ARC Industry Forum, Orlando 2/13/2014. Overview. Martin Swaine 4D Program Manager, Shell P&T (Projects & Technology) Shell International

Similar documents
RULES OF CREDIT FOR EWP S WHY GO THERE??? Presenter Glen Warren Co-Chair COAA WFP Committee

RT319 Validating Advanced Work Packaging as a Best Practice A Game Changer

Importance of Construction Management in Project Execution

INNOVATION EMPOWERS. CONSTRUCTABILITY AND CONSTRUCTION PLANNING BY ADOPTING STATE OF THE ART ENGINEERING AND CAD TECHNOLOGY

HEDCO Total Management Solution

Accenture Management Consulting. Open Roles

Vendor Interaction Portal a practical example for Business Process Management at BASF

Project Materials Control

Procurement and Supply Chain In a Work Face Planning Environment

Integrating the Marine Enterprise

WORKFACE PLANNING CONFERENCE WFP IS MAKING IT HAPPEN. PROJECT PLANNING A CASE STUDY Wayne Cusitar, P.Eng., MBA

ERP Software for: MTO / ETO Manufacturers

Business Challenges. Customer retention and new customer acquisition (customer relationship management)

5 Best Practices for SAP Master Data Governance

1.040 Project Management

Engineering, Procurement and Construction (EPC) Projects

SMARTPLANT ENTERPRISE

CAD/CAE systems and cost engineering

Industry Solutions Process Manufacturing Flexible and Agile Engineering Document Control for Efficient, Safe and Compliant Plants

SOLUTION BRIEF: CA CLARITY GRANTS MANAGER. CA Clarity Grants Manager

Deloitte and SuccessFactors Workforce Analytics & Planning for Federal Government

ERP vs. PLM: What s the Difference?

PROCUREMENT, FABRICATION & CONSTRUCTION

Transportation Management

IT Service Management. The Role of Service Request Management

MADE2MANAGE ENTERPRISE RESOURCE PLANNING. WE OWN THE SHOP FLOOR Plan, schedule, execute and track with an industrial strength feature set.

Effective Materials Management

Construction Industry Institute (CII) Best Practices Course for Construction Management Programs

AVEVA NET Accesses and Manages the Digital Asset. Executive Overview Project Risk: Inaccessible, Unreliable Information... 4

Software Development Moves from a Craft to an Engineering Discipline Using the Essence Standard

Job Manager for Metal Fabrication

Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL.

Evaluating Your Inbound Supply Chain

#KPMG Ignite. Join the conversation

ORACLE PROJECT MANAGEMENT

Data Quality Governance: Proactive Data Quality Management Starting at Source

Visual Enterprise Architecture

Customer Master Data: Common Challenges and Solutions

CA Clarity PPM pro Business PMO a IT PMO. Petr Běhávka CA Technologies, Principal Consultant

26/10/2015. Enterprise Information Systems. Learning Objectives. System Category Enterprise Systems. ACS-1803 Introduction to Information Systems

Endeavour Dynamics Offering

MANUFACTURING EXECUTION SYSTEMS VS. ERP/MRP

The CFO s motivation...

ACS-1803 Introduction to Information Systems. Enterprise Information Systems. Lecture Outline 6

September 17, 1:00 PM. Dean Sorensen, Founder, IBP Collaborative

Accenture Enterprise Services for Metals. Delivering high performance in enterprise resource planning

The Software-defined Data Center in the Enterprise

Connecting your global manufacturing company NEXT»

ERP. Key Initiative Overview

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

State of Michigan Department of Technology, Management & Budget

SELECTING SOFTWARE FOR AIM: ASSET INFORMATION MANAGEMENT

Virtualization. Key Initiative Overview

Career Management. Making It Work for Employees and Employers

Tax technology Megatrends and the impact on tax functions January 2014

PS.12. 4D Scheduling A Case Study

Reduce Engineering Project Complexity

IFS Applications for the Oil & Gas industry

Project driven supply chain in complex MRO services Oracle e-business suite

The Purchasing Process

Morris S. Stover, P.E. Sponsor, Transmission Area

Project and Portfolio Management for the Innovative Enterprise

e Brochure of Caliber Tech Solutions Pvt. Ltd.

Agenda. Project Management Pain Points. Solution Option Highlights. The Dark Side. Discussion. Identify your business needs / requirements

Just-In-Time Manufacturing Management System. Get all your manufacturing operations managed more effectively

A Provance White Paper

Provide Outsourcing services In the areas of Engineering Design & Project Management Consultancy Services

Key Challenges in Implementing the Enterprise Asset Management system

ORACLE PROJECT PLANNING AND CONTROL

Supply Chain Optimization

Project Management Guidelines

Offshore Engineering Data Harvey Johnman November 2013

GE Fanuc Production Management Software

SOA MATURITY MODEL. SOA Blueprint A structured blog by Yogish Pai

Asset and Lifecycle Management

EMC DOCUMENTUM Capital Projects Express. KEEP YOUR PROJECTS ON TRACK Flexible Document Control for Agile Teams

At the Heart of Connected Manufacturing

A Leading Provider of Engineering Information Management Solutions and Services. Facilitating multi-office, multi-contractor execution strategies

Technip Data Management Journey. IPMA Italy. Jean-Luc Brunat VP, Business Support Functions & Group Data Systems Group IT. Rome, December 3 rd 2013

1.1 Identification This is the Subcontractor Management Plan, document number XYZ035, for the SYSTEM Z project.

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Process, Power and Marine Division

