NRC INSPECTION MANUAL



Similar documents
SECTION EARTH MOVING

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

4-02 Gravel Base Ballast and Crushed Surfacing

Stormwater/Wetland Pond Construction Inspection Checklist

Unit Price Averages Reports

Permeable Pavement Construction Guide

Vehicle Tracking Control (VTC)

C. Section TESTING LABORATORY SERVICE.

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

Soils and Aggregates Division

SECTION SITE PREPARATION

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

Division 2 Section Section 02795

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Permeable Pavement Operation & Maintanence Guide

Prefill and Water Balance Criteria. Division of Water Quality Municipal Wastewater Treatment

Vehicle Tracking Pad

Emergency Spillways (Sediment basins)

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Section 2100-Trenching and Tunneling

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

BMP #: Dry Wells / French Drains

Quality Assurance Concepts. Outline

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION PERVIOUS INTERLOCKING CERAMIC PAVERS

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

BMP 6.4.6: Dry Well / Seepage Pit

Building Your Interlocking Concrete Pavement to Last a Lifetime

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

Property Care White Papers. Site Drainage: Monitor and Maintain

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

Riprap-lined Swale (RS)

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

Employee Training Plan Farm A

AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month

Quality Assurance Program. June by Texas Department of Transportation (512) all rights reserved

ROXBURY PARK PLAY AREAS RENOVATION CITY OF BEVERLY HILLS TECHNICAL SPECIFICATIONS TABLE OF CONTENTS

Tobique Employment & Training

Aggregates for Path Construction

Helen Mercury Mine EE/CA OPINION OF PROBABLE COST

Tree Pits Operation & Maintenance Guide

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

Local Road Assessment and Improvement Drainage Manual

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

NRC INSPECTION MANUAL INSPECTION PROCEDURE 88045

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Soils, Foundations & Moisture Control

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Porous Pavement Alternatives Cost Analysis

GEOTECH ENGINEERING and TESTING

INFORMATION NOTICE: USE OF XRF DEVICES CONTAINING RADIOACTIVE MATERIAL North Dakota Department of Health Radiation Control Program (2/06)

Mine Plan of Operations Reclamation Bond Checklist

APPENDIX B. I. Background Information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

BRIDGES ARE relatively expensive but often are

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Preventing Storm Water Pollution: What We Can Do

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

A. Work on this project shall consist of, but is not limited to, the following:

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

SECTION ABANDONMENT OF SEWER MAINS

SECTION PAVEMENT DESIGN

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Specification Guidelines: Allan Block Modular Retaining Wall Systems

STANDARD SPECIFICATIONS SECTION PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

Commercial Roof Management

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. TABLE OF CONTENTS (OLS Document #9645, effective )

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Transcription:

NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction is being accomplished in accordance with the license application, license conditions and construction specifications. 01.02 To determine whether the system for preparing and maintaining records is functioning properly. 01.03 To determine whether records reflect work accomplishment consistent with the license application, license conditions, and construction specifications. 01.04 To determine if the records and/or work activities indicate any generic problems, inadequacies, or other weaknesses that could impact the facility operations. 88001-02 INSPECTION PREPARATION Applicable portions of the license application, license conditions, the final design, and the construction specifications should be reviewed to determine construction requirements. 88001-03 WORK OBSERVATION By direct observation of earthwork and other activities in progress, the reviewer should ascertain whether applicable activities are being controlled and accomplished in accordance with the requirements of the documents reviewed. Reviews will generally be conducted by a geotechnical engineer, surface water hydrologist, hydrogeologist, or health physicist as appropriate, depending on the nature of the review item. Inspections should be conducted in order to observe the key construction milestones listed in Table 1. During construction reviews, the reviewer should also determine the locations of ground-water monitoring wells and observe their condition. If ground-water sampling is in progress, the procedures Issue Date: 04/15/94-1 - 88001

should also be observed. Specific procedures applicable to particular construction and monitoring activities that may be viewed on a site-specific basis are as follows: 88001-2 - Issue Date: 04/15/94

