Robust Optimization for Unit Commitment and Dispatch in Energy Markets



Similar documents
Two-Stage Stochastic Linear Programs

A Log-Robust Optimization Approach to Portfolio Management

Randomization Approaches for Network Revenue Management with Customer Choice Behavior

Advanced Lecture on Mathematical Science and Information Science I. Optimization in Finance

Robust and Data-Driven Optimization: Modern Decision-Making Under Uncertainty

Computing the Electricity Market Equilibrium: Uses of market equilibrium models

Nan Kong, Andrew J. Schaefer. Department of Industrial Engineering, Univeristy of Pittsburgh, PA 15261, USA

A joint control framework for supply chain planning

ARTICLE IN PRESS. European Journal of Operational Research xxx (2004) xxx xxx. Discrete Optimization. Nan Kong, Andrew J.

Distributionally Robust Optimization with ROME (part 2)

Moral Hazard. Itay Goldstein. Wharton School, University of Pennsylvania

Duality in General Programs. Ryan Tibshirani Convex Optimization /36-725

Econometrics Simple Linear Regression

A joint chance-constrained programming approach for call center workforce scheduling under uncertain call arrival forecasts

Managing Financial Risk in Planning under Uncertainty

5 INTEGER LINEAR PROGRAMMING (ILP) E. Amaldi Fondamenti di R.O. Politecnico di Milano 1

A Log-Robust Optimization Approach to Portfolio Management

STRATEGIC CAPACITY PLANNING USING STOCK CONTROL MODEL

Chapter 9 Short-Term Trading for Electricity Producers

VI. Real Business Cycles Models

Statistical Machine Learning

Variance Reduction. Pricing American Options. Monte Carlo Option Pricing. Delta and Common Random Numbers

A Robust Formulation of the Uncertain Set Covering Problem

Robust Geometric Programming is co-np hard

Robust Optimization Strategies for Total Cost Control in Project Management. Joel Goh. Nicholas G. Hall. Melvyn Sim

Support Vector Machine (SVM)

INTEGER PROGRAMMING. Integer Programming. Prototype example. BIP model. BIP models

Discrete Optimization

Nonlinear Optimization: Algorithms 3: Interior-point methods

Two Topics in Parametric Integration Applied to Stochastic Simulation in Industrial Engineering

Lecture 3. Linear Programming. 3B1B Optimization Michaelmas 2015 A. Zisserman. Extreme solutions. Simplex method. Interior point method

Re-Solving Stochastic Programming Models for Airline Revenue Management

Distributed Control in Transportation and Supply Networks

Introduction to General and Generalized Linear Models

24. The Branch and Bound Method

Stochastic control of HVAC systems: a learning-based approach. Damiano Varagnolo

A stochastic programming approach for supply chain network design under uncertainty

Spatial Decomposition/Coordination Methods for Stochastic Optimal Control Problems. Practical aspects and theoretical questions

A General Approach to Variance Estimation under Imputation for Missing Survey Data

The Advantages and Disadvantages of Online Linear Optimization

A Robust Optimization Approach to Supply Chain Management

Investment and Risk Management in Electrical Infrastructure

Modern Optimization Methods for Big Data Problems MATH11146 The University of Edinburgh

A simulation based optimization approach to supply chain management under demand uncertainty

Spatial Statistics Chapter 3 Basics of areal data and areal data modeling

Integer Programming Approaches for Appointment Scheduling with Random No-shows and Service Durations

Equilibrium computation: Part 1

Introduction to Support Vector Machines. Colin Campbell, Bristol University

Numerical methods for American options

Mathematical finance and linear programming (optimization)

ASSET-LIABILITY MANAGEMENT FOR CZECH PENSION FUNDS USING STOCHASTIC PROGRAMMING

USING SPECTRAL RADIUS RATIO FOR NODE DEGREE TO ANALYZE THE EVOLUTION OF SCALE- FREE NETWORKS AND SMALL-WORLD NETWORKS

ECON20310 LECTURE SYNOPSIS REAL BUSINESS CYCLE

2007/26. A tighter continuous time formulation for the cyclic scheduling of a mixed plant

Nonparametric adaptive age replacement with a one-cycle criterion

Locating and sizing bank-branches by opening, closing or maintaining facilities

Some representability and duality results for convex mixed-integer programs.