The Extended Oil & Gas Supply Chain

CASE-IN-POINT: AVAYA'S SUPPLY CHAIN TRANSFORMATION - ENABLED BY A VISION FOR PEOPLE, PROCESS, AND TECHNOLOGY

Supply Chain Analytics and Data Management Deloitte Consulting Perspectives. June 4, 2009

Application Overhaul. Key Initiative Overview

MANAGING RISK IN OUTSOURCED MANUFACTURING. An E2open White Paper. Contents. White Paper

your project controller

Welcome to Overcoming Small Business Challenges In Today s Federal Marketplace

Achieving high performance with Accenture s on-demand solution for the chemical industry. Driving business performance with SAP Business ByDesign

How To Implement An Enterprise Resource Planning Program

Transcription:

ARC Industry Forum, Orlando 2/13/2014 Overview Martin Swaine 4D Program Manager, Shell P&T (Projects & Technology) Shell International

2001, CII Formed Fiatech Realize Best of What Is! Realize Best of What Could Be!

AIM Project Objective Realize immediate and tangible benefits by making implementations of AWP on projects reliable. AIM Participants: Shell, Dow, Chevron, Construct-X, AVEVA, Fiatech, Hatch, Zachry, Jacobs, Bentley, Black & Veatch, University Of Texas Austin, Others

AIM Motivation CII Identified Potential Up to 25% increase in productivity Reduction in TIC of 4-10% Predictability / Visibility Safety Benefits Identified Barrier Data Provisioning

Current Approaches to WFP/AWP WFP Project Mandates Contractors Perform WFP Project Considers Use of IT Tool to Support AWP Information Reqs & IT Systems Arch Are Not Clear Project Resorts to Manual Dev of Work Packs Results are Sub-Optimal & Potential Not Achievable

Current Approaches to WFP/AWP AWP Project Mandates Contractors Implement AWP (with technology) Automation Tool to Support AWP is Selected Project Data Deliverables are Not Clarified in Contracts Work Project Packs Use Are of Automation Developed But Tool Completely Likely Remain Misses Highly the Mark Static Expectations of AWP Implementation May Not be Met

AIM Approach to WFP/AWP AWP & Project Data Contracts Specify AWP and Requisite Project Data As Deliverables People, Work Process and Technology are Aligned for AWP Consolidated and Validated BOM/MTO is Fed to IT Tools to Support AWP Works Packs Remain Agile and Sync ed with Engineering Revisions AWP is Reliable with Improved Productivity, Predictability & Safety

AIM Phase 1 Objectives Draft framework for contractually specified project data deliverables. Analysis of typical data exchanges that should be contractually specified based upon data needed by project stakeholders across organizational boundaries. Development of draft documents for the key data exchanges e.g. structural steel Layout Information Resource Pools, Producers and Consumers.

Phase 1 Focus - Structural Steel

Phase 1 Focus on Structural Steel (End-to-End) Path of Construction Structural Analysis Scheduling Structural Detailing Steel Fabrication Engineering Design Estimating Procurement IWP Development Site Materials Management Qty Tracking / EVR Turnover Shipping / Logistics Field Installation QA/QC Commissioning

Project Scenario - Stakeholders Owner EPC Steel Fabricators Pipe Fabricators 3 rd Party Logistics Civil Contractor Mechanical Contractor Electrical Contractor

Project Scenario - Application Silos Owner 3D CAD ERP EPC Structural Analysis 3D CAD Estimating Scheduling Procurement Qty Tracking Turnover Packages Fabricators Structural Detailing Steel Fab MRP 3 rd Party Logistics Logistics Tracking Vendor Portal Mechanical Sub-contractor WFP Qty Tracking Site MMS QA/QC

Project Scenario - Data Exchanges 1. Alignment of Engineering and Procurement with Construction 2. Structural Steel Detailing Data from Fabricator 3. Consolidated & Validated BOM / MTO 4. Schedule and Cost Estimates by CWP 5. Fabrication Tracking and Advanced Shipping Notices 6. Material Receiving at Site 7. IWP Execution Plan and Sequence 8. Material Trial Allocation by IWP 9. Logistics Expediting for Material Shortages 10. Material Reservation and Issuance by IWP 11. Field Progress of IWP Execution 12. Schedule Roll-Up and EVR from IWP Progress 13. QA/QC of Steel Installation 14. Turnover of Steel Data to Operations

Owner Data Exchanges Structural Steel Detailing & Consolidated BOM/MTO EPC 3D CAD Fabricators Structural Detailing 3 rd Party Logistics Mechanical Sub-contractor WFP Qty Tracking Site MMS QA/QC

Data Exchange Logistics Expediting Owner EPC Procurement Fabricators 3 rd Party Logistics Mechanical Sub-contractor Steel Fab MRP Logistics Tracking WFP Vendor Portal Site MMS

Owner Data Exchange Field Progress & Roll-Up to Level 3 Schedule EPC Scheduling Qty Tracking Fabricators 3 rd Party Logistics Mechanical Sub-contractor WFP Qty Tracking QA/QC

Attend Fiatech Vision 2020 Technology & Showcase - over 6 hours directed at AWP and AIM and/or Contact Reg Hunter (hunter@fiatech.org) Top 3 takeaways 1. Over 40 presentations 2. 8 pre & post conferences 3. 40 exhibitors Presentations: Speakers: Joseph Grenny Larry Smith Anirban Basu Jack Ulrich Dow AREVA CH2MHILL Zachry Fluor CCC Bechtel Kiewit Shell Chevron Saudi Aramco Petrobras CNARIO Beck Group KBR Top Quadrant EPRI Microsoft WorleyParsons Southern Company DPR ExxonMobil BASF KaiserPermanente Copyright 2014. All rights reserved