Transmission Projects PG&E SCE 1. Build Shepherd Substation (MWC 60) Install 115 kv ring bus and loop 115 kv line, phase # 4 2. CDCR Mule Creek Prison Load Interconnection, phase # 1 3. Chowchilla Solar Generation Interconnection Project (Q644), phase # 1 4. Contra Costa-Moraga 230 kv Reconductoring, phase # 2 5. Corral_SCADA Switch, phase # 1 6. Eel River 60kV Sub- Add Bank 2, phase # 1 7. Eel River install SCADA SW 17, phase # 1 8. Henrietta Solar Generation Interconnection Project, phase # 1 9. Install Catlett Bk 2, phase # 1 10. Install Jolon Bk 2 & 1-12kV, phase # 1 11. Kern-Old River 70 kv # 1 & 2 Reconductoring, phase # 3 12. Lathrop Irrigation District Load Interconnection, phase # 1 13. Laytonville 60kV Circuit Breaker, phase # 1 14. Newark - Ravenswood 230 kv Reconductoring, phase # 1 15. Oakland D: 115kV Bus Reliability, phase # 1 16. Rio Bravo Solar 1 - C5 (Q900), phase # 1 17. Salado-replace 115/60kV Bank 1, phase # 1 18. Sobrante: Add 2 Bus Sectnlzng 115kV CBs, phase # 4 19. Weber - French Camp 60 kv Line, phase # 1 20. Weber 60 kv Bus Reliability, phase # 1 1. Blythe Solar Power Project - Q294-1000MW Transmission, phase # 1 2. Oasis Gen Tie, phase # 1 3. Saugus Add new A-Bank, extend bus & reconfigure 1A, 2A & 3A banks to double-breaker Config, phase # 1 SDGE 1. Generator Interconnection - Pio Pico Energy Center, phase # 1 2. Generator Interconnection - Pio Pico Energy Center, phase # B VEA N/A External 1. NWMT: RIMROC Station needs updating as compared to Peak RC 2. CFE: CCM230 Station needs updating as compared to Peak RC 3. PAC: Harrison Emergency Model Update California ISO Public Page 1 of 7
Generation Projects 1. Bear Mountain Limited - Decrease EMS PMax from 55.3MW to 48.1MW Capacity: 48.1MW RES_ID: BEARMT_1_UNIT POD: 115kV Bus at BEARMT 2. Facility 1 - Increase EMS PMax from 33.7MW to 34.7MW Capacity: 34.7MW RES_ID: FRIANT_6_UNITS POD: 70kV Bus at FRIANT 3. FM O&G Welport Cogen CAISO Meter Capacity: 7MW RES_ID: TEMBLR_7_WELLPT POD: TEMBLOR 115KV SUB 4. Altamont Dyer - Decrease EMS PMax from 58.7MW to 45MW Capacity: 45MW RES_ID: USWND1_2_UNITS POD: 60kV Bus at USWND1 5. Altamont Ralph - Increase EMS PMax from 93.7MW to 110MW Capacity: 110MW RES_ID: USWND4_2_UNITS POD: USWND4 230kV Bus 6. Altamont Frick - Decrease EMS PMax from 15MW to 10MW Capacity: 10MW RES_ID: USWPFK_6_FRICK POD: Vasco 60kV tap Bus 7. Adera Solar RES_ID: ADERA_1_SOLAR1 POD: Le Grande-Dairyland 115kV tap (Pole 006/010) 8. RE Astoria Capacity: 100MW RES_ID: ASTORA_2_SOLAR1 POD: 220kV Bus at WHIRLWIND 9. RE Astoria 2 Capacity: 75MW California ISO Public Page 2 of 7
RES_ID: ASTORA_2_SOLAR2 POD: 220kV Bus at WHIRLWIND 10. Calipatria Solar Farm Pseudo Tie IMPER RES_ID: CALPSS_6_SOLAR1 POD: 92kV Bus at the Calipatria Solar Farm Sub 11. Golden Springs Building G Capacity: 1.3MW RES_ID: DELAMO_2_SOLAR3 POD: 230kV Bus at DEL AMO 12. Dracker Solar Unit 1 Capacity: 110MW RES_ID: DRACKR_2_SOLAR1 POD: 230kV Bus at Colorado River Sub 13. Dulles Capacity: 2MW RES_ID: ETIWND_2_SOLAR5 POD: 230kV Bus at Etiwanda Sub 14. New-Indy Ontario Existing QF Coversion Capacity: 33.6MW RES_ID: ETIWND_2_UNIT1 POD: 220kV bus at Etiwanda Sub 15. Cameron Ridge II Capacity: 11.9MW RES_ID: FLOWD_2_WIND1 POD: Windhub 230kV Sub 16. Corcoran 3 RES_ID: FRESHW_1_SOLAR1 POD: 115kV Bus at Freshwater Sub 17. Frontier Blackwell RES_ID: FRNTBW_6_SOLAR1 POD: 70kV Bus at Frontier Blackwell Sub 18. San Gorgonio Capacity: 12.6MW California ISO Public Page 3 of 7
