Nine Steps to Oil Analysis Success



Similar documents
Oil Analysis Implementation Strategy

CSI Oil Analysis Options

World-Class Oil Sampling It is Possible

At Bently Nevada Corporation (BNC) we know one. Establishing a Lubricant Analysis Program. Joshua Hutton. John Kitchens.

PdM Overview. Predictive Maintenance Services

Reliability Solutions

COURSE 1020 OIL ANALYSIS WHY ATTEND

Starting a new Oil Analysis Program Burden or Benefit?

An Overview of WearCheck Oil Analysis Services

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

Predictive Maintenance

Automated Oil Analysis Interpretation System.

BQ-9000 Quality Management System. Marketer Requirements

SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE. By David Stevens, Technical Manager & Trainer, AVT Reliability

SKF Asset Management Services. Your trusted resource for life cycle support and sustainability of physical assets

On-line PD Monitoring Makes Good Business Sense

Enhanced calibration High quality services from your global instrumentation partner

Asset Management 101

W H I T E P A P E R T h e I m p a c t o f A u t o S u p p o r t: Leveraging Advanced Remote and Automated Support

Operations & Maintenance 101 Maintenance Strategies and Work Practices to Reduce Costs

Analytical Products and Solutions. Complete service and maintenance solutions for your analytical equipment. usa.siemens.com/analyticalproducts

Proper planning can prevent severe damage in the event of a failure.

What to Look for in a Vibration Consultant By Alan Friedman, DLI Engineering. Introduction. The Most Basic Form of Vibration Analysis

Trend Health Check & Monitoring Program - in-depth fluid condition analysis at laboratory

Lubrigard. A Guide To Lubrication Management

Operations & Maintenance 201 Using online monitoring and predictive diagnostics to reduce maintenance costs

Engine Lube and Hydraulic Oil Analysis Program OIL ANALYSIS

Maintenance Plan. Many of the individual components of a comprehensive maintenance program are listed below, along with brief descriptions.

Data Management Implementation Plan

Asset management systems increase reliability and efficiency

Procedure for Equipment Calibration and Maintenance

Implementing ISO 9001

BQ-9000 Quality Management System. Certified Marketer Requirements

Better-performing Assets Make Companies

Measuring instruments in industry.

Confidence. Convenience flexibility

Lab Service, Asset Management and Extending the Life of Your Lab Equipment. Scott Greenwood Director, Services

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

Global Condition Monitoring Services Market

Risk Assessment for Medical Devices. Linda Braddon, Ph.D. Bring your medical device to market faster 1

A Risk Based Thinking Model for ISO 9001:2015

UNCONTROLLED COPY FOR REFERENCE ONLY

Maximizing return on plant assets

Quality Management System Manual

RCM Success Starts with CMMS

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

AS9100 Quality Manual

GLOBAL TECHNICAL SERVICES AND SOLUTIONS TECHNOLOGY, RESEARCH AND INNOVATION: FOR YOUR PEACE OF MIND

Global Services. FS-Elliott Co., LLC. Represented by:

Predictive Maintenance in a Mission Critical Environment

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Sample specifications for an effective Flow Monitoring Services RFP

Asset Management Acceptance Testing Asset Control Parts and Equipment Sales

Information Technology Asset Management: Control and Compliance

LEAP SM Oil Analysis Program Saves Money with Consistent, Accurate Monitoring

Chromatograph Maintenance and Troubleshooting Class # 5050

Camar Aircraft Products Co. QUALITY MANUAL Revision D

ISO 9001:2008 QUALITY MANUAL. Revision B

Fundamentally, IT support is a business decision, not a technical issue. Downtime costs money, time and reputation.

Cargo by Cargo. Carbon and Sustainability (C&S) Assurance Guide

GE Power Electronics Business Total Quality Management for Suppliers

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Customer Support Agreements

Duplex ID Card & License Scanner. User Guide

Prequalification of Roading Contractors

control manual Optimal maintenance decisions for asset managers by andrew k.s. jardine and neil montgomery 44 Industrial Engineer

Content Sheet 10-1: Overview of External Quality Assessment (EQA)

NC SBI QUALITY ASSURANCE PROGRAM

Interactive Computer Based Courses

MAINTENANCE PRODUCTS AND SERVICES S O S SM. Services

The President of Inductors Inc. is the senior executive responsible for operations.

Oil Analysis. It is important that the sampling be done in the following manner: 1.

FIELD MAINTENANCE SERVICE

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ PHONE: (520) FAX: (520)

STREAMLINE. Products for the Pure Water Cleaning Industry INSTRUCTION MANUAL

Operation & Maintenance Manual SYSTEM NAME

Reliability Modeling Software Defined

Developmental Sales Coaching

1 Greet the Caller. 2 Provide Assurance. 3 Gain Permission to

Making the Most of SáOá SM Services

LAB 37 Edition 3 June 2013

White Paper from Global Process Innovation. Fourteen Metrics for a BPM Program

Proactive Asset Management with IIoT and Analytics

What Can the OIL ANALYZERS Fluid Analysis Program Do For You?

