Full Network Model Scope for FNM DB2015Q4



Similar documents
March 14, Subject: Southern California Edison 2014 Annual Progress Report

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) )

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations

California s Energy Future

Syed Ahmed Richard Krause Southern California Edison

6. The estimated costs here do not include any applicable ITCC tax

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

Integration of Renewable Resources

How To Operate The Williston Uvls

Western Area Power Administration Rocky Mountain Region (LAPT) Network Integrated Transmission Service. Designated Network Resources

Evolution of Control for the Smart Transmission Grid

Generator Interconnection and Deliverability Study Methodology Technical Paper

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

ADMS(Advanced Distribution Management System ) in Smart Grid

KERN COUNTY SOLAR PROJECTS. Approved Projects

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Treasure Valley Electrical Plan

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

What Quanta Offers. Industry leader S&P 500 Company Ranked #1 utility specialty contractor by Engineering News Record. Confidential and Proprietary

The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development

SCE Experience with PV Integration

About Southern California Edison

A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance

Q140 Cluster Addendum

Strategic Microgrid Development for Maximum Value. Allen Freifeld SVP, Law & Public Policy Viridity Energy

Energy Systems Integration

16 West Coast Regional Plan

Distributed Generation and the Impact on a Distribution System. Brian Lassiter Technical Sales Engineer

Rule Fast Track Analysis for National Life Insurance Co.

TERMS AND CONDITIONS

Sanjeev Choudhary SunEdison Advanced Solutions

Tehachapi Wind Energy Storage Project (TSP)

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

Emera Maine Proposed Potential Transmission Projects. Line Identification Line 75 - KR Sub. Estimated Cost $201,464 $0 $3,200,000

THE GEYSERS Renewable, Geothermal Energy. Mike Rogers, Senior Vice President Calpine Geothermal Operations

Proceedings of the 38th Hawaii International Conference on System Sciences

Enterprise Approach to OSIsoft PI System

Satellite-Based Software Tools for Optimizing Utility Planning, Simulation and Forecasting

IESO Supply Deliverability Guidelines

Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use.

Rocky Mountain Power Transmission Five Year Study Findings Meeting

Memorandum. This memorandum requires Board action. Executive Summary

CLASS. Customer Load Active System Services

Promoting the Cross-Border Renewable Energy Market

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions June 4, Electric Grid Operations

ENERGYWORKS WINDPOWER PROFESSIONAL SERVICES

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

Chapter 7 - Appendix A

Power products and systems. Intelligent solutions for power distribution Zone concept

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD

San Diego Gas & Electric Company FERC Order 717 Transmission Function Employee Job Descriptions August 10, Electric Grid Operations

Intentionally left blank

Distributed PV the road California is already on. Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

Houston Region Import Capacity Project

Tehachapi Renewable Transmission Project (TRTP)

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis

2014 EIA Energy Conference. Edward Randolph Director, Energy Division California Public Utilities Commission

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman.

California s Electricity Market. Overview

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

How To Get A Power Line In The United States

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

An Airport Sustainable Energy Strategy

White Paper #11: Devers-Palo Verde No. 2 Project

Tri-State Generation and Transmission Association 2013 Annual Report. Powered by People. Powered. People Colorado, Nebraska, New Mexico and Wyoming.

Morris S. Stover, P.E. Sponsor, Transmission Area

March ComEd Grid Modernization

EVN SMART GRID PLAN. Technical and Operational Dept., Vietnam Electricity Nguyễn Hải Hà

SmartSacramento. Green Summit Jim Parks Program Manager SmartSacramento Team. April 19, 2011

Renewable Energy: Essential terms terms and and concepts for citizens and a dvocates advocates

Telephone Company Lease Line Elimination. Dewey Day Principal Operational Technology Architect Pacific Gas & Electric

Cyber Infrastructure for the Smart Grid

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

Transmission Planning in the ERCOT Interconnection

Transcription:

