİKSAR HEPP Regulator 40.1 2001 Feasibility Report for BOT Tokat TEPE Inf. Inc. 108 AKINCI HEPP Regulator 96.8 2001 Feasibility Report for BOT Tokat TEPE Inf. Inc. 109 KOZCAĞIZ DAM Master Plan and EARTH FILL 60.2-2001-2002 Bartın Planning Report 110 BAHÇELİK HEPP 65 4.17 Kayseri 2002-2005 Entire Dam MOLU Inc. Co. 111 MACARRETANE MOZAMBİK Rehabilitation of Hydromechanica REGULATOR 4-2002-2009 DAM Macarretane System TECNICA ARA-Sul (Mozambique) ALPASLAN II Diversion-Bottom Outlet and 112 ZONED 116 200 2002-2004 Muş Energy Water Intake Structure MWH (HARZA) 113 SEYRANTEPE Granular fill type DARENHES 48.5 48 2003-2008 Entire Dam Elazığ with central core 114 BAYRAMHACILI SENERJİ 60 30 2003 Entire Dam Nevşehir Energy Gen. Inc. 115 AKOCAK HEPP Trabzon - 75 2003 Entire Dam NUR Energy Inc. 116 HAMZALI HEPP CANAL GÜNGÖR - 13.8 2003-2004 Entire Dam Ankara 117 OTLUCA HEPP GÜNGÖR - 48 2004 Entire Dam Mersin 118 ZİNCİRLİ HEPP GÜNGÖR - 16.3 2004 Entire Dam Antalya 119 ÇAMLICA III HEPP GÜNGÖR - 25 2004 Entire Dam 120 SARAÇ GÜNGÖR EARTH FILL 30 10.1 2004-2005 Entire Dam Sivas - The explanation on the items with () for detail design services is given on page 16/16. BOT : Build-Operate-Transfer Model 04.09.2014 Page: 8/16

LIST OF DAMS AND HYDROELECTRIC S 121 ERBAA HEPP 122 CEVİZLİK 123 AKINCI HEPP 124 BÜYÜKKARAÇAY 125 NARLI Tokat Rize Tokat Hatay Muğla Roller Compacted Concrete (RCC) - 50.4 2004 Entire Dam 47 96.2 2004 Entire Dam - 96.8 2004-2005 Entire Dam ETİ FERNAS Construction Ltd. Co. ETİ 105 10.4 2005-2007 Entire Dam 99.5 70.5 2005 Entire Dam ETİ 126 WADI DAYQAH DAM OMAN Muscat RCC & Rock Fill Compacted Concrete 74 42 - - 2005-2014 Entire Dam Entire Dam BVI ve NESPAK MRMEWR Ministry of Regional Municipalities, Environment and Water Resources 127 ÇAMBAŞI 128 TATAR 129 AKTAŞ DAM 130 AYVADERE 131 GÜNEYCE 132 ÇANKAYA KARAKURT DAM & 133 HEPP 134 GÖKDERE 135 PİRİNÇLİ Trabzon Elazığ İzmir Trabzon Trabzon Trabzon Kars Karaman Çorum Granular fill type with central core Semi Pervious Fill with Clay Core 106 48.2 2005 Entire Dam 84 129.5 2005-2013 Entire Dam FERNAS Energy Gen. Inc. DAREN HES 105-2006-2007 Entire Dam Regulator 12 Regulator 7 Regulator 15 - The explanation on the items with () for detail design services is given on page 16/16. 10 2006 Entire Dam 93 86.2 2006 Entire Dam 160 88.3 2006 Entire Dam 155 180 2006 Entire Dam 36.4 2006 Entire Dam 18.7 2006 Entire Dam ATLAS Mining Maritime Trade Inc. ATLAS Mining Maritime Trade Inc. ZORLU Energy Electricity Gen. Inc. BİLSEV Energy Gen. Inc. SEMA Electricity DERYA Electricity 04.09.2014 Page: 9/16

