Distributed PV the road California is already on. Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011



Similar documents
PG&E and Renewables. Finding the ROI in Green Programs. Andrew Yip Manager Solar and Customer Generation Integrated Demand-Side Management

California Distributed Generation (DG)

Net Energy Metering and the Future of Distributed Generation

SDG&E s Solar Projects

2014 EIA Energy Conference. Edward Randolph Director, Energy Division California Public Utilities Commission

PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation

California s Energy Future

The California Solar Initiative

Selling Residential Solar A Market Based Approach

Renewable Energy: Essential terms terms and and concepts for citizens and a dvocates advocates

About Southern California Edison

Emilio Camacho, Esq.

Webinar Basics. 5. If at any time you experience technical difficulties, please call the C.A.S.H. office at (916)

California s Electricity Market. Overview

Solar Interconnections

Overview of the CPUC s California Solar Initiative and DG Programs: James Loewen, Energy Division California Public Utilities Commission

Perspectives for ESS in Germany and Europe legal situation and applications StoREgio energy storage system association

Forecast of Future Electricity Costs in California. Prepared by: Strategic Resource Advisers, LLC November 12, 2014

Solar Resource Measurement Importance. Wil Grady P.E. Southern California Edison Power Supply NREL PV Solar Resource Workshop Denver 2015

Renewable Energy Credit (REC) Price Forecast (Preliminary Results)

California Energy Commission 2015 Accomplishments

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations

ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012

SOLAR POWER IN SANTA CLARA COUNTY MARKETS AND DEVELOPMENT TRENDS

Clean Energy Jobs Plan

Clean Energy Trends in North Carolina.

Overview of Long Island Electric Service Territory

CPUC California Solar Initiative 2010 Impact Evaluation

California: A Strong Global Market for Energy Storage

Energy Systems Integration

Tehachapi Renewable Transmission Project (TRTP)

CALIFORNIA PERSPECTIVE ON HIGH PENETRATION PV

Western Markets Overview

Jan McFarland Executive Director CA Alternative Energy and Advanced Transportation Financing Authority

MAKING SOLAR ENERGY COST-EFFECTIVE TODAY IS A SNAP

FINAL FORECAST

Research and Development: Advancing Solar Energy in California

PG&E s Distribution Resource Plan

Tehachapi Wind Energy Storage Project (TSP)

Cost and Performance Review of Generation Technologies Recommendations for WECC 10- and 20- Year Study Process

Solar Panels and the Smart Grid

From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015

Renewable Energy and Energy Efficiency for Tribal Community and Project Development. Basic Energy and Market Terms

U.S. Solar MARKET TRENDS JULY Larry Sherwood

Ubiquitous Computing in Business Processes Part V

Renewables Policy: A California Perspective

State of Renewables. US and state-level renewable energy adoption rates:

Prepared for: California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102

Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders

NEVADA S ELECTRIC POWER SYSTEM AND THE CLEAN POWER PLAN

Appendix F. DRECP Energy Development Assumptions and the BLM LUPA

Satellite-Based Software Tools for Optimizing Utility Planning, Simulation and Forecasting

Welcome to the SDG&E Renewable Market Adjusting Tariff (Re-MAT) Program Overview Webinar

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

SDG&E s - Sustainable Communities Program

Energy Action Plan II

Solar for Businesses. Getting Started with Solar. Laura Williams, Renewables Project Manager. June 10, 2015

Capital Cost Review of Power Generation Technologies Recommendations for WECC s 10- and 20-Year Studies

Half the cost Half the carbon

Evolution of the smart grid in China

NET ENERGY METERING: SUBSIDY ISSUES AND REGULATORY SOLUTIONS

Renewable Energy Roadmap Overview

Storage Battery System Using Lithium ion Batteries

REQUEST FOR PROPOSALS

Storage Incentives or Demand Side Management: is PV on the right track? 28 th EUPVSEC Paris, France Bryan Ekus Partner IBESA

Regulation by the Feed-in Tariff: Experiences from Germany

The Smart Grid: Utility Master Energy & Sustainability Planning

LADWP GREEN POWER PROGRAM

State Planning Agency, Tribal Utilities & Renewable Energy Regime in California

METERING BILLING/MDM AMERICA

Distributed Energy Resource Options and The Importance of The Electric Power Grid

Transcription:

Distributed PV the road California is already on Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011 1

John Geesman, Energy Commissioner, 2007 source: California Energy Circuit, State Sees DG Providing 25% Peak Power, May 11, 2007. There s an ongoing schizophrenia in state policy between what we say we want to do and what we actually allow to happen. 2

CPUC just can t say no Project Cost MM ($) CPUC judge s decision Full CPUC action PG&E Oakley 624 MW gas-fired $800 deny approve SCE Eldorado Ivanpah Transmission $450 deny approve SDG&E Sunrise Powerlink Transmission $2,000 deny approve 3