Transmission Projects PG&E SCE 1. Build Shepherd Substation (MWC 60) Install 115 kv ring bus and loop 115 kv line, phase # 4 2. CDCR Mule Creek Prison Load Interconnection, phase # 1 3. Chowchilla Solar Generation Interconnection Project (Q644), phase # 1 4. Contra Costa-Moraga 230 kv Reconductoring, phase # 2 5. Corral_SCADA Switch, phase # 1 6. Eel River 60kV Sub- Add Bank 2, phase # 1 7. Eel River install SCADA SW 17, phase # 1 8. Henrietta Solar Generation Interconnection Project, phase # 1 9. Install Catlett Bk 2, phase # 1 10. Install Jolon Bk 2 & 1-12kV, phase # 1 11. Kern-Old River 70 kv # 1 & 2 Reconductoring, phase # 3 12. Lathrop Irrigation District Load Interconnection, phase # 1 13. Laytonville 60kV Circuit Breaker, phase # 1 14. Newark - Ravenswood 230 kv Reconductoring, phase # 1 15. Oakland D: 115kV Bus Reliability, phase # 1 16. Rio Bravo Solar 1 - C5 (Q900), phase # 1 17. Salado-replace 115/60kV Bank 1, phase # 1 18. Sobrante: Add 2 Bus Sectnlzng 115kV CBs, phase # 4 19. Weber - French Camp 60 kv Line, phase # 1 20. Weber 60 kv Bus Reliability, phase # 1 1. Blythe Solar Power Project - Q294-1000MW Transmission, phase # 1 2. Oasis Gen Tie, phase # 1 3. Saugus Add new A-Bank, extend bus & reconfigure 1A, 2A & 3A banks to double-breaker Config, phase # 1 SDGE 1. Generator Interconnection - Pio Pico Energy Center, phase # 1 2. Generator Interconnection - Pio Pico Energy Center, phase # B VEA N/A External 1. NWMT: RIMROC Station needs updating as compared to Peak RC 2. CFE: CCM230 Station needs updating as compared to Peak RC 3. PAC: Harrison Emergency Model Update California ISO Public Page 1 of 7

Generation Projects 1. Bear Mountain Limited - Decrease EMS PMax from 55.3MW to 48.1MW Capacity: 48.1MW RES_ID: BEARMT_1_UNIT POD: 115kV Bus at BEARMT 2. Facility 1 - Increase EMS PMax from 33.7MW to 34.7MW Capacity: 34.7MW RES_ID: FRIANT_6_UNITS POD: 70kV Bus at FRIANT 3. FM O&G Welport Cogen CAISO Meter Capacity: 7MW RES_ID: TEMBLR_7_WELLPT POD: TEMBLOR 115KV SUB 4. Altamont Dyer - Decrease EMS PMax from 58.7MW to 45MW Capacity: 45MW RES_ID: USWND1_2_UNITS POD: 60kV Bus at USWND1 5. Altamont Ralph - Increase EMS PMax from 93.7MW to 110MW Capacity: 110MW RES_ID: USWND4_2_UNITS POD: USWND4 230kV Bus 6. Altamont Frick - Decrease EMS PMax from 15MW to 10MW Capacity: 10MW RES_ID: USWPFK_6_FRICK POD: Vasco 60kV tap Bus 7. Adera Solar RES_ID: ADERA_1_SOLAR1 POD: Le Grande-Dairyland 115kV tap (Pole 006/010) 8. RE Astoria Capacity: 100MW RES_ID: ASTORA_2_SOLAR1 POD: 220kV Bus at WHIRLWIND 9. RE Astoria 2 Capacity: 75MW California ISO Public Page 2 of 7

RES_ID: ASTORA_2_SOLAR2 POD: 220kV Bus at WHIRLWIND 10. Calipatria Solar Farm Pseudo Tie IMPER RES_ID: CALPSS_6_SOLAR1 POD: 92kV Bus at the Calipatria Solar Farm Sub 11. Golden Springs Building G Capacity: 1.3MW RES_ID: DELAMO_2_SOLAR3 POD: 230kV Bus at DEL AMO 12. Dracker Solar Unit 1 Capacity: 110MW RES_ID: DRACKR_2_SOLAR1 POD: 230kV Bus at Colorado River Sub 13. Dulles Capacity: 2MW RES_ID: ETIWND_2_SOLAR5 POD: 230kV Bus at Etiwanda Sub 14. New-Indy Ontario Existing QF Coversion Capacity: 33.6MW RES_ID: ETIWND_2_UNIT1 POD: 220kV bus at Etiwanda Sub 15. Cameron Ridge II Capacity: 11.9MW RES_ID: FLOWD_2_WIND1 POD: Windhub 230kV Sub 16. Corcoran 3 RES_ID: FRESHW_1_SOLAR1 POD: 115kV Bus at Freshwater Sub 17. Frontier Blackwell RES_ID: FRNTBW_6_SOLAR1 POD: 70kV Bus at Frontier Blackwell Sub 18. San Gorgonio Capacity: 12.6MW California ISO Public Page 3 of 7

