Determining Productivity of Masons for both Stretcher and Header Bonding on Building Sites



Similar documents
THE DEVELOPMENT OF DESIGN METHODS FOR REINFORCED AND UNREINFORCED MASONRY BASEMENT WALLS J.J. ROBERTS

Dimensioning and Estimating Brick Masonry

Understanding BS EN 771-3: Aggregate concrete masonry units

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA

LAYING BLOCK AND BRICK

Chapter. Earthquake Damage: Types, Process, Categories

Cost Control Techniques Used On Building Construction Sites in Uganda

ADVANTAGES OF MODULAR LAYOUT

Laying the First Course. 1. Excavate the site and construct the footing.

How To Find Out What Happened To Slave Housing

Guide to working on Public Sewers

Monocouche Best Practice Guide. New-Build Housing Managing movement to avoid cracking

What you need to know about concrete block basement construction.

Basic Requirements for Residential Plan Review _

Simplifying design and construction. Alan Tovey, Director The Basement Information Centre

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Technical Notes 3B - Brick Masonry Section Properties May 1993

Installation Instructions

Technical housing standards nationally described space standard

Metal Scaffolding Safety. Henry Tho LAM and Alexander C.S. CHAN. Industrial Centre The Hong Kong Polytechnic University Hong Kong

The University of Birmingham (Live System)

3 Masonry and Manufactured Stone (Interior and Exterior)

DEVELOPMENT OF A NEW TEST FOR DETERMINATION OF TENSILE STRENGTH OF CONCRETE BLOCKS

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

HOUSE BUILDING DIGEST

How To Build A Luxury Apartment Complex In London

How to Build a Dry Stone Wall

CHAPTER 2 QUANTITY TAKE-OFF

plans based on actual cost, schedule and technical progress of work [1, 9].

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

September Joint

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

THE PROCESS CAPABILITY ANALYSIS - A TOOL FOR PROCESS PERFORMANCE MEASURES AND METRICS - A CASE STUDY

Cost of Building a Typical Home The impact of using PVC and alternative construction materials in house construction

Design and Construction of Cantilevered Reinforced Concrete Structures

Basic Queuing Relationships

NEW AUSTRALIAN STANDARDS FOR MASONRY IN SMALL STRUCTURES S.J. LAWRENCE

CHAPTER 4 LEGAL DESCRIPTION OF LAND DESCRIBING LAND METHODS OF DESCRIBING REAL ESTATE

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

I. VOCATIONAL EDUCATION IN POLAND AFTER VOCATIONAL EDUCATION REFORM OF 1 SEPTEMBER 2012

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Technical housing standards nationally described space standard

Connex. Mortarless Masonry Block System

A site plan or floor plan clearly identifying the location(s) of all new replacement window(s)

The Nubian Vault (NV) is an ancient technique, standardized and adapted to meet the needs of the populations of the Sahel.

CHESTERFLEX ROOF WATERPROOFING MEMBRANES

BUILDING KNOWLEDGE SINCE 1979

WATER PENETRATION TESTING OF STUCCO ON CONCRETE MASONRY CONSTRUCTION

Natural Thin Stone Veneer

Exempted Development - Frequently Asked Questions

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Measuring, Estimating and Tendering Processes in Construction and the Built Environment

Construction Technology COURSE OUTLINE

Optimum proportions for the design of suspension bridge

Structure of Presentation. The Role of Programming in Informatics Curricula. Concepts of Informatics 2. Concepts of Informatics 1

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Free-Form Concrete Pool

Strengthening of Brick Masonry Walls against Earthquake Loading

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

Hanson Building Products. precast basement solutions

Article 5: Building Regulations

Vanishing Lid Trays Construction Methods with Tile or Masonry

A Comparison Study Between Event Chain Methodology And Critical Path Method In The Construction Industry

