Project Cash Flow. Scenario Testing



Similar documents
CHAPTER 6 PROJECT CASH FLOW

CHAPTER 9 PROJECT FINANCE AND CONTRACT PRICING

Project Control. 1. Schedule Updating

Market Size Forecasting Using the Monte Carlo Method. Multivariate Solutions

SENG 380:Software Process and Management. Resource Allocation Part 1

SECTION COST LOADED CRITICAL PATH SCHEDULE

CHAPTER 8 PROJECT TIME-COST TRADE-OFF

Project Management Using Earned Value

A collection of Safran Project report samples for project professionals

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

Module 10: Assessing the Business Case

PMBOK GLOSSARY. Activity Duration Estimating. Estimating the number of work periods which will be needed to complete individual activities.

Cash flow is the life line of a business. Many start-up

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

CSC 443: IT Project Management Midterm 1 exam - Spring semester March 21 st, 2012

CPM -100: Principles of Project Management

Dashboards and Reporting for Program Management

Quantitative Risk Analysis with Microsoft Project

Amajor benefit of Monte-Carlo schedule analysis is to

State of Michigan (SOM) August Department of Technology, Management & Budget

Chapter 12. Aggregate Expenditure and Output in the Short Run

Collaborative Scheduling using the CPM Method

RISK MITIGATION IN FAST TRACKING PROJECTS

FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE. SLIDE 1: Financial and Risk Analysis with RETScreen Software

CPM-200: Principles of Schedule Management

PROJECT COST MANAGEMENT

Pricing of Construction Contract Change Order Documentation

How to Use the Cash Flow Template

Activity Schedules in the NEC3 Engineering and Construction Contract

Buy-back Contract Risk Modeling Using System Dynamics

APPLICATION OF PROJECT MONITORING TOOLS FROM OWNER S PERSPECTIVE

Forecasting cash flow expenditure at pre-tender stage: Case studies in New Zealand construction projects

One-Minute Spotlight. The Crystal Ball Forecast Chart

Cost components. Why estimate? You may ask; why do we need estimates? Estimating can help to: Total project costs. Profit added FINAL BID

Schedule Risk Analysis Simplified 1 by David T. Hulett, Ph.D.

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

Spec. Standard: 11/27/ Revision: 11/27/06

PROJECT RISK ANALYSIS AND MANAGEMENT

Construction Economics & Finance. Module 6. Lecture-1

Subcontractor Involvement Project Tracking Progress Curves. CSTM 462 Fall 2012

CE2451 Engineering Economics & Cost Analysis. Objectives of this course

Project Cost Control: The Way it Works By R. Max Wideman

PROFIT MEASURES FOR CONSTRUCTION PROJECTS

HOW TO PLAY. Copyright 2012 by Harvard Business School Publishing.

RISK FACTORS IN CONSTRUCTION PROJECTS CASH-FLOW ANALYSIS

Contractor s Estimation of Cost and Bidding Strategy. Construction Project Management_Kumar Neeraj Jha

Value for Money Assessment for Public-Private Partnerships: A Primer. December 2012

1 Supplement: IAS 11 Construction contracts

PROJECT TIME MANAGEMENT

The BASICS of CONSTRUCTION ACCOUNTING Workshop GLOSSARY

Cash Flow of High Rise Residential Building

Project Cost Management

Unit 4: Time Management (PMBOK Guide, Chapter 6)

A study of cash flows in projects with fuzzy activity durations

PROJECT TIME MANAGEMENT. 1 Powered by POeT Solvers Limited

Alexandria National Cemetery SECTION NETWORK ANALYSIS SCHEDULE

The work breakdown structure can be illustrated in a block diagram:

Acompany that consistently selects the right projects and

Project Control with ProTrack

Project Cash Flow Forecasting Using Value at Risk

Life Cycle Cost Analysis (LCCA)

Statistical Modeling and Analysis of Stop- Loss Insurance for Use in NAIC Model Act

= C + I + G + NX ECON 302. Lecture 4: Aggregate Expenditures/Keynesian Model: Equilibrium in the Goods Market/Loanable Funds Market

Introduction to Statistical Computing in Microsoft Excel By Hector D. Flores; and Dr. J.A. Dobelman

Heat Transfer Prof. Dr. Aloke Kumar Ghosal Department of Chemical Engineering Indian Institute of Technology, Guwahati

Basics of Cost and Schedule Control

Chapter 1 Job Costing Using WIP Accounts

The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.

