1 Butt Fusion Welding of HDPE Pipes Work Procedure A pipeline is as good as its weakest point. Accordingly it is not only important that quality pipes and components are used in a piping system, but also the methodology used to join the pipes and other components. Butt Fusion is the most important and widely used method of connection for HDPE pipes larger than 110 mm. It is a method of jointing pipe ends by way of heating and cooling under pressure, resulting in pipe joints as strong as the pipe itself. The principle of butt fusion is to heat the pipe ends to a designated temperature ( C under pressure for a specified amount of time, then the pipe ends are fused together under pressure for a period of time.
2 STEP WORKING PROCEDURE 1. Preparation of welding: before you start the operation, it is important to prepare the work area. 2. Select the operation area that is suitable for the work. Install the protection tent or other equipment to protect the welding zone against rain, sunshine or bad weather (if required Set up the welding machine with all the accessories according to the welding pipe size. Check if the machine is functioning. All of the problems or missing parts must be fixed prior to the start of the welding operation. Insert two pipes ends on both side of the machine clamps, protrude approx. 3-5 cm. from each shell side, clamping and adjust the pipe or piping part, the surfaces to be welded should be parallel to each other. Adjust the alignment of pipe line by tightening or losing bronze nuts on the top aluminum clamps. Secure longitudinal movement of the parts to be welded by taking appropriate measures. Clean outside and inside pipe surface. 3. Insert the facing tool or trimmer between the two pipe ends into the lock position on the welding machine.
3 4. Start the facing tool or trimmer by turning on the control switch. Slowly approach the pipe ends towards the facing tool or trimmer by controlling the directional valve on hydraulic control unit while keeping control pressure a little higher. The cutter will cut the surface of both pipe ends making them clean, plane and parallel. 5. When the pipe ends had been trimmed squarely and with an even thickness, slowly decrease the pressure before switching off. Remove the facing tool or trimmer from welding machine to the support frame and clear the facing scraps from pipe ends. Inspect the ends, they must be clean and plane; otherwise repeat the step 3 5 again. During the clearing and inspection, avoid any contact with the surface of pipe ends. 6. Recheck the alignment of the pipeline by bringing the pipe ends closely together and measure the actual tolerance. The misalignment value between both pipe ends should not be more than 10% of the pipe wall thickness. The gap width is the allowance between the treated pipe end, should not exceed the value shown on Table 2. If they are not in the control tolerance, then repeat the steps 2-5 again.
4 7. During the alignment checking in step 6, the welder team must measure the force or pulling pressure (drag pressure by looking and recording the data found at the pressure indicator device The pressure must be created to pull the whole work piece moving in between welding process. The drag pressure is the additional value that must be added up to the alignment pressure (P1 and joining pressure (P3 from calculation or machine pressure data for each operation area and every welding joint The welding team to prepare the welding parameter by calculating using the recommended values according to Table 1, Table 3 or machine data for the welding operation control. Check the heating plate temperature on the setting range according to step 1; cleaning both heating plate side with cleaning agent and insert its back to support while waiting for welding operation to start. Bring the pipe ends apart, to clean both pipe ends using coat with an ethyl-alcohol or other suitable cleaning agent and avoided any contact to the surface after cleaning. Repeat the cleaning process, if necessary. 10. To start with the welding process, begin with the alignment stage by inserting the heating plate between the two pipe ends, moving both pipe ends close together until contact with the heating plate. Start the build up pressure to the alignment pressure level (P1 + drag pressure, maintain the pressure until there are welding seam appear. 11. In this stage, the uniform bead should had been created between the heating plate throughout the whole circumference of both pipe ends. The pressure must be maintained until the bead height according to the calculation value in table 1 by visual inspection. Continue to the heating-up stage by reducing pressure and maintaining the heating-up pressure level (P2 along heating-up time (T2.