Triarch Products Over Various Interior Substrates

Construction Contractors License Application Step-by-Step

2.2 REFLECTIVE ROOFING (ADOPTED 19 DECEMBER 2006) 1. INTRODUCTION

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

Georgia State University. Urban Life Building Roof Replacement

GRC Porticos. Lightweight entrance porticos ABBEY ARTSTONE

SECTION STORM DRAINAGE TABLE OF CONTENTS

Economic Statistics (ECON2006), Statistics and Research Design in Psychology (PSYC2010), Survey Design and Analysis (SOCI2007)

POST AND FRAME STRUCTURES (Pole Barns)

UNDERSTANDING THE INDEPENDENT-SAMPLES t TEST

The Principles. Fact Sheet 01. Central Police Station Revitalisation Project Restoration of the Historic Buildings

Metropolitan Builders Association Masonry & Concrete Standard

National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

TECHNICAL MANUAL. New Homes

Exemplary Retrofitting of an Old School in Stuttgart - EROS -

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

Experiment (13): Flow channel

Business Statistics. Successful completion of Introductory and/or Intermediate Algebra courses is recommended before taking Business Statistics.

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

RESIDENTIAL WOOD DECKS

Rockwool Flexi Insulation Application Guide

CHECKLIST OF DOCUMENTS NEEDED DO NOT FAX, BRING ALL DOCUMENTS WITH THIS APPLICATION THREE CONTRACTOR AFFIDAVITS OF WORK EXPERIENCE.

Transcription:

Determining Productivity of Masons for both Stretcher and Header Bonding on Building Sites Jemima Nalumansi 1, Godfrey Mwesige 2 1 Undergraduate Student, Faculty of Technology, Makerere University, P. O. Box 7062, Kampala, Uganda Corresponding author email: netheldj@gmail.com 2 Assistant Lecturer, Faculty of Technology, Makerere University, P. O. Box 7062, Kampala, Uganda ABSTRACT This paper presents the findings of a study to determine the daily productivity of masons on building sites in Kampala taking into consideration header and stretcher bonds, and working below and above window levels. The study involved field observations over a period of three months. Findings show that for stretcher bond working up to window level, the mean built area per day was 3.17 m 2 and 4.82 m 2 for brick work in header bonding. Whereas working above window level the mean built area was 2.77 m 2 and 2.90 m 2 for stretcher and header bonds respectively. Working above window level, height is the main determinant of productivity as it is yields nearly equal masonry areas irrespective of the bond type. The height affects equally the time delivery of masonry materials. The study also established that productivity was lower for stretcher than header bond for masonry works up to window level. The reason according to interviews with masons at several sites is the time spent levelling the brick work in stretcher than in header bond takes time and significantly reduces masonry work output. Key Words: Bond, header bond, productivity, masons, stretcher, masonry 1.0 INTRODUCTION Productivity of masons on building projects is important in construction project management as it affects key planning decisions involving time and resource allocation. Therefore understanding the productivity of masons is important for management of building projects that involve masonry works. A mason is a skilled casual worker who builds with stone or similar material such as brick, concrete or artificial stone. The masonry process is perceived to be one of the labour intensive aspects of construction from time immemorial as in Chudley and Greeno (2005). This is because blocks/bricks must be handled and placed one at a time with expected work output referred to as productivity. Productivity of masons is measured in terms of area in square metres of brick work built by a single mason per unit of time preferably a day normally 8 hours of work. The size and bonding type of bricks/blocks primary influences the speed, workmanship and output of the masons. A brick is defined as a walling unit with co-ordinating or format size of 225mm length, 112.5 mm width and 75mm height according to British Standards Institution BS [3921] (1985). A block is a walling unit exceeding the BS dimensions specified for bricks and its height shall not exceed either its length or 6 times its thickness. Header bond has all the headers in every course and it is used for structural or external brick walls. A Stretcher bond on the other hand has the length of the brick running parallel to the wall usually resulting in thin and nonstructural walls. Stretcher bonds are used for partitions in building and for external walls for buildings roofed with light material such as iron sheets. This paper presents the results of field observations on productivity of masons on thirty one building projects in Kampala with window level as reference datum. 339

