For drinking water pipe distribution systems, both main and supply lines Sewer and discharge pipe systems



Similar documents
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Euro Oak Installation

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Sika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades

Beacon Hill Sewer District Standard Specifications

Solvent Cementing Instructions For Plastic Pipe & Fittings

ElastoFlake & ElastoTec

Colonnade Security Pipe

SECTION STORM DRAINAGE SYSTEM

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Lenntech psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503

TG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION

Puddle Flange. FRANK Puddle Flange

PRODUCT DATA SHEET DESCRIPTION:

Section SEWER PIPE INSTALLATION AND TESTING

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

Profiles for floors of same height Cerfix Projoint

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

SECTION POLYVINYL CHLORIDE (PVC) PIPE

TECHNICAL SPECIFICATION

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Pipes and Fittings for Gravity Sewer Mains. SewerMAX

HVAC Super Pro FAQ. Can HVAC SUPER PRO be used on both hard and soft copper and aluminum tubing?

T H A N K Y OU F O R Y OUR P U R C H A S E O F A N E S S E N T I A V A N I T Y, P L E A S E R E A D T H E S E V A N I T Y C A R E A N D I N S T A L L

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Anodizing Reference Guide

Sun Windows General Information Sun New Construction Window Installation Instructions

BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.

PAAM COMMERCIAL PRIVATE LIMITED

Chapter. Restoration of Damaged Structures

GENERAL RUBBER LINING PRINCIPLES

RTV159. RTV157 and RTV159 High Strength Silicone Adhesive Sealants

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

Pipeline Replacement using Relining

TARIFF CODE and updates standard

CHESTERFLEX ROOF WATERPROOFING MEMBRANES

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa

Butt Fusion Welding of HDPE Pipes Work Procedure

BLACK JACK ALL WEATHER ROOF COATING

IMPORTANT SAFETY RULES TO FOLLOW

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description

LEAD CRYSTAL. User Manual. Valve-regulated lead-crystal batteries Energy storage Cells

HEAVY-DUTY HAND CUTTING TORCHES AND ACCESSORIES. Page 1 Version no.: V

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Trade Standard of Town Construction in PRC

Gear PEPSI CAN STOVE INSTRUCTIONS

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

TITANIUM FABRICATION CORP.

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

2. The mold is closed up and held under hydraulic pressure while the rubber material or compound cures.

ATLANTA 90CM HIGH BEDSTEAD

This data sheet describes the most common joining methods of steel water mains and the most important phases of installation.

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

SIGRAFLEX . Properties. Applications

The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.

GUIDELINE FOR SAFETY IN THE HANDLING OF FLAMMABLE LIQUIDS

VULCASCOT RUBBER CABLE PROTECTOR SYSTEMS Technical Data Sheet

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

AMERICAN Mechanical Joint Pipe For Water, Sewage or Other Liquids

James M. Pleasants Company

PRODUCT DATA SHEET Sika Cable System

HYLINER AKS HDPE LINING

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL

Secondary Containment Comparison ATI Ultra COAT vs HDPE

Rooflight INSTALLATION INSTRUCTIONS

Royal Seal Gasketed Sewer Pipe

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

COATING & WRAPPING OF UNDERGROUND PIPING

PART 17 SAFETY/RESCUE HARNESS JACKET TYPE M 500/1 BRIGADE ORDER TECHNICAL NO. 13 C O N T E N T S. Page No PURPOSE STRATEGIC AIMS AND OBJECTIVES

CataLoG No. weight o.d. i.d. GLaSSwaRe

DRY CLEANING PLANTS REQUIREMENTS FOR INSTALLATION AND OPERATION

#25 The Basics of Lightweight Conveyor Belting

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A

IH E Sigma Island 90

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Portable Air Conditioner

Drive shaft, servicing

PHOENIX Product Data Sheet (Updated on 14-Jan-2012)

Arctic King Fuel Tanks meet the Environment Canada TECHNICAL REQUIREMENTS FOR COLLAPSIBLE FABRIC STORAGE TANKS (BLADDERS) - December 17, 2009

Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

Instruction Manual. Image of SP-3015 & SP Important Safeguards. Automatic Dispensing Hot Water Pot with Reboil Function

Gas Meter Clearances and Service Installation Requirements

SECTION 1 GENERAL REQUIREMENTS

Epdm Flat Roofing Systems

Char-Lynn Hydraulic Motor. Repair Information Series. October, 1997

Waste Collection Systems

Wastewater Capital Projects Management Standard Construction Specification

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Material Product Data Sheet Sealers for Thermal Spray Coatings

VdS en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS en : (01)

Transcription:

