The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

BUILDING SAFETY UNIT

Practice Note

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

PLAN SUBMITTAL INFORMATION

INFORMATION BULLETIN NO.

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Basic Requirements for Residential Plan Review _

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Mobile Home Pre-Inspection Checklist

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

Page & Turnbull imagining change in historic environments through design, research, and technology

INFORMATION BULLETIN NO.

Residential Deck Safety, Construction, and Repair

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Single Family Dwelling Submittal Requirement Checklist with Basement

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

Residential Decks. Planning and Development Services Department

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas August 30, Prepared for:

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Building Permit Application

University of Northern Iowa Design Documents Standards. October 2014

3rd Annual Design Drafting Contest

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Raising the Roof Creating Roofs in Revit David Cohn

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Residential Inspection Guidelines

Roof Tutorial. Chapter 3:

Lighthouse Engineering, L.L.C.

POST AND FRAME STRUCTURES (Pole Barns)

Residential Plan Routing Information

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

Residential Building Permit Guide

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

SECTION GROUND WATER STORAGE TANKS

DEPARTMENT OF PLANNING AND DEVELOPMENT

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

Bureau Veritas Contact Information

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

2014 FLORIDA BUILDING CODE

APPLICANT / CONTACT:_

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST RESIDENTIAL FIRE SPRINKLERS NFPA 13D

Town of Beaumont. Lot Grading Guidelines

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Weekend Cabin Retreat Project Site Plans

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

Kanawha County Floodplain Regulations Quick Guide & Overview

Does Wall Township require an inspection by the building department on resale of a home?

FLOOD DAMAGE PREVENTION ORDINANCE

Chapter 6 ROOF-CEILING SYSTEMS

How To Install An Overhead Sewer

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

ORDINANCE NO

Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed with Staff)

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

BUILDING PERMIT SPECIFICATIONS

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

Self-Home Inspection Checklist

Site Development Information Worksheet for single family residential development

16. Storm water drainage

Excerpts from the Canadian National Building Code (NBC)

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

PROJECT COST ESTIMATES & FEASIBILITIES

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

PRIVATE WELL SEPARATION

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Commercial Building Valuation Report

SOLAR PV SYSTEMS PERMITTING PROCESS

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

City of Elk River BASEMENT Office Use Only

CITY OF HILSHIRE VILLAGE NEW HOUSE AND HOUSE ADDITION PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

Transcription:

THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers and Draughtsman Re: Requirements for Land Development and Planning Applications Reference is made to the St. Kitts and Nevis Building Code; Section 1 Administration of the Code subsections 109 110 in relation to the submission of Plans, that is to say: The plans to be submitted with an application for development permission are as set out in the publication of the Board REQUIREMENTS FOR LAND DEVELOPMENT AND PLANNING APPLICATIONS and detailed in subsection 110 which deals with Building Application Submission. Please be advised that all other relevant information is embodied within the Code and reference should be made to the Code for such information. This publication is a supplement of the Code and it is not intended to replace the Code in any form or manner. Requirements for Building Application Submission GENERAL REQUIREMENTS The application must satisfy the following: The applicant must present proof of ownership which could be in the form of (COT, Deed, and A letter from N.H.C. (National Housing Corporation) granting permission to build if 25% of the cost of the land is not paid. All Site, Location, Topographical and Floor plans shall show a north arrow. All drawings shall bear the name and address of owner and designer(s) and shall be individually numbered for ease of reference. Minimum sheet size shall be 18 x 24 for Final Approval. Sheet size 11 x 17 is acceptable for Approval in Principle. All application must be submitted in triplicate. The application forms must be completed giving all required information along with the corresponding application fee. The application must be correctly categorised before it can be considered for approval by the board 1

Applications for Final Approval must be accompanied by plans giving all the information set out below. Location Plan i) A Location Map is required. Where necessary, a Development Plan of the area shall be provided to aid the Building Inspectors. These plans are available for most areas of the island and are obtainable at the Lands and Survey office. ii) The location plan must show the name and position of existing roads and fixed and easily identifiable points such as streams, road junctions, bridges, and nearby houses. Site Plan i) Site plans must be submitted to an appropriate scale that is legible. ii) The Site Plan must show: The area, boundaries, principal dimensions and co-ordinates of the land. The location of existing buildings on the land and any other information to assist in clarity. The location of existing utility lines, poles and stays The location of any new proposed building and the relevant dimensions and appropriate setbacks. Including all stairs, cantilevers, roof overhangs and all other building elements Setbacks are taken from the nearest points to the boundaries For new building complete site setting out information is required For developments with an average slope of 4-0 or more, a topographical plan is required. Such topographical plan must be certified by a licensed surveyor. Site plan must show existing and finished contours Such contours or spot levels as are necessary for determining the grade of any proposed road and for the proposed drainage. Location of all retaining walls to be shown 2