Federal judges can say no sources: Los Angeles Times, Court rejects U.S. bid to establish corridors for new electric transmission lines, February 1, 2011. San Diego Union Tribune, Judge blocks Imperial Valley solar project, December 17, 2010. 9 th Circuit strikes down DOE s attempt to establish national interest electric transmission corridors. This could be blow to SCE and SDG&E. Federal judge in San Diego blocks 709 MW of solar dishes in Imperial Valley, ruling government had not consulted enough with tribe. 4

What is the state s plan? Energy Action Plan Energy Action Plan Loading Order: Energy efficiency & demand response (net zero energy buildings EE/rooftop PV) Renewable energy Combined Heat & Power - CHP Conventional gas-fired generation Transmission as needed 5

How much rooftop PV does California need to meet 2020 net zero energy targets for existing buildings? ~15,000 MW CPUC, California Long-Term Strategic Energy Efficiency Plan, January 2011 update Target: 25% of existing residential reaches 70% reduction by 2020 Assume 30% reduction with EE, 40% with PV Residential rooftop PV requirement = 4,800 MW Target: 25% of existing commercial reaches net zero energy by 2020 Assume 30% reduction with EE, 70% with PV Commercial rooftop PV requirement = 9,800 MW Total residential and commercial rooftop PV = 14,600 MW 6

What is utility renewable energy plan? CPUC, 33% RPS Implementation Analysis Preliminary Results, June 2009, p. 87. J. Firooz, Transmission in Short Supply or Do IOUs Want More Profits?, Natural Gas & Electricity Journal, July 2010. graphic: Black & Veatch and E3, Summary of PV Potential Assessment in RETI and the 33% Implementation Analysis, Re-DEC Working Group Meeting, December 9, 2009, p. 10. 10,000 MW of largescale, remote solar. 0 MW of distributed PV. Customer-owned rooftop PV is not RPS-eligible. The more new, high profit (12% ROI) transmission the better. $15 billion in new transmission additions in California, justified on renewable energy, if utility plans realized. 7

20,000 MW of existing transmission supplying SoCal today, average load is 14,000 MW. 10,000+ MW Path 46 has lightest load in West. Sources: 2005 CEC Strategic Transmission Investment Study; June 2010 WECC Path Utilization Study Part of TEPPC 2009 Annual Report. 8

Local PV and remote solar the tortoise and the hare PV Project Underway California Solar Initiative Utility distributed PV SB 32 feed-in tariff CPUC renewable auction mechanism SMUD feed-in tariff Total committed DG PV Capacity (MW) 3,000 1,100 750 1,000 100 ~6,000 Completion date 2016 2014 2014 2014 2012 9

Remote solar projects still standing in ARRA cash grant hunt extended thru 2011 Remote solar project Capacity (MW) Ivanpah Blythe + Palen Genesis Desert Sunlight Chevron Lucerne Valley Total large remote solar 370 1,500 250 550 45 2,715 10

Germany the gold standard ~7,000 MW distributed PV installed in 2010 80+% on rooftops 1,550 MW of wind installed in 2010 80% distributed PV, 20% wind in 2010 Framework for success: feed-in tariff 11

Feb. 24 th 2011, Germany PV provides 10% of country s electricity at mid-day, should be ~20% on mild day in June German source, EEX Transparency Platform: http://www.transparency.eex.com/en/statutory%20publication%20requirements%20of%20the%20transmission%20system%20operators Installed Jan. 1, 2011: wind, 27,000 MW ac solar PV, 14,000 MW ac >80% of PV is rooftop Graphic: yellow = PV green = wind gray = conventional 12

Western Interconnect 2010 loads a bit higher than German loads: min 73,000 MW, max ~150,000 MW Black & Veatch, Need for Renewables and Gas Fired Generation in WECC - Wyoming Infrastructure Authority Board Meeting, Jan 25, 2010. 13

Cost of energy for solar, geothermal, and wind RETI Phase 2B report and CPUC renewable study source: Renewable Energy Transmission Initiative (RETI) Phase 2B Final Report, May 2010, Tables 4-5, 4-7, 4-8, CPUC 2010 LTPP proceeding, Long-Term Renewable Resource Planning Standards, Attachment 1, Table 1, June 2010. Technology Capacity (MW) Capacity factor (%) Cost of energy ($/MWh) Solar thermal, dry-cooled 200 24 202 Fixed thin-film PV 20 24 138 Tracking polysilicon PV 20 27 135 Geothermal utility-scale 81 148 Onshore wind utility-scale 33 95 14

DOE on current cost of distributed 10-20 MW PV source: DOE, Solar Vision Study Draft, Chapter 4: Photovoltaics: Technologies, Cost, and Performance, May 28, 2010, Figure 4-4, p. 7. 15

DOE on current cost of commercial rooftop PV source: DOE, Solar Vision Study Draft, Chapter 4: Photovoltaics: Technologies, Cost, and Performance, May 28, 2010, Figure 4-4, p. 7. 16

Germany installs residential PV at $4/W dc, we do same system for ~$6/W dc C. Landen Sovella AG, Complexity cost and economies of scale: Why German residential PV costs 25% less than US, presented at Solar Power International, October 2010. 17

