Terms of Reference (ToR)



Similar documents
Penobscot County IT Department Technology Modernization: Server and Storage Virtualization

Terms of Reference for an IT Audit of

REQUEST FOR PROPOSAL. # Storage Solution RFP

CounselorMax and ORS Managed Hosting RFP 15-NW-0016

Morgan County REQUEST FOR PROPOSAL PROJECT NAME: Off-Site Data Backup and Disaster Recovery Solution

CLOUD SERVICE SCHEDULE Newcastle

Questions and Answers, PA , Web Hosting and Data Analysis

IBM G-Cloud Microsoft Windows Active Directory as a Service

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/ ARCHIVING

IBM Smartcloud Managed Backup

Client Study Portfolio

Introduction and Background

REQUEST FOR PROPOSAL

Product Overview. UNIFIED COMPUTING Managed Hosting Compute Data Sheet

Infrastructure Support Engineer Job Profile

ATTACHMENT 1 CURRENT NJ SVRS ENVIRONMENT

5054A: Designing a High Availability Messaging Solution Using Microsoft Exchange Server 2007

REQUEST FOR PROPOSALS INFORMATION TECHNOLOGY SUPPORT SERVICES. Bid Packets are Due:

Guardian365. Managed IT Support Services Suite

Subject: Request for Proposals: Enterprise Systems Backup Solution, # FIT Due: May 14, 2013 at 2:00 PM EST

Approximately 260 PST files totaling 180GB will be included in the pilot. 2. Are the Windows XP clients running XP 64 bit or 32 bit OS?

INFRASTRUCTURE AS A SERVICE (IAAS) SERVICE SCHEDULE Australia

STATEMENT OF WORK LOS ANGELES COUNTY DEPARTMENT OF REGISTRAR-RECORDER/COUNTY CLERK. System Center Configuration Manager.

pavcloud PaaS IaaS VaaS DCaaS For orders and information call or FEATURES: BENEFITS: DCaaS VaaS IaaS PaaS

Showcasing ICT Innovation. Virtual Server Technology

Audience. At Course Completion. Prerequisites. Course Outline. Take This Training

IT Discovery / Assessment Report Conducted on: DATE (MM/DD/YYY) HERE On-site Discovery By: AOS ENGINEER NAME Assessment Document By: AOS ENGINEER NAME

Job Description. Job Title: Network Services Manager. Department: INFORMATION TECHNOLOGY MAIN PURPOSE OF JOB: MAIN DUTIES AND RESPONSIBILITIES:

NOTICE ADDENDUM NO. TWO (2) JULY 8, 2011 CITY OF RIVIERA BEACH BID NO SERVER VIRTULIZATION/SAN PROJECT

Request for Proposal. MPAO Data Center Virtualization

SERVICE SCHEDULE INFRASTRUCTURE AND PLATFORM SERVICES

INSIDE. Preventing Data Loss. > Disaster Recovery Types and Categories. > Disaster Recovery Site Types. > Disaster Recovery Procedure Lists

Terms of Reference for Satellite Links National Maritime Safety Authority (NMSA)

REQUEST FOR PROPOSAL (RFP) FOR SERVER VIRTUALIZATION HARDWARE, SOFTWARE AND IMPLEMENTATION

INVITATION TO QUOTE ITQ REF NO: NKF/BL/2015/015 Date: 30 September 2015

SQL Server Database as a Service (DBaaS)


PAAS Public Sector Managed Services

JOB DESCRIPTION QUESTIONNAIRE FOR SUPPORT STAFF

How To Run A Cloud Based Data Centre

SPECIAL CONDITIONS FOR THE UPGRADE OF EXISTING MICROSOFT EXCHANGE SERVER 2003 TO MICROSOFT EXCHANGE SERVER 2010

Course 2788A: Designing High Availability Database Solutions Using Microsoft SQL Server 2005

ediscovery Implementation Services Statement of Work To be Executed under State Blanket Contract ITS53 Cat2B

Local server VS Cloud service A real scenario

Barracuda Backup Server. Introduction

END-USER REMOTE SUPPORT AND HELPDESK SERVICES SERVICE DEFINITION

System Administration and Server Management Service Level Agreement (SLA)

DATA CENTRE SOLUTIONS. Virtual hosting, virtual disaster recovery, SAN replication and offsite backup services

End-User Remote Support and Helpdesk Services

WAVEX BACKUP DATA STORAGE ( DSX2 ) Keeping your organisation safe

Modification after decommission of AX100 SAN (RVN00-FILEDR) /3/2009 Deputy IT Operations Manager

Deployment Options for Microsoft Hyper-V Server

City of Richmond Business and Financial Services Department. Contract 4595P. Security Information Event Management System