RES_ID: GARNET_2_WIND3 POD: Devers 230kV Bus 19. Windustries Capacity: 9.8MW RES_ID: GARNET_2_WIND4 POD: Devers 230kV Bus 20. Lemoore 1 Capacity: 1.5MW RES_ID: HENRTA_6_SOLAR1 POD: Henrietta 70kV Bus 21. Kingbird Solar A RES_ID: KNGBRD_2_SOLAR1 POD: 230kV Bus at WHIRLWIND Sub 22. Kingbird Solar B RES_ID: KNGBRD_2_SOLAR2 POD: 230kV Bus at WHIRLWIND Sub 23. One Ten Partners Capacity: 2MW RES_ID: LITLRK_6_SOLAR3 POD: Antelope Sub 66kV Bus 24. Little Rock Pham Capacity: 3MW RES_ID: LITLRK_6_SOLAR4 POD: Antelope Sub 66kV Bus 25. Maricopa West Solar PV RES_ID: MARCPW_6_SOLAR1 POD: Maricopa West 70kV Bus 26. Brookfield Tehachapi 3 Capacity: 3MW RES_ID: MIDWD_2_WIND2 POD: 230kV Bus at WINDHUB 27. Citizen Solar B Capacity: 5MW California ISO Public Page 4 of 7

RES_ID: MNDOTA_1_SOLAR2 POD: MENDOTA 115kV Bus 28. Windstream 6111 Capacity: 6.5MW RES_ID: NZWIND_2_WDSTR5 POD: Windhub 230kV Bus 29. Oasis Solar RES_ID: OASIS_6_SOLAR2 POD: Antelope 66kV Bus 30. Potrero Hills Energy Capacity: 8MW RES_ID: PEABDY_2_LNDFL1 POD: 230kV Bus at Peabody Sub 31. Rio Bravo Solar 1 RES_ID: PMPJCK_1_SOLAR2 POD: PMPJCK 115kV Bus 32. Bowerman Power RES_ID: SANTGO_2_LNDFL1 POD: 220kV Bus at Santiago Sub 33. SKIC Solar Capacity: 10MW RES_ID: SKERN_6_SOLAR2 POD: 70kV Copus-Old River line tap (Pole No. 10/184A) 34. 2143 Dacy Capacity: 1.3MW RES_ID: SYCCRK_1_SOLAR1 POD: 115kV Bus at SYCAMORE CREEK 35. Wind Wall Monolith I Capacity: 17MW RES_ID: TEHAPI_2_WIND1 POD: 230kV Bus at Vincent Sub 36. Wind Wall Monolith II Capacity: 22.5MW California ISO Public Page 5 of 7

RES_ID: TEHAPI_2_WIND2 POD: 230kV Bus at Vincent Sub 37. Golden Hills A Capacity: 43MW RES_ID: USWND2_1_WIND1 POD: 115kV Bus at Tesla Sub 38. Golden Hills B Capacity: 43MW RES_ID: USWND2_1_WIND2 POD: 115kV Bus at Tesla Sub 39. EUI Windpark I Capacity: 9.4MW RES_ID: VENWD_1_WIND1 POD: Devers-Garnet 115kV tap 40. EUI Windpark II Capacity: 16.1MW RES_ID: VENWD_1_WIND2 POD: Devers-Garnet 115kV tap 41. Painted Hills Wind Park Capacity: 19.3MW RES_ID: VENWD_1_WIND3 POD: Devers-Garnet 115kV tap 42. Nicolis RES_ID: VESTAL_2_SOLAR1 POD: Vestal Sub 230kV Bus 43. Tropico Capacity: 14MW RES_ID: VESTAL_2_SOLAR2 POD: Vestal Sub 230kV Bus 44. Calgren - Pixley Capacity: 11.2MW RES_ID: VESTAL_2_UNIT1 POD: Vestal 230KV Sub 45. Wildwood Solar 2 Capacity: 15MW California ISO Public Page 6 of 7

RES_ID: WLDWD_1_SOLAR2 POD: 115kV Bus at Wildwood Sub 46. Mojave Solar Project - Increase EMS PMax from 250MW to 275MW Capacity: 275MW Aggregated RES_ID: SANDLT_2_SUNITS Child RES_IDs: SANDLT_2_STGA (137.5 MW) SANDLT_2_STGB (137.5 MW) POD: Kramer 230 kv Bus California ISO Public Page 7 of 7