Dynamic Thermal Ratings in Real-time Dispatch Market Systems

Portfolio Distribution Modelling and Computation. Harry Zheng Department of Mathematics Imperial College

Pricing Transmission

Probabilistic Models for Big Data. Alex Davies and Roger Frigola University of Cambridge 13th February 2014

1 Teaching notes on GMM 1.

2.3 Convex Constrained Optimization Problems

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

An Internal Model for Operational Risk Computation

Lecture 3: Linear methods for classification

Worst-Case Conditional Value-at-Risk with Application to Robust Portfolio Management

USBR PLEXOS Demo November 8, 2012

Cyber-Security Analysis of State Estimators in Power Systems

Optimization Methods in Finance

Modelling framework for power systems. Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo

Increasing Supply Chain Robustness through Process Flexibility and Inventory

An Hybrid Optimization Method For Risk Measure Reduction Of A Credit Portfolio Under Constraints

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

3.1 Solving Systems Using Tables and Graphs

Revenue Management for Transportation Problems

Proximal mapping via network optimization

Risk-limiting dispatch for the smart grid: some research problems

Coordinated Price-Maker Operation of Large Energy Storage Units in Nodal Energy Markets

Theory and applications of Robust Optimization

Stock Price Dynamics, Dividends and Option Prices with Volatility Feedback

Summary of specified general model for CHP system

A Programme Implementation of Several Inventory Control Algorithms

Markups and Firm-Level Export Status: Appendix

Optimal Haul Truck Allocation in the Syncrude Mine

Department of Mathematics, Indian Institute of Technology, Kharagpur Assignment 2-3, Probability and Statistics, March Due:-March 25, 2015.

Bilevel Models of Transmission Line and Generating Unit Maintenance Scheduling

Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective

Average Redistributional Effects. IFAI/IZA Conference on Labor Market Policy Evaluation

Recovery of primal solutions from dual subgradient methods for mixed binary linear programming; a branch-and-bound approach

Linear Programming Notes V Problem Transformations

5. Linear Regression

Linear Programming: Chapter 11 Game Theory

The Heat Equation. Lectures INF2320 p. 1/88

Point Biserial Correlation Tests

Credit Risk Models: An Overview

A Note on the Bertsimas & Sim Algorithm for Robust Combinatorial Optimization Problems

UNCERTAINTY IN THE ELECTRIC POWER INDUSTRY Methods and Models for Decision Support

Algebra I Vocabulary Cards

Transcription:

1/41 Robust Optimization for Unit Commitment and Dispatch in Energy Markets Marco Zugno, Juan Miguel Morales, Henrik Madsen (DTU Compute) and Antonio Conejo (Ohio State University) email: mazu@dtu.dk Modeling and Optimization of Heat and Power System DTU, 12th January 2015

2/41 Outline 1 Mathematical Framework 2 Energy & Reserve Dispatch 3 CHP Unit Commitment & Scheduling 4 Conclusion

3/41 Why Optimization Under Uncertainty Sources of uncertainty in energy systems Decision-making in energy markets Better decisions if optimization accounts for uncertainty

4/41 Deterministic Optimization Framework Unit commitment and dispatch formalized as optimization problems Min. x,y c x + q y s.t. Ax b, Tx + Wy h x, y represent decision variables: unit status, dispatch, storage level, network state, etc. inequality and equality constraints impose limits on dispatch: dispatch limits, ramping, supply/demand balance, etc.

