Steentil, an early stone bridge in the monastic landscape of Groningen, the Netherlands



Similar documents
CHAPTER 3A Environmental Guidelines for STREAM CROSSING BY ALL-TERRAIN VEHICLES

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

Safe & Sound Bridge Terminology

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

Factors that influence the speed of bacterial wood degradation

RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA

It was my assignment to physically inspect the 8 trees on site near the proposed construction,

Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey of Finland

HOUSE BUILDING DIGEST

ARCHAEOLOGICAL AND DENDROCHRONOLOGICAL RESEARCH IN HIGH ASIA

SUSTAINABLE URBAN DRAINAGE SYSTEMS

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria

STRATFORD CAMPUS, UNIVERSITY OF EAST LONDON ARCHAEOLOGICAL DESKTOP STUDY

Watershed Works Manual

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Elevating Your House. Introduction CHAPTER 5

Bedwyn Brail, Wiltshire: Geophysical and Earthworks Survey

SECTION SITE PREPARATION

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

GOOD NEWS BUT NOT ALWAYS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Greater London Region GREATER LONDON 3/503 (E.01.K022) TQ

Quality Control of Groningen 14 C Results from Tel Reh ov

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Hopewell Archeology: The Newsletter of Hopewell Archeology in the Ohio River Valley Volume 6, Number 1, September 2004

November General Notes. Tree Protection. Tree Protection and New Development Guidance Note

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Fire, Forest History, and Ecological Restoration of Ponderosa Pine Forests at Mount Rushmore, South Dakota

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

SEPTIC TANKS FOR THE COLLECTION & SETTLEMENT OF DOMESTIC SEWAGE

NEW METHODS OF DATING IN ARCHAEOLOGY

OSU Extension FACT SHEET

CHAPTER 5 OPEN CHANNEL HYDROLOGY

BRIDGES ARE relatively expensive but often are

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Spatial sampling effect of laboratory practices in a porphyry copper deposit

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014

Division of Forestry

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

No allowance will be made for classification of different types of material encountered.

How to build raised beds page

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

Siting and settlement: The most important way to protect shelter from floods is to build in a place that is unlikely to be flooded.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

6 RETROFITTING POST & PIER HOUSES

Guideline for Stress Testing the Climate Resilience of Urban Areas

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Walsall Council Validation Guide for submitting a Householder Planning Application

G R O U N D E D A R C H I T E C T U R E

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

CHAPTER 2 QUANTITY TAKE-OFF

LS 2540 SEWER LATERALS AND INSPECTION TEES

Solving Persistent Moisture Problems and Moisture Damage

Requirements for Building Application Submission

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

Prattsville Berm Removal Project. 1.0 Project Location

Residential Foundations and Basements

STRUCTURAL DAMAGE OF A 5-STOREY BUILDING: DIFFERENTIAL SETTLEMENT DUE TO CONSTRUCTION OF AN ADJACENT BUILDING OR BECAUSE OF CONSTRUCTION DEFECTS?

Prehistoric timber circle from Holme

Drawing Accurate Ground Plans from Laser Scan Data

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

Index-Velocity Rating Development (Calibration) for H-ADCP Real-Time Discharge Monitoring in Open Channels

Description of Underwater Noise Attenuation System Design Unit 4. New NY Bridge Project

DURABILITY OF MORTAR LININGS IN DUCTILE IRON PIPES Durability of mortar linings

Emergency Safeguarding. of the World Heritage. Site of Byblos

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SECTION 1 GENERAL REQUIREMENTS

14 September Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste St. Paul, MN 55102

Durability of acetylated Radiata Pine investigation of the resistance against brown-, white- and soft rot fungi

City of Shelbyville Site Inspection Checklist

An Archaeological Settlement Analysis of Goshono Site

Building over or close to a public sewer

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

A guide to preventing structural damage

Installation (Figure 1) (Figure 4) (Figure 5) (Figure 2) (Figure 3) (Figure 6)

16. Storm water drainage

CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

ACQUIRING MINERAL RIGHTS IN THE NORTHWEST TERRITORIES

METHOD OF STATEMENT FOR STATIC LOADING TEST

TELL ES-SULTAN (JERICHO): RADIOCARBON RESULTS OF SHORT-LIVED CEREAL AND MULTIYEAR CHARCOAL SAMPLES FROM THE END OF THE MIDDLE BRONZE AGE

