Plotted: October 31, 2014, 13:51:44 Filename: O:\Proj\ BVP Design & Tender\10.0 DRWINGS\10.5 Structural\10.5.2 Sheet\2511-00512-01.dwg\01 for / pour Parks anada gency Western and Northern Region L'gence Parcs anada Ouest et Nord Région 01
Plotted: October 31, 2014, 10:54:47 Filename: O:\Proj\ BVP Design & Tender\10.0 DRWINGS\10.5 Structural\10.5.2 Sheet\2511-00512-02.dwg\02 TH km 66.9 ESS ROD TO km 69 GRVEL PIT TH km 49.9 ESS ROD TO MNNIX PIT TH km 46.0 HIGHWY 93 SOUTH /STLE MOUNTIN INTERHNGE LBERT-B. BORDER BVP km 24.1 STLE MOUNTIN BVP km 16.6 WEST TURNROUND SITE BVP km 0.3 EST TURNROUND SITE BVP km 0 (TH km 22.3) HIGHWY 1 / BOW VLLEY PRKWY INTERHNGE PROJET LOTION (TH) km 0 EST PRK GTE LOTION MP LONG TERM SIGN PLN FOR BOW VLLEY PRKWY TRVEL RESTRITIONS GUIDE SIGN PLN LOTION PLN ND DRWING INDEX MF N.T.S 02
Plotted: October 31, 2014, 10:54:17 Filename: O:\Proj\ BVP Design & Tender\10.0 DRWINGS\10.5 Structural\10.5.2 Sheet\2511-00512-SP01.dwg\SP01 NOTES: SIGN LOTIONS RE PPROXIMTED SIGN IMGES RE NOT TO SLE NOT LL GUIDE SIGNS RE SHOWN FOR LRITY FRENH TRNSLTIONS SHOWN ON THE LED SIGN PNELS TO BE ONFIRMED PRIOR TO IMPLEMENTTION RESTRITION MONTHS SHUNSHINE ROD INSTLL GREEN BLNK TB INSTLL "NEXT EXIT" TB (JUN 26 TO FEB 28) DURING NON-TRVEL MONTHS (JUN 26 TO FEB 28) NON-TRVEL RESTRITION DURING TRVEL RESTRITION MONTHS (MR 1 TO JUN 25) PROPOSED: 1-E-1-1 TRNS ND HIGHWY (HWY 1) TO LKE LOUISE BOW VLLEY PRKWY (HWY 1) TO JOHNSTON NYON BOW VLLEY PRKWY - LOSED TRVEL RESTRITION MONTHS (MR 1 TO JUN 25) BOW VLLEY PRKWY - LOSED BOW VLLEY PRKWY - OPEN BOW VLLEY PRKWY - PROPOSED: 1-E-1-2 PRKWY - LOSED PROPOSED: 1-E-1-3 OPEN PRKWY - OPEN BOW VLLEY BOW VLLEY EX. 1-E-1-4 REMOVE EXISTING SIGN T GORE ND REPLE WITH PROPOSED 1-W-1-4 GTE EST GTE TURNROUND Km 0.3 REMOVE SIGN BOW VLLEY PRKWY - OPEN BOW VLLEY PRKWY - OPEN BOW VLLEY PRKWY - OPEN BOW VLLEY PROPOSED: 1-W-1-4 BOW VLLEY PRKWY - LOSED PRKWY - LOSED PROPOSED: 1-W-1-3 BOW VLLEY PRKWY - LOSED NON-TRVEL RESTRITION MONTHS (JUN 26 TO FEB 28) BOW VLLEY PRKWY - OPEN BOW VLLEY PRKWY - TRVEL RESTRITION MONTHS (MR 1 TO JUN 25) LOSED PROPOSED: 1-W-1-2 TO BNFF INSTLL "NEXT EXIT" TB DURING NON-TRVEL RESTRITION MONTHS (JUN 26 TO FEB 28) PROPOSED: 1-W-1-1 INSTLL GREEN BLNK TB DURING TRVEL RESTRITION MONTHS (MR 1 TO JUN 25) LONG TERM SIGN PLN FOR BOW VLLEY PRKWY TRVEL RESTRITIONS GUIDE SIGN PLN WITH SOLR PNEL RRY GENERL GUIDE SIGN PLN DL N.T.S SP01