Hardware/Software Guidelines

Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services

REQUEST FOR PROPOSAL FOR: ENTERPRISE BACKUP SOLUTION

Backup and Disaster Recovery Planning On a Budget. Presented by: Najam Saeed Lisa Ulrich

Job Description. Job Title: Department: ICT Service Support Manager Responsible to:

IBM Total Storage Virtual Tape Server Storage Solution Provides Exceptional Function, Scalability, Attachment, Availability, and Performance

Drupal Private Cloud Hosting

Dell Compellent Copilot Optimize Service Description

Manchester City Council Report for Information. Report to: Resource and Governance Overview and Scrutiny Committee - 15 December 2011

Columbia College Process for Change Management Page 1 of 7

REQUEST FOR PROPOSAL STORAGE AREA NETWORK SOLUTIONS FOR THE PARK CITY SCHOOL DISTRICT RFP #

G-CLOUD 7 - VIRTUAL ASSET MANAGER (VAM) SPECIALIST CLOUD SERVICES (SCS)

Dublin City University

Information Services hosted services and costs

Infrastructure & Software

For windows erver, Which edition of Windows server 2008 is required ( i. e. Web / Standard / Enterprise )?? Kindly suggest.

Schedule 2Z Virtual Servers, Firewalls and Load Balancers

Role Purpose: Position Context. Responsibilities Duties

- Brazoria County on coast the north west edge gulf, population of 330,242

How do you test to determine which backup and restore technology best suits your business needs?

PROMAPP TECHNICAL INFORMATION

SINGLE RESOLUTION BOARD VACANCY NOTICE ICT OPERATIONS MANAGER (SRB/AD/2015/016)

Addendum 1 RFP #154D-16F CityWorks System Cloud Hosting

: Office System Environment

ABOUT US. Our mission. Our vision

A Glossary of Web Hosting Terms

Product Overview. UNIFIED COMPUTING Managed Hosting Compute

Using Backup Exec System Recovery's Offsite Copy for disaster recovery

TIBCO Nimbus Cloud Service

West Georgia Technical College

ITSM Tools Operation Continuity Plan Example

SECURE AUTOMATED RELIABLE

Big Data Analytics Service Definition G-Cloud 7

Adlib Hosting - Service Level Agreement

Version: Page 1 of 5

Hosted Desktop as a Service

Virtual Server and Storage Provisioning Service. Service Description

City of Hapeville, GA VC3Advantage Work Order

Solicitation Web Hosting Services for the Disaster Volunteer Network. State of California

APPLICATION FOR LOUISIANA STATE ARCHIVES IMAGING EXCEPTION TO LA. R.S. 44:39 SSARC 790

A Proposal for Managed IT Services. Texas Osteopathic Medical Association

Virtual Server Hosting Service Definition. SD021 v1.8 Issue Date 20 December 10

G-Cloud 6 brightsolid Secure Cloud Servers. Service Definition Document

Managed IT Services. Eliminating technology pains in small businesses

This Service Level Agreement (hereinafter referred to as the SLA ) is an agreement entered into between:

REQUEST FOR PROPOSAL (RFP) BID# MARINA AND LAND LEASE MANAGEMENT SYSTEM. SUBMISSION DEADLINE: Tuesday, April 15, 2014 at 11:00 AM (ET)

Transcription:

NATIONAL MARITIME SAFETY AUTHORITY INFORMATION & COMMUNICATION TECHNOLOGY DEPARTMENT Terms of Reference (ToR) Supply and implementation of virtualized server infrastructure & Disaster Recovery solution EXPRESSIONS OF INTEREST DUE BY OCTOBER 31 st 2014

The National Maritime Safety Authority (NMSA) was established by an Act of Parliament in 2003. Its purpose is to regulate the maritime safety standards, coordinate Search and Rescue operations and control marine pollution in PNG waters. The Authority s ICT Department provides Information and Communication Technology services and systems that support all NMSA departments and offices throughout the country. The availability and integrity of all data and information systems under ICT department is vital to the daily operations of NMSA. The Authority is inviting suitably qualified Information and Communication Technology companies to express their interest in supplying and implementing a virtualized server infrastructure and Disaster Recovery Solution for NMSA. The term of engagement will be one (3) months. All EOI must specify their bidding price to undertake this assignment. 1 TASK DESCCIPTION This project will be accomplished in two phases. Phase I will consist of an initial build out of highly available clustered servers and redundant storage while Phase II will focus on Disaster Recovery. Project/Task Title: To engage suitably qualified Information and Communication Technology companies to supply and/or implement a virtualized server infrastructure and Disaster Recovery Solution for NMSA. Executing Agent: National Maritime Safety Authority (NMSA) Implementing Body: ICT Department Project Sponsor: Executive Manager, Corporate Services Project Location: NMSA Head Office, Level 2 Pacific MMI Building, Port Moresby Closing Date for Bid: COB 31 st October 2014 Commencement Date: 17 th November 2014 Project Duration: Three (3) Months 2 PROJECT OBJECTIVE The objective of the engagement is to implement a virtualised server infrastructure and Disaster Recovery solution. Server Virtualisation A robust server infrastructure built on a virtualised platform utilising the most effective, efficient and economically suitable virtualisation technology and hardware. Disaster Recovery and High Availability A disaster recovery solution combining local backups with off-site replication of up to five mission critical Windows-based servers with high availability. 2