5 12 Open both pipe ends, carefully remove the heating plate without touching the melted area and see to it that the removing time should not be longer than the changeover time (T3, insert heating plate to the support. 13 Immediately increase pressure up to the joining pressure level (P3 + drag pressure within the joining pressure built-up time (T4 Uniform beads must be created throughout the whole circumference of the pipe joints. Maintain or Keep the joining pressure constant throughout the cooling time (T5 or until the welding joint cools down. Avoid forced cooling down by applying water Remove the clamps after the cooling stage is complete. Welding bead of each jointing has to be visually inspected and measured based on the following: o Both ends should be almost equal in dimension o The bead surface should be smooth and do not shine. o Bead width must be according to the limit dimension Possible differences in the formation of the beads may be justified by different behavior of the joined materials. All the welding information must be recorded into the data logger, log sheet or welding protocol form.
6 Table1. Welding Parameter and control for calculation method and recommended values to be used Description Parameter Calculation Recommend ed Values 1. Heating temperature C Alignment pressure (bar (P ± 0.01 A1 / A2 x 1.5 _ N/mm2 3. Alignment time (Bead (T1 Until bead Until bead Table3 Created created follow item 4 created follow item 4 4. Bead height (mm (0.1 x e (0.1 x e - 5. Heating-up pressure (P N/mm2 A1 / A2 x (bar 6. Heating-up time (sec. (T2 10 x e 10 x e Table3 7. Changeover time (sec. (T3 3 + (0.01 x OD 3 + (0.01 x Table3 OD 8. Joining pressure built-up (T4 3 + (0.03 x OD 3 + (0.03 x Table3 time (sec. OD 9. Joining pressure (bar (P3 0.15±0.01 A1 / A2 x N/mm2 10. Minimum cooling time (T5 3 + e 3 + e Table3 (min. 11. Minimum bead width (mm. 3 + (0.50 x e 3 + (0.50 x e Maximum bead width (mm. 5 + (0.75 x e 5 + (0.75 x e - Remarks: OD = Outside Diameter (mm., e = Wall Thickness (mm. A1 = Pipe section area (mm2 by calculation formula: [ (OD2 ID2/4] A2 = Hydraulic cylinder section area (mm2 by calculation formula: [(Number of hydraulic cylinder x (id2cylinder OD2Shaft/4]
7 Alignment of pipe and gap width The joining areas have to be plane with a clean and grease-free tool directly before the welding, so they are plane-parallel in clamped condition. The gap width and the misalignment have to be controlled. The misalignment of the joining areas on the pipe outside respect may not pass the permissible value of 0.1 x wall thickness of pipe. The permissible gap width under alignment pressure is show on Table2. Table2. The maximum gap width is allowance between the treated welding zones. Pipe outside diameter Gap width (mm. range (mm. < < < < >
8 P Bead Pressure Welding Pressure Soaking Pressure Time t 1 t 2 t 3 t 4 t 5 Table3. Recommended values for the heating tool butt-fusion welding of pipes and fittings from HDPE, at an ambient temperature of approximately 20 C and moderate air flow ( Interim values have to be interpolated Nominal Alignment Heating-up Changeover (T3 Joining wall Bead height on (T2 Heatingup time =10 x maximum time Pressure Cooling (second (T4 Joining (T5 Thickness heating tool at (mm the end of the wall thickness build-up time under alignment time (heating-up time joining (alignment with with < 0.02 (second pressure 0.15 N/mm² N/mm² P=0.15 N/ (mm minimum (second mm² values (minute minimum values
9
Socket Heat Fusion Techniques. A Guide for Instruction and Training in Vanguard Socket Heat Fusion
Socket Heat Fusion Techniques A Guide for Instruction and Training in Vanguard Socket Heat Fusion TABLE OF CONTENTS This brochure has been developed to assist those responsible for socket fusion joining
General Guidelines for Butt, Saddle, and Socket Fusion of Unlike Polyethylene Pipes and Fittings TN-13/2007
General Guidelines for Butt, Saddle, and Socket Fusion of Unlike Polyethylene Pipes and Fittings TN-13/2007 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org
HEAT FUSION JOINING PROCEDURES
HEAT FUSION JOINING PROCEDURES TABLE OF CONTENTS INTRODUCTION...1 FEDERAL REGULATIONS...1 HEAT FUSION...2 INCLEMENT WEATHER...3 NOTES ON FUSION CONFIDENCE...3 FUSION CHECKLIST...4 BUTT FUSION...5 Procedure...6
SECTION 33 11 00.13 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS
SECTION 33 11 00.13 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS PART 1: GENERAL 1.01 SECTION INCLUDES Furnishing and installing up to 16-inch high density polyethylene (HDPE) pipe and fittings for
Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013
Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044
PolyPipe RECOMMENDED. Heat Fusion Joining Procedures
PolyPipe RECOMMENDED Heat Fusion Joining Procedures TABLE OF CONTENTS INTRODUCTION 1 FEDERAL REGULATIONS 1 QUALIFICATION PROCEDURE 2 HEAT FUSION 2 INCLEMENT WEATHER 3 NOTES ON FUSION CONFIDENCE 4 FUSION
TECHNICAL SPECIFICATION
THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,
A World Class Manufacturer of Induction Bends
A World Class Manufacturer of Induction Bends COFELY FABRICOM BENDING A leading position in bending High Flexibility and Close Tolerances As a world leading manufacturer of pipe bends, produced by induction
Generic Butt Fusion Joining Procedure for Field Joining of Polyethylene Pipe TR-33
Generic Butt Fusion Joining Procedure for Field Joining of Polyethylene Pipe TR-33 2012 105 Decker Court, Suite 825, Irving, TX 75062 Phone: 469-499-1044 Fax: 469-499-1063 www.plasticpipe.org Contents
Arctic Insulation & Manufacturing The Pre-Insulated Pipe People
Arctic Insulation & Manufacturing The Pre-Insulated Pipe People Butt Fusion Process for McElroy Small Diameter Hand Operated Equipment MiniMc Fusion Machine ½ CTS 1 IPS 1 LC Fusion Machine ½ CTS 1 IPS
Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service
(July 2003) (Rev.1 July 2014) Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service 1. General 1.1 This document gives the guidelines for maximum
I BEAM TRACK INSTALLATION
PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must
725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
Structural welding is a process by which the parts that are to be connected are heated and
CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
WAVISTRONG ASSEMBLY INSTRUCTIONS CONICAL-CYLINDRICAL (CB-CS) ADHESIVE BONDED JOINT. Complete Pipe System Solutions
ASSEMBLY INSTRUCTIONS CONICAL-CYLINDRICAL (CB-CS) ADHESIVE BONDED JOINT Complete Pipe System Solutions WAVISTRONG ASSEMBLY INSTRUCTIONS CONICAL-CYLINDRICAL (CB-CS) ADHESIVE BONDED JOINT Date issued : February
Flash Butt Welding Machines
Flash Butt Welding Machines Types AS 15 - AS 320 Flash butt welding current brake current (ka) current time flattening reversal preheating welding time flash butting forging A reliable and economic process
Pipe Inspection Carbon Steel Trials
Pipe Inspection Carbon Steel Trials Client Innospection Limited Facility Head Office Aberdeen Item Inspected Pipe No 1 Inspection Method SLOFEC Date Commenced 01/01/2009 Date Completed 10/01/2009 Type
QUANTIFYING SOLAR ENERGY
www.sustainicum.at QUANTIFYING SOLAR ENERGY Recommendations for implementation in the course Author: E-Mail address: Institution: Philipp Weihs [email protected] BOKU Important considerations Very
Accessories for GF and RA machines
Orbital cutting & beveling machines for high-purity process piping www.orbitalum.com Accessories for GF and RA machines A brand of ITW Orbital Cutting & Welding 23 www.orbitalum.com Orbital cutting & beveling
WELDING & CUTTING MAIN EQUIPMENT
GASES DIVISION GAS WELDING & CUTTING EQUIPMENT WELDING & CUTTING MAIN EQUIPMENT GAS WELDING & CUTTING KIT The MARIGASES GAS WELDING AND CUTTING KIT is a high quality set containing all the tools and components
Pipe Cutting and Beveling Clamshells
Pipe Cutting and Beveling Clamshells Who We Are One Company, Total Support, Complete Solutions For more than a century, Hydratight has provided world-class bolted joint solutions and continues to set international
SMD Rework Station TABLE OF CONTENTS
SMD Rework Station Thank you for purchasing the Hakko 50B SMD Rework Station. The Hakko 50B is designed to solder and desolder surface mounted devices with hot air. Please read this manual before operating
Rubber Lining Application Manual Revision Date: September 1, 2009. Section 10: Pipe Lining Procedures Page: 10-1
Section 10: Pipe Lining Procedures Page: 10-1 GENERAL PROCEDURE FOR APPLYING RUBBER LINING TO PIPE 1. METAL SPECIFICATION Pipe should be fabricated in accordance with requirements found in RMA Bulletin
Chapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
General Guidelines for Repairing Buried PE Potable Water Pressure Pipes
515 General Guidelines for Repairing Buried PE Potable Water Pressure Pipes Introduction Traditional piping systems have gasket-sealed bell and spigot joints every 20 feet, which can be a potential maintenance
Fusion Equipment Safety Information... Page 4. Manual Butt Fusion Machine Procedure... Page 18. Hydraulic Butt Fusion Machine Procedure...