Model 601A02. Low-cost Industrial ICP Accelerometer. Installation and Operating Manual

Quality management systems

STATEMENT BY ALAN RAPAPORT, M.D., M.B.A. PHYSICIAN SURVEYOR THE JOINT COMMISSION BEFORE THE NEW MEXICO HEALTH AND HUMAN SERVICES COMMITTEE

The Pressure Washer Industry Standard

Arrangements for the Maintenance and Testing of Laboratory Autoclaves

Supplier Quality Assurance

Automated IT Asset Management Maximize organizational value using BMC Track-It! WHITE PAPER

Proactive and Predictive Strategies for Setting Oil Analysis Alarms and Limits

Transcription:

Nine Steps to Oil Analysis Success Robert Scott, Noria Corporation When oil analysis programs fail or are abandoned by a company, it is often because no apparent benefits from the program have been realized. Samples are taken and results are received from the lab but maintenance issues are not recognized or resolved. Often, the program seems to become more involved and labor-intensive than was originally anticipated. Typically, the effort put into the program reflects the benefits derived. Don t be fooled by someone who claims that all the end-user has to do is collect the oil samples and pay the bills. There is more to it than that, and most of that effort will fall to the plant maintenance personnel. The intent of this article is to help end-users who may not have been involved in an oil analysis (OA) program or who have had a program in the past, but it was discontinued. Now your company, possibly with new management, is considering starting a new program. An OA program begins with an understanding of machinery reliability and a willingness to improve on the current reliability status within the plant. Oil analysis is a tool which can be used to help monitor oil-lubricated equipment. It s like taking a human blood sample. It doesn t provide all of the information regarding what is happening within the equipment, but it can provide valuable insight. The purpose of an OA program includes the following: Proactively monitoring harmful contaminants within the oil. Monitoring the condition of the equipment and improving predictive maintenance, which in turn provides better control of downtime. Monitoring the condition of the oil including optimizing oil drain intervals. The following steps should be addressed to implement a successful OA program, and more importantly which party, the lab or the end-user, must take ownership and responsibility for performing these tasks. Step 1: Commit to a Program Committing to an OA program includes accepting ownership and responsibility for the program by the facility. It is critical to understand that the program will require the facility to commit the necessary finances, manpower and training to

provide the skills and abilities within the plant personnel to operate the program successfully. Measurable goals should be set for the program and monitored to determine if progress is being made and where adjustments need to be made in the future. The program should dovetail (work hand-in-hand) with other technologies such as vibration, thermography, ultrasonics and motor current analysis. Step 2: Develop a Baseline The second step is to develop a baseline of the current oil condition, equipment failures and reliability within the plant, which is needed to measure progress. It is likely that at some point, plant management will want to know how effective the program has been. Therefore, the individual responsible for the program must know the condition of the equipment, failure rates and costs before the program was initiated. To create a good baseline, it may take some time to pull the information from existing maintenance records, especially if past maintenance records are poor. Step 3: Select a Laboratory Plant personnel must be the ones to select a laboratory. The first consideration is whether the plant is large enough to warrant an in-house (on-site) portable OA laboratory. Generally, these bench-top pieces of equipment cost more than $35,000 and are suited for immediate and preliminary routine monitoring of numerous pieces of equipment. Generally, it is necessary to monitor more than 100 oil systems to justify such an expense. If an on-site lab is established, oil samples with nonconforming results may warrant further analysis of the sample at a commercial OA laboratory for better results. If the plant is not large enough to warrant in-house OA laboratory, then an outside commercial lab needs to be chosen to perform routine oil analysis. Here are some factors that need to be considered: Is the lab personnel adequately educated and certified? Is the lab equipment up to date and in relatively good condition? Is the lab clean and well organized? What test methods are being used and/or are available? (modified test procedures vs. ASTM standard test procedures) What is the ability of the lab to interpret data? (diagnostics) How will immediate emergency reporting be handled? What is the routine reporting format? Are the reports easy to read? Is the routine reporting timeframe within three to four days from sample shipping? What field technical/training support is available from the lab?

