SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

Beacon Hill Sewer District Standard Specifications

CHAPTER 6 - SANITARY SEWER

LS 2540 SEWER LATERALS AND INSPECTION TEES

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

WATER SERVICE 2

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

For a building with a crawl space, see Figure

Section 2100-Trenching and Tunneling

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Standard Specifications for Installation and Repairs of Water and Sewer Service Lines

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

Specifications for Residential Property Owners Connection to New Public Sewer

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Sewage Compliance Form Instructions

Town House Center Highway North Huntingdon, PA 15642

SECTION STORM DRAINAGE SYSTEM

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION POLYVINYL CHLORIDE (PVC) PIPE

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SECTION 7- STORM SEWER

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

SANITARY SEWER SPECIFICATIONS

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System

CHAPTER 11 STORM DRAINAGE

8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS

SECTION 15 AIR RELEASE VALVE ASSEMBLIES General

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Sanitary Sewer Mains and Services

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

SECTION ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

Section C-1 Pipes and Fittings

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Customer Procedures and General Information for Sewer Customers

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

Close-Out Documents... 9

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

FY08 SEWER POINT REPAIRS BID TABULATION

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

SECTION SANITARY SEWER PIPE

INDEX. Sec. No. Items Page Nos.

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

OAR52 A-1 (September, 1981)

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 3 SANITARY SEWER DESIGN

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

CW GRAVITY SEWERS TABLE OF CONTENTS

C. Section TESTING LABORATORY SERVICE.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

BUILDING SEWER CONNECTION REQUIREMENTS

CHAPTER 11 STORM DRAINAGE

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification GRAVITY SANITARY SEWER SYSTEM

SECTION DUCTILE IRON PIPE AND FITTINGS

Let Us Give Utilities the Respect that they Deserve.

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

Sewer Line Rehabilitation

Developer s/consultants Field Services Guidelines

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

Fabricated Drainage Products

SECTION STORM DRAIN SYSTEM

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

SECTION GRAVITY SANITARY SEWERS

Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Mueller. Pipe Repair Products. Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source.

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Wastewater Capital Projects Management Standard Construction Specification

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION DUCTILE IRON PIPE AND FITTINGS

Transcription:

EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding material around pipe, and 12" bedding material on top (from top of pipe). Compact bedding material in district lifts with t-bars and mechanical equipment to 95% std. proctor density. After trench is backfilled and compacted to 95% dry density, replace gravel surface with 12" of pit run, plus 4" road base. Bedding material is imported crushed rock or angular surface gravel that meets the following gradation per ASTM D488 No. 67: Sieve size, Total percent passing Weight: 3/4 in = 100%; 3/8 in = 20-55; No. 4 = 0-10%; No. 8 = 0-5%; (sand, pea gravel or screened rock no larger than V* inch). Connections and service lines shall be buried at a minimum depth of 7', with one foot compacted cover of sand or pea gravel bedding. Additional compaction of backfill material is required every two feet thereafter, as trench is filled to surface. Maintain 10-foot separation between water and sewer service lines. A negative grade shall be maintained on all water service lines, from the house to the main. The owner shall make provisions for draining the service line on the customer's side of the curb stop valve. If the grade is reversed, the owner must make provisions for draining the line at the house. Draining the service lines is not the responsibility of the SLWSD. Water Service Lines: The water service lines shall be Type K, soft copper, 3/4 inch diameter; larger sizes may be used with prior approval by the SLWSD. The service line shall be one continuous line without joints if possible. Fittings shall be brass or copper alloy, AWWA approved. Connections shall be by flared joint; no soldered joints shall be permitted underground. Corporation stops shall be used for the connections of service line to the main line. Corporation stops shall be brass and conform to AWWA C800, such as Mueller H-15000, Ford F-600 or approved equal. The inlet shall be standard AWWA corporation stop, threaded inlet, and the outlet shall be for flared Type K copper service pipe. A curb stop shall be installed at the lot/property line. Curb stops shall be brass and conform to AWWA C800, such as Mueller H-15204, Ford B-22 or approved equal. Connections shall be flared Type K copper service pipe. Top of curb stops shall extend to at least two inches (2") above the ground surface. Service saddles shall be used for all water taps on all pipe materials and sizes. Service saddles shall be double strap bronze saddle, Rockwell No. 323 or approved equal. All taps shall be placed at 45 from the vertical to minimize the effects of settling, repairs, and ground movement. The water service line shall be pressure tested at normal operating pressure from the water main to the building before backfilling. Testing shall be observed by a representative of the District.

