Data Centre Services. JT First Tower Lane Data Centre Facility Product Description



Similar documents
Data Centre Services. JT Rue Des Pres Data Centre Facility Product Description

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security.

singapore//singapore data center specifications tel: fax: internet + intellectual property + intelligence

melbourne//australia data center specifications internet + intellectual property + intelligence tel: fax:

South Datacentre Studley

Powerful Dedicated Servers

LDeX Group. Colocation Solutions for High Expectations

HealthcareBookings.com Security Set Up

hong kong//china data center specifications tel: fax: internet + intellectual property + intelligence

BELLE VUE MANCHESTER DATA CENTRE

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management

out of this world guide to: POWERFUL DEDICATED SERVERS

112 Linton House Union Street London SE1 0LH T: F:

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

moscow//russia data center specifications tel: fax: internet + intellectual property + intelligence

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Data Center Presentation

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

ASX Australian Liquidity Centre. ASXCoLo

LEVEL 3 DATA CENTER ASSESSMENT

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

DATACENTER COLOCATION. Flexible, Secure and Connected

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group

Colocation Service Definition. SD008 v1.3 Issue Date 19 Feb 09

Datacentre South Gyle 1 Data sheet

Colocation. Introduction. Structure of the service. Service Description

Datacentre South London Data sheet

Sovereign. The made to measure data centre

Introducing UNSW s R1 Data Centre

Data Center Infrastructure & Managed Services Outline

Web Hosting Features

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering % uptime

Data Center Overview Document

DATA CENTRE DATA CENTRE MAY 2015

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

Frankfurt Data Centre Overview

Datacentre Reading East 2 Data sheet

san francisco//usa data center specifications tel: fax: internet + intellectual property + intelligence

Netmagic Vikhroli Datacenter Infrastructure & Capabilities

Technical specifications. Containerized data centre NTR CDC 40f+

NeuStar Ultra Services Physical Security Overview

DATA CENTRE DATA CENTRE

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Datacentre Maidenhead P1 Data sheet

Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive

TELEDATA DATA CENTRE AND COLOCATION SERVICES IN MANCHESTER

Data Centre Best Practices Summary

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

vcloud SERVICE Virtual Tech in partnership with Equinix - vcloud Service

Pacnet Hong Kong CloudSpace2 Technical Specifications. Upholding the Principles of Efficiency and Sustainability in Data Center Design

POWERING A CONNECTED ASIA. Pacnet Hong Kong CloudSpace1 Technical Specifications. Asia s Pioneering Facility with Direct Subsea Cable Access

IBM Twin Data Center Complex Ehningen Peter John IBM BS 2011 IBM Corporation

Liebert GXT MT+ CX UPS, 1000VA VA Intelligent, Reliable UPS Protection. AC Power for Business-Critical Continuity

Every business owns precious data and every business should recognise the risk of losing their data. Natural Disaster

Data Centre Infrastructure

Upgrading the PRS datacentres: space requirement. S. S. Mathur, GM-IT, CRIS

Server Monitoring & Management Services

White paper. SAS Solutions OnDemand Hosting Overview

Strategic Data Centre Site Profiles Data Centre Co-Location London North

DESIGNING DATA CENTERS & SERVER ROOMS

Server Room, Data Centre Management and Monitoring Solutions

PowerGem Pro Uninterruptible Power Supply

National Aluminium Co. Ltd.

Access Control and Operating Conditions Monitoring System for Telecommunication and Server Racks

MARULENG LOCAL MUNICIPALITY

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

Why Choose Go4Hosting Data Center?

Data Centre Testing and Commissioning

Energy Efficient Server Room and Data Centre Cooling. Computer Room Evaporative Cooler. EcoCooling

Portable Energy Efficient Data Centre Solution

Building a data center. C R Srinivasan Tata Communications

Global Data Center & Colocation Facilities

on-line LOCAL AREA NETWORKS (LAN) SERVERS DATA CENTERS internet centers (isp/asp/pop) industrial plcs industrial applications

ISS Data Centre Server Hosting. Service Description

On Telecom Hosting and Colocation Data Centre Solutions

The evolution of data connectivity

SiteRanger tm. Power quality / site monitoring. Comm/net Systems, Inc.

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

Data Centers in Hong Kong Powering business success

Colocation. Scalable Solutions for a Shared IT Infrastructure. Enterprise. Colocation

Network Router Monitoring & Management Services

Colocation. Scalable Solutions for Shared IT Infrastructure. Enterprise. Colocation

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

Alarm and Detection/Suppression

OCDC. OMNIconnect Data Centre.