3 STANDARDS AND GUIDANCE The organisation engaged to provide these services, will be guided by NMSA Act 2003, ITIL, COBIT5, ISO 27000 and other ICT best practices. The organisation is expected to hold with high regard, the integrity, objectivity, independence, professional competence, due care, confidentiality, professional behaviour and technical standards. 4 REQUIREMENTS OF THE SUPPLIER By accepting the Terms of Reference (TOR), the Supplier confirms that their company meets the following conditions: Has extensive experience to supply and installation of servers and virtual environments in small to medium businesses; Has the capacity and capabilities to supply, implement and support product and services; Is fully committed to undertake this engagement in accordance with the scope of work defined and any instructions issued by the CEO and the Board, where necessary; Will maintain professional independence through our the duration of the engagement; and The firm must be registered, as required by the provisions of the Companies Act 1997, must be in compliance with the guidelines of the Companies Regulations 1998, the Investment Promotion Act and the Internal Revenue Commission. 5 SCOPE OF WORKS NMSA has an existing infrastructure which includes hardware and software that could be utilised as well for this project. Technical specifications provided in Addendum include existing setup to be used as a guide for the EOI. Scope of works for the EOI is as follows: Phase I: Supply of server hardware and switches Supply of virtulaisation, backup and other necessary software Installation and make operable virtualised environment Migrate existing servers and data to the related virtual server Migrate users and domain Document all systems and provide documentation to NMSA Retire and decommission old equipment after migration to the virtual server Work with ICT Manager to resolve unplanned issues All pricing should reflect government and corporate discounts where applicable Phase II: Commencement of this phase is dependent on Phase I. Build, test and make operable High Availability and Disaster Recovery solution with additional capacity for data protection and disaster recovery. Document Disaster Recovery plan, technical systems configuration and setup and, provide to NMSA. 3

6 DELIVERABLES Phase I of this EOI is for the supply and installation of: computer server hardware data storage hardware operating system software virtualisation system software data backup hardware data backup software migration of data from old hardware to new as-built documentation of server environment Phase II of this EOI is for the acquisition and implementation of a: Disaster Recovery solution which will be a similar to the existing data centre setup at ICT Data Centre, Level 2 Defens Haus, Port Moresby, NCD. This will include: computer server hardware operating system software virtualisation system software data backup hardware data backup software Disaster Recovery Plan as-built documentation of DR solution NMSA will consider all available DR solutions: physical setup, hosted setup or a cloud based setup. 7 OUTCOME AND PERFORMANCE STANDARDS The vendor is expected to produce a complete project checklist, with milestone markers and delivery dates upon starting the project. The vendor should schedule weekly progress meetings for the duration of the project(s). 8 PAYMENT SCHEDULE The payment terms of the project will be as follows: 30% upon approval of the proposal. 20% when hardware is delivered, installed and virtual services are operational 20% when existing data has been migrated, the project is complete and documentation is delivered and approved by NMSA ICT Department. 30% balance released when all involved partners supported by NMSA ICT Department have signed off on acceptance of the newly installed systems. 4

9 CONTRACTUAL TERMS AND CONDITIONS Terms and conditions are requirements that are binding upon the vendor awarded the proposal and form a part of all contract documents and a part of the terms of all purchase orders for items included in the specifications and proposal forms issued herewith. They communicate NMSA s expectations in regards to the vendor s performance in connection with any NMSA ICT Department purchase. a) Negligence: The vendor will be responsible for any mishap or accident during the installation / maintenance of the equipment which may occur due to negligence on the part of the vendor. b) Insurance: The vendor must show proof of General Liability, Professional Liability and Property Damage insurance. This insurance must be adequate to cover claims for damages caused by the contractor(s) and must remain in force throughout the duration of the project. c) Purchase Orders: Contracts for purchase will be put into effect by means of a written purchase order executed by NMSA Executive Manager Corporate Services. Any deviations from this must be pre-approved in writing through the NMSA Executive Manager Corporate Services only. d) Invoices and Payments a. The vendor shall submit separate invoices on each purchase order as per payment schedule. Invoices must indicate initial Purchase Order number and shall be itemized as per deliverables. b. Invoices are Mailed to: Attn: Mrs Lena Korugl, ICT Manager, National Maritime Safety Authority, Level 2 Pacific MMI, P.O Box 668, Port Moresby, NCD e) Termination: The performance of work under this order may be terminated in whole or in part by the NMSA ICT Department in accordance with this provision. Termination of work hereunder shall be effected to the vendor with a notice of Termination specifying the extent to which performance of work under the order is terminated and the date upon which such termination becomes effective. f) Warranties Please include written explanation of warranty terms from each manufacturer, software supplier and service vendor(s) this must include any and all time lengths, any extension at no-charge, when the warranty period begins and ends. g) Vendor Qualification: Vendors must prove their qualifications concerning the following criteria: a. Financial capabilities; b. Ability to fulfil and abide by the terms and specifications; c. Quality and stability of products supplied and sources; d. The vendor must have qualified systems engineers with relevant certifications and qualifications necessary to be able to perform the engagement. Copies of certifications and/or licenses can be provided to support EOI; and e. Experiences in similar projects are relevant and the vendor must be able to demonstrate this experiences. The vendor may be requested to provide evidence of similar. 5