5/41 Optimization Under Uncertainty Most often not all parameters are known in advance { } Min. c x + M ω q x,y ω ωy ω s.t. Ax b, Tx + Wy ω h ω, ω Ω Uncertain parameters depend on random variable ω Variables y ω are adjustable (recourse) Measure of recourse cost in the objective function (expectation, etc.) Constraints hold for different realizations of the uncertainty

6/41 Stochastic Programming Tractable version of stochastic problem by sampling the uncertainty Min. x,y ωs c x + S p ωs q ω s y ωs s=1 s.t. Ax b, Tx + Wy ωs h ωs, s = 1,..., S Probably the most popular method of optimization under uncertainty Only used as a comparison in this presentation

7/41 Adaptive Robust Optimization (ARO) Tractable version of stochastic problem based on notion of uncertainty set Min. x c x+ max s.t. Ax b, min q,h y q y Tx + Wy h, (q, h) U, M( ) replaced by worst-case realization of recourse cost Inner minimization problem guarantees feasibility of solution Three-level game against nature

8/41 ARO and Non-Anticipativity t 1 t 2 t 3 t 4 Worst-case trajectory of uncertainty revealed before making recourse decisions Recourse has perfect knowledge of future worst-case uncertainty

9/41 Affinely Adjustable Robust Optimization (AARO) Enforcing Linear Decision Rules Optimal recourse functions y(ω) approximated by linear rules: y = Yω Computational Simplification Linear coefficient Y is a first-stage variable: essentially a max-min problem y ω

10/41 Affinely Adjustable Robust Optimization (AARO) Problem Formulation { } Min. x,y c x + E ω ω Q Yω s.t. Ax b, Tx + WYω Hω, ω U { } Min. x,y c x + E ω ω Q Yω s.t. Ax b, max {Tx + (WY H) ω} 0 ω Ω Differences from ARO: Not bound to optimize worst-case cost: can be made less conservative min-max problem can be simplified via duality argument: single stage problem

11/41 Energy and Reserve Dispatch using Adaptive Robust Optimization

12/41 Electricity Market Setup Day-ahead market: 12- to 36-hour ahead Energy and reserve are co-optimized (first stage) Followed by a balancing (real-time) market (second stage) Network is represented as in US markets The right of starting-up and shutting-down own units is not confiscated as in EU markets

13/41 Adaptive Robust Optimization Approach Two-stage robust optimization turn into three-level optimization problems 1 Make dispatch decision x with prognosis of the future (minimize cost) 2 Uncertainty (wind power production w) unfolds (maximize cost) 3 Make operation (recourse) decision y (minimize cost)

14/41 The Robust Optimization Approach min x c x T x +max w s.t. Fx = d ŵ, Gx g. min y c y T y s.t. Py = w Qx, : λ, s.t. H w h, Ly l Mx N w, : µ, This is a complicated problem! There is no general solution technique for three-level optimization problems

15/41 Modeling the Uncertainty Set Uncertain stochastic power production at different nodes described by polyhedral uncertainty set W can be modeled via linear inequalities H w h can include budget constraints on the stochastic production can limit the variation of stochastic production among adjacent plants w 1 w 2 ŵ W

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x Cost 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut (p,r) 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x Cost 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut (p,r) 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x Cost gap 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut (p,r) 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x Cost gap 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut (p,r) 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x Cost gap 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut (p,r) 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut Cost gap (p,r) 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut Cost gap (p,r) 16/41

Column & Constraint Generation Approach In the linear case, for any feasible x the worst-case realization of w is a vertex of the polytope W the worst-case recourse cost is the maximum of a finite number of affine functions of x Cost 1 Find optimal first-stage solution for approximation (lower bound) 2 Calculate worst-case recourse cost (upper bound) 3 Generate cut (p,r) 16/41

17/41 Modified IEEE 24-Node Reliability Test System Block offers by generators Flexible generators provide reserve Three lines with reduced capacity Wind farms at 6 nodes of the system

18/41 Wind Power Data Data from 6 locations in Spain Uncertainty set parameters estimated from historical data Historical data also used as scenarios

19/41 Uncertainty Set for Wind Power Production Budget of uncertainty: Intervals: Wn max Budget: w n W max n Φ N n w n W max n, n Φ N Γ One additional type of constraint to model geographical correlation ρ n1 n 2 w n 1 w n 2 ρ wn max 1 wn max n1 n 2, n 1, n 2 Φ N, n 1 n 2 2

