Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA

Similar documents
Pressure Equipment Certification. Ensure the Conformity and Quality of Your Pressure Equipment. Worldwide.

Quality Management System-A Revision 7 (NRC-approved Version)

Review for S, A, PP, E, M, H (other than Cast Iron and/or Cast Aluminum), HLW, U, UM, U2, U3, RP, PRT and T Certificates

1 RCNY CHAPTER 100

SECTION III DIVISIONS 1 AND 2

Supporting New Build and Nuclear Manufacturing in South Africa

National Board of Boiler and Pressure Vessel Inspectors Application for the Inservice or Owner-User Commission

Valve Services. Comprehensive. Dynamic. Flexible.

2. Be sure to fill out all applicable pages of this application completely. Use additional pages, if necessary.

May 9, 2013 SUBJECT: FINAL SAFETY EVALUATION FOR TECHNICAL REPORT NEI 11-04, QUALITY ASSURANCE PROGRAM DESCRIPTION, REVISION 0

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

Owner-User Pressure Equipment Integrity Management Requirements

Quality Assurance Source Requirements Traceability Database. Ram Murthy. Anna Naydenova

How To Make A Pressure Relief Valve

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls

The World Nuclear Supply

STANDARD REVIEW PLAN

SPED Piping Certification Guide (Revised: 12/05)

August 24, 2009 NRC INSPECTION REPORT / AND NOTICE OF VIOLATION TO JAPAN STEEL WORKS

Quality Assurance QUALITY ASSURANCE PLAN

Rules for Certified Individuals

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

Software Review Job Aid - Supplement #1

SECTION III, DIVISIONS 1 AND 2

Recertification CARD No. 22 Quality Assurance

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

9. QUALITY CONTROL/QUALITY ASSURANCE

ASME QRO Certification Program

TRAINING AND QUALIFICATION OF PERSONNEL RWAP-04

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

Model Safety Program

Presented For CHINA-PHARM 2008 Beijing, China PRC

How To Determine An Operating Safety Certificate

INDUSTRIAL SERVICES PRESSURE EQUIPMENT CERTIFICATION (PED) Pressure equipment certification. Your key to market access in Europe.

QT-2 QUALITY MANUAL Written to the requirements of ASME NQA & 09a and 10 CFR Part 21. Revision: 14

FIVE YEAR CERTIFICATION REPORT

ABSTRACT. The Guidelines Section A is related to the general requirements of NSQ100 (Chapters 0, 1, 4, 5 and 6). Summary

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Course available 24/7 for up to six months from the date of purchase or until completion

VDOT GOVERNANCE DOCUMENT

General Rules for the Certification of Management Systems Code: RG

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

ABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary

General Rules for the certification of Management Systems

BLADDER SURGE CONTROL SYSTEM

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

Recommended Administrative Boiler and Pressure Vessel Safety Rules and Regulations

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

Qualification of Auditor and Lead Auditor to perform an assessment according NSQ-100

Pressure Piping Construction Requirements

STEEL fabrication quality SySTEmS guideline

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

MD 7.5 ETHICS COUNSELING AND TRAINING DT-10-10

ICC EVALUATION SERVICE, LLC, RULES OF PROCEDURE FOR EVALUATION REPORTS

GENERAL OPERATIONS MANUAL FOR ASTM PRODUCT CERTIFICATION PROGRAM

SECTION III DIVISIONS 1 AND 2

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

NRC INSPECTION MANUAL INSPECTION PROCEDURE 88045

NRC INSPECTION MANUAL

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Attachment 5 Electrical Engineering

PRESSURE EQUIPMENT SAFETY REGULATION

Design, Inspection, Testing and Repair of ASME-Coded Pressure Systems and Safety Relief Valves

TNRCC WATER QUALITY INVESTIGATOR TRAINING PROGRAM

Chapter EDITION. Plumbers Insurance required of certain providers of low-flow showerheads or faucet aerators

Section 1. Overview of Relationships and Responsibilities

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

CLARK COUNTY DEPARTMENT OF BUILDING & FIRE PREVENTION 4701 W. Russell Road Las Vegas, NV (702) Fax (702)

POWER & RENEWABLE ENERGY SERVICES

Quality Management Systems & Certification Consulting

Options for Cyber Security. Reactors. April 9, 2015

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and

Section i POLICY AND AUTHORITY STATEMENT

1. Organization and Management of UNR Safety Programs

Quality Assurance Procedures for Construction and Materials Sampling and Testing 14

