SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST



Similar documents
SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

UNCONTROLLED COPY FOR REFERENCE ONLY

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

DEC STD ISO Quality Systems - Model for Quality Assurance in Production and Installation

Surgi Manufacturing Quality Manual

QUALITY MANUAL REVISION RECORD

AVNET Logistics & EM Americas. Quality Manual

Supplier Quality Requirements F16 Program

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Cartel Electronics. AS 9100 Quality Systems Manual

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

Bogue Machine Company, Inc. Business Instruction

ONTIC UK SUPPLIER QUALITY SURVEY

0. 0 TABLE OF CONTENTS

MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL

GLOBAL AEROSPACE PROCEDURE

Supplier Quality Assurance Requirements Manual

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

AS9100 Quality Manual

Quality Management System Manual

Camar Aircraft Parts Co. Procedures Manual

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Gulfstream Production Certificate Operations

ALL PRODUCTS MFG & SUPPLY

CORPORATE QUALITY MANUAL

SUPPLIER QUALITY SYSTEM AUDIT

Quality Management System Manual QM-QUA-001

Turbo Resources International Quality Procedure

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

Technical Manufacturing Corporation (TMC) Quality Manual

Self-Audit Checklist

BASE CONSTRUCTION INC

Uncontrolled Document

Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ PHONE: (520) FAX: (520)

Rockwell Automation Quality Management System

Quality Management System Manual ISO9001:2008

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility

Helical Products Co., Inc.

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

Quality Management System Manual Revision L

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA FAX

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

Supplier Quality Assurance Requirements Manual

ISO 9001:2008 Audit Checklist

Supplier Quality Requirements and Clauses

ISO 9000 Quality Standard Background Information Quality Systems Implementation

Quality Management System and Procedures

Micro Plastics, Inc. Quality Manual

Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1

Quality management systems

Quality Management System General

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

CENTRIS CONSULTING. Quality Control Manual

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc Business Park Drive, Suite A-1 Costa Mesa, CA 92626

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Quality Management System Manual

NATO STANDARD AQAP-2310 NATO QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR AVIATION, SPACE AND DEFENCE SUPPLIERS

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

ISO 9001:2000 Gap Analysis Checklist

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

Mossfiel Electrical & Safety Management Pty Ltd

Quality Systems Manual

How To Manage A Plant

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

ISO 9001:2000 AUDIT CHECKLIST

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

Eagle Machining, Inc. Quality Management System

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

ISO/IEC QUALITY MANUAL

This procedure applies to all aspects of Specialized Turning, Inc. s Aerospace Quality Management System.

QUALITY MANAGEMENT SYSTEMS

QUALITY MANUAL WITH SUPPORTING PROCEDURES

Quality Management Systems Manual

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

This Business Management System Manual is based on ISO 9001:2008 requirements

QUALITY MANUAL ISO Quality Management System

Purchase Order Clauses and Conditions

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

Tronair Quality Manual

Revision Date Author Description of change Jun13 Mark Benton Removed Admin. Manager from approval

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Quality Management System

AMETEK Airtechnology Group Ltd

ISO 9001:2008 QUALITY MANUAL. Revision B

Quality Agreement Template

Transcription