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

Earth Coordinates & Grid Coordinate Systems

APPENDIX G SETTLEMENT

Public Landscape Aids And Protection Of Assets

Transcription:

Steentil, an early stone bridge in the monastic landscape of Groningen, the Netherlands Henny Groenendijk, Hans van der Plicht & Harm Jan Streurman Review data Submission: 15/3/2011 Revised submission: 22/3/2012 available online at www.jalc.nl and www.jalc.be Abstract Restoration of a historic bridge near Aduard, Groningen known as Steentil revealed an early predecessor. A sample of wood from a pile of this early bridge is dated by Radiocarbon to the last 2 decades of the 13th century. Keywords: Medieval bridge, Radiocarbon dating, monastic landscape, Groningen 1 Introduction In the Late Middle Ages, the marsh and peat districts of the present provinces of Groningen and Friesland were converted into monastic landscapes in short time. Numerous monastic orders settled in the wetlands, contributing considerably to the transformation of a semi-natural into a cultural landscape. In 1192, a Cistercian monastery was founded at Aduard in Eastern Lauwers Frisia, which quickly became the focus of development of the Groningen marsh region. The Aduard monastery possessed over 5,000 hectares of cultivated land and was very active in peat reclamation for economic purposes, which required a well-maintained network of waterways, waterworks like sluices and country-roads. Yet little is known about the manner how these roads crossed over waterways, and whether bridges were constructed for this purpose. The restoration of the historic bridge located near Aduard, Groningen (a monument listed as Steentil, meaning stone bridge ) in 2009 offered an opportunity to gain more insight in this medieval water-engineering. Indeed, it revealed an early predecessor dating to the end of the 13th century, which was an unexpected surprise. The location of this bridge is shown in figure 1.

Henny Groenendijk, Hans van der Plicht & Harm Jan Streurman Figure a) Location of the Steentil bridge near Aduard, province of Groningen (topographical map :. ). Figure b) Location of Aduard in the Netherlands. Journal of Archaeology in the Low Countries - (October ) Groenendijk and AUP

Steentil, an early stone bridge in the monastic landscape of Groningen, the Netherlands 161 2 An unexpected find During preparation of the restoration of the present bridge, research in the records indicated that a stone bridge, mentioned for the first time in 1417, may already have been in existence around 1400. At that time, the monks from Aduard were supposed to dig the canal known as Aduarderdiep (Friso & Holstein 2010). The earliest indication on a map dates to 1560 (the van Skrooten map ). The oldest picture of the bridge dates to 1675 (the Hoge Justitiekamer map ), which shows a three-arched bridge constructed on two brick foundation abutments (fig. 2). This is very different from the present bridge, which was constructed by order of the Province of Groningen in 1722. It is characterised by two land abutments and a wide span. However, the original stone bridge may have been one-arched too, as the then existing bridge was to be extended with two arches according to a resolution dating from 1637 (Friso & Holstein, 2010, 43f). Figure 2 Oldest known depiction (1675) of the three-arched Steentil (source: Groninger Archieven, toegang 817, inv.nr. 1059). For the restoration of the present bridge in 2009, the water of the Aduarderdiep was pumped away from the building trench. This enabled the inspection of the land abutments of the 1722 bridge. Members of the local historical society discovered a configuration of vertical wooden piles in the heavy clay at the bottom of the watercourse, adjacent to both brick abutments. They realised the importance of this observation and reported the find to the first author. The presence of large medieval bricks suggested a medieval origin. Yet, the use of such bricks at a distance of only 1.5 kilometres from the Aduard monastery is not surprising. The configuration of wooden piles appeared original, and the local historical society was asked to document this apparent foundation. The measurements provided insight into the construction: the poles were grouped into two densely placed grids, adjacent to the land abutments, spanning c. 10.5 m and with a width of 4.5 m. For the 1722 bridge, these dimensions are 13.0 m and 6.5 m, respectively. A plan of the site, with the features discussed indicated, is shown in figure 3. A sample of one of the piles was taken by sawing off the upper end for determination of the wood and dating by dendrochronology. The trunk which was sampled measured 60 cm in diameter. The wood species appeared to be willow. Unfortunately, the number annual rings was only 45, which made the sample unsuitable for dendrochronological dating. Therefore, it was decided to date the wood by radiocarbon.

