TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.



Similar documents
APPENDEX I FORM 1. including Kharab Kharab Area ,540.96m 2. Net Plot Area 1,86, m 2 1,38, m 2. Total Built up Area

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

Environmental Management Plan

Proposed Terms of Reference for EIA studies

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

1. INTRODUCTION: Proposed Residential and Commercial development at S. No. 22/2, Pune by Goel Ganga Developers (India) Pvt Ltd.

Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP

FORM-1 A 1. LAND ENVIRONMENT

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Environment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd.

Environmental Site Inspection Checklist

ENVIRONMENTAL MANAGEMENT PLAN :-

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from

PROJECT REPORT ON EXPANSION OF RESIDENTIAL APARTMENT PROJECT

COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Foul Drainage, systems and responsibility. Environmental Protection

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

ENVIRONMENT MANAGEMENT PLAN

How To Conduct An Environmental Impact Assessment

BASEMENT FLOODING. Prevention Guide for. Homeowners


Environment Management Plan. Residential & Commercial project

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

EMP for Pirangut Project Tal Mulshi Pune ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN

FORM 1. Project Proponent: M/s Casa Grande Private Limited. EQMS India Pvt. Ltd.

1.0 INTRODUCTION 1.1 GENERAL

Proposed General Plan Update Goals, Policies, and Implementation Actions

Village of St. Louis Sewer Back-up Policy

Protect your home from basement flooding

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Improper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.

BOMBAY XI FORM 1 FORM-1. Plot Area. FSI Area

What Is An On-Lot Sewage Disposal System?

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

Rainwater Harvesting

City of Green Bay Department of Public Works Engineering Department

Measures for reducing risk and increasing

List of Documents. List of Annexure

APPENDIX I FORM S. No. in the schedule 8(a) Building and Construction project.

A Property Owner s Guide

Form-I for seeking clearance for project attracting CRZ notification

Sydney Port Botany Terminal 3 Project Water Resource Management Plan

PROPOSED TERMS OF REFERENCE

Development of Organic Waste Treatment Facilities, Phase 2

CHAPTER 9 PERMITTING. 9.2 Scotland Exemption Waste management licence PPC permit 102

Downspout Disconnection Program FAQs

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

Ingredion ANZ Pty Ltd

Green House, Hungary

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Package Treatment Plant Policy and Procedure

APPENDIX I. Revised FORM 1

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

APPENDIX I (See Paragraph 6) FORM 1

Annexure-A. No additional land used. acquired for any activity of project without obtaining proper permission. v For controlling fugitive natural dust

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

4.2 Option 1 Expand Existing Lagoon System

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE

LEED PRESENTATION OUTLINE

Introduction to Waste Treatment Technologies. Contents. Household waste

Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery

PRE FEASIBILITY REPORT

PROPOSED RESIDENTIAL CUM COMMERCIAL BUILDING BLOCK NO. 24, NO. 670/16-A, N-28/16-A, CHAMUNDI VIHAR LAYOUT ROAD, NAZARABAD MOHALLA, MYSURU.

Permeable Paving System with StormAbsorb Technology

ENVIRONMENT MANAGEMENT PLAN

PRESENTATION. Improving the performance of Public Water Utilities A case study of Bangalore N.C. MUNIYAPPA, Chairman, BWSSB LOCATION MAP OF BANGALORE

Project Details-Minor Minerals (Other Than Sand)

Frequently Asked Questions about Septic Systems

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

ENVIRONMENT MANAGEMENT PLAN

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

6. Principles of effective plumbing systems

Water Recycles poster

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Type of Sewer Systems. Solomon Seyoum

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

Protect your. home from. basement. have you done everything you can?

CONCEPTUAL PLAN. CENTRAL PUBLIC WORKS DEPARTMENT (CPWD) GPOA Project Division Near Rajiv Nagar Thana Aashiyana Digha Road PATNA FOR

APPENDIX 4. Risk Tables

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

RHODE ISLAND. Downloaded

Florida Department of Environmental Protection

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Guidance on applying for approval of installation of a commercial onsite wastewater system

2013 CONSTRUCTION CONTRACTOR CATALOGUE ECATTS. Copyright ECATTS. All Rights Reserved.

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

ASSESSMENT OF ALTERNATIVE WATER

Best Management Practices

Transcription:

TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2 at Begur village and Sy No. 19(P) Hulimavu Village, Begur hobli, Bangalore South taluk, Bangalore BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. legally clear from all angles. Does the developer have legal powers to take up the project at the said location? 2. Whether the land is safe from the Soil analysis report suggested that land is pollution point of view? If not any fit for the development of gated mitigative measures are proposed to combat the pollution problem. community as envisaged in the CDP plan also. 3. What will be the impact on the existing water table due to the development of the project? Proponents propose to use water from the BWSSB and bought out from suppliers hence Ground Water will be used only during emergency and as such due to rain water harvesting, Ground Water table will 4. What will be the impact on the quality of the soil due to the project 5. What will be the damage caused to the top soil due to the project 6. Whether the air quality is good enough to accommodate the project 7. Whether the water quality is good enough to accommodate the project. 8. Whether the noise level permits the project to come up at the said location? 9. Whether the soil engineering parameters safe enough for the project to come up? get recharged and improve in due course. There will be no impact on the soil as there will not be discharge of wastewater or hazardous waste onto the soil and hence there will not be any impact on the soil quality. No damage has been done to the top soil as the same was conserved and will be used back for landscaping. Ambient Air Quality monitoring is being conducted in and around the project site. These points have been clearly addressed in detail in the earlier EIA report. The quality of the surface water and ground water were analyzed in the study area and the reports of the same were shown in the EIA report. However the quality of water has no bearing on the project as the water is going to be sourced through tankers during construction. The details will be addressed in detail in the EIA report. The noise levels will be tested in the study area as well as in the project site. Soil investigation test was conducted, which indicated that it is safe for the 1

Sl No TOR RESPONSE proposed building to come up and the same is enclosed. 10. Will there be any fire hazard to the project from the existing conditions? 11. What will be the impact on the local fauna due to the project? Will there by any threat to the local species of insects or animals due to the project. 12. Will the project cause any threat to the protected areas of archeological importance or on the heritage properties? 13. What will be the impact on the national parks due to the project? 14. What will be the impact on the water bodies near by due to the project? 15. What will be the safety norms adopted for the safety of the labour engaged in the construction? 16. What will be the steps taken to give hygienic and healthy environment to the labour 17. What will be the steps taken to prevent water pollution from the labour colony 18. What will be the steps taken to conserve the fresh water during the construction phase of the project. 19. What are the safety measures adopted for the safety of the labour? How their health is going to be monitored? What will be the steps taken in case of any emergency situation or accidents? 20. What is the monitoring carried out during the construction phase and how it is going to be done? There are no activities which are prone to fire hazards in the surrounding area and the project is safe from the fire hazards from the neighboring activities. A detailed study on the flora and fauna in the study area was carried out. Results will be depicted in the EIA report. There are no Archeological sources and hence there will be no threat to protected areas. There are no National Parks in the vicinity of the project. No contaminated water is being let out of the site and hence there will be no deleterious impact on the nearby water bodies. The labor colony is proposed at the project site and all measures such as sanitation, mobile Sewage Treatment Plant, shelter, electricity, safety gadgets, insurance, medical aid are been providing for the safety of the laborers. The wastewater generated from the labour colony is being collected and taken to a mobile Sewage Treatment Plant for treatment. Fresh water is being providing through tankers etc. The waste water generated from the labour colony is being collected taken to a mobile Sewage Treatment Plant for treatment & disposal. Treated grey water is being used for construction, thereby reducing fresh water consumption. A first aid kit is being provided at the security gate for emergency situations. In case of serious and fatal accidents, the laborers will be shifted to the nearby nursing home. The laborers are been made to follow the safety methods during construction. Regular health check-up is being conducting at the site. Ambient air quality monitoring is being conducting for the dust emissions, barricades are put up at the site to avoid 2

Sl No TOR RESPONSE the dust to travel outside the site. Sprinkling of water is being done at regular intervals, to keep the dust generated at the ground level. An external approved agency has been awarded the contract for conducting the same. 21. How the debris management is going to be done during the construction of the project 22. Will there be any awareness programmes planned during the construction and after implementation of the project in the field of Environment, Health and Safety? 23. What is the procedure adopted to over see the environmental related issues during the construction? 24. What are the efforts made to use the eco friendly construction materials? B. AFTER PROJECT IMPLEMENTATION The debris generated from the structural works has been used for filling at the driveways. Yes. Regular awareness programme for the laborers, EHS personnel are being conducted by our Environmental Consultants. The Projects General Manager is also designated as EHS head and would be having weekly review meetings to discuss the issues related with environment. It is proposed to use fly ash blended cement concrete and other locally available materials to be used to the maximum extent possible. 25. What will be the impact on the quality of the under ground water due to the project 26. What will be the impact on the quality of the air in the surrounding area due to the project 27. What will be the impact on the noise level due to the project 28. What will be the threat of fire hazard due to the project operations? There will be no impact on the Ground Water as the proponents have proposed to use the water supplied by BWSSB, bought out from suppliers and not the Ground Water. Due to rain water recharge, the ground water quality and level shall improve over time. There will not be any sources of air pollution other than the DG sets- 380 KVA DG set - 12no 250 KVA DG set 5 no Shall be installed as back-up power during power failure. Occasional emissions of DG Sets shall be there. There will be negligible emissions of SO 2. It will be extracted into above 17 m from Ground level in leeward direction. The only sources of noise pollution are the DG sets, for which acoustics will be provided. The buildings are designed as per the fire norms. The only source of fire hazard could be from the stored fuel, which is going to be stored as per the safety regulations to avoid any such 3