A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE

Better decision making under uncertain conditions using Monte Carlo Simulation

Memorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E.

Scheduling Resources and Costs

PROJECT ESTIMATION & CONTROL

Valuation of Your Early Drug Candidate. By Linda Pullan, Ph.D. Toll-free USA Worldwide

Course- Financial Management.

Risk Workshop Overview. MOX Safety Fuels the Future

Schedule Risk Analysis Simulator using Beta Distribution

SENATE FILE NO. SF0026. Employee insurance participation-feasibility study. Sponsored by: Joint Labor, Health and Social Services Interim Committee

MnDOT Project Management Office Presents: Schedule Updates. Presenter: Eric Costantino Senior Schedule Consultant DRMcNatty & Associates, Inc.

Project Time Management

Certification Program on Corporate Treasury Management

CHAPTER 6 FINANCIAL FORECASTING

Project Cost Management

PN /16/ CRITICAL PATH METHOD PROGRESS SCHEDULE

CISC 322 Software Architecture. Project Scheduling (PERT/CPM) Ahmed E. Hassan

10.1 Communications Planning 10.2 Information Distribution Figure Performance Reporting 10.1 Communications Planning 10.

EXHIBIT 2-2-C PROGRESS SCHEDULES

Project Control System Manual. Jefferson Science Associates, LLC. 600 Progress Status. Project Control System Manual Revision

Project Management Glossary

WORK PROGRAM GUIDELINES

CRASHING-RISK-MODELING SOFTWARE (CRMS)

Certificate In Project Management (CIPM)

Review on Using Packages to Enhance the Teaching of Critical Path Networks

Transcription:

Project Cash Flow By Dr. Ibrahim Assakkaf The Need Scenario Testing Cash flows can be estimated by attempting to assess flows from 1. Project in progress. 2. Projects under contract but not yet begun. 3. Potential projects which will start during the coming financial accounting period. 1

Scenario Testing The Need (cont d) These sources of income can be viewed as: 1. Birds in the hand. 2. Birds in the bush, and 3. Birds flying the sky. In other words, cash flows can be projected from projects in progress and projects which may, with some probability, start in the coming period for which forecasts are being made. The Need (cont d0 Scenario Testing The advent of spreadsheet analysis and high speed computers has led to scenario testing of future cash flow expectations. 2

The Technology Spreadsheet (can do probabilistic cash flow projections) More advanced analysis can also factor in historical evidence of payment trends and potential impact of macroeconomic factors. These techniques can go beyond the typical best-, expected-, and worst-case scenario modeling. The Technology These techniques may also rely on monte Carlo simulation, Markov modeling, or the use of fuzzy data sets to build up statistically valid outcomes. This level of analysis used to be in the economist s realm, but is now commonplace in the future in the finance and business development groups of corporations. 3

Cash Flow Projections Life of a project can be used to develop the projection of income and expense during this project life. Complexity of the project obviously has an affect on the method used. In many contracts (e.g., public contracts such as those used by state agencies), the owner requires the contractor to provide an S-curve of estimated progress and costs across the life of the project. Cash Flow Projections The contractor develops this by constructing a simple bar chart of the project, assigning costs to the bars, and smoothly connecting the projected amounts of expenditures over time. Consider the highly simplified project of the next slide in which four major activities are scheduled across a four-month time span. 4