Technical Information UPVC upvc (unplasticized polyvinylchloride) pipes and fittings exhibit excellent resistance to aggressive environments both naturally occurring and as a result of industrial activity. They are resistant to almost all types of corrosion, either chemical or electrochemical in nature. Since upvc is a non-conductor, galvanic and electro chemical effects do not occur in upvc pipes. upvc Pipes and fittings a often used in the following circumstances: For drinking water pipe distribution systems, both main and supply lines Sewer and discharge pipe systems Due to its non-metallic nature, the material used is totally resistant to all forms of metallic corrosion. Aggressive water resulting from high sulphate soils and low hardness water will not attack upvc pipes. Our pipes are therefore resistant to a wide range of industrial waters and chemicals and offer an advantage in long-term systems life and manufacture costs. For more information on the resistance of upvc for specific chemical(s), do not hesitate to let Interplast know. We inform you of the suitable pipe solution necessary. Being made of a tasteless and odorless material, upvc pipes remain neutral to all transported fluids. upvc is completely inert and is widely used for transporting liquids made for human consumption. Because of their mirror-smooth inside surface, upvc pipes have minimum flow head loss. There is also no buildup of inside deposits, a particular advantage in the construction of sewerage systems. The physical properties of upvc pipes are not affected by neither direct sunshine, nor wind or rain. However, to avoid surface browning due to long exposure to direct sunlight, it is recommended that the pipes are kept protected from direct sunlight. Rigid PVC is not conductive to combustion. In the event of a fire, flames are unable to travel on upvc pipes. They therefore offer added safety when used for electrical installations, both domestic and industrial. upvc pipes are relatively light. Their specific weight 1.43 is one-fifth that of steel pipes. This cuts down transportation costs and facilitates installation when in difficult and remote places. Installation is quick and easy with a complete line of fittings either with the solvent glue weld sockets or the rubber seal socket joints. In either case, a leak-proof joint is assured. Subsequent maintenance work is also carried out with a minimum of complication and cost. Applicable Standards Interplast produces upvc pipes according to the specifications requested by the client. Our product portfolio consists of pipes made according to the following standards: EN1452-2 ISO 4422-2 DIN 8062 / ISO 161 BS 3505 DIN 4925-II & III (Borehole application)

upvc dimensions The pipe industry maintains two different ways to refer to the dimension of a pipe. One is the Dimension of the DN size. This is commonly used for steel and iron pipes. The plastic industry commonly uses the Outside or OD size. Pipe Size Outside Pipe Size Outside DN NPS OD DN NPS OD (mm) (inches) (mm) (mm) (inches) (mm) 6 1/8 10 250 10 250 8 1/4 12 250 280 DIN 10 3/8 16 300 12 315 15 1/2 20 350 14 355 20 3/4 25 400 16 400 25 1 32 450 18 450 DIN 32 1 1/4 40 500 20 500 40 1 1/2 50 500 560 DIN 50 2 63 600 24 630 65 2 1/2 75 700 28 710 80 3 90 800 32 800 100 4 110 900 36 900 125 125 1000 40 1000 125 140 DIN 1100 44 1200 150 6 160 1200 48 1200 150 180 GAS 1400 56 1400 200 8 200 1600 64 1600 200 225 DIN 2000 80 2000 DIN= German Industrial Norm GAS= uses in Gas distribution network General Properties of upvc at 20 Celsius Test Unit Value Remarks Specific Gravity - 1.42-1.43 Usually 1.43 Shore Hardness Deg. 70-90 Equivalent to the hardness of Aluminum. Varies with temperature. Tensile Strength Kg/cm² 500 Bending Strength Kg/cm² 950 Varies with temperature. Modulus of Elasticity Kg/cm² 3.2 x 10 Impact Strength Izod Joules 4.7-5.4 Water Absorption Mg/cm² 1.05 Elongation at Break - >80% Softening Point (V.S.P) 5KG C 80 Fabricating Temperature C 110-140

Co-efficient of linear Expansion at Mm/m C 0.08 70 C Specific Heat Kcal/Kg C 0.025 Heat Reversion <2.5% Specific Volume Resistivity Ohm/cm >3-5x10 15 upvc is non-conductor of electricity and is not subject to galvanic or electrolytic attack. Dielectric Strength KV/mm >40 Electrical equipment s must not be earthed to upvc pipes. Relationship between tensile strength and temperature [PIC: Tensile strength UPVC.jpg] Relationship between tensile Rigidity and temperature [PIC: Rigidity strength UPVC.jpg] Cutting and chamfering Pipe should be cut square. A simple method of cutting pipes square is to wrap newspaper or similar sheet paper around the pipe with no overlap of the edges. Mark line around pipe (felt pen is ideal). Cut to line with a fine toothed saw. [PIC: UPVC Pipe cutting 1.jpg] Pipe ends should be chamfered at an angle of approximately 15 to about ⅓ of the wall thickness with a coarse file, surform tool or chamfering tool. [PIC: UPVC Pipe cutting 2.jpg] Solvent Weld Joints Pipes up to 75mm may be jointed easily with solvent adhesives. Larger sizes require special techniques and require two men to make such joints. 1. Jointing Procedure. Mark depth of entry of the pipe into the socket and alignment mark. 2. Make small chamfer on the edge of the pipe end with medium file. [PIC: UPVC Pipe cutting 3.jpg] 3. Roughen the outside of the pipe and the inside of the socket using sand paper or emery cloth up to the entry mark. [PIC: UPVC Pipe cutting 4.jpg] 4. Clean both surfaces and remove all dust, grease and swarf using a dry clean cloth and cleaner. [PIC: UPVC Pipe cutting 5.jpg] 5. Stir adhesive thoroughly. 6. Apply adhesive without delay after cleaning, using a flat clean brush. Apply an even unbroken layer brushing axially to the pipe end and socket mouth with a heavier layer on the pipe. Where loose fits are found, the pipe should be given a second coat. [PIC: UPVC Pipe cutting 6.jpg] 7. Immediately insert the pipe into the socket up to the entry mark, align pipe and twist 90 degrees. Hold in position for a few seconds, then wipe off excess adhesive.