29. What will be the additional load of burden of solid waste from the project and how it is going to be handled? 30. What will be the additional load of burden of hazardous waste from the project and how it is going to be handled? 31. What will be the impact of waste water pollution on the soil and ground water due to the waste water generated? How it is going to be combated? 32. What will be the impact of leachate due to the solid waste from the project? 33. What will be the steps taken to conserve the fresh water during the operation phase of the project 34. What will be the procedure adopted to over see the environmental related issues during the operation phase of the project? 35. Will the project have any impact on the surrounding area temperature by the accidents and hence there will not be any threat of fire hazards. Incase of unforeseen situation, the fire safety measures as per the fire norms required will be provided for fire fighting During operation phase 4.1 MT/Day of MSW ( Organic- 2.5 TPD & Inorganic 1.6 TPD) and 20 Kg/Day of STP sludge shall be generated. Organic waste will be taken to bio-converter and inorganic waste will be given to BBMP Recyclers. STP sludge will be used back as manure on garden. There will be no Hazardous Waste generated except the used oil form DG Sets. The same will be handed over to authorized recyclers. Waste water generated will be treated using STP adopting advanced Sequencing Batch Reactor with diffused aeration, and the treated water will be used back in toilet flushing, landscaping, etc. Hence there will be no impact on soil or ground water as zero discharge policy will be adopted. The organic waste is going to be stored in a covered area with impervious flooring and will be converted using bio converters and hence there is no question of coming in contact with rain water or any water to get the leachate. Waste water generated will be treated by adopting advanced Sequencing Batch Reactor, and will be used back in toilet flushing, landscaping, etc. The total water demand during operational stage will be 1260 KLD. Out of this 833 KLD will be fresh water for domestic utilities and 427 KLD will be treated water for flushing. During monsoon season rain water will be harvested and collected in collection tanks, and used back as domestic water depending upon the intensity of the rain. An Environment Management Cell will be set up to monitor the environmental related issues. The General Manager Maintenance will be made the EHS head with proper training and regular awareness programmes will be conducted to the persons related with the environmental Issues. Since the proposed project is a residential one, there will be no glazing used as wall material 4

means of reflection of heat? 36. What are the steps taken to conserve energy in the project? Whether non conventional source of energy is used? 37. What is the percentage of land used for the greenery? 38. What will be the water required for the gardening purpose and how it is going to be met? 39. What will be the steps taken incase of any accidents after the project is commenced? What are the monitoring facilities 40. going to be provided after the project is commenced and what are the types of monitoring done? 41. Who will be responsible for the implementation of environmental management plan after the project is commenced? 42. How is the project going to help the local administration in terms of financial support? 43. How the air pollution is going to be controlled from the project? 44. What are the modern technologies adopted during the construction phase to help the environment? 45. Will there be any flooding of the area after the project is implemented? How the storm water is going to be managed? and hence there will be no impact on the surrounding temperature by means of reflection of heat. Saving of 23.87% per annum is proposed to be achieved by use of CFL Lamps, LED lamps,t5 lamps, Copper wound transformer, VFDs, solar energy, HF Ballast etc. Lighter shade paints shall be used externally for the building which absorbs less heat.. The total land area about 27.52% of land area is reserved for greenery. Additional plantation proposed will keep the area cool and green. The total water requirement will be 255 KLD for gardening, which will be met by treated water. GM Maintenance will take the post of the EHS head. He will have the well equipped and trained staff under him to take control over the situation in case of any accidents. Ambient air quality monitored and water quality analysis will be done though approved external agencies. The GM Maintenance will head the Environment Management cell and EHS. Regular environmental audits will be conducted to assess the conditions. The local administration will get the benefit in terms of taxes paid. DG sets are provided with chimneys to control the emissions and to disperse the emissions at higher altitude respectively. There will not be any other source of air pollution. Mobile treatment plant adopting SBR technology is proposed for treating the waste water generated from the labour colony. The proposed project will have well planned storm water drainage plan, with recharge pits. The overflow from the storm water drain will be let into the external sewer/ BBMP parks/construction site. 5