Robust Optimization vs Stochastic Programming Risk-Neutral Case Cost Robust Optimization Stochastic Programming Energy disp. 19 015.55 17 525.95 Up reserve 1529.04 1395.77 Down reserve 0 526.68 Total day-ahead 20 544.59 19 448.40 Mean CVaR 95% VaR 100% Mean CVaR 95% VaR 100% Energy redisp. 2671.12 7223.69 7943.22 2176.31 9236.00 10 045.83 Load-shedding 19.49 374.75 9743.38 39.06 751.15 19 529.87 Total balancing 2690.60 7598.44 17 686.60 2215.37 9987.15 29 575.70 Total aggregate 23 235.19 28 143.03 38 231.19 21 663.77 29 435.55 49 024.10 20/41

21/41 Robust Optimization vs Stochastic Programming Risk-Averse Case CVaR Expectation Cost [$] Cost [$] 2.3 x 104 2.25 2.2 2.15 2.1 In-sample 2.05 0 0.2 0.4 0.6 0.8 1 α 2.9 x 104 2.85 2.8 SP RO SP RO Cost [$] Cost [$] 2.35 x 104 2.3 2.25 2.2 Out-of-sample 2.15 0 0.2 0.4 0.6 0.8 1 α 2.95 x 104 2.9 2.85 SP RO SP RO 2.75 0 0.2 0.4 0.6 0.8 1 α 2.8 0 0.2 0.4 0.6 0.8 1 α

22/41 Robust Optimization vs Stochastic Programming Computational Properties Computational results with different IEEE power system models 10 4 10 3 Computation time (s) 10 2 SP (24 bus) 10 1 RO (24 bus) SP (118 bus) RO (118 bus) SP (300 bus) 10 0 RO (300 bus) 100 150 200 250 300 350 400 450 500 # scenarios

22/41 Unit Commitment and Scheduling for Heat & Power Systems using Affinely Adjustable Robust Optimization

23/41 Heat and Power System Example Heat plant District heating CHP (extraction) CHP (backpressure) Heat tank Electricity market

24/41 A Multi-Stage Uncertain Problem The problem is uncertain (heat demand, prices) and multi-stage: Day-ahead Determine unit commitment and schedule for the following day (periods 1,..., N T ) Oper. h 1 Uncertainty at time 1 unfolds and units are re-dispatched (based on realizations until time 1) Oper. h 2 Uncertainty at time 2 unfolds and units are re-dispatched (based on realizations until time 2). Oper. h N T Uncertainty at time N T unfolds and units are re-dispatched (based on all realizations)

24/41 A Multi-Stage Uncertain Problem The problem is uncertain (heat demand, prices) and multi-stage: Day-ahead Determine unit commitment and schedule for the following day (periods 1,..., N T ) Oper. h 1 Uncertainty at time 1 unfolds and units are re-dispatched (based on realizations until time 1) Oper. h 2 Uncertainty at time 2 unfolds and units are re-dispatched (based on realizations until time 2). Oper. h N T Uncertainty at time N T unfolds and units are re-dispatched (based on all realizations)

24/41 A Multi-Stage Uncertain Problem The problem is uncertain (heat demand, prices) and multi-stage: Day-ahead Determine unit commitment and schedule for the following day (periods 1,..., N T ) Oper. h 1 Uncertainty at time 1 unfolds and units are re-dispatched (based on realizations until time 1) Oper. h 2 Uncertainty at time 2 unfolds and units are re-dispatched (based on realizations until time 2). Oper. h N T Uncertainty at time N T unfolds and units are re-dispatched (based on all realizations)

24/41 A Multi-Stage Uncertain Problem The problem is uncertain (heat demand, prices) and multi-stage: Day-ahead Determine unit commitment and schedule for the following day (periods 1,..., N T ) Oper. h 1 Uncertainty at time 1 unfolds and units are re-dispatched (based on realizations until time 1) Oper. h 2 Uncertainty at time 2 unfolds and units are re-dispatched (based on realizations until time 2). Oper. h N T Uncertainty at time N T unfolds and units are re-dispatched (based on all realizations)