Table of Contents Fusion Equipment Safety Information........ Page 4 Tips For Success............................. Page 15 Manual Butt Fusion Machine Procedure....... Page 18 Hydraulic Butt Fusion Machine
DIN 17172-78 STEEL PIPES FOR PIPE LINES FOR THE TRANSPORT OF COMBUSTIBLE FLUIDS AND GASES
DIN 17172-78 STEEL PIPES FOR PIPE LINES FOR THE TRANSPORT OF COMBUSTIBLE FLUIDS AND GASES For connection with the International Draft Standards 3183 and 3845 published by the International Organization
TRIMMING UNIT/DIAMOND MACHINE TST.13
TRIMMING UNIT/DIAMOND MACHINE TST.13 REFERENCE BOOK rel. 02.15 TRIMMING UNIT/DIAMOND MACHINE TST.13 REL. 02.15 ENGLISH LANGUAGE 1 MACHINE DESCRIPTION TST.13 was designed and built for processing methacrylate.
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering.
The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com [email protected] (c) 2/20/03 The David steam engine is a simple oscillating steam engine, many plans
EDI Extrusion Coating Technology
Extrusion Dies Industries, LLC EDI Extrusion Coating Technology Designers and manufacturers of high performance die systems Headquarters and Main Office: Extrusion Dies Industries, LLC 911 Kurth Road Chippewa
VdS 2100-09en. VdS Guidelines for water extinguishing systems. Non-return valves. Requirements and test methods. VdS 2100-09en : 2011-05 (01)
VdS Guidelines for water extinguishing systems VdS 2100-09en Requirements and test methods VdS 2100-09en : 2011-05 (01) Publishing house: VdS Schadenverhütung GmbH Amsterdamer Str. 172-174 50735 Köln,
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Installation instruction
1/5 ATTENTION! Mounting and dismounting of a shrink disc must be restricted to qualified personnel. Incorrect handling may cause injury to persons and damage to machines! At work, with heavy parts and
Autobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid
1 Secondary Task List 100 ORIENTATION 101 Identify opportunities in the auto body field. 102 Identify basic auto body construction. 103 Identify program rules and policies. 104 Identify government agencies
Apr 17, 2000 LAB MANUAL 1811.0
Apr 17, 2000 LAB MANUAL 1811.0 1811 BULK SPECIFIC GRAVITY (GMB) AND DENSITY OF COMPACTED BITUMINOUS SPECIMENS USING PARAFFIN OR PARAFILM ASTM Designation D 1188 (MN/DOT Modified) 1811.1 SCOPE This test
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION
SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density
SITEMA PowerStroke. Technical Information TI-P11. 1 Function. 2 Applications. Mould Closing Devices series FSK. Contents
English translation of German original Technical Information TI-P11 SITEMA PowerStroke Mould Closing Devices series FS drive system for powerful forces on a short stroke hydraulic actuation closing force
Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.