Figure 9.1 (p. 148) Development of the S-Curve. Cash Flow Projections Bars representing the activities are positioned along a time scale indicating start and finish times. The direct costs asociated with each activity are shown above each bar in the figure. It s assumed that the monthly cost of indirect charges (i.e., site office costs, telephone, heat, light, which cannot be charged directly to an activity) is $5,000. 5

Cash Flow Projections Assuming that the direct costs are evenly distributed across the duration of the activity, the monthly direct costs can be readily calculated and shown below the time line in the figure. The direct charges in the second month, for example, derive from activities A, B, and C, all of which have a portion in the period. Cash Flow Projections The direct charge is simply calculated based on portion of the activity scheduled in the second month as: 1 Activity A : 50,000 = $25,000 2 1 Activity B : 40,000 = $20,000 2 1 Activity C : 60,000 = $20,000 3 $65,000 6

Cash Flow Projections The figure shows the total monthly and cumulative monthly expenditures across the life of the project. The S-curve is nothing more than a graphical presentation of the cumulative expenditures over time. A curve is plotted below the time-scaled bars through the points of cumulative expenditures. Cash Flow Projections As activities come on-line, the level of expenditures increases and the curve has a steeper middle section. Toward the end of a project, activities are winding down and expenditures flatten again. 7

Cash Flow to the Contractor The flow of money from the owner to the contractor is in the form of progress payments. As already noted, estimates of work cmpleted are made by the contractor periodically (usually monthly) and verified by the owner s representative. Depending on the type of contract (e.g., lump sum, unit price, etc.), the estimates are based on evaluations of the percentage of total contract completion or actual field measurements of quantities placed. Cash Flow to the Contractor This process is best demonstrated by further consideration of the four-activity example just described. Assume that the, contractor originally included a profit or markup in his bid of $50,000 (i.e., 25%) so that the total bid price was $250,000. The owner retains 10% of all validated progress payment claims until one-half of the contract value (i.e., $125,000) has been built and approved as an incentive for the contractor to complete the contract. 8

Cash Flow to the Contractor The retainage will be deducted from the progress payments on the first $125,000 and eventually paid to the contractor on satisfactory completion of the contract. The progress payment will be billed at the end of the month, and the owner will transfer the billed amount minus any retainage to the contractor s acount 30 days later. Cash Flow to the Contractor The amount of each progress payment can be calculated as: Pay = 1.25 (indirect expense + direct expense) = - 0.10 [ 1.25( indirect expense + direct expense) )] 9

Cash Flow to the Contractor The minus term for retainage drops out of the equation when 50% of the contract has been completed. Because of the delay in payment of billings by the owner and retainage withheld, the revenue profile lags behind the expense S-curve as shown in the following figure of the next slide. Figure 9.2 (p. 149) Expenses and income profiles. 10

Cash Flow to the Contractor The revenue profile has a stair-step appearance since the progress payments are transferred in discrete amounts based on the preceding equation. The shaded area of the previous figure between the revenue and expense profiles indicates the need on the part of the contractor to finance part of the construction until such time as he is reimbursed by the owner. Figure 9.3 (p. 150) Influence of front, or mobilization, payment on expense or income profiles. 11

Table 9.1 (p. 151) Overdraft calcuations. Figure 9.4 (p. 152) Plot of maximum overdraft. 12

Figure 9.5 (p. 153) Composite overdraft profiles. Figure 9.6 (p. 153) ROR for small bar chart problem. 13

Table 9.2 (p. 154) ROR Calculations for Small Project. Figure 9.7 (p. 154) ROR for small bar chart problem with mobilization payment. 14

Table 9.3 (p. 155) Overdraft Calculation with Mobilization Payment Table 9.4 (p. 156) ROR Calculations to Include Mobilization Payment 15

Problem 9.1 (p. 156) Problem 9.2 (p. 157) 16

Problem 9.3 (p. 157) Problem 9.4 (p. 157) 17