03.01 Test Fill Construction b. Visually check the barrier test zone to ensure proper thickness and material type. c. Observe gradation, bentonite amendment operations (if applicable), plasticity index, and moisture/density testing, and compare results of tests with specifications. d. Observe installation of instrumentation/testing/monitoring equipment, including infiltrometers where applicable. e. Review quality control plan and infiltration test results. 03.02 Foundation and Subgrade Preparation a. Check to ensure that the subgrade is cleared of all vegetation and topsoil, shows no deterioration due to frost action or erosion, and exhibits no rutting from construction vehicles. b. Check to ensure that the subgrade exhibits no areas of subsidence, extreme surface drying, or localized ponding (overly wet areas). c. Observe proof rolling operations or density testing; if density testing is performed, compare results of tests observed in the field with specifications. 03.03 Placement of Capillary Break b. Observe the capillary break zone to verify proper thickness and material type, and to ensure that segregation of materials has not occurred. c. Observe gradation and/or moisture/density testing and compare results of tests observed with specifications. 03.04 Placement of Seepage Barrier/Liner b. Visually check the liner zone to ensure proper thickness and material type. c. Observe gradation, plasticity index, and/or moisture/density testing and compare results of tests observed with specifications. Issue Date: 04/15/94-3 - 88001

03.05 Placement of Contaminated Materials This includes checking the loose-lift thickness (during placement) against the specifications. b. Visually check the quantity, maximum size, and distribution of foreign material, and the distribution of organics against the allowable criteria of the specifications. Also, note if non-homogeneous areas exist. c. Observe moisture/density testing and compare results of tests observed with specifications. Note any ponding, runoff, or dust conditions. d. Observe radiological monitoring (health and safety, as well as radionuclide concentration measurement). 03.06 Placement of Soil Cover (Radon Cover) This includes checking required loose-lift thickness and proper blending of any additives, and if method specifications for density have been established by test fill, verification of number of equipment passes. b. Visually check cover layer(s) to ensure proper material type and final thickness for each layer. c. Observe gradation, plasticity index, and/or moisture/density testing and compare results of tests observed with specifications. 03.07 Placement of Frost Protection Layer Check required loose-lift thickness, and if method specifications for density have been established, verify number of equipment passes. b. Visually check the frost protection cover layer to ensure proper thickness and material type. c. Observe gradation, plasticity index, and moisture/density testing and compare results of tests with specifications. 03.08 Placement of Bedding Layer(s) and Rock Cover (Riprap) For the rock cover and other riprap layers, this includes checking that placement techniques are conducted in a manner that prevents material degradation, assures uniform 88001-4 - Issue Date: 04/15/94

distribution and minimizes voids. b. Visually check the bedding zones and riprap layers to ensure proper thickness and material type for each zone, measuring as necessary. If possible, excavate by hand to a sufficient depth to verify thickness by measurement. c. Visually check riprap for approximate size (maximum, average). If possible, excavate by hand to verify size of underlying rocks, measuring as necessary. d. Observe gradation testing to assure that representative samples are being tested. e. Observe gradation testing of filter and rock layers and compare results of gradation and durability tests observed with specifications and RAP requirements. 03.09 Other Potential Construction Observations a. Check operations at borrow areas and quarries; verify that any procedures for moisture control are properly conducted; and visually check that material type(s) are consistent with specifications and are representative of materials actually being placed. b. Check layout of diversion ditches. Check for conformance to design configuration and riprap requirements. c. Check overlap and integrity of geotextile separators, if they are used. d. If an approved vegetative cover is used in place of rock cover, check to ensure uniform seeding, use of specified seed type, seed density, etc. e. Check overall site grading to assure that cut and fill procedures will not result in grading which would be susceptible to future surface erosion. f. Observe verification soil sampling and Opposed Crystal System (OCS) analysis. g. Observe gamma surveying and, if possible, alpha surveying. 03.10 Monitoring Well Observations a. Check locations of existing wells. Verify that the field locations correspond to the location depicted on site drawings. Verify that the well is properly and permanently labeled. b. Verify that existing well locations are adequately marked with flagging or some other identification placard to avoid inadvertent destruction by heavy equipment. Issue Date: 04/15/94-5 - 88001

