*AKA: Green Infrastructure (GI) and other aliases



Similar documents
How To Amend A Stormwater Ordinance

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Georgia Coastal Stormwater Supplement April 2009

What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed

Green Infrastructure In New Jersey The Current State of Implementation. Prepared for Sustainable Jersey by the Natural Resources Defense Council

A Developer s Guide: Watershed-Wise Development

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

Implementing Green Infrastructure in Atlanta

APPENDIX A: STORMWATER MANAGEMENT CHECKLIST

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

5.14 Floodplains and Drainage/Hydrology

US Army Corps of Engineers Authorities and Programs

Environment Virginia Conference April 6, Integrating Stormwater, Urban Design, and Growth Policies

Costs for Green Infrastructure and Stormwater Retention Practices

FLOOD PROTECTION BENEFITS

Green Infrastructure in Action: Examples, Lessons Learned & Strategies for the Future December 2014

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

Land Conservation in the Floodplain

A. General Information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

CWSRF Project Descriptions and Examples for Green Project Reserve

United States Environmental Protection Agency. EPA 841-B December

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

UNIFIED FACILITIES CRITERIA (UFC) LOW IMPACT DEVELOPMENT

COMMUNITY CERTIFICATIONS

1.7.0 Floodplain Modification Criteria

The answers to some of the following questions are separated into two major categories:

Costs for Green Infrastructure and Stormwater Controls

Adoption of Flood Insurance Rate Maps by Participating Communities

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

Flood Risk Management

Flood Risk Management

understanding Sustainable Landscaping & Tree Preservation Standards

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

GOALS, OBJECTIVES AND POLICIES

Shooks Run Drainage Study Basic Terminology

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

Total Criteria Score Out of a possible 6

URBAN DRAINAGE CRITERIA

STORMWATER AND URBAN DESIGN

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Low Impact Development

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

Decision-Support Tools and Databases to Inform Regional Stormwater Utility Development in New England

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS

Chapter 6: Mitigation Strategies

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Peter J. Strazdas Associate Vice President, Facilities Management Western Michigan University

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Green Stormwater Infrastructure in the Sustainable Site. Outline: 2/19/2014. The Stormwater Problem: Impacts of turning spongy forests into cities

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

LIVING LANDS Helping Land Trusts Conserve Biodiversity

City of Powder Springs

Thanks to its newly issued federal stormwater permit, Washington,

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

ATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS)

Appendix F Benefit-Cost Analysis of Flood Protection Measures

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

Protecting Floodplain. While Reducing Flood Losses

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Flood Damage Prevention in Delaware County, NY

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

NAPA COUNTY WATERSHED SYMPOSIUM

Tropical Storm Allison

Green Infrastructure in Arid and Semi-Arid Climates

Stormwater Design Guidelines Frequently Asked Questions:

Green Infrastructure: Basic Principles and Techniques

New LID Requirements for Rhode Island: Moving Beyond Encouragement

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Essential Resources for the Stormwater Program Revised September 2008 EPA 833-F

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies

Post-Flood Assessment

7.0 Stream Restoration

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Stormwater management around the world Lessons from Novatech 2010 Dennis Corbett and Marion Urrutiaguer

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

Baltimore City Phase II Watershed Implementation Plan (WIP) July 2, 2012

Appendix J Online Questionnaire

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA

Building Olive s Flood Resiliency

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Transcription:

*AKA: Green Infrastructure (GI) and other aliases

Paul Wagner, USACE IWR Lisa Hair, USEPA, Office of Water Roger Lindsey, Nashville Metro Water Services Tom Palko, Nashville Metro Water Services Dan Medina, Atkins Global Definition and Introduction Riverine and Coastal Application Future Needs Riverine and Coastal Federal Mechanisms to Encourage Change

Natural and Nature-based Infrastructure Natural: Naturally occurring systems that provide services, i.e. natural dunes or forests Nature-based: Engineered systems to mimic or restore natural functions, i.e. floodplain restoration Green Infrastructure Large scale (Benedict and McMahon) or Site-scale for Stormwater Management practices that reduce runoff volume via infiltration or capture and use Site-scale is also called Low-Impact Development (LID) Terminology is evolving, overlapping

2007: EPA Commissioned National Research Council to review Stormwater Program Result: Current methods not effective Finding: Runoff volume control needed - not just concentration of pollutants in runoff

Low Impact Development (LID) Natural approaches - infiltration and evapotranspiration and harvest-and-use Distributed small-scale hydrologic controls retain rainfall close to the source Replicates the pre-development hydrologic regime: reducing runoff volume compared to impervious surfaces Modified from Prince George's County, Maryland. Larry Coffman et al. (1999).

