MDOT Construction Field Services Update. 2013 MDOT LAP/Consultant Construction Kickoff Meetings



Similar documents
NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

Inspections: Central Laboratory of the Regions

CHAPTER 4 CONCRETE TRAINING AND QUALIFICATIONPROGRAM

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Quality Assurance Procedures for Construction and Materials Sampling and Testing 14

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

Quality Assurance Program for Design-Bid-Build Projects. January by Texas Department of Transportation 512/ All Rights Reserved

QUALITY ASSURANCE PROGRAM

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

Work Type Definition and Submittal Requirements

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

Construction Management Program

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Soils and Aggregates Division

Project Procedures Guide. Sampling Frequencies for Materials Testing and Inspection

CONSTRUCTION INSPECTOR CERTIFICATION PROGRAM

High-Speed Nondestructive Testing and Intelligent Construction Systems

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

1. Is it required that each company that bids on this RFP be pre-registered or pre-qualified prior to bidding?

Section 100 Contractor Quality Control Program

CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) FINAL AUGUST 2015

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING Subdivision Improvement Performance Bond Requirements

Table of Contents. Introduction and Purpose Technician Certification Programs... 4

MATERIALS CERTIFICATION SCHOOLS

MATERIALS CERTIFICATION SCHOOLS

MATERIALS CERTIFICATION SCHOOLS 2016

Field Density Determination of Asphalt Concrete by the Coring Method

Quality Assurance Program. June by Texas Department of Transportation (512) all rights reserved

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

C. Section TESTING LABORATORY SERVICE.

Asphaltic Wedge Paving

LOCAL PUBLIC AGENCY (LPA) QUALITY ASSURANCE PROGRAM

HIGH TENSION CABLE BARRIER

Quality Assurance/Quality Control Plan. Division of Transportation Solutions

OCCUPATIONAL GROUP: Facilities Support. CLASS FAMILY: Facility Management CLASS FAMILY DESCRIPTION:

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

ODOT Inspection Certification Program

Example Specification for Concrete using Current Building Code Requirements

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Acceptance Codes APPENDIX - A. Acceptance Criteria

e-construction Lead State Profiles

Construction Contract Administration and Technology Updates

Appendix. Change Management Plan. Communication Plan. QA/QC Plan. Transition and Closure Plan C-1

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS

ADMINISTRATIVE MANUAL FOR CONSTRUCTION TECHNICIAN TRAINING AND CERTIFICATION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT

Pennsylvania Asphalt Improvement Network (PASIN) Hot Mix Asphalt Industry Baseline Assessment Report. December 2006

PROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES

Quality Assurance QUALITY ASSURANCE PLAN

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Special Inspector Qualification Michael Roach, P.E., Building Official

Office of Construction and Innovative Contracting Technical Certification Unit. Technical Certification Handbook 2016

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Hot Mix Asphalt Test Result Verification and Dispute Resolution

General Contractor Pre-qualification Requirements

CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES

Getting Connected with the Colorado Department of Transportation (CDOT)

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

VDOT GOVERNANCE DOCUMENT

MDOT Prevailing Wage Compliance

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.

Asphalt Pavement Association Of Michigan Selecting the Right Mix Atrium Drive, Suite 202 Okemos, MI

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

Section 5.6 QUALITY CONTROL PROGRAM

Asset Maintenance Bridge Emergency Response

RFP No R PERSONAL COMPUTER, LAPTOP, TABLET, PHONES, AND PRINTER TECHNICAL SUPPORT. ADDENDUM NO. 2 October 21, 2015

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

MoDOT Quality Oversight Plan

INTRODUCTION: PURPOSE:

Quality Management Plan

Electronic Signature How To Guide

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

SUBCONTRACTOR Pre-Qualification Form

Transcription:

MDOT Construction Field Services Update 2013 MDOT LAP/Consultant Construction Kickoff Meetings

Topic Overview Contract Administration Issues & Trends e-construction Documentation Buy America

Construction Issues Topic Overview (continued) Geotechnical/Density Paving Concrete and Hot Mix Asphalt (HMA) Notifications and Where to Find Documents Breaking News

Contract Modifications BOH-IM 2012-03 Processing Contract Modifications Timeliness Consulting with TSC Construction Engineers Timelines e-sign

Contract Modifications STC/SAB Process > 200 days Current Requirements BOHIM 2012-03 Maximum approval 64 days for Tier III Additional Oversight Signatures Mandatory Local Agency signature Tier III Average Time 39 days handwritten signatures 6 days electronic signatures

e-sign Contract Modifications Tier I e-signed contract modifications can be approved within minutes Eliminates mail time e-sign has minimal cost Can t refuse e-sign (via e-sign Act 6/2000) Contractors being paid 4-5 times faster

Timely Progress Payments BOH-IM 2012-12 Timely Progress Payments Pay in whole for work completed and accepted No Retainage Affects Prompt Payment which is part of the Contract documents