Representative California peak load profile 18

PV and wind summer output profiles: PV tracks demand, wind is opposite demand 19

Summer peak availability - sun and wind are not the same Resource Reference Capacity factor (%) Tracking PV CPUC/E3, June 2009 77 Fixed rooftop PV Itron, 2010 CSI evaluation 50-60 Onshore wind PG&E 2006 Long-Term Plan 4 20

Achilles heel of remote central station generation, whether solar or wind - cost of new transmission sources: 1) RPS Calculator, 2) J. Firooz, P.E., CAISO: How its transmission planning process has lost sight of the public s interest, prepared for UCAN, April 15, 2010. CPUC calculated $34/MWh transmission cost adder in June 2009 for remote renewable generation. CPUC assumed renewable generation financed over 20 yr, transmission over 40 yr. Cost adder is $46/MWh if generation and transmission financed over same 20 yr period (apples-to-apples). 21

Achilles heel of wind power is lack of summer daytime output used by utilities to justify new generation of high cost peaker turbines source: CEC, Comparative Cost of Electric Generation Technologies, January 2010, Table 4 and Table 5. Note the dates shown in the table, 2009 and 2018, are commercial start dates. Combustion turbine (MW) Capacity factor (%) Cost of energy 2009 ($/MWh) Cost of energy 2018 ($/MWh) 50 5 844 1,009 100 5 795 951 22

Utilities wind power must be backed-up by combustion turbines World without RPS requirements utilities build combustion turbines to meet rising peak load. World with RPS requirements utilities build combustion turbines, and wind turbines, and new transmission to meet rising peak load. Or central station solar thermal or solar PV, and new transmission. Or distributed solar PV (ideally with limited 2 to 3 hr energy storage), and no new transmission. 23

Gov. Brown s Clean Energy Jobs Plan local focus 12,000 MW of local renewable power by 2020, out of 20,000 MW target Feed-in tariff for renewables under 20 MW 4,000 MW of new combined heat & power (can be fueled with biogas or biomethane) 24

The 21 st century smart grid, with full two-way flow at every substation source: CEC 2007 Integrated Energy Policy Report, December 2009, p. 155. 25

Utilities spend ¾ of total budgets on distribution system, but not yet building for 21 st century source: CEC 2007 IEPR, December 2009, pp. 155.-156 Utilities spend approximately three-fourths of their total capital budgets on distribution assets, with about two-thirds spent on upgrades/new infrastructure in most years. Investments will remain for 20 to 30 or more years. Magnitude of these investments suggests need to require utilities, before undertaking investments in non-advanced grid technologies, to demonstrate that alternative investments in advanced grid technologies that will support grid flexibility have been considered, including from a standpoint of cost-effectiveness. 26

2010 UCLA/LABC feed-in tariff for LA: enough for sustained wave of PV, and less than grid power note: grid power estimate is all-in including cost of energy, time-of-use, losses, and transmission & distribution costs PV category 2011 ($/kwh) 2019 ($/kwh) residential, 17% commercial, 50% ground, 33% PV composite Grid power 0.29 0.19 0.15 0.19 ~0.22 0.19 0.13 0.10 0.13 ~0.30 27

Residential rates are already at $0.30/kWh for about a third of the electricity sold in PG&E territory sources: 1) PG&E A. 10-03-014 General Rate Case Phase 2 filing, Chapter 3, 2) CEC 2009 Integrated Energy Policy Report (IEPR), Figure 4, p. 52. Assumption residential IOU customer consumption is 2/3 of total statewide residential consumption. California s investor-owned utilities (IOUs) bill residential customers using tiered rates, with high users paying much more. PG&E example: Tier 1 and 2 are in the $0.12 to 0.14/kWh range, Tier 3 at $0.30/kWh. About a third of the 30,000 gigawatt-hr per year PG&E residential usage is billed at Tier 3 rate. This means about 10,000 gigawatt-hr per year is billed at $0.30/kWh. 5,000 to 6,000 MW of distributed PV capacity would be required to generate 10,000 gigawatt-hr per year. 28

SDG&E example: urban PV potential is vast Commercial buildings: 1,600 to 1,800 MW (www.renewablesg.org) Commercial parking lots: 3,000 MW, residential: 2,800 MW Total PV potential: ~7,500 MW Highest demand ever recorded in SDG&E territory: 4,600 MW 29

PV and parking lots smart dual use Presentation by Chevron Energy Solutions, Solar Forum at Diablo Valley College, Feb. 8, 2008 30

PV for parking lot- shade is added value Presentation by Chevron Energy Solutions, Solar Forum at Diablo Valley College, Feb. 8, 2008 31

California is already on the road to a predominantly distributed PV future No technical or economic impediments. PV at the point-of-use is more cost-effective than remote solar thermal whether or not new transmission is needed. Remote PV that does not require new transmission is comparable in cost to PV at the point-of-use line losses negate much of the desert sun advantage. Hurdles are institutional investor-owned utility model has not yet been re-aligned to advance distributed energy future. 32