Eco-Roof (green roof or blue roof)g Underground: Infiltration Vaults and Expanded Tree Pits Infiltrating swales

Examples: Tulsa, OK; Charlotte-Mecklenburg, NC Future increases in imperviousness = increased development set-backs by local code, at a high cost to existing river-front landowners. But we can t set back existing riverfront development for future upstream imperviousness, it s too costly. Land for more reservoirs is too costly. Levees are not always a desirable option. Small storm retention ordinances are a feasible and relatively low-cost option.

Typical LID design retains 0.5 to 2 ; or more Not noticeable at major storms (i.e. 50 yr) BUT 80% to 90% of annual rainfall is <1.5 AND - 80% to 90% of annual pollution is reduced Replicating predevelopment runoff rate and duration assures water quality protection and integrity of stream channels and floodplain connectivity. Restoration may be too costly. On a watershed scale, flood reduction benefits can accrue, as studied in future conditions study EPA recently prepared.

NE: Omaha, Papio Creek Watershed Plan - LID adoption multi-jurisdiction for flood control; WQ side-benefit MN: Capital Region Watershed District - LID cheaper flood control option; water quality improvement for popular lake CA: Los Angeles Sun Valley Watershed - LID flood control benefits changed LA s approach to overall stormwater management NC: Asheville Flood Task Force Ordinances recommending LID for flood control as part of comprehensive approach

-Improved water quality -North Carolina Coastal Federation cites shellfish bed protection - Stream channel and habitat protection - Nashville LID could reduce repetitive flood losses and maintain baseflow in summer for endangered species, per USACE -Puget Sound Biological Opinion to protect salmon includes LID - Groundwater recharge for water supply - Protecting Florida s Springs: An Implementation Guidebook, State of FL - Lower costs for water treatment and dredging -Streambank erosion is the major sediment contributor - Lower costs for stream/floodplain restoration - Greener towns: self-watering landscapes

Small storm retention is required for redevelopment and/or new development: State-wide: CA, NY, PA, NJ, MN, MD, DE Retention requirement varies from about 85 th percentile to over 95 th percentile ( about 0.75 to 1.8, varies) www.epa.gov/npdes/pubs/sw_state_summary_standards.pdf MS4 permitted cities in MA, MT, NH, WV, TN, DC Adopted in regions for specific issues, examples: Maricopa County (Phoenix), AZ: LID for flood management since 1985; 100-yr, 2-hr event Kane and Lake Counties, IL; LID adopted for flood management US Navy in 2007: Pioneers policy that is now a requirement for new and redevelopment of federal facilities

FEMA model ordinance for Puget Sound: Stormwater and drainage features shall incorporate low impact development techniques, if technically feasible, that mimic predevelopment hydrologic conditions, such as stormwater infiltration, rain gardens. If more than 10 percent of the portion of the lot in the Regulatory Floodplain is covered by impervious surface, the applicant shall demonstrate that there will be no net increase in the rate and volume of the stormwater surface runoff that leaves the site Because western Washington State LID standards are similar, most NFIP communities are adopting it in local ordinances to comply with NFIP. 5 communities have adopted the FEMA Model Ordinance, and 10 have modified their ordinances to match it (per FEMA) Floodplain Management and the Endangered Species Act, A Model Ordinance, FEMA Region 10, January 2012

Stormwater runoff volume retention shall be achieved onsite in the amount equivalent to the runoff generated from one inch rainfall over the impervious surfaces of the development Alternative Compliance Sequencing. To the maximum extent practicable, the volume reduction standard shall be fully met onsite. If it is not possible because of site conditions listed above, the following steps shall be taken in the order shown: [as much on site as possible, then offset with banking, pay impact fee for remainder]