Second International Conference on Advances in Engineering and Technology 2.0 PROBLEM STATEMENT Daily productivity of masons building projects in Kampala is not documented in the literature for common bonding types of header and stretcher leaving managers to base on their past experience. This makes it difficult for new construction managers to plan for project duration and resource requirements. There is need therefore to observe and document productivity of masons on building projects in Kampala. 3.0 RESEARCH OBJECTIVE The objective of the study was to determine the daily productivity of masons in both stretcher and header bonding at selected building construction sites in Kampala with the window level as the reference datum. Realization of the above objective was through; determination of normal daily working hours of masons, observing and measuring the wall area built per day by individual masons, and using statistical methods to make statements on productivity of masons in respective categories. 4.0 LITERATURE REVIEW 4.1 Productivity Productivity is defined as the output per person, machine or organization per given time and can be measured in units of product, number of customers, or any other measure that a business might prefer to use (Chitkara, 1998). Productivity defines the success of construction projects and therefore good managers strive to devise methods that boost productivity, reduce project duration, cost and improve profitability. Low or uncertain productivity of construction workers is one of the causes of cost and time overruns in construction projects as noted by Alinaitwe et al, (2007). Chitkara (1998) defined the computation for average economic productivity as dividing by output (measurable outcomes) by input units (time or physical). If the production process uses only one factor such as labour, then this yields labour productivity. In the case of masonry works, productivity is a function of square metres of walling built per payable unit time; day or hour depending on the laws. However, most commonly, the time unit is a day. The productivity of masons is influenced by experience, level of education, motivation and input process such as delivery of working materials. 4.2 Brick Work The use of brickwork flourished during the third and fourth centuries, after which the craft suffered a rapid decline until its re-introduction from Flanders towards the end of fourteenth century. Since then it has been firmly established and remains as one of the major building materials Chundley and Greeno (2005). Brickwork is used primarily in the construction of walls by bedding and jointing of bricks into established bonding arrangement. A standard work size should be of 215 x 102.5 x 65 mm British Standards Institution (1985). However, variable brick dimensions exist on the market in Kampala. The bricks are laid in mortar in either stretcher or header. Figure 1: Brick dimensions 4.3 Block Work They can be made with either clay blocks or pre-cast concrete blocks. Standard block size is 300 225 150 mm. However, block works are less popular as masonry materials on building 340

projects compared to burnt clay bricks. The blocks are laid in mortar and usually in stretcher bond. Figure 2: Block dimensions 5.0 METHODOLOGY The methodology employed for the study involved identification of building project sites, obtaining access permission and carrying out field observations on masonry works by different masons. Photographs were taken at the several sites using a camera to keep record of the difference in heights of construction. A tape measure was used to measure the actual work done in a given time and recorded in a note book. Statistical methods were used to organize and aggregate data for further analysis involving computation of the mean and standard deviation. 5.1 Data collection and analysis Data for the research was collected by observation of on-going masonry works at different sites in Kampala shown in Table 1, 2 & 3 for block and brick works. Time for commencement and stoppage of work were recorded as well. Basic statistical methods were used to compute statistics for analysis of the mean, standard deviation and coefficient of variation shown in Equation 1, 2 & 3. However, the sample size was smaller, and therefore more data shall be required for in-depth analysis. X s n i 1 n x CV 100 i ( X ( n i s x 1) X ) 2 Where x i is built area per day per masonry and bonding type, and n is number of entries recorded in respective categories, x-bar is the mean built area per day per category, s is the standard deviation, and CV is the coefficient of variation expressed as a percentage. Confidence interval of the mean was carried out using a t-test at 95-percent confidence level and results are presented in Table 4. 6.0 FINDINGS Data was collected at 14 site building sites for block work, 8 for brick work in stretcher and 9 in header bonding around Kampala shown in Table 1, 2 & 3. The sample size should have been larger for improved data reliability. However, the lead researcher was constrained in time and resources to increase the sample size. Nevertheless, the data collected provides a benchmark and documentation for the daily productivity of masons in Kampala. (1) (2) (3) 341