c. Verify that the outer protective casing, padlock, concrete pad, and other surface expressions are in good repair. Verify that well caps are secure to minimize inadvertent dust invasion inside the well casing. Note any irregularities, such as bent or damaged casing, animal burrows or erosion around the well, and proximity of equipment tracks. d. Check the locations of previously abandoned monitoring wells. Verify the field locations with respect to the site drawings. Verify that the surface expression has been completed in accordance with the Monitoring Well Abandonment Specification. Note any irregularities, such as concrete shrinkage, surface depressions, or exposed well pipe. 03.11 Ground-Water Sampling Observations a. Observe any monitoring well sampling or well measurements that may be occurring. Verify that the equipment is handled in accordance with the project specifications. Verify that equipment use and decontamination procedures have been followed in accordance with appropriate standard operating procedures. b. Verify that calibrations have been performed and documented on equipment used to make field measurements. c. Verify that accurate and legible records are maintained during the field sampling, including chain-of-custody documentation. Sampling information should be recorded on the DOE or contractor forms identified in the Quality Control (QC) project documents and in sufficient detail to support later quality assurance reviews. Verify that samples are collected, handled, and stored in accordance with procedures identified in the QC plan. d. Verify that potentially contaminated ground water removed during well purging and sampling is handled in accordance with standard procedures. The reviewer may not be able to directly observe all facets of the activities identified above. Activities which should be observed include the Key Construction Milestones identified in Table I, as well as major construction activities which are unique to the site. Such unique activities may include slurry wall construction, bentonite amendments to radon barriers, ground modification, monitoring well activities, or other phases of work identified in the license application. Observation of some field testing should be made at all inspections. In some cases, it will be necessary to observe a completed activity rather than work in progress. The intent of the review is to determine whether the activities and/or the end product meet the requirements of the license application, license conditions and applicable regulations. 88001-6 - Issue Date: 04/15/94

Additionally, during work observation, informal interviews with the licensee inspection personnel should be randomly conducted to determine how well employees know their work activity. The reviewer should ascertain whether a sufficient number of adequately qualified inspection personnel are at the site, commensurate with the work in progress, and whether they are adequately performing their assigned duties through the established organizational structure. A determination of personnel qualifications should be based on the published position description/job standards which is available at the project office. 88001-04 RECORDS REVIEW The reviewer should examine selected documentation maintained on site to ascertain the following: 04.01 Records confirm that required material characteristics and other specification requirements were met. 04.02 Records confirm that specified materials were installed in accordance with specifications. 04.03 Records indicate that adequate corrective action is being taken following non-conformance/deviation occurrences. 04.04 Records confirm that the required inspections and testing were performed adequately and at required frequencies. 04.05 Records establish that inspection personnel are adequately qualified for their assigned duties and responsibilities. 04.06 Records confirm that any field measurements of parameters for radon barrier analysis meet those presented in the license application and license. The licensee must notify the NRC if deviations are noted and the license must be amended to incorporate a new analysis before the radon barrier is completed. END Issue Date: 04/15/94-7 - 88001

TABLE I, 88001 CONSTRUCTION INSPECTIONS FOR 11E.(2) BYPRODUCT MATERIAL DISPOSAL SITES AND FACILITIES (11E.(2) SITES) LICENSED AND REGULATED UNDER 10 CFR PART 40 KEY CONSTRUCTION MILESTONES a. Early Stages of Construction: 1. Test Fill Construction * 2. Foundation and Subgrade Preparation * 3. Placement of Capillary Break * 4. Placement of Seepage Barrier/Liner* 5. Placement of Contaminated Materials ** b. Soil Cover: 1. Placement of Radon Barrier ** 2. Placement of Frost Protection Layer * c. Placement of Bedding Layer(s) and Rock Cover *** d. Completion of Disposal (Closeout) *** * May or may not apply to a particular site depending on sitespecific design. ** Will apply to all sites. *** Will apply to nearly all sites (vegetative cover may be proposed for 1 or 2 sites). Issue Date: 04/15/94 T-1 88001, Table