LIST OF DAMS AND HYDROELECTRIC S AKSU-ANAKOL 136 (ÇORUH) 137 ADASU 138 ASLANCIK Erzurum Adapazarı Giresun Send. Gravel & Rock Fill With Blanket Granular fill type with central core 112 120 2006 Entire Dam LİMAK Inc. Co. Regulator 17.5 9.5 2007 Entire Dam 30 85.3 2006 Entire Dam ADASU Energy Inc. 139 SAYAN Regulator SEMA Electricity 13 2006-2007 Entire Dam 12,5 140 ULADI DAM İzmir 86.5-2006-2007 Entire Dam 141 YEDİGÖZE YEDİGÖZE 131 294 2006-2007 Entire Dam 142 NİKSAR HEPP SELEN - 40.2 2006-2013 Entire Dam Tokat DEREKÖY DAM & 143 125 111 2006 Entire Dam DEMİRKAPI HEPP Rize 144 ÇETİN EnBW Kraftwerke A.G. 165 244 2006-2007 Entire Dam Siirt (Germany) 145 DERELİ BEREKET Energy - 46 2007 Entire Dam Giresun 146 ÇIRAKDAMI BEREKET Energy - 46 2007 Entire Dam Giresun 147 ÇAMLICA 98 80.6 2007 Entire Dam Artvin 148 TUNCA Edirne 11.68 2007-2010 Entire Dam KADINCIK III & 40 DERYA Electricity 149-2007 Entire Dam KADINCIK IV HEPP Mersin 50 150 KEMERÇAYIR - 15.5 2007-2013 Entire Dam Trabzon - The explanation on the items with () for detail design services is given on page 16/16. 04.09.2014 Page: 10/16

LIST OF DAMS AND HYDROELECTRIC S 151 ÜÇHANLAR 152 ÜÇHARMANLAR 153 BADEMLİ DAM 154 BURGAZ DAM 155 YALNIZCA 156 ORTAÇAĞ HEPP 157 SARNIÇ HEPP 158 ERİK HEPP 159 YUMRUTEPE HEPP 160 İKİSU HEPP 161 KALECİK HEPP 162 KEPEZKAYA HEPP 163 KARACASU DAM 164 UZUNÇAYIR 165 ALKUMRU 166 DEREKÖY Trabzon Trabzon İzmir İzmir Karabük Trabzon Artvin Artvin Giresun Giresun Artvin Karaman Aydın Tunceli Siirt Rize GRANULAR FILL WITH CENTRAL CLAY CORE EARTH FILL EARTH FILL WITH CLAY CORE SANDGRAVEL FILL WITH CLAY CORE - 11.3-16.6 2007-2013 Entire Dam 2007-2013 Entire Dam 56-2007-2008 Entire Dam 115-2007-2008 Entire Dam - 14.8-8 - 24.9-14.3-13.1-43.9-31 - 28 (talveg) 55 (talveg) 58 - The explanation on the items with () for detail design services is given on page 16/16. 2007-2009 Entire Dam 2007-2010 Entire Dam 2007-2010 Entire Dam 2007-2010 Entire Dam 2007-2010 Entire Dam 2007-2010 Entire Dam 2007-2009 Entire Dam 2007-2013 Entire Dam - 2007-2012 74 134 222-110 Final and detail design for the body of dam 2007-2012 Detail design of power plant 2007-2011 Entire Dam 2007-2013 Entire Dam Ekber Topal Energy Gen. Ltd. Co. LİMAK Construction Trade Co. Inc. LİMAK Hydroelectric Power Investments Inc. LİMAK Hydroelectric Power Investments Inc. BESS Electric. Gen. Ind. & Trade Inc. 04.09.2014 Page: 11/16