Second International Conference on Advances in Engineering and Technology 6.1 Working Duration The research established variable working duration per day, ranging from 6.5 hours to 10 hours. The modal working duration was 8.0 hours per day although 8.50 hours was also common according to records. Therefore the working duration is variable between sites. All sites had one hour dedicated for lunch between 1300 and 1400 hours. The observed work commencement time was 0800 hours and completion time variable at 1700, 1730 and 1800 hours a day. 6.2 Built area per day Table 1, 2 & 3 show the observed built areas per day for block works in stretcher, brick works in stretcher and brick work in header respectively considering works below and above window level. Block work was mainly done in stretcher bonding. Table 1: Built area in block work per day under stretcher bonding Built Area per Day (m 2 ) Working Period Site Location Below Window Level Above Window Level (Excluding one Hour Lunch Time) Proposed office block, plot 1, 5 - Lourdel Rd. (8hrs 30 min) Golf course towers, Yusuf Lule Rd. - 3 8:30am 5:00pm (8hrs 30 min) Perimeter wall, Kirinya Bweyogerere - 4 8am 5pm (8hrs) Regency apartments extension, Naguru - 4 8am 5pm (8hrs) Church building, Mbalwa Wakiso 3.5-8am 5pm (8hrs) Store house extension, UMA Nakawa 4-9am 5:30pm (7hrs 30 min) Tirupati Mazima mall, Kabalagala 5-8am 5pm (8hrs) Proposed petrol station, Kayunga road, Kamwokya - 2.8 8am 5pm (8hrs) Workshop and offices, 7 th St. 3 - industrial area Perimeter wall, Mbuya - 3.2 Residential house, Banda 3-9am 5:00pm (7hrs) Perimeter wall, Nalya 3.5-8am 5:00pm (8hrs) SDA Church extension, Kireka - 2.8 8am 5:00pm Office dev t, Yusuf lule Road - 2 Mean (m 2 ) 3.86 3.11 Standard Deviation (m 2 ) 0.84 0.71 Coefficient of Variation (%) 22 23 (8hrs) 342

Site Location Egyptian Embassy Renovation, Kololo hill lane Table 2: Built area in brick work per day under stretcher bonding Below Window Level Built Area per Day (m 2 ) Above Window Level Building extension, Kireka 3 - Company office building, along K la-mukono road Perimeter wall, Kirinya Bweyogerere Commercial flat, Kakajjo Bweyogerere Proposed warehouse, Haree Construction Co. Bweyogerere Working Period (Excluding one Hour Lunch Time) - 3 8am 5:00pm (8hrs) - 2.32 9am 4:30pm (6hrs 30min) (8hrs 30min) 3.5-8am 5:00pm (8hrs) - 3.41 7am 5:00pm (9hrs) - 3 8am 5:00pm (7hrs), with 2 hour lunch Residential house, Bugolobi Nakawa - 2.1 8am 6:00pm (9hrs) Residential flat, Mbuya 3-8am 5pm (8hrs) Mean (m 2 ) 3.17 2.77 Standard Deviation (m 2 ) 0.29 0.54 Coefficient of Variation (%) 9 20 Table 3: Built area in brick work per day under header bonding Built Area per Day (m 2 ) Below Working Period Site Location Above Window (Excluding one Hour Window Level Level Lunch Time) Commercial flat, Ntinda 4.2-8am 5:00pm (8hrs) Perimeter wall, Namugongo, Jjanda Bungalow, Namugongo - 4-3 9am 5:00pm (7hrs) (8hrs 30min) Proposed residential house, Kireka 5.85-8am 6:00pm (9hrs) Commercial flat, Kiwatule 5.4-8am 5:00pm (8hrs) Residential flat, Bunga Ggaba - 1.4 8:30am 5:00pm Proposed shopping arcade, Kireka opp. Shell Bungalow, Bweyogerere - 3.2 6-7am 6:00pm (10hrs) 8:15am 5:30pm (8hrs 15min) Residential flat, Mbalwa Wakiso 2.65-8am 5:00pm (8hrs) Mean (m 2 ) 4.82 2.90 Standard Deviation (m 2 ) 1.40 1.09 Coefficient of Variation (%) 29 38 343