Transcription:

JT First Tower Lane Data Centre Facility Product Description JT s Data Centre Hosting Service provides a secure computer room enviroment with protected incoming power supplies, state-of-the-art security and a fully resilient network providing the latest IP and networking solutions. Data centre specification JT s Data Centre provides a secure, environmentally controlled and protected facility, with reliable connectivity providing: Dual fed UPS (10 minutes battery autonomy at full load) Generator backup (24 hour diesel supply) Fully redundant air conditioning system VESDA early warning fire detection Temperature and humidity sensors Water detection sensors FM 200 Gas Suppression Rack specification All racks are lockable and designed to accommodate multi-vendor servers and are compliant with IBM, Compaq, Dell, Hewlett Packard and Sun: Earth continuity Dual power distribution units (2x 32 amp circuits) Dual redundant UPS (10 minutes battery autonomy at full load) Cable management strip per unit 600 x 1000 mm rack space All racks in the Data Centre are connected to a centralised switching environment with 10/100 Mbps/1 gig. Ethernet or fast Ethernet presentation provided. VLANs can also be provided. 01 Contact our Business Solutions team T: 882 345 E: business.solutions@jtglobal.com W: www.jtglobal.com

Data Centre - Air conditioning Climate control for the Data Centre is provided by 7x Denco 90 (KW) units and 7x Airedale 85 (KW) units. Each of these units circulates 5.6 cubic metres of air per second. The total cooling for the Data Centre is 1225 (KW). The air conditioning in the Data Centre is retained at an N+2 situation ensuring that if one air conditioning unit fails there is sufficient cooling capacity provided by other air conditioning units. Power room - Air conditioning The power room has its own air conditioning units, which are independent of the cooling system for the Data Centre. To ensure that the UPS is kept in the optimum climate 3 Stulz Comptrol 1002 units have been installed. Electricity JT has its own electricity substation, which is dedicated to providing the power supply to the whole site. The local electricity company has provided this Data Centre with separate 1000KW electrical supplies which are diversely fed from HV network. Data Centre The power to the facility is fed by separate 1 MVA transformers. Each cabinet is supplied with 2x 32 amp single phase supply via separate CPDU s. Provision has been made to accommodate all individual power requests. Generator The Data Centre is supported by five onsite generators which are contained within their individual acoustic housings separate to the Data Centre. Each unit is rated at 400 KW. In the unlikely event of a generator failure these units are configured to N+1 to provide total power resilience. Alarmed components Action taken Monitoring Engine run Immediate attention 24/7/365 Engine fail Immediate attention 24/7/365 Low fuel Immediate attention 24/7/365 Low water Immediate attention 24/7/365 Battery charger fail Immediate attention 24/7/365 Test Off load Full load Frequency 4 weekly Yearly 02

Fuel storage Each generator has its own integral 24 hour fuel tank. UPS 2x Chloride 800KVA units, 3 phase in, 3 phase out, full on-line, double conversion UPS units, each supplies 10 minutes battery autonomy with 400 sealed for life batteries. The UPS equipment has been configured with 12 pulse rectifiers and 5% harmonic input distortion filters. The UPS units have been configured as a N+N UPS having both static and manual bypass capabilities. In addition there is a further external, total wrap around 800 amp rated by-pass system, complete with its own independent mains supply. The power output of the system is configured as 960 KVA for Data Centre 01 and 930 KVA for Data Centre 02; the run time is 8 minutes per UPS at 98% load, which is variable to the level of applied load. Every 3 months the level of applied load and characteristics are examined on the UPS. Security systems The facility is protected by a Europlex 3GS combined intruder and door access control system, utilising door contacts and dual technology movement detectors, which all report back to a centralised 3GS system with its onward connected signalling. Access is controlled by HID proximity fob readers with entry into the Data Centre by combined individual fob and PIN code. In addition, a digitally recorded CCTV system is installed with cameras viewing all entrances into the Data Centre. All information recorded by the system is downloaded and stored on to a hard disc digital recording system. The systems are maintained by Computer Protec and are checked at six-month intervals. Computer Protec provide JT with reports of maintenance visits detailing the status of the system and highlighting any errors found. As well as CCTV, JT Data Centres have twice nightly security patrols which changes to 4 times per day on Saturday and Sunday. Fire detection Data Centre 02 is protected by a sophisticated particle detection system, the Very Early Smoke Detection Apparatus (VESDA) LaserPLUS system has been installed. This system detects fire at the earliest possible stage by drawing in air through a network of air sampling pipes. The detection chamber uses a Class 1 laser to achieve the optimum response to a vast range of smoke types. Using unique detection principles, the LaserPLUS has a sensitivity range of 0.005-20% obscuration/m. These systems are constantly monitored by our Network Operations Centre (NOC). 03

Gas suppression In addition to protection provided by the VESDA laser system, the Data Centre is equipped with an FM-200 Fire Suppression agent. FM-200 has zero ozone depleting potential, and is typically deployed where an electrically non-conductive medium is needed, and people compatibility is an overriding factor. FM-200 is a colourless, liquefied compressed gas. It is stored as a liquid and dispensed into the hazard as a colourless, electrically nonconductive vapour that is clear and does not obscure vision. It leaves no residue and has acceptable toxicity for use in occupied spaces at design concentration. FM-200 does not displace oxygen and therefore is safer for use in occupied spaces without fear of oxygen deprivation. FM-200 is chosen to protect occupied areas such as computer rooms and the telecommunications market, as it out performs the majority of other gaseous systems in terms of speed of reaction to fire. FM-200 is effective within 10 seconds of initial discharge. Benefits and features Fast and effective No significant reduction in oxygen levels Clean gaseous agent leaving no residue Zero ozone depleting potential Short atmospheric life span Electronically non-conductive Safe for use in fully occupied areas Extensively tested, recognised and approved worldwide Telecommunication connectivity Two diverse fibres routed from the North and South of the island to separate redundant ODF s. The facility is connected to the JT network and as such the complete JT portfolio of connectivity services (both fibre & copper) is available and includes all types of Private Circuits, ADSL services, telephony lines and Internet Backbone bandwidth services. 04