2014-10-31 ISSUED FOR REVIEW KDW MF No. Description/Description Drawn by Dessiné par pproved pprouvé Revision / Revision B detail number numéro de detail source drawing no. de dessin no. detail on drawing no. detail sur dessin no. B onsultant's Stamp Sceau de l'expert-conseil Eng. Stamp Sceau de l'ingénieur lient/client Plotted: October 31, 2014, 10:45:21 Filename: O:\Proj\ BVP Design & Tender\10.0 DRWINGS\10.5 Structural\10.5.2 Sheet\2511-00512-01.dwg\S01 onsultant's Name Nom de l'expert-conseil Project title/titre du projet LONG TERM SIGN PLN FOR BOW VLLEY PRKWY TRVEL RESTRITIONS Drawing title/titre du dessin GUIDE SIGN PLN WITH SOLR PNEL RRY POLE ND BSE DETILS Surveyed by/rpenté par Designed by/oncept par lient cceptance/cceptation du client Project No./No. du projet Drawing Reference No./No. de réference du dessin Drawn by/dessiné par Reviewed by/revisé par Parks anada Project Manager/dministrateur de Projets Parcs anada sset No./No. du-bien pproved by/pprouvé par Scale/Échelle MF NJ S SHOWN Sheet No./ No. de la feuille S01 1 841 x 594 mm
2014-10-31 ISSUED FOR REVIEW KDW MF No. Description/Description Drawn by Dessiné par pproved pprouvé Revision / Revision B detail number numéro de detail source drawing no. de dessin no. detail on drawing no. detail sur dessin no. B onsultant's Stamp Sceau de l'expert-conseil Eng. Stamp Sceau de l'ingénieur lient/client Plotted: October 31, 2014, 10:42:02 Filename: O:\Proj\ BVP Design & Tender\10.0 DRWINGS\10.5 Structural\10.5.2 Sheet\2511-00512-01.dwg\S02 onsultant's Name Nom de l'expert-conseil Project title/titre du projet LONG TERM SIGN PLN FOR BOW VLLEY PRKWY TRVEL RESTRITIONS Drawing title/titre du dessin GUIDE SIGN PLN WITH SOLR PNEL RRY REFERENE DRWING 1 Surveyed by/rpenté par Designed by/oncept par lient cceptance/cceptation du client Project No./No. du projet Drawing Reference No./No. de réference du dessin Drawn by/dessiné par Reviewed by/revisé par Parks anada Project Manager/dministrateur de Projets Parcs anada sset No./No. du-bien MF pproved by/pprouvé par Scale/Échelle N.T.S Sheet No./ No. de la feuille S02 1 841 x 594 mm
2014-10-31 ISSUED FOR REVIEW KDW MF No. Description/Description Drawn by Dessiné par pproved pprouvé Revision / Revision B detail number numéro de detail source drawing no. de dessin no. detail on drawing no. detail sur dessin no. B onsultant's Stamp Sceau de l'expert-conseil Eng. Stamp Sceau de l'ingénieur lient/client Plotted: October 31, 2014, 10:42:29 Filename: O:\Proj\ BVP Design & Tender\10.0 DRWINGS\10.5 Structural\10.5.2 Sheet\2511-00512-01.dwg\S03 onsultant's Name Nom de l'expert-conseil Project title/titre du projet LONG TERM SIGN PLN FOR BOW VLLEY PRKWY TRVEL RESTRITIONS Drawing title/titre du dessin GUIDE SIGN PLN WITH SOLR PNEL RRY REFERENE DRWING 2 Surveyed by/rpenté par Designed by/oncept par lient cceptance/cceptation du client Project No./No. du projet Drawing Reference No./No. de réference du dessin Drawn by/dessiné par Reviewed by/revisé par Parks anada Project Manager/dministrateur de Projets Parcs anada sset No./No. du-bien MF pproved by/pprouvé par Scale/Échelle N.T.S Sheet No./ No. de la feuille S03 1 841 x 594 mm