1. TEKA Soft Loc Installation Guide Thank you for having chosen TEKA Parquet. To guarantee a constant quality product TEKA engineered hardwood flooring is made out of selected wood species and runs only
POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT
POSEION 2-29, 2-25 & 2-22 POSEION 2-29, 2-25 & 2-22 XT Repair Manual Index A. Safety precautions 3 B. Technical data 4 C. Structure 5-6. Service / Repair 7-23 E. Tools 24 F. Function 25-26 G. Electric
39HQ Airovision Air Handling Units
39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport
HERZ-Thermal Actuators
HERZ-Thermal Actuators Data Sheet 7708-7990, Issue 1011 Dimensions in mm 1 7710 00 1 7710 01 1 7711 18 1 7710 80 1 7710 81 1 7711 80 1 7711 81 1 7990 00 1 7980 00 1 7708 11 1 7708 10 1 7708 23 1 7709 01
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University
Operating instructions. SCORP 220 Plus SCORP 360. Pipe Cutter. Code 790 014 762 Machine-no.:
precision. power. simplicity. Operating instructions Pipe Cutter SCORP 220 Plus SCORP 360 Code 790 014 762 Machine-no.: All rights reserved, in particular the rights of duplication and distribution as
DIAMOND Retractable Rodding Robot Model SPRAYROD-R
2004-12-21 2 1 (23) DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 2 (23) Table of contents 1 TECHNICAL DESCRIPTION...4 1.1 MAIN DETAILS...5 1.2 COMPONENTS DESCRIPTION...5 1.2.1 Pneumatic
HEAVY DUTY SEVERING AND BEVELLING MACHINE TNO FAB-SERIES
HEAVY DUTY SEVERING AND BEVELLING MACHINE TNO FAB-SERIES PROTEM USA LLC 29340 Industrial Way, # 402 Evergreen, CO 80439 USA Phone: +1 303 955 4862 Fax: +1 303 955 5904 [email protected] www.protemusa.com
Lathe Milling Attachment
Lathe Milling Attachment By L C. MASON BY CLEVERLY stacking cold-rolled flat stock together, T-slots and slide for this lathe milling attachment are made without costly machinery. In fact, only two tools,
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
GENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
3D Printed Injection Molding Tool ("PIMT") Guide. Objet Ltd.
3D Printed Injection Molding Tool ("PIMT") Guide Objet Ltd. 2 Injection molding is a high speed, automated and versatile process that can produce high precision complex three dimensional parts from a fraction
North Carolina FFA Association Agricultural Mechanics Career Development Event
North Carolina FFA Association Three (3) of the following Agricultural Mechanics Performance Skills will be selected for the state competition. North Carolina FFA Association Agricultural Mechanics Performance
Metal Pressfitting Pipe Systems
VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing
Weld Design. CATIA V5 Training Foils. Weld Design. Copyright DASSAULT SYSTEMES 1. Instructor Notes:
CATIA V5 Training Foils Weld Design Version 5 Release 19 January 2009 EDU_CAT_EN_WD1_FI_V5R19 1 About this course Objectives of the course Upon completion of this course you will be able to: - Weld parts,
SINTEF Building and Infrastructure. Contents
Contents Contents... 2 1. Introduction... 3 2. Test Object... 3 3. Test Method... 4 4. Testing... 5 4.1 Hunton Asfalt Vindtett 12 mm... 5 4.2 Hunton Bitroc 15 mm... 5 4.3 Hunton Asfalt Vindtett 25 mm...
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
Trouble shooting guide
guide DPR/PSR Leak Insuffi ciently tightened, shallow bite Tighten the nut according to correct number of turns, direct assembly only for maintanance/repair, use of recommended pre-assembly machines Mark
Quick guide: using CTE security straws for cryopreservation of pronuclear stages, embryos and sperm
Quick guide: using CTE security straws for cryopreservation of pronuclear stages, embryos and sperm 1. How to prepare straws for pronuclear stages and embryos (use straws with plug, 66.5 mm) Straws are
foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
Unit 15: Measurement Length, Area and Volume
Unit 15: Measurement Length, Area and Volume Section A: Circumference measuring the circumference of a round object. You will to show all of your working out. C 5 d where: C 5 circumference 5 3.14 d 5
Power Cube Open Source Ecology Page 1. Power Cube. Version 4
Power Cube Open Source Ecology Page 1 Power Cube Version 4 Power Cube Open Source Ecology Page 2 Contents Table of Contents Power Cube... 1 Contents...2 Introduction... 3 Bill Of Materials...4 Discrete
AISI O1 Cold work tool steel
T OOL STEEL FACTS AISI O1 Cold work tool steel Great Tooling Starts Here! This information is based on our present state of knowledge and is intended to provide general notes on our products and their
Silicon Pyranometer Smart Sensor (Part # S-LIB-M003)
(Part # S-LIB-M003) The smart sensor is designed to work with the HOBO Weather Station logger. The smart sensor has a plug-in modular connector that allows it to be added easily to a HOBO Weather Station.