LIST OF DAMS AND HYDROELECTRIC S 167 KELKİT-AKINCI HEPP 168 BEYYURDU DAM 169 ASLANDAĞI DAM 170 AYVALI 171 PEÇENEK DAM 172 ÇİLEKLİTEPE HEPP 173 ARKUN 174 KIZILEV HEPP 175 ÖZLÜCE HEPP 176 SERPİN HEPP 177 KİRAZLIK HEPP 178 SAYAN HEPP 179 PERVARİ WEIR 180 BOYABAT 181 AYDINCIK DAM 182 ADATEPE DAM Tokat Hakkari Hakkari Erzurum Ankara Giresun Artvin Giresun Erzurum Giresun Siirt Osmaniye Siirt Sinop Manisa K.Maraş - 96.8 2007-2013 Entire Dam ETİ 54 8.71 2007 Entire Dam 69 11 2007 Entire Dam 171 112.9 2007- Entire Dam ÖZDOĞAN Energy Inc. EARTH FILL 32.5-2008-2009 Revision of Planning Report AKAR-SU CONCRETE GRAVITY - 23.6 2008 Entire Dam 190 244 12.5 16.4 10 22 18 38.7 CENAY Electric. Gen. Ind. & Trade Inc. 2008-2014 Entire Dam YAPI TEKNİK DOKA Electric Gen. Inc. 2008-2013 Entire Dam AKSU Electric Gen. Inc. 2008-2013 Entire Dam AKSU Electric Gen. Inc. 2008-2013 Entire Dam AKSU Electric Gen. Inc. - 42.1 2008-2013 Entire Dam BAREN Energy Gen. Inc. - 12 2008-2009 Entire Dam KAREL Electric Gen.Inc. - 183.1 2008 Entire Dam 195 510 2008-2012 Entire Dam YAPI TEKNİK ONK Electric Gen. Trade Inc. Co. BOYABAT Electric Gen. Inc. EARTH FILL 39-2008-2009 Entire Dam WITH CLAY CORE - The explanation on the items with () for detail design services is given on page 16/16. 89-2008-2013 Revision of Planning Report HİDRODİZAYN 04.09.2014 Page: 12/16

LIST OF DAMS AND HYDROELECTRIC S 183 KARAKUZ DAM 184 ÇELENGÖZ DAM 185 CİZRE 186 BOZKIR 187 TEFEN HEPP 188 MENGE 189 KÖPRÜ 190 191 192 193 194 SAYAN WEIR KESKİN DAM BAĞIŞTAŞ II DAM KIZKAYASI DAM BAĞIŞTAŞ I DAM 195 NAMAZGAH DAM 196 BAYRAM DAM 197 KEMAH 198 HİMMETLİ HEPP K.Maraş Manisa Şırnak Konya Karabük Osmaniye Siirt Erzincan Bursa Erzincan Kocaeli Artvin Erzincan WITH CLAY CORE 67-2008-2013 Revision of Planning Report HİDRODİZAYN ZONED EARTH FILL 29-2008-2009 Entire Dam GRANULAR FILL TYPE AYDINLI Energy WITH CENTRAL CORE 51.4 240 2009-2010 Entire Dam Gen.& Trade Inc. 116 15 2009-2011 Entire Dam - 33 2009-2014 Entire Dam AKSU Electric Gen. Inc. CONCRETE GRAVITY 68 89 2009-2012 Entire Dam 109 145 2009-2013 Entire Dam - 12 2009-2011 Entire Dam 205 164 2009 Entire Dam 21 49.80 2009-2010 Entire Dam YAPI TEKNİK WITH CLAY CORE 194 130 2009-2013 Entire Dam WITH CLAY CORE 52 122 2009- Entire Dam ENERJİ SA Energy Gen. Inc. ENERJİ SA Energy Gen. Inc. KAREL Electric Gen. Inc. NTF Const. & Trade Co. Ltd. AKDENİZLİ Electric Gen. Inc. ÇALIK Energy Gen. & Mining Inc. OREN Energy Electric Gen. Inc. 25-2009-2011 Entire Dam İSU CONCRETE GRAVITY - The explanation on the items with () for detail design services is given on page 16/16. 35 90 2009-2013 Entire Dam 96 150 2009 Entire Dam 28.5 27.60 2010-2012 Design Supervision LNS Energy Gen. Ind. & Trade Inc. AK Energy Electric Gen. Inc. MEM Energy Electric Gen. Inc.Co. 04.09.2014 Page: 13/16