Location and width of existing and proposed means of access including roads adjacent to the property. The application must satisfy the relevant parking requirements applicable to the development. Parking must be clearly defined providing all necessary dimensions and materials to be used. Details must be referenced to appropriate sheet(s). Water and sanitary drainage systems. the sizes of all drain pipes must be specified Location of grease traps, septic tanks and soak pits. They must be drawn to scale and must be dimensioned iii) Any land reserved for public access or for public use For additions to existing buildings, existing and proposed site plans are required. Floor Plan Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. General floor layout Names of all rooms Dimensions of spaces Width of openings Thickness of walls Materials of construction Floor plan must show relationship with the site Minimum width of stairs is 3-0 clear (exclusive of handrails, balusters etc.). Direction of flow and number of Risers must be indicated. In the event where a topographical plan is required, Floor plan(s) must relate to the topographical plan. The cross sectional cut lines must be shown in a continuous manner and must be cross referenced 3

Foundation Plan - Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. General foundation type proposed The cross sectional cut lines must be shown in a continuous manner and must be cross referenced Columns, stiffeners, footing and all structural components are to be called out and cross referenced to the corresponding details All structural reinforcement to be used must be specified The composition of the substructure must be specified. Clearly stating the grade of BRC to be used and the procedure of compaction to be followed Where a topographical plan is required, the foundation plan must show all relations to it Plan must be completely and accurately dimensioned Elevations - Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length.. At least four (4) Elevations must be provided. General architectural style of the building Location of openings with dimensions Floor heights ground to floor/floor to top of ring beam Roof pitch Surface finishes Where a topographical plan is required, the elevations must show all relations to it 4

Sections A minimum of two or as requested by the board. Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. Roof pitch Floor heights ground to floor/floor to ceiling Height between floor and bottom of footing and ground to Bottom of footing Height of openings Materials of construction Where a topographical plan is required, the sections must show all relations to it Details to be called out and cross referenced At least one of the Sections shall be taken through the stair case. All changes in Floor levels Structural Plans - Scale 1 = 1 0 ; Details of beams, columns and slabs Details of all walls Roof design and construction details Foundation details, piling etc Details of water cisterns and catchments All reinforcement details Eave, Valley, Ridge, Gutter and Wall to Timber Frames Details Stair details. Architectural and structural at a minimum scale ¾ = 1-0. 5

Roof Framing Plan - Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. Support of all roof elements including supporting beams. All rafter types and sizes are to be specified Roof design and construction details Roof materials to be used All roof members must be called out and cross referenced All reinforcement details Structure Framing Plan - Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. Support of all suspended slab, including all columns and beams. All beams to be labelled and cross-referenced to specific details Location, size and spacing of reinforcement in slab must be specified Finish treatment of suspended slab. Where slab is to be used as roof, specify dewater treatment. Where shear bars are used, the placement, dimension and spacing of such bars must be specified Plumbing - Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. Location of inspection boxes, grease traps etc Sizes and slopes of the pipes used in the sewer lines Location of shut-off valves. Size and location of pumps. Sizes of water lines Location of Vertical down pipes 6

Water storage and catchment details Location of water heater Vents Electrical - Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. Electrical layout Location of Electrical meter(s), Distribution Panels and Transformer(s). Sewerage - Scale ¼ = 1 0 ; 3 / 16 = 1-0 or ⅛ = 1 0 for large developments 6000 ft 2 and over in foot print; or 100-0 in length. Details of septic tanks, soakaways and leech field where needed. Details & type of sewerage treatment plant. Note that all drawings of structural works must be stamped and/or signed by the architect/engineer responsible for the design. INTERIOR REMODELING FOR OVER 25% OF THE BUILDING Location plan showing the precise location of the property Highlighted in relation to main roads and private roads submitted to an appropriate scale that is legible. Existing floor plan of building (minimum scale ⅛ = 1') Proposed new floor plan showing scope of works (minimum scale ⅛ = 1') Roof plan of building (minimum scale ⅛ = 1') Section through building showing construction details (minimum scale ¼ = 1') Details of all structural work Electrical and plumbing drawings where applicable (minimum scale ⅛ = 1') Clearly differentiate between new and existing works 7