Questionnaire Pure Media Systems
1. PROJECT INFORMATION: Project Name: Client: Contact Person: Telephone / Fax N : Email: 2. BASIC INFORMATION Type of Pure Media System PW / HPW - Generation PW / HPW - Storage & Distribution System Cold
Water Pump Replacement
1 of 8 2/5/2008 6:36 AM Document ID# 713637 2001 Cadillac Seville Print Water Pump Replacement Tools Required 1. J 38816-A Water Pump Remover & Installer 2. J 38185 Hose Clamp Pliers
1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/059. 0 19/02/2008 Basic proposal PP GM SB
Pagina N.: 1 of 19 1 X 90 Tons 30 m/min Tensioners JOB 08/059 0 19/02/2008 Basic proposal PP GM SB Rev N Date Issue Description Prepared by Checked by Approved by Pagina N.: 2 of 19 TABLE OF CONTENTS:
AZEK Rail Install Guide
TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with CableRail by Feeney... 1 Installing CableRail by Feeney for AZEK Rail... 7 Installing AZEK Rail Stairs with CableRail
1 DESCRIPTION OF THE APPLIANCE
1 DESCRIPTION OF THE APPLIANCE 1.1 INTRODUCTION The cast iron SF boilers are a valid solution for the present energetic problems, since they can run with solid fuels: wood and coal. These series of boilers
Quick Start Guide See Inside for Use and Safety Information
3 rd Generation Personal 3D Printer Quick Start Guide See Inside for Use and Safety Information The USB Mass Storage Device Contains the User Guide and Quick Start Guide in other Languages Congratulations
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
OPERATING INSTRUCTIONS
GB OPERATING INSTRUCTIONS Automatic Wedge Welding Machine Please read operating instructions carefully before use and keep for further reference. APPLICATION The is an automatic wedge welding machine for
Test Report No. C829QPEN
Institut für Solartechnik Hochschule für Technik Rapperswil Oberseestrasse 10, CH 8640 Rapperswil Tel +41 55 222 48 21, Fax +41 55 222 48 44 www.solarenergy.ch Ordered by: Westech Components Wuxi Co.,
TECHNICAL INFORMATION
TECHNICAL INFORMATION Models No. 2012NB Description 304mm (12") Automatic Thickness Planer CONCEPTION AND MAIN APPLICATIONS * Compact and light weight (27 Kg./59 lbs) automatic thickness planer for easier
Checking Wheel Brakes Wear
Issue 1 en 1 Checking Wheel Brakes Wear Contents Disc Brakes... 3 Removing the wheels... 4 Checking the Brake Pads... 5 Check brake disc thickness... 7 Checking brake disc for cracks... 8 Drum Brakes...
Cold Room & Refrigeration System (Casserole Assembly) No of units: 1
Technical Specifications Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 For chiller storage of all sorts of items Chiller storage temperature: 2-5 C Provides excellent thermal efficiency
TRANS-05, Torque Tube Removal, Rebuilding, and Installation
TRANS-05, Torque Tube Removal, Rebuilding, and Installation Tools Metric Wrench Set Metric Socket Set Jack Stands (6 minimum) Floor Jack 8mm Cheesehead socket (also referred to as 12 point internal socket
PRESSBLOWER Injection Blow Moulders
PRESSBLOWER Injection Blow Moulders PRESSBLOWER Type SB2/60 with Parison Programming Tasks Solutions C. V. Joint Boots View of production stations Precision builds the basis for fulfilling high demands
SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES
SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES 4121 N.W. 37 th Street, Lincoln, NE 68524 Telephone (402) 470-2627 Fax (404) 470-2410 www.gtexhaust.com
TARIFF CODE and updates standard
TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of
English AUTOMATION SYSTEMS FOR SLIDING GATES. Operating and installation instructions SLIDE SERIES
English AUTOMATION SYSTEMS FOR SLIDING GATES Operating and installation instructions SLIDE SERIES v.0 Rev /202 INDEX ) General Safety Regulations... pág. 0 2) Description... pág. 02 3) Technical Specifications...