25/41 Robust Optimization Approach Our approach based on Robust Optimization (RO) } Minimize c x + E ω {q ωy(ω) x,y( ) where s.t. Ax b, Tx + Wy(ω) h ω, ω U (3) x are first-stage decision (unit commitment, schedule) y( ) are recourse functions of the uncertainty ω (unit operation) The solution is optimal in expectation (1) The solution is feasible for any ω in an uncertainty set U (3) (1) (2)

26/41 Linear Decision Rules Optimal recourse decision approximated via linear decision rules y t y it (ω) = ŷ it + Y itτ ω τ, τ=1 i, t ω Recourse decision depends on history of uncertainty up to now (t) Independence on future uncertainty realizations (τ > t): non-anticipative

27/41 Final Linear Reformulation We make the following assumptions: linear dependence of parameters to uncertainty: q ω = Qω, h ω = Hω budget uncertainty set defined by Dω d By duality arguments, the problem can be reformulated linearly: { Min. x,y,λ c x + tr Q Y (Σ ω + E{ω}E{ω} )} s.t. Ax b, Λ d Tx, D Λ = (WY H), Λ R R L 2 0

28/41 Case-Study Setup Three production facilities with storage Extraction CHP (AMV3, AVV1) Back-pressure CHP (AMV1) heat-only plant Historical heat load from VEKS RO: budget uncertainty set (tunable interval size and budget) SP: Gaussian scenarios Power prices from NordPool SP: Gaussian scenarios correlated with heat demand Figure from HOFOR.dk

29/41 Back-pressure vs Extraction CHP Units P Back-pressure CHP unit constant heat/power ratio (r b ) rb H Extraction CHP unit more flexible operation in heat/power space feasible region approximated by polyhedron P rv rb H

Parameters of the System Extraction Back-pressure Heat-only Power/heat ratio r b 0.64 0.28 0 Electricity loss for heat prod. r v -0.13 Fuel per electricity unit ϕ p 2.40 2.40 Fuel per heat unit ϕ q 0.31 0.36 1.09 Minimum fuel input f 120 72.24 0 Maximum fuel input f 631.20 516 1086.96 Ramp-up/-down for fuel input r/ r 150 50 1086.96 Minimum heat output q 0 70 0 Maximum heat output q 331 500 1000 Fuel marginal cost c 24.16 12.75 93.96 No-load cost c 0 0 0 2684.56 Start-up/shut-down cost c SU /c SD 7 382.55 6 040.27 0 Minimum up-time T U 2 5 0 Minimum down-time T D 2 5 0 Provides real-time flexibility yes no yes 30/41

31/41 Scheduling Example Results from the Deterministic Model 60 40 20 4 8 12 16 20 24 Time period (h) 600 Extraction Backpressure Storage Demand Schedule (MWh) 400 200 0 4 8 12 16 20 24 Time period (h)

32/41 Scheduling Example Results from the Robust Optimization Model 60 40 20 4 8 12 16 20 24 Time period (h) 600 Extraction Backpressure Storage Demand Schedule (MWh) 400 200 0 4 8 12 16 20 24 Time period (h)

Tuning the Need for Flexibility The extraction unit is the main provider of flexibility Unit Γ 2 4 6 8 10 Total heat dispatch MWh 265.20 444.27 622.24 811.31 1250.74 Periods online h 4 5 6 8 24 33/41

34/41 Piecewise Linear Decision Rules We can define different decision rules for partitions of the uncertainty set 2 different rules for each dimension of the uncertainty partitioning demand deviation about 0 straightforward choice different response to deficit/surplus heat demand y LDR PLDR ω

Linear vs Piecewise Linear Decision Rules Dispatch Improvement Dispatch for extraction unit during peak-demand day Decision rule Unit Γ 2 4 6 8 10 Linear MWh 7944.00 7783.77 7572.89 7377.16 7200.06 Piecewise-linear MWh 7944.00 7944.00 7944.00 7944.00 7944.00 35/41