Rationale: smaller runoff volume leads to smaller floodplains and thus fewer flood damages Evaluate 20 HUC8 watersheds with and without GI-based retention out to the year 2040 Retention assumed: 85 th percentile storm on redevelopment; 90 th percentile storm on new development Approximately 0.5 for 85 th and 1 to 1.7 for 90 th Estimate monetary flood losses for each scenario Benefits = losses without GI losses with GI

At year 2040: $100 to $300 Million per year Would continue to increase over time Present Value 2020 to 2040 $0.8 to $2.3 Billion Hazus identified losses only, not damage from stream erosion or pollution i.e. avoided costs

Twenty HUC8 watersheds selected Publically available datasets Stream gage hydrology (PeakFQ) Hydraulic modeling (Rapid Flood Delineation [RFD] Atkins model) Damage estimation (Hazus) Nationwide scale-up (SAS regression)

When applied watershed wide, small storm retention is effective at reducing Peak flows for large events Flood elevations Flood losses Benefits can be quantified by the Average Annualized Losses Avoided (AALA) method (i.e. Hazus AAL with/without GI) Need to improve messaging about the link between runoff volume reduction and flood loss avoidance Watershed flood modeling should consider future conditions with runoff retention ordinances on new and redevelopment: As part of alternatives analysis; and To protect existing infrastructure To improve or maintain water quality and local water resources

Nashville Metro Water Services Discussion of Coastal Applications

FEMA CRS scoring has credits for: stormwater retention ordinances and LID flood control projects only if future conditions are studied large-scale, contiguous Green Infrastructure Plan USFWS has accepted LID in ordinances as one part of a Habitat Conservation Plan (HCP) under Endangered Species Act individual developers saved the headache. (Example: Etowah HCP, Georgia) FEMA has included LID in Model Ordinances in Puget Sound, and has funded pilots (Cuyahoga Falls, OH) because of repetitive losses EPA: Drinking water source protection, TMDLs, Combined Sewer Overflow Consent Decrees, etc., may allow LID credit or benefit from LID ordinances

WRDA 86 Section 402, as amended, requires non-federal interest to prepare a floodplain management plan (FPMP) to reduce impacts of future flood events Guidance for FPMP development in Policy Guidance Letter (PGL) 52 FPMP should include measures, practices, and policies to reduce loss of life, damages to property and facilities, public expenditures, preserve the level of protection provided by the Corps project, and enhance natural floodplain values Can include land use regulations, various preparedness activities, floodplain acquisition and easements, and preservation of natural resources and functions of the floodplain An example strategy highlighted in PGL 52 includes public development and redevelopment policies such as no net increase in runoff requirements for new development within its jurisdictions FPMP development is the project sponsor s responsibility; USACE can assist

The Energy Independence and Security Act of 2007, Section 438 (EISA 438) requires Federal facility buildings, both new development and redevelopment, to match predevelopment stormwater runoff rates, volume, and temperature. Storm water runoff requirements for federal development projects. The sponsor of any development or redevelopment project involving a Federal facility with a footprint that exceeds 5,000 square feet shall use site planning, design, construction, and maintenance strategies for the property to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow.

EPA Green Infrastructure website Local or state stormwater programs Industry news: Stormwater Magazine (free) EPA non-point source community list serve: Subscribe at: epa.gov/nps/npsinfo Green Highways Partnership (EPA/DOTs/ASCE and more) city and town announcements and reports searched from newspapers Subscribe at: greenhighwayspartnership.org Green Roof Design and News: Living Architecture Monitor (free)

Rapid Flood Delineation (RFD) model As accurate as HEC-RAS High speed hydraulic profile calculation (6,000 miles per CPU hour) Automatic cross sections Depth grids

1,200 1,000 800 Damages (millions) 600 Damages avoided with GI Without GI 400 200 0 0 20 40 60 80 100 Return period (years)

AALA = Average annualized losses avoided $60 AALA (per million dollars of exposure) $50 $40 $30 $20 $10 $- 02040205 12040104 12090205 12100301 03130001 12080005 02050306 02080201 01100004 03150201 2080205 10190003 10190004 05120208 02030201, 02030202 16040101 05140205 04080203 12080007 07010102