162 Henny Groenendijk, Hans van der Plicht & Harm Jan Streurman Figure 3 Plan of the wooden piles found in 2009, belonging to the first Steentil bridge (source: F. den Haring, Historische Vereniging Aduard). 3 Radiocarbon dating A large sample of the willow wood was made available for radiocarbon dating. We choose to date the sample by radiometry (the so-called conventional method), because this method enables measuring large samples to the highest precision possible. About 200 grams of wet wood from the outer rings were used. The wood was chemically pretreated by the standard AAA (Acid-Alkali-Acid) procedure, to remove possible contaminants and to isolate the datable fraction (Mook & Streurman 1983). The pre-treated material was combusted into pure CO2 gas, of which the 14 C radioactivity is measured by proportional gas counting (Van der Plicht 2005). The 14 C date of the Steentil sample was determined as 685±15 BP (laboratory number GrN-32447). The date was calibrated using the Intcal09 curve (Reimer et al. 2009), yielding a calendar age of 1285-1295 AD (1-sigma confidence interval). At the 2-sigma level this would be 1280-1300 AD (fig. 4). The numbers are rounded to the nearest 5. Figure 4 Calibration of the 14 C date for sample GrN-32447, 685±15 BP. The relevant part of the calibration curve (red), the 14C measurement (green) and the calibrated probability distribution (blue) are shown. The significant probability for the date is 1285-1295 AD. In theory, the second peak is a posssible solution as wel, but with a very small probability (<10%).

Steentil, an early stone bridge in the monastic landscape of Groningen, the Netherlands 163 Quite often, the excursions ( wiggles ) in the calibration curve deteriorates the precision, but in this case the sample happens to be within a time range enabling inference of a very precise historical date range. 4 Discussion In the coastal zone, wood species used for vertical constructions during the Late Middle Ages ranges from alder to ash, with occasionally oak. Oak as a local building material was long available in the sandy parts of Groningen, but became scarce during the 16th century, requiring an increase in import of oak timber (Groenendijk & Van Rijn 1996). In the clay region there has always been a shortage of oak. Alder (Alnus) was the most popular wood species for foundation purposes, as this tree was abundant in both clay and peat regions and in the stream valleys of the sand regions. Trunks of Alnus are well capable of carrying vertical loads and are resistant to rot when applied below the ground water level. Willow (Salix), in spite of being a typical wetland species and easily available, is not suitable for timber, as it is very soft, flexible and susceptible to rot. Following Wiselius (1994), the mechanical strength index is 26 and the durability grade is V, which indeed means wood classifications unfavourable for construction purposes. In domestic building therefore willow may be used for wattle work, but it is unknown in over-ground structures (Casparie et al. 1995). The use of willow for foundation purposes under the medieval Steentil seems rather anomalous and suggests that immediate availability was more important than structural demands at the time. Yet, willow has been used in vertical structures, even in the Cistercian monastery at Aduard itself. The second abbey church of the monastery rested completely on pile grids, the number of wooden piles being estimated as 12,500. They measure between 10 and 35 cm in diameter and with lengths not exceeding 2.40 m. Despite the lack of wood determinations in these older excavations, a 1976 test pit in the monastery area produced pile grids only consisting of willow and birch (Praamstra & Boersma 1977, 187). So we may conclude that willow must have been known in monastic building engineering, including foundations in a wet and weak subsoil. There is little doubt that monks, or building contractors with ample experience under supervision of the Cistercian monastery, constructed the first Steentil bridge at a distance of 1.5 km from Aduard. They chose untreated willow and were not concerned about the bark left. Though we are ignorant about the lengths of the piles, the willow pile sampled may have exceeded the average length of 2.40 m as encountered in the 1976 trench in Aduard. However, we think that the builders had no intention to reach the firm Pleistocene subsoil, as its top lies more than 10 m below Ordnance Level here. Was it the heavy clay, allowing to found on the basis of the sticky property of clay (kleef in Dutch) that encouraged them to do so? This might well be the case, compared with the shallow foundation depths found in the monastery itself. Whatever the consideration of the constructors might have been, the application has been successful, as is clearly proven by the perfect condition of the wood after 700 years (fig. 5). Though the wood had become very weak, the trunk itself still retained its original shape. The flattening of the upper ends suggests that the piles were meant to carry a weight, probably spread over transverse beams. A possible transverse beam was encountered in 2010 as a stray find, but mistakenly remained undocumented. On the other hand, part of the pile grid was covered directly with masonry of large medieval bricks 1 and it may be that the piles were kept upright only by means of a wooden frame around the edges. Both foundation constructions, with and without intermediate transverse beams, occur with medieval buildings in the weak Groningen soil. Under the bridge, a collection of stray moulded bricks was found. It looked like a pavement but its distribution and composition were random. Therefore, this pavement is likely the result of the demolition of the first and the second stone bridge. So, it is imaginable that the

164 Henny Groenendijk, Hans van der Plicht & Harm Jan Streurman Figure 5 Poles of the wooden foundation at the bottom of the Aduarderdiep next to the present eastern land abutment; the upper ends are flattened and the sapwood of the trunk is still present (photo: H.A. Groenendijk). original foundation consisted of vertical piles with joisted beams, the latter being removed when the three-arched bridge was demolished, to be replaced by the 1722 design. On the other hand, the observation of masonry directly placed on the vertical piles points to joisting by means of a wooden frame around the pile s edges. Bricks were produced at the Aduard monastery and were already widely used during the end of the 13th century. 5 Conclusion The precisely dated age range of the willow pile firmly establishes the felling period of the tree between 1285 and 1295 AD. The pile was part of a vertical construction driven into the heavy clay to support the land abutments of a brick stone bridge crossing the Aduarderdiep. As written sources suggest, the Aduarderdiep has been dug around 1408 (Mol & Delvigne 2010, 166ff); consequently the first mentioned stone bridge crossing the Aduarderdiep cannot predate the digging. However, our result shows that the bridge is older. This leaves open two possibilities. One, the 1285-1295 bridge crossed a natural predecessor of the present Aduarderdiep, a branch of the Peizerdiep system, and the canal was dug at a later date using the ancient stream bed. Two, the Aduarderdiep is at least a hundred years older and was already in existence around 1285-1295. We consider the second possibility more likely, for two reasons. First, at the location of the Steentil an ancient course of the Peizerdiep has not been observed. The nearest stream deposits are located a few hundred metres to the east. Second, the builders constructed a foundation in the monastic way, i.e. using wooden piles, like they did for the Aduard monastery previously. If the old Peizerdiep was still in its natural state by then, a simple ford would also suffice to cross this watercourse. We assume that the first Steentil bridge was constructed by order of the Cistercian monks, who introduced the engineering of raising brick structures on weak subsoils. The excavation of the Aduarderdiep was conceived to improve the freshwater discharge of the hinterland and the water transport of goods and persons. The construction of a bridge added the opportunity of regulating both road and water traffic. The relatively wide span of 10.5 m between the bridge

Steentil, an early stone bridge in the monastic landscape of Groningen, the Netherlands 165 abutments enabled an easy passage of freight vessels, and it is likely that their passage was in some way controlled by the Aduard monastery. At present, the Steentil is the oldest stone bridge observed in the monastic landscape of the northern coastal region of the Netherlands. Yet an even older bridge support, made of oak, was found in the Westerwolde district of Groningen. This wooden construction bridged a manmade stream and dates back to the early 12th century, when monasteries were not yet present in the northern region and brick was not available. 2 The discussion concerning the influence of the monasteries on the semi-cultivated landscape of the northern Netherlands, as it existed at the end of the High Middle Ages, has only just begun (for Aduard: Mol & Delvigne 2010). The presumption of a drastic change gains ground, as the scale of interference is more and more understood as a result of correlated measures, taken by the monasteries, foremost the Cistercians. This comprises the improvement of waterways, the cutting of peat and the embankment of the expanding tidal inlets. However, exact data on monastic interventions, other than written evidence, are rare. The Steentil find sheds light on both water and road management at the end of the 13th century. The comprehensive report on the Steentil restoration project (Friso & Holstein, 2010) is not clear concerning the meaning of the single wooden pile dated. We are however convinced that the wood sampled, measured by radiometry and yielding a very precise historic date range, takes away all doubts concerning the age of the wood. Theoretically, the piles could originate from an older structure, being recycled, but this is contradicted by the presence of bark. We have no knowledge about the lengths and possible traces of earlier use. We consider earlier use not very likely. The trunks could only survive below the ground water level, as willow is very sensitive to rot. Moreover, the extraction of such piles from a wet soil like peat or clay seems hardly feasible. Therefore we conclude that the piles discovered in 2010 under the Steentil belong to an original construction dating from the late-13th century. All piles, including the one sampled, were left in the soil and once more have disappeared under the water surface. Henny Groenendijk h.groenendijk@provinciegroningen.nl Groningen Institute of Archaeology, Groningen University, the Netherlands Hans van der Plicht J.van.der.Plicht@rug.nl Center for Isotope Research, Goningen University, the Netherlands Harm Jan Streurman h.j.streurman@rug.nl Center for Isotope Research, Goningen University, Groningen, the Netherlands Notes 1. Weblog F. den Haring (chairman to the Historische Vereniging Aduard) dd. 12.09.2009 and personal communication. 2. The find was made in 2009 in the municipality of Vlagtwedde; kind information of drs J. Molema, Libau, Groningen. References Casparie, W.A., M.C. van Heuveln, G.L.G.A. Kortekaas & I.L.M. Stuijts 1995, Vijftig houtsoorten in Groningen. In: K. Helfrich, J.F. Benders & W.A. Casparie (eds.), Handzaam hout uit Groninger grond. Houtgebruik in de historische stad, Groningen (Stichting Monument & Materiaal), 38-43.

166 Henny Groenendijk, Hans van der Plicht & Harm Jan Streurman Mol, J.A. & J. Delvigne 2010, Het klooster, het land en het water. In: J. van Moolenbroek, J.A. Mol & J. Loer (eds.), De Abtenkroniek van Aduard. Studies, editie en vertaling, Hilversum/Leeuwarden (Verloren/ Fryske Akademy) 153-172. Friso, W. & K. Holstein (eds.), 2010, Steentil bij Aduard, Groningen (Holstein Restauratie Architectuur). Groenendijk, H.A. & P. van Rijn 1996, Een woud voor een weermuur. De Wedderborg in het bezettingsjaar 1530 en het bosbestand van Westerwolde, Gronings Historisch Jaarboek 1996, 9-28. Mook, W.G., & H.J. Streurman 1983, Physical and chemical aspects of radiocarbon dating, PACT Publications 8, 31-55. Van der Plicht, J. 2005, De 14 C methode. In: Nederlandse Onderzoeks Agenda Archeologie, Amersfoort (Rijksdienst voor Archeologie, Cultuurlandschap en Monumenten). www.noaa.nl Praamstra, H. & J.W. Boersma 1977, Die archäologischen Untersuchungen der Zisterzienserabteien Clarus Campus (Klaarkamp) bei Rinsumageest (Fr.) und St. Bernardus in Aduard (Gr.), Palaeohistoria 19, 173-259. Reimer, P.J., M.G.L. Baillie, E. Bard, A. Bayliss, J.W. Beck, P.G. Blackwell, C. Bronk Ramsey, C.E. Buck, G. S. Burr, R.L. Edwards, M. Friedrich, P.M. Grootes, T.P. Guilderson, I. Hajdas, T.J. Heaton, A.G. Hogg, K.A. Hughen, K.F. Kaiser, B. Kromer, F.G. McCormac, S.W. Manning, R.W. Reimer, D.A. Richards, J. R. Southon, S.Talamo, C.S.M. Turney, J. van der Plicht & C.E. Weyhenmeyer 2009. IntCal09 and Marine09 radiocarbon age calibration curves, 0-50,000 years cal BP, Radiocarbon 51, 1111-1150. Wiselius, S.I., 1994, Houtvademecum, Almere (Kluwer Techniek). 7e druk.