Sewer Service Lines: Sewer service lines shall be 4 inch, PVC, S.D.R. 35 thickness, with preformed watertight joints with rubber gaskets. The sewer service lines shall be water tight. The sanitary sewer service line shall be used for the conveyance of sanitary wastes only. Connections to roof, building foundation, or any other drain system are strictly prohibited. Minimum grade for sewer service lines is 1/4 inch per foot (2%). The sewer service will be tapped with 45 wye, tee or approval saddle with stainless steel bands. Taps shall be installed at 45 to main pipe to provide for a 2% minimum grade for service line, unless otherwise approved. Adaptor couplings may be used to bend service line to appropriate grade as required. The sewer service line must be connected to the house sewer pipe, immediately, or install a watertight cap on house end with a 4x4 marker post. Road Excavation and Restoration/Repair: Road excavation and subsequent backfill to restore to original conditions shall conform to WCPVA and SLWSD specifications as identified here in. Backfill in the road at tap location, in public right-of-way,s, utility easements, over new service lines shall be bedded with sand, pea gravel or screened rock no larger than 3/4 inch, around pipe, and over the top of the pipe for a depth of at least 1 foot over the pipe. Backfill shall be properly compacted every two feet, to meet std. specification. The last two feet of fill will be pit run, compacted, and topped by 4 inches of road base.

TELEPHONE PEDESTAL TYPICAL AS-BUILT INFORMATION 1. PROVIDE AT LEAST TWO SWING TIES FROM PHYSICAL MONUMENTS (TELEPHONE PEDESTALS. FIRE HYDRANTS, POWER POLES, BUILDING CORNERS, PROPERTY PINS) TO WATER TAP ON MAIN LINE, CURB STOP VALVE AND SEWER TAP ON MAIN LINE. 2. AS-BUILT INFORMATION TO INCLUDE DEPTH OF WATER MAIN AND SEWER MAIN AT TAP LOCATIONS. 3. PROVIDE PHOTOGRAPHS OF TAP ON MAIN AND SERVICE UNE IN TRENCH. 4. DISTRICT WILL NOT ACTIVATE SERVICE UNTIL AS-BUILT INFORMATION HAS BEEN SUBMITTED AND CONTRACTOR SUBMITS EVIDENCE OF PAYMENT FOR WORK TO DISTRICT. engineering design I ting 2300 15"1 Street, Suite 220 1303.964.3333 Denver. Colorado 80202 F 303.944.3355 STANDARD DETAILS AS-BUILT RECORDATION DETAIL DATE: A/25/07 REV: NO. D.1

SERVICE LINE TO BE INSTALLED AT 2% (MIN.) GRADE, UNLESS OTHERWISE APPROVED. SEWER MAIN INSTALL WATERTIGHT CAP w/ 4x4 MARKER POST OR CONNECT TO BUILDING SEWER 45* WYE OR APPROVED SADDLE w/ S.S. BANDS ROTATE 45* AS SHOWN ABOVE. 2300 15"' Street, Suite 220 Denver, Colorado 80202 STANDARD DETAILS SEWER SERVICE CONNECTION DATE: 4/25/07 REV: NO. S.1

FINISH GRADE ROADWAY CURB STOP AND BOX WITH ARCH BASE INSULATING COUPUNG REQUIRED w/ METALLIC WATER MAINS. CORP. STOP WATER MAIN FOR WATER MAIN MATERIALS OTHER THAN DUCTILE IRON, PROVIDE DOUBLE STRAP OR EXTRA-WIDE STRAP BRONZE SERVICE CLAMP. NEW TYPE-K COPPER SERVICE BRICK BASE 8" X 8" X 4" SET ON UN DISTURBED SOIL BE engineering design consulting WATER SERVICE DETAIL 2300 15"1 Street, Suite 220! 303*44.3333 Denver, Colorado 80202 f 303.964.3355 STANDARD DETAILS DATE: 4/25/07 REV: NO. W.1