Timely Finaling of Projects Currently collecting statewide best practices Goal is to issue final estimate within 120 days of project acceptance Issues with documentation leading cause of overdue finals

Project Inspection and Onsite inspection Oversight Certified for inspections Final inspections

e-construction 5 Major Components 3D Plans/Model at Bidding (GPS equipment) e-signature Mandatory Paperless Projects (Electronic Records) Contractor submits to ProjectWise (no software) New MDOT e-filing system Saves Time and Cost For MDOT, Contractors, Subs, Suppliers, Local Agencies & Consultants.

e-construction 4 Pilot projects (> $120 million) Direct Cost Savings Immense Time Savings Transparent Accountable Reduced Construction Cost Goal is 2014 Statewide Implementation

Documentation Extension of Time Requests Progress Clauses Maintenance of Traffic

Office Technician Certification BOH-IM 2013-03 Office Technician Certification Requirements For State or Federal Aid Projects must: Current, non-expired MDOT Office Technician Certification on file Expire 4 years from date of certification Includes all similarly titled certifications Part of being Pre-Qualified for Road CE already

Local Agency Force Account BOH-IM 2013-04 Construction Oversight of Local Agency Force Account Essentially the original 1120 stays in the Project Files, maintained by the Local Agency. Local Agency must maintain original 1120 for auditing purposes. Copies of 1120 distributed per the BOH-IM

Buy America Required Documentation Step Certification for Pay Items and Materials that require Step Certification. Step Certification documentation is from company that affects steel/iron. Attention is directed to note list on step cert list. Pay Item List is available at: MDOT Website for Maps and Publications select Manuals and Guides

Buy America Minimal use of foreign steel allowed, greater of the following two values: 0.10 percent of total project cost $2,500 Payment is not to be processed until all Buy America certifications are received by the Engineer, includes stockpile payments Items not on step cert list do not require Buy America documentation

Buy America Qualified Products List, Approved Manufacturers and Tested Stock Construction Field Services maintaining Buy America Certification Field documentation is product label, shipping record, etc. Compliance Document available at: MDOT Website under Maps and Publications select Manuals and Guides

Buy America Clarification letter from FHWA on 12/21/12 BOH-IM 2013-01 Miscellaneous steel components or sub components are not subject to Buy America. For audit purposes always a good idea to print the Step Cert list current for that letting

Geotechnical Subsurface investigation Appropriate Design (site conditions) Depth of Investigation Density Reports Submitted daily to project office for QA review Submitted weekly to Lansing Density Unit and Region Area Density Supervisor

Geotechnical Drilled Shaft Construction New specification 718 in the 2012 SSFC Tremie Pour Checklist MDOT Form 1990 LRFD Plan Notes Pile Forms (1157L, 1161L) Provide final copies not raw data

Paving - Concrete Quality Assurance/Quality Control New Special Provision 12SP604(A) for Local Agency Projects only. Quality Assurance pay item no longer applies Conc Quality Initiative pay item no longer applies All QA calculations made by Agency Costs for QC program and initial curing facilities are included in unit prices for the work no additional payment

Paving - Concrete Concrete Pavement Repairs Maturity Method of Acceptance Beam Breaks with specified minimum flexural strength required. 28 Day Cylinders for acceptance of pavement repair not required. Better definitions Repair versus what is a Replacement.

Paving - Concrete Simplified the concrete patching mixture selection as follows, Less than 72 hours opening to traffic: Grade P-NC at 300 psi flexural strength 72 hours or greater opening to traffic: Grades P1 or P1M at 550 psi opening to traffic strength Note: MDOT Grade HE concrete no longer exists

Documentation Density Paving - HMA Proper documentation must be recorded. Temperature Needs to be recorded on load tickets. Calculations of Yield Many times a number is given but not the calculations that support it. JMF Written up for the project prior to the start of paving.

Paving - HMA Pre-Production meetings QC/QA testing requirements Communication Plan JMF Testing responsibilities

FHWA CAP Program FHWA Compliance Assessment Program (CAP) Random projects selected out of FHWA headquarters. Assigned to random FHWA Staff Picking State and Local projects

FHWA Construction Review Plan Samples of both MDOT and Local Agency Projects Currently updating their Construction Inspection Report form Will cover there standard areas of emphasis and include Special Emphasis Areas

FHWA Construction Review Plan Special Emphasis Areas Review of Pavement Marking Scaring Review of SESC issues Review of Contractor Force Accounts Inquiry of witnessing HMA Binder sampling on Construction Contracts

Job Site Posters Make sure their posted and legible No specific size requirements but you have to be able to read them. Dates must not be cut off as that is how you verify the correct poster Refer to MDOT form 1967 for the Jobsite Poster Checklist.

Document Locations, Notifications, and e-sign Demonstration

e-mail Update Notifications

Questions Scott Greene greenes2@michigan.gov 517-322-5705