10 ADDENDUM A. Current Server Environment Servers Services Purchased Description/Operating System Memory Hardware Specs 1 DC/DNS/DHCP/WSUS/FILE 2011 Windows Server 2008 R2 Enterprise, 64 Bit 12 GB Dell PowerEdge R710 2 SDC/BACKUP 2011 Windows Server 2008 R2 Enterprise, 64 Bit 6 GB Dell PowerEdge T610 3 SQL 2011 Windows Server 2008 R2 Enterprise, 64 Bit 12 GB Dell PowerEdge R710 4 MAIL 2011 Windows Server 2008 R2 Enterprise, 64 Bit 12 GB Dell PowerEdge R710 5 APPLICATION/SOLARWINDS 2011 Windows Server 2008 R2 Enterprise, 64 Bit 32 GB Dell PowerEdge R710 6 APPLICATION 2011 Windows Server 2008 R2 Standard, 64 Bit 12GB Dell PowerEdge R310 7 APPLICATION/ORACLE DB 2007 Windows Server 2003 R2 Standard Edition 4GB Dell PowerEdge 2950 8 FILE SERVER/ANTI VIRUS 2007 Windows Server 2003 R2 Standard Edition 4GB Dell PowerEdge 2950 9 PRINT 2007 Windows Server 2003 R2 Standard Edition 2GB Dell PowerEdge 2950 10 TERMINAL/PRINT 2007 Windows Server 2003 R2 Standard Edition 4GB Dell PowerEdge 2950 Storage Dell Power Vault MD3200i currently being installed Backup Dell Power Vault 114X Tape Drive Backup Executive Software (Symantec) 6

B. Requirements The following information should be used to determine the scope of this project and provide pricing for this engagement: All equipment and material should be new. Used, refurbished or repurposed equipment or material will not be acceptable unless existing NMSA servers can be utilised. 2-3 Dell host servers, or equivalent, suitable for virtualization needs of current servers and any additional in future. Hyper-V or vsphere virtualization schema with management systems Backup/High Availability Software and Recovery/Failover Plan Microsoft Server 2008 R2 Datacentre licensing for all host Vendor should: Furnish and install server hardware, storage, and licensing, with capabilities to handle the virtualization goals as described in document and guided by current servers in data centre (see Addendum A). Provide all necessary virtualization software components. Provide sufficient professional services to completely establish the virtual environment and begin 7

C. Others Training As part of the virtualization implementation NMSA would like to ensure training is provided to key personnel involved in supporting the virtual environment and the use of it features. Following the successful completion of the project, the vendor is required to provide a minimum of 1 day of training on the proper configuration, daily operation, and maintenance of the system. The training will be for no more than 4 individuals who work directly for the IT Department. The vendor will provide at minimum 2 copies of all installation, configuration, and/or training materials. This includes any and all materials offered by the vendor deemed to be helpful in the day to day operations of the system. Maintenance and Support Following the successful completion of the project, the vendor is required to provide the following support information regarding technical support and other vendor services. Materials describing the process for reporting a hardware and or software failure in any of the components of the proposed system. The methods available for contacting tech support (phone, email, website, etc.) including escalation procedures. Standard warranty and maintenance for each of the components proposed. Upgrade path for management software and any annual support fee for the software. Documentation Following completion of the project, the vendor is required to provide the following documentation regarding the scope of the project: Written documentation and diagramming of this project. The documentation should consist of the following: o DETAILED TECHNICAL REPORT. A document developed for the use of PUSD's technical staff which discusses: the scope, approaches employed, diagram of topography, deviations from original plan, etc. o EXECUTIVE SUMMARY REPORT. A document developed to summarize the scope, approach, and results, in a manner suitable for senior management. Cost All items should be grouped in the following categories: Hardware Software and Licenses Professional Services- (Flat fee only) 8