Doc Edition Section Question Answer Q1 9th /

DoES-QW2 Suitability Assessment Declaration

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS

The city of Milwaukee s Sample Preventative maintenance manual for Electronically monitored boilers

Term Final Definition or Clarification Original or Source Definition Source Comment

Certification Procedure of RSPO Supply Chain Audit

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

Essentials Welding QA/QC Plan Sample

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

On-Site Risk Management Audit Checklist for Program Level 3 Process

SERVING THE NATIONS LEADING COMPANIES

September 20, 2011 SUBJECT: NRC INSPECTION REPORT NO / AND NOTICE OF NONCONFORMANCE

Transcription:

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA ASME Vice President, Conformity Assessment and Vice Chairman of Committee on Nuclear Certification 2nd NRC Workshop on Vendor Oversight for New Reactor Construction Thursday June 17, 2010 New Orleans, LA 1

ASME Survey Process: NCA 3800 and NCA 4000 2

Topics 1) Status of ASME Certificate Holders 2) Nuclear Certifications issued by ASME 3) US Regulation/Code of Record 4) Program Requirements 5 Types of Certification 6) ASME Accreditation/Authorization Process 3

Nuclear Certificate Holders Globally as of March 2010 there are 247 Companies that hold 645 Nuclear Certificates. This includes N- Type and QSC holders Fifty-Two percent (52%) of the issued Nuclear Certificates or 334 are issued to 117 Companies who are located outside of North America. 4

HSB Global Standards 30 Year Nuclear Certificate Holder Trend 00 00 00 00 ~ ~\ - \,\ ----.- ---+--- ---- Total USA International 00 00 \ " - ~./ "- ~ --- ---... ~ ~... 0 1980 1985 1990 1995 2000 2005 2010 Year [Data through April 30, 2010] 5

Accreditation/Survey Process 6

Certifications N Certificate Vessels, Components, Piping Systems, Pumps, Storage Tanks NV Certificate Pressure Relief Valves NPT Certificate Parts, Appurtenances, Welded Tubular Products, Piping Subassemblies NA Certificate Assembly of all items NS Certificate Supports Quality Systems Certificate Materials (QSC) Own Certificate- Nuclear Plant Owner 7

10 CFR 50 Regulation Requirements Endorsement and application of Code editions and addenda are listed in 10CFR50.55 a Currently Section III of the ASME Boiler and Pressure Vessel Code referred to is the 1963 Edition through 1973 Winter Addenda, and the 1974 Edition (Division 1) through the 2004 Edition (Division 1), subject to the limitations and modifications: When applying editions and addenda later than the 1989 Edition of Section III, the requirements of NQA-1, "Quality Assurance Requirements for Nuclear Facilities," 1986 Edition through the 1992 Edition, are acceptable for use provided that the edition and addenda of NQA-1 specified in NCA-4000 is used in conjunction with the administrative, quality, and technical provisions contained in the edition and addenda of Section III being used. 8

Establish Code of Record ASME Code (NCA-1140) requires that In no case shall the Code Edition and Addenda dates established in the Design Specifications be earlier than: (a) 3 years prior to the date that the nuclear power plant construction permit application is docketed; or (b) the latest edition and addenda endorsed by the regulatory authority having jurisdiction at the plant or site at the time the construction permit application is docketed; or (c) the edition and addenda endorsed for a design certified or licensed by the regulatory authority. 9

Requirement An ASME Certificate of Authorization is required for companies providing items in accordance with Section III. Items are defined in Section III as: a product constructed under a Certificate of Authorization or Accreditation (supports) (NCA-3120), or material (NCA-1220) An Owners Certificate shall be obtained from ASME (NCA-3230) 10

Program N-type Certificate Holders shall Comply with: ANSI/ASME NQA-1-1994 Edition, Quality Assurance Program requirements for Nuclear Facilities, except as modified and supplemented in NCA-4134 (Except for NS (supports) Certificate Holders) NS Certificate Holders (supports) shall comply with NCA-3680 and NCA-4110(b) No ANI Involvement and Code Stamping 11

Program QSC Certificate Holders shall comply with the Quality System program requirements in NCA- 3850 Similar to NCA-4000 but self contained OWN Certificate Holder shall comply with the requirements of NCA-3230 An interview with the Applicant, the Applicant s Authorized Inspection Agency and the Enforcement Authority (when applicable) at the Applicant s office. 12