Linear vs Piecewise Linear Decision Rules In-Sample vs Out-of-Sample Results Theoretical improvement Empirical improvement % Γ 40 20 0 10 8 6 4 2 2 2.4 2.8 3.2 3.6 4 Γ % 4 2 0-2 10 8 6 4 2 2 4 3.6 3.2 2.8 2.4 Interval size (# sd) Interval size (# sd) decision rules not binding in practice anticipative out-of-sample evaluation (stochastic programming) 36/41

Price of Robustness Sensitivity analysis can help tune the RO parameters (cost vs robustness) Average profit Worst-case load-not-served 10 5 4.5 (MWh) 400 200 Γ 4 2 4 6 8 10 4 3.6 3.2 2.8 2.4 2 Γ 0 2 4 6 8 10 4 3.6 3.2 2.8 2.4 2 Interval size (# sd) Interval size (# sd) 37/41

RO vs Alternative Methods Out-of-Sample Analysis Model Interval Load not served (MWh) Γ Average profit (e) radius (# sd) largest expected 2.00 2 449 301.37 329.38 7.88 2.00 4 446 337.45 198.93 3.38 2.00 6 443 598.68 144.68 2.51 RO-PLDR 2.40 2 443 474.44 127.20 0.51 2.40 4 440 776.45 39.64 0.29 2.40 8, 10 438 086.22 31.58 0.20 2.80 2 432 707.89 16.59 0.05 3.20 2 10 419 281.79 0.00 0.00 DET 455 815.78 745.78 69.52 SP 448 945.73 159.90 2.13 Load-not-served not penalized in the objective function Out-of-sample analysis based on SP 38/41

39/41 Conclusion Robust optimization addresses some of the shortcomings of stochastic programming intractability (large scenario sets) violation of non-anticipativity in multi-stage problems Simpler models of the uncertainty are required uncertainty sets low-order moments (mean, standard deviation, etc.) Trade-off between optimality and conservativeness can be tuned via uncertainty set parameters similar results in terms of CVaR for risk-averse SP (ARO model for energy and reserve) tunable conservativeness in AARO model for CHP units Promising results in terms of scalability

40/41 References M. Zugno, A.J. Conejo (2014). A Robust Optimization Approach to Energy and Reserve Dispatch in Electricity Markets, (under review). M. Zugno, J.M. Morales, H. Madsen (2014). Commitment and Dispatch of Heat and Power Units via Affinely Adjustable Robust Optimization (working paper, available soon). M. Zugno, J.M. Morales, H. Madsen (2014). Robust Management of Combined Heat and Power Systems via Linear Decision Rules, 2014 IEEE Energy Conference (ENERGYCON) Proceedings, 479 486.

41/41 Thank you for your attention! Q&A Session

42/41 Inner Problem Reformulation via Duality From min-max-min to min-max-max: min x c x T x+max w s.t. Fx = d ŵ, Gx g. max λ,µ ( w Qx)T λ + (l Mx N w) T µ s.t. P T λ + L T µ = c y, µ 0, s.t. H w h, Inner max-max problem can be merged into a single bilinear maximization problem

43/41 Solution via Cutting-Plane Method min x,β c x T x + β s.t. β w T k λ k + (l N w k ) T µ k (λ k Q + µ k M) x, k, Fx = d ŵ, Gx g. 1 Start with a lower bound β for the recourse cost 2 Find optimal first-stage solution x for the approximation (lower bound) 3 Calculate worst-case recourse cost (upper bound) 4 Generate cut for the vertex, go back to 2

43/41 Solution via Cutting-Plane Method min x,β c x T x + β s.t. β w T k λ k + (l N w k ) T µ k (λ k Q + µ k M) x, k, Fx = d ŵ, Gx g. While (upper bound - lower bound > ɛ) 1 Start with a lower bound β for the recourse cost 2 Find optimal first-stage solution x for the approximation (lower bound) 3 Calculate worst-case recourse cost (upper bound) 4 Generate cut for the vertex, go back to 2