LIST OF DAMS AND HYDROELECTRIC S 199 200 201 GÖKKAYA DAM ÇAYÖNÜ - DERYA WEIR KAYABEYİ DAM 202 GÖKTAŞ I 203 GÖKTAŞ II 204 ÇAKMAK DAM 205 ŞENYAYLA I ŞENYAYLA II 206 207 KARGI 208 GÖKBEL I GÖKBEL II 209 210 DARAN I DARAN II 211 NOBULEVI DAM 212 TSKHIMRA DAM 213 Diyarbakır Ardahan Edirne Diyarbakır Diyarbakır Ankara Ankara Ankara Karaman Karaman GEORGIA GEORGIA 69 30 2010-2012 Design Supervision CONCRETE GRAVITY 35.5 34.76 2010- Entire Dam 134 77.50 2010-2014 Entire Dam 148 130 2010-40 157 2010- MEM Energy Electric Gen. Inc.Co. ERENTUR Ind. & Trade Inc. PELİN Energy Gen & Trade Co. Ltd. TSKB Garanti Yapı Kredi İş Bank / BEREKET Energy Inc. TSKB Garanti Yapı Kredi İş Bank / BEREKET Energy Inc. EARTH FILL WITH CLAY CORE 56-2010-2012 Revision of Planning Report 40 9.80 2010- Entire Dam 65 15.54 2010- Entire Dam WITH CLAY CORE 65 100 2010- Entire Dam - The explanation on the items with () for detail design services is given on page 16/16. 6 2 2010-2014 Entire Dam 8.3 6.60 2010-2014 Entire Dam 23.15 43.76 2010-2013 13.10 18.54 2010-2013 42 27.77 2011-2012 Entire Dam 97 44.62 2011-2013 Entire Dam ME-ED Energy Electric Gen. Co.Ltd. ME-ED Energy Electric Gen. Co.Ltd. KARGI Energy Electric Gen. Inc. GÖKBEL Energy Electric Gen. Inc. GÖKBEL Energy Electric Gen. Inc. Yapı Kredi Bank Kurtsuyu Elec.Gen.Inc. Yapı Kredi Bank Kurtsuyu Elec.Gen.Inc. KLG LLC (Kolin / Limak JV) KLG LLC (Kolin / Limak JV) 04.09.2014 Page: 14/16

LIST OF DAMS AND HYDROELECTRIC S 214 215 216 217 ERJIA I - II LECHEKKA DAM AND HEPP PEMBELİK DAM ARTVİN DAM 218 BALLIKAYA DAM TORTUM II 219 220 BİTLİS ARINCIK WEIR 221 & AK HEPP 222 KUŞAKLI 223 BURGAZ 224 İKİSU 225 KÖROĞLU HEPP 226 OYLAT HEPP 227 AKBAŞ 228 AKKENT-ÇALKUYUCAK GEORGIA GEORGIA Tunceli Artvin Adapazarı Erzurum Bitlis Muş İzmir Giresun Osmaniye Bursa Denizli Denizli CONCRETE GRAVITY CONCRETE ARCH GRAVITY 32 20 32.73 2011-2014 Entire Dam 60.50 25.31 2011- Entire Dam 77 130.26 2011- Entire Dam 180 332 2011- KLG LLC (Kolin / Limak JV) KLG LLC (Kolin / Limak JV) DARENHES Elect. Gen. Inc. GarantiYapı Krediİş BankVakıf Bank / Doğuş Energy WITH CLAY CORE 100-2011 Entire Dam 10 22 10 52.32 11 19.00 2011 Due Diligence Services 2011 Due Diligence Services 2011 Due Diligence Services 14.50 20 2011-2014 Entire Dam SANDGRAVEL FILL WITH CLAY CORE 115-2011-2014 Entire Dam - The explanation on the items with () for detail design services is given on page 16/16. 