Second International Conference on Advances in Engineering and Technology With block work, the mean built area working below window level was 3.86 m 2 and 3.11 m 2 working above window level a difference of 0.75 m 2. Therefore, working at height above window level reduces productivity of masons as expected in practice. With brick work in stretcher bonding, the mean built area was 3.17 m 2 and 2.77 m 2 below and above window level respectively. The reduction is not significant if compared with the confidence bound at 95-percent level in Table 4. The mean built brick work area in header bonding was 4.82 m 2 and 2.90 m 2 for below and above window levels respectively. Height has significant influence on productivity of masonry works under header bonding. This is attributed to material haulage intensity required at heights that may not much the supply from porters. Built area per day in brick work for header bonding exhibited significant variations explained by the large coefficient of variation. The least variable measurements were built area of brick work under stretcher bonding below window level. Productivity of brick work is greatest under header bonding. This attributed to the fact that masons do less work levelling and plumbing the brick. In fact, starting bricks are plumbed and levelled as a start for the wall alignment. It is therefore possible to have unlevelled or plumbed wall if the mason is not experienced although productivity will be significantly higher compared to stretcher bonding. Table 4: Limits of mean built area for block and brick works DESCRIPTION Mean (m 2 ) CONFIDENCE INTERVALS (95% confidence Level) Stretcher Bonding Header Bonding Lower Lower Upper Mean Bound (m 2 ) Bound (m 2 ) (m 2 Bound ) (m 2 Xo ) Upper Bound (m 2 ) Below Window Level Block Work 3.86 3.22 4.50 - - - Brick Work 3.17 2.31 4.03 4.82 3.06 6.58 Above Window Level Block Work 3.11 2.61 3.61 - - - Brick Work 2.77 1.89 3.65 7.0 CONCLUSION The study established that daily working duration varies between sites from 6.0 to 10.0 hours with the modal duration of 8.0 hours. Masonry works below window level for block and brick work results in higher built area per day than above window level. For brick work, header bonding results in higher productivity than stretcher bonding but may result in unplumbed wall finishes if due care and supervision is not taken. The productivity of masons is governed by; weather patterns, availability and access of materials, commencement time and experience of the mason and porters. It is recommended that further research is carried out with large samples to establish significance of experience and level of education on productivity as well as large samples to predict productivity more reliably. 8.0 REFERENCES Adrian J. J. (2004), Construction Productivity: Measurement and Improvement, Stipes Publishing L.L.C, USA Alinaitwe M. H., Mwakali A. J., & Hansson B., (2007), Efficiency of Craftsmen on Building Sites-Studies in Uganda, Journal of Civil Engineering and Management, ISSN 1392-3730, 13(3) 169-176 British Standards Institution (1985), Specifications for clay bricks, BS 3921, ISBN 0580146421 Xo 2.90 1.52 4.28 344

Chitkara (1988), Construction project management, Planning, Scheduling and Controlling, Tata McGraw Hill Publishing Company Chudley R., & Greeno R. (2005), Construction Technology, 4 th edition, Pearson and Longman Ott R. L. and Longnecker M., (2001), An Introduction to Statistical Methods and Data Analysis, 5 th edition, Duxbury Thomson Learning Welkowitz, J, Ewen, R & Cohen, J (2002), Introductory Statistics for the Behavioural Science, 6 th edition, John Wiley & Sons 345