RES_ID: GARNET_2_WIND3 POD: Devers 230kV Bus 19. Windustries Capacity: 9.8MW RES_ID: GARNET_2_WIND4 POD: Devers 230kV Bus 20. Lemoore 1 Capacity: 1.5MW RES_ID: HENRTA_6_SOLAR1 POD: Henrietta 70kV Bus 21. Kingbird Solar A RES_ID: KNGBRD_2_SOLAR1 POD: 230kV Bus at WHIRLWIND Sub 22. Kingbird Solar B RES_ID: KNGBRD_2_SOLAR2 POD: 230kV Bus at WHIRLWIND Sub 23. One Ten Partners Capacity: 2MW RES_ID: LITLRK_6_SOLAR3 POD: Antelope Sub 66kV Bus 24. Little Rock Pham Capacity: 3MW RES_ID: LITLRK_6_SOLAR4 POD: Antelope Sub 66kV Bus 25. Maricopa West Solar PV RES_ID: MARCPW_6_SOLAR1 POD: Maricopa West 70kV Bus 26. Brookfield Tehachapi 3 Capacity: 3MW RES_ID: MIDWD_2_WIND2 POD: 230kV Bus at WINDHUB 27. Citizen Solar B Capacity: 5MW California ISO Public Page 4 of 7
RES_ID: MNDOTA_1_SOLAR2 POD: MENDOTA 115kV Bus 28. Windstream 6111 Capacity: 6.5MW RES_ID: NZWIND_2_WDSTR5 POD: Windhub 230kV Bus 29. Oasis Solar RES_ID: OASIS_6_SOLAR2 POD: Antelope 66kV Bus 30. Potrero Hills Energy Capacity: 8MW RES_ID: PEABDY_2_LNDFL1 POD: 230kV Bus at Peabody Sub 31. Rio Bravo Solar 1 RES_ID: PMPJCK_1_SOLAR2 POD: PMPJCK 115kV Bus 32. Bowerman Power RES_ID: SANTGO_2_LNDFL1 POD: 220kV Bus at Santiago Sub 33. SKIC Solar Capacity: 10MW RES_ID: SKERN_6_SOLAR2 POD: 70kV Copus-Old River line tap (Pole No. 10/184A) 34. 2143 Dacy Capacity: 1.3MW RES_ID: SYCCRK_1_SOLAR1 POD: 115kV Bus at SYCAMORE CREEK 35. Wind Wall Monolith I Capacity: 17MW RES_ID: TEHAPI_2_WIND1 POD: 230kV Bus at Vincent Sub 36. Wind Wall Monolith II Capacity: 22.5MW California ISO Public Page 5 of 7
RES_ID: TEHAPI_2_WIND2 POD: 230kV Bus at Vincent Sub 37. Golden Hills A Capacity: 43MW RES_ID: USWND2_1_WIND1 POD: 115kV Bus at Tesla Sub 38. Golden Hills B Capacity: 43MW RES_ID: USWND2_1_WIND2 POD: 115kV Bus at Tesla Sub 39. EUI Windpark I Capacity: 9.4MW RES_ID: VENWD_1_WIND1 POD: Devers-Garnet 115kV tap 40. EUI Windpark II Capacity: 16.1MW RES_ID: VENWD_1_WIND2 POD: Devers-Garnet 115kV tap 41. Painted Hills Wind Park Capacity: 19.3MW RES_ID: VENWD_1_WIND3 POD: Devers-Garnet 115kV tap 42. Nicolis RES_ID: VESTAL_2_SOLAR1 POD: Vestal Sub 230kV Bus 43. Tropico Capacity: 14MW RES_ID: VESTAL_2_SOLAR2 POD: Vestal Sub 230kV Bus 44. Calgren - Pixley Capacity: 11.2MW RES_ID: VESTAL_2_UNIT1 POD: Vestal 230KV Sub 45. Wildwood Solar 2 Capacity: 15MW California ISO Public Page 6 of 7
RES_ID: WLDWD_1_SOLAR2 POD: 115kV Bus at Wildwood Sub 46. Mojave Solar Project - Increase EMS PMax from 250MW to 275MW Capacity: 275MW Aggregated RES_ID: SANDLT_2_SUNITS Child RES_IDs: SANDLT_2_STGA (137.5 MW) SANDLT_2_STGB (137.5 MW) POD: Kramer 230 kv Bus California ISO Public Page 7 of 7