Chapter 16. Mensuration of Cylinder
335 Chapter 16 16.1 Cylinder: A solid surface generated by a line moving parallel to a fixed line, while its end describes a closed figure in a plane is called a cylinder. A cylinder is the limiting case
HDPE Fusion Procedures
P.O. Box 245 Syracuse, NY 13211 www.roth-america.com 888-266-7684 HDPE Fusion Procedures P/N: 2300100907 Table of Contents: Section 1: Overview Allowable Piping Materials...3 Acceptable HDPE Pipe...3 Section
TANK FABRICATION. Automated Solutions for Your Tank Fabrication Project. Bug-o Systems www.bugo.com
TANK FABRICATION Automated Solutions for Your Tank Fabrication Project. Bug-o Systems www.bugo.com BUG-O ALL TIME GIRTH WELDER Bug-o Systems offers the Automatic Girth Welder for tank fabrication applications.
The JIG is UP Or A couple hours up front pays in the long run.
Ed Simon Page 1 of 5 The JIG is UP Or A couple hours up front pays in the long run. A large part of the fun of beekeeping is the construction and assembly of the equipment. Since it is a hobby, I decided
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
Crimp Tooling Where Form Meets Function
Crimp Tooling Where Form Meets Function Quality, cost, and throughput are key attributes for any production process. The crimp termination process is no exception. Many variables contribute to the results.
Agilent X/P/K281C Adapters
Agilent X/P/K281C Adapters Including Options 006, 012, 013, 106 Operating and Service Manual Contents 1 Introduction 7 Product Overview 8 Options 8 Instruments Covered by Manual 10 2 Installation 11 Initial
1.1 DIMENSIONS AND WEIGHT PAG. 2 1.2 LOAD CENTRE FOR LIFTING PAG. 2 1.3 STORAGE CONDITIONS PAG. 2
TRANSPORT AND INSTALLATION. DIMENSIONS AND WEIGHT PAG.. LOAD CENTRE FOR LIFTING PAG..3 STORAGE CONDITIONS PAG. STARTING. INSTALLATION PAG.. SPACE REQUIREMENTS PAG. 3.3 ELECTRIC CONNECTION PAG. 3 3 DESCRIPTION
LockerLock Schließgehäuse LockerLock lock case Boîtier de fermeture LockerLock Scatola di ciusura LockerLock Caja de cierre LockerLock
LockerLock Schließgehäuse LockerLock lock case Boîtier de fermeture LockerLock Scatola di ciusura LockerLock Caja de cierre LockerLock Caution! Õ It is necessary to read the section "Commissioning" in
14. Tools and Software
14. Tools and Software System overview: Geberit welding machine MEDIA 160 and tools... 364 System overview: Geberit welding machine UNIVERSAL 315 and tools... 365 14.1 Tools for Geberit Silent-db20 / Geberit
SITEMA PowerStroke. Technical Information TI-P12. 1 Function. 2 Applications. Mould Closing Devices series FSKP. Contents
SITEMA PowerStroke FSP ocking, actuating and releasing by pneumatic pressure English translation of German original Technical Information TI-P1 SITEMA PowerStroke Mould Closing Devices series FSP drive
Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford
Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump
SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE
SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop
LINEAR MOTION CONTROL
LINEAR MOTION CONTROL Technical Data Sheet Static Locks RLSS Series Nexen s new generation of linear holding/locking devices take rod locking technology to the next level. With superior performance, these
Peel Adhesion of Pressure Sensitive Tape
Harmonized International Standard Call Letters PSTC 101 Date of Issuance 10/00 Revised 10/03 Revised 05/07 Peel Adhesion of Pressure Sensitive Tape 1. SCOPE 1.1 These methods cover the measurement of the
GOST 632-80 CASING AND COUPLINGS
GOST 632-80 CASING AND COUPLINGS Casing to this standard shall be seamless, with round and buttress-type threads (OTTM-type casing), with high-seal thread connection (OTTG-type casing) and respective couplings;
ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-
Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and