101 57.17 2011- Entire Dam 5 9.53 2012 Entire Dam 17 1.94 2012 Entire Dam 5.3 12.26 2012-2013 5.3 13.49 2012-2013 Yapı Kredi BankAkbank Nur-Tek Elect. Gen. Inc. Yapı Kredi BankAkbank Nuve Elect. Gen. Inc. Yapı Kredi BankAkbank Özbey Energy ENERJİSA Energy Gen. Inc. LİMAK Const. Trade & Ind. Inc. ETKEN Elect. Energy Gen. Ltd. Co. ETKEN Elect. Energy Gen. Ltd. Co. Yapı Kredi Bank Merter Tekstil Branch Yapı Kredi Bank Merter Tekstil Branch 04.09.2014 Page: 15/16

LIST OF DAMS AND HYDROELECTRIC S 229 KOÇALİ DAM 230 ÇARDAK DAM 231 BEŞPARMAK DAM 232 233 KAYRAKTEPE DAM & HEPP ALPASLAN II DAM & HEPP 234 YUSUFELİ 235 CİZRE HEPP 236 BALLIKAYA DAM 237 CİZRE HEPP 238 ARADAH DAM SAMİ SOYDAM 239 SANDALCIK 240 GÖKSU 241 KÖPRÜBAŞI Adıyaman Antalya Aydın Mersin Muş Artvin Şırnak Adapazarı Şırnak SAUDI ARABIA Denizli Bolu Trabzon 124-2012-2013 Entire Dam 43.5-2012-2013 Entire Dam 45-2012-2014 Entire Dam 165 290 2012- Entire Dam WITH CLAY CORE 116 280 2012- Entire Dam DOUBLE CURVATURE CONCRETE ARCH 270 540 2013- Entire Dam 51.4 240 2013-2014 Entire Dam WITH CLAY CORE 97-2013 Entire Dam CONCRETE GRAVITY 51.4 240 2013-2014 Entire Dam 70.85-2013-2014 Bottom Outlet Valve Chamber WITH CLAY CORE 115 129 2013- Entire Dam 6.1 16.56 2013-6 8.20 2014- Alpaslan II Energy Gen. & Min. Ind. Trade Inc. LCK Yusufeli Ordinary Partnership NUROL / CENGİZ Partnership YÖNTAŞ İnş. San. ve Tic. A.Ş. ÇATAK Enerji Elk. Üretim A.Ş. KİT Müh. ve Mak. Ltd. Şti. Garanti Bank/Akbank ZORLU Hid. En. Ür. A.Ş. Ziraat Bank Tek-En En.Ür.A.Ş. Yapı Kredi Bank Küçük Enerji Ür. A.Ş. 1 - SU-YAPI HAS BEEN WORKING ON DAMS AND HEPP SINCE 1964. THE ABOVE LIST INCLUDES THE SERVICES THAT HAVE BEEN PERFORMED AFTER 1975. 2 - PRE-TENDER DRAWINGS FOR THE FACILITIES, CIVIL WORKS OF WHICH ARE BIDDED BY AND FOR WHICH THE IS PROVIDED TO THE CIVIL WORKS CONTRACTOR BY SU-YAPI, ARE BASED ONLY ON HYDRAULIC DIMENSIONS, OTHER THAN THE DRAWINGS FOR EMBANKMENT; THEREFORE, FOR SUCH FACILITIES IS PERFORMED BY THE REQUIRED, STABILITY ANALYSIS AND STRUCTURAL DESIGN WHICH ARE CARRIED OUT WITHIN THE SCOPE OF STUDIES. FURTHERMORE, IF A NEED FOR DESIGN REVISION ARISES, TO COPE WITH THE SOIL, MATERIAL RESTRAINTS, PROGRAM AND OPERATING CONDITIONS CONFRONTED IN STAGE SUCH REVISIONS ARE CARRIED OUT BY SU-YAPI AS WELL. THE DRAWINGS DURING PHASE ARE DEVELOPED IN PARALLEL TO THE CIVIL WORKS AND ACCORDING TO OUR CONTINOUS IN-SITU STUDIES AND SITE CONDITIONS. 3 - BOT : BUILD-OPERATE-TRANSFER MODEL, : GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS 04.09.2014 Page: 16/16