[PIC: UPVC Pipe cutting 7.jpg] Solvent Weld jointing of large diameter pipes require special care and our Technical Service Department should be contacted in case of difficulty. Always replace the lid of the can after making a joint and follow the instructions on the can observing any warnings. Joints should not be moved or disturbed for 10-15 minutes then the jointed pipe may be handled with care. Allow 4 hours if the jointed pipe lengths are to be laid in a trench. Allow 8 hours to elapse before applying working pressures or 24 hours for test pressures. With pipe sizes up to 50mm, it is possible to reduce this time. Allow 1 hour for each 3.5 atmospheres of pressure. Brushes must be clean and dry before commencing solvent welding. Brushes must be thoroughly cleaned after use by washing in cleaning fluid. Do not dilute solvent adhesive with cleaning fluid. Use Solvent adhesive and cleaning fluid in a well-ventilated area. Keep away from naked flames and do not smoke. Always replace lids of containers. In any event, attention is drawn to the instructions printed on the containers. When laying continuous runs of pipe, joints may be made quicker than the setting times advised above. The joint will not be disturbed with long lengths, providing that the pipe is not twisted or the previously made joint lifted out of place. Rubber Ring Joints Ensure that the spigot and socket are free from dust, grit, grease and as dry as possible. Insert pipe into the socket without seal ring in place and mark pipe when it is fully inserted. Place seal in groove of socket ensuring that seal is correct way round. Anger seal rings should be fitted with tapered section facing the outside of the socket. Apply jointing lubricant to the chamfer and the end of the spigot of the pipe or fitting only. Push the pipe firmly into the socket up to the insertion mark previously made. If an expansion gap is required the pipe is then pulled back by the desired amount. [PIC: UPVC Rubber Ring Joint.jpg] Storage & Handling Unplasticized PVC pipes are strong yet light, their specific gravity being approximately one-fifth of Cast Iron. As a result, these pipes are more easily handled than their metal counterparts. Reasonable care, however, should be used at all times. Since the soundness of any joint depends on the condition of the spigot and the socket, special care must be taken in transit, handling and storage to avoid damage to the ends. When loading pipes on to vehicles, care must be taken to avoid their coming into contact with any sharp corners such as cope irons, loose nail-heads, etc., as pipes may be damaged by being rubbed against these during transit. Whilst in transit, pipes shall be well secured over their entire length and not allowed to project unsecured over the tailboard of the lorry. [PIC: UPVC Pipe loading NO.jpg] [PIC: UPVC Pipe loading YES.jpg] When off-loading, pipes should be lowered, not dropped to the ground. Pipes may be off-loaded from lorries by rolling them gently down timbers, care being taken to ensure that pipes do not fall one upon another, nor on to any hard or uneven surfaces. [PIC: UPVC Pipe Offloading NO.jpg] [PIC: UPVC Pipe Offloading YES.jpg]

Pipes should be given adequate support at all times. Pipes should not be stacked in large piles, especially in warm temperature conditions, as the lower layers may distort, resulting in difficulties in jointing and pipe alignment. Any pipe with ends prepared for jointing (Socket and spigot joints, A joints, etc.) should be stacked in layers with sockets placed at alternate ends of the stack and with the sockets protruding to avoid unstable stacks and the possibility of imparting a permanent set to the pipes. [PIC: UPVC Pipe Stacking.jpg] For long-term storage, pipe racks should provide continuous support. For pipe sizes 160mm and above timber of at least 3in. (75mm) bearing width at spacing s not greater than 3ft. (915mm), should be placed beneath the pipes. Side support should be placed at 6ft. (1.8m), if the stacks are rectangular. Closer supports will be required for sizes below 160mm. In such pipe racks, pipes may be stored not more than seven layers, or 6ft. (1.8m) high, whichever is the lesser, but if different classes of pipe are kept in the same racks, then the thickest classes of largest diameter must always be placed at the bottom. [PIC: UPVC Pipe Storage.jpg] For temporary storage in the field, where racks are not provided, the ground should be level and free from loose stones. Pipes stored thus should not exceed three layers high and should be stacked to prevent movement. Stack heights should be reduced if pipes are nested, i.e. pipes stored inside pipes of larger diameters. Reductions in height should be proportional to the weight of the nested pipe compared to the weight of the pipes normally contained in such stowage s. upvc pipes, should be stored in the shade to avoid ultraviolet (U/V) degradation from the Sun s rays. [PIC: UPVC Pipe Storage Field.jpg]