Certificate of Authorization Certificate of Authorization Authorization granted by the Society for a three (3) year period The Certificate identifies either shop or field fabrication and each different Code class Certification is for the use of Code Symbol Stamp, certifying a Certificate Holder s Data Report, and performing welding Certificate Holder assumes responsibility for pressure test which is witnessed by the Authorized Nuclear Inspector (ANI) 13

Certificate of Accreditation Certificate of Accreditation Accreditation is granted by the Society for a three (3) year period Issued to an organization that has a documented Quality Assurance Program and whose ability to staff, equip, or otherwise implement the program has been evaluated by the Society Implementation of the program is not necessary No Code Symbol Stamp is issued 14

Quality Systems Certificate Quality Systems Certificate Accreditation granted by the Society for a three (3) year period The Certificate scope identifies manufacturing or supplying ferrous & non-ferrous (may be both) Certification is for the performing material manufacturing or supplying - no Code symbol stamp Authorized to include Certificate Number and expiration date on documents issued Annual audits are required by ASME 15

Evaluation for obtaining a Certificate A Survey by ASME is required to evaluate the Quality Assurance Program of the applicant and the implementation thereof Authorization to apply the Code stamp will be granted only after a satisfactory Survey by ASME. This activity is for the applicant to demonstrate the implementation of the Quality program 16

ASME Accreditation Process The applicant contacts an Accredited Authorized Inspection Agency (AIA) and obtains a contract with them. The Accredited Authorized Inspection Agency will work with the applicant in preparation of the ASME Nuclear Survey 17

ASME Accreditation Process ASME and the Applicant will agree on mutually acceptable dates for the Survey to be conducted. The ASME Team will be assigned only after the following is received by ASME: A completed application from the applicant identifying the requested Certificates of Authorization & Stamps The required monetary deposit Verification from the Accredited AIA that they have a contract with the applicant and the applicant is ready for Survey. Take Note: Scheduling reviews can take up to 8 months 18

ASME Accreditation Process The Applicant is responsible for obtaining concurrence of the Accredited AIA and Enforcement Agency (where applicable) for the review dates Depending on the ASME Survey scope, the activity could take up to 5 days Function Normal schedule Nuclear Survey 3/4 days 19

Process A Certificate of Authorization or Accreditation will be granted by the Society only after satisfactorily demonstrating and implementing the program to the Society ASME Survey Team (N-Type) consists of: ASME Team Leader ASME Team Member ( 2 if international ) Authorized Nuclear Inspector Supervisor Authorized Nuclear Inspector ASME Survey Team (QSC) No AIA personnel 20

Process Survey will be 3-5 days depending on number of locations The first day is usually offsite reviewing QA manual and completed ASME Guide questionnaire. The Team will arrive on-site the second day and should have a dedicated conference room for their work. Entrance Meeting Introduction of Management Possible Orientation Tour of the Shop 21

Process The Team will normally split into two groups One will proceed with a review of the QA manual One will proceed with a audit of the implementation of the QA program and ASME requirements 22

ASME Accreditation Process At the conclusion of the Survey the Team makes a recommendation to the ASME Committee on Nuclear Certification The recommendations will be one of the following: To issue the Certificates of Authorization as requested To issue the Certificates of Authorization as requested after verification from the AIA is received on deficiencies noted during the ASME Survey To require re-survey of the applicant after the required corrections to the program have been made 23

Owners Certificate ASME will arrange for an interview with the Applicant, the Applicant s Accredited Authorized Inspection Agency and the Enforcement Authority (when applicable) at the Applicant s office to discuss the Applicant s Code related responsibilities as outlined in NCA-3200. The Applicant is expected to document their recognition and agreement to abide by these responsibilities in a letter or procedure. 24

This letter or procedure would be either part of or a supplement to the Applicant s Quality Assurance Program required to satisfy NCA-8140. The applicant s Quality Assurance Program will be evaluated by the ASME Team for the controls necessary for the Applicant s scope of activities to be performed by the Applicant. After the interview, the ASME Team Leader will submit a written report to ASME. 25

Owners Certificate This report will be reviewed in accordance with the ASME Committee on Nuclear Certification procedures to determine whether the Owner s Certificate shall be issued by ASME. The ASME Conformity Assessment Department will inform the Applicant of final action taken. 26

HSB Y Global Standards Thank You 27