How complete is the quality assurance/control programs? (lab equipment calibration, ISO accreditation, statistic process control used, and lab lube exchange analysis program participation) What is the cost of the service? What is included in a basic package vs. extra charges for additional or more comprehensive tests? (for example: ferrous density, Karl Fischer, water) How are payments made? (prepay vs. invoice) What exactly does the lab charge for, or in other words, what are the lab s charges triggered by? Is it the complete analysis, the sample bottle or the paperwork that accompanies the bottle? Remember, bottles occasionally get lost in the process. If possible, visit a couple of laboratories to get a feel for what constitutes a good lab versus a mediocre lab. Step 4: Analyze Equipment Selecting the equipment to be monitored can take one of two approaches. One option is to select several pieces of no critical equipment in an attempt to become involved in OA without a large initial commitment to a program. But if plant management has a strong commitment to an OA program, then begin by selecting the major or critical equipment within the plant. Not every piece of lubricated equipment warrants being part of the OA program, just as not every piece of equipment is monitored for vibration. The qualities of major or critical equipment include: Critical to plant production and safety, the consequences of failure are high High capital cost High repair expenses Specific equipment with a history of maintenance or failure problems Units where the cost of the oil is a factor (large sump volume or synthetic) Note that to this point, all of the responsibility and functions rest with the enduser. Step 5: Select the Test Slate Selecting the laboratory tests to be performed is based upon the equipment or component type with consideration of the failure history, any RCM and FMEA analysis, and oil change interval goals. This selection needs to be a collaborative effort between the laboratory personnel and the end-user. The end-user must bring the knowledge of the plant to the decision process while

the laboratory will be more informed about the specific test options and costs. Selecting the appropriate test methods to use will be based on the accuracy needed and the cost. A common observation is that a more critical piece of equipment with a history of water ingression may warrant a higher cost but more accurate (quantitative) Karl Fischer water test versus an inexpensive, less accurate (qualitative) routine crackle test. Step 6: Sampling Guidelines This step covers how to physically acquire the oil samples and the related decisions that need to be addressed. These decisions include selecting the appropriate: sampling locations on each piece of equipment sampling frequency sampling procedures (how to obtain proper samples for each piece of equipment) sampling tools and hardware (valves) needed All of these decisions must be made by the end-user, who should have knowledge of the classic sampling locations, sampling dos and don?ts, the limitations of sampling at certain locations, equipment criticality, oil flow sampling options and the sampling hardware available. Lab personnel may be able to offer assistance with these issues, but the plant lubrication specialist should be the primary decision maker because these activities will take place on a routine basis within the plant by plant personnel. Installation of proper sampling valves will be the responsibility of plant personnel. Supplying sample bottles and ensuring that their cleanliness level is adequate for most applications is generally the responsibility of the laboratory. Providing sample information such as the oil type, hours on the oil, machine type and ID, as well

as sending the samples to the laboratory in a timely manner will fall back to the end-user to ensure all procedures are completed properly. Note that all of the work performed to this point occurs before the first oil sample has been taken and the first analysis performed. Once sampling has begun, the program will perform the following tasks. Step 7: Analysis and Results Laboratory sample analysis and data handling (which includes data logging and quality assurance of the laboratory data) is where most of the laboratory responsibility will lie. The lab is responsible for: logging the sample data into the laboratory computer ensuring correct lab testing procedures are in place and being followed ensuring the lab equipment is calibrated ensuring quality control samples are run and that action is taken for non conformance ensuring samples are analyzed within 24 to 48 hours of receiving the sample ensuring a report is provided to the client within 24 hours of completing the analysis The end-user should accept the responsibility for providing samples of new oil to the laboratory for analysis to provide a baseline for the data interpretation. Step 8: Interpreting Results The responsibility for data analysis or interpretation is often a contentious issue. Many end-users want the lab to interpret the data because they do not feel competent in their analyzing skills. However, only the end-user has all of the information (maintenance records, oil top-up volume etc.) needed to interpret the data. Typically, the laboratory data interpretation is computer generated with almost no human interpretation. Once the laboratory data is input into the computer, it is compared to the new oil reference data, and to general industry warnings and condemning limits which each laboratory has input into its own computer. These limits are the foundation of the computer s interpretation. Although they are generally reasonable, these limits or flags can be modified or fine-tuned based on customer feedback and specific goals. Interpretive comments offered by the lab are usually computer generated and therefore are rudimentary and must conform to a previously recognized problem. They can be helpful, but should not be the only data interpretation.

The end-user needs to become educated to a level where he or she feels as confident in reviewing and interpreting the lab data as he would vibration data. The maintenance and/or reliability department(s) are the only people who have all of the maintenance and monitoring information available, which enables them to ultimately make appropriate maintenance decisions. Step 9: Tracking the Performance Tracking the OA program performance and analyzing its cost benefits is solely the responsibility of the end-user. The lubrication specialist or the maintenance department should monitor the program to ensure the benefits which were originally targeted are achieved. This could take the form of tracking and plotting the contamination control data from the lab and comparing these values to the contamination targets set for each piece of equipment. Eventually, plant management will want to see an evaluation of the cost of the OA program relative to the benefits received. This is where the baseline of plant performance, generated at the beginning of the program, will be beneficial. In the end, the majority of the effort and responsibility of an OA program lies with the end-user. The laboratory must be relied upon to provide accurate oil analysis. The program will also progress when modifications and improvements are made as experience is gained and equipment within the plant is altered or renewed. Please reference this article as: Robert Scott, Noria Corporation, "Nine Steps to Oil Analysis Success". Practicing Oil Analysis Magazine. July 2006