43/41 Solution via Cutting-Plane Method min x,β c x T x + β s.t. β w T k λ k + (l N w k ) T µ k (λ k Q + µ k M) x, k, Fx = d ŵ, Gx g. While (upper bound - lower bound > ɛ) 1 Start with a lower bound β for the recourse cost 2 Find optimal first-stage solution x for the approximation (lower bound) 3 Calculate worst-case recourse cost (upper bound) 4 Generate cut for the vertex, go back to 2

43/41 Solution via Cutting-Plane Method min x,β c x T x + β s.t. β w T k λ k + (l N w k ) T µ k (λ k Q + µ k M) x, k, Fx = d ŵ, Gx g. While (upper bound - lower bound > ɛ) 1 Start with a lower bound β for the recourse cost 2 Find optimal first-stage solution x for the approximation (lower bound) 3 Calculate worst-case recourse cost (upper bound) 4 Generate cut for the vertex, go back to 2

43/41 Solution via Cutting-Plane Method min x,β c x T x + β s.t. β w T k λ k + (l N w k ) T µ k (λ k Q + µ k M) x, k, Fx = d ŵ, Gx g. While (upper bound - lower bound > ɛ) 1 Start with a lower bound β for the recourse cost 2 Find optimal first-stage solution x for the approximation (lower bound) 3 Calculate worst-case recourse cost (upper bound) 4 Generate cut for the vertex, go back to 2

So far only easy-to-enumerate polyhedral sets have been considered, or heuristic techniques 44/41 Subproblem Choice vs Uncertainty Set Point 3 in the cutting-plane method requires the solution of a bilinear program Simple, easy-to-enumerate uncertainty sets (budget) Heuristic methods (suboptimal) We want to be able to solve the problem exactly for any polyhedral uncertainty set w 2 ŵ W w 1

45/41 Reformulation of the Problem (1) Swapping Inner Problems The inner problems can be swapped: min x c x T x+max λ,µ s.t. Fx = d ŵ, Gx g, (Qx)T λ + (l Mx) T µ+max w s.t. P T λ + L T µ = c y, µ 0, ( λ T + µ T N ) w s.t. H w h, : ξ,

46/41 Reformulation of the Problem (2) Using Strong Duality The inner problem is linear strong duality holds: ( λ T + µ T N ) w = h T ξ } {{ } objective function We can exchange a bilinear term with a linear one, but the innermost problem becomes a minimization problem We can enforce KKT conditions to guarantee optimality and get rid of a level

indicates that the product of the operands is 0 this can be linearized using binary variables (MILP) 47/41 Reformulation of the Problem (3) Final Formulation min x c x T x+ max λ,µ, w,ξ (Qx)T λ + (l Mx) T µ + h T ξ s.t. Fx = d ŵ, Gx g. s.t. 0 ξ h H w 0, H T ξ = λ N T µ, P T λ + L T µ = c y, µ 0,

RO vs Alternative Methods Out-of-Sample Analysis (Spring) Model Interval radius (# sd) Γ Average profit (e) RO-PLDR Heat load not served (MWh) largest expected 2.00 2 251 514.22 217.26 5.70 2.40 2 250 505.55 6.78 0.01 4.00 2 248 484.94 0.00 0.00 DET 260 927.88 340.15 49.74 SP 257 295.35 76.17 1.54 48/41

RO vs Alternative Methods Out-of-Sample Analysis (Summer) Model Interval radius (# sd) Γ Average profit (e) Heat load not served (MWh) largest expected RO-PLDR 2.00 2 88 423.27 0.00 0.00 DET 94 413.41 117.00 16.10 SP 92 356.87 0.00 0.00 49/41

RO vs Alternative Methods Out-of-Sample Analysis (Autumn) Model Interval radius (# sd) Γ Average profit (e) RO-PLDR Heat load not served (MWh) largest expected 2.00 2 249 631.81 90.35 0.41 2.40 2 248 673.51 0.00 0.00 DET 259 135.23 238.72 12.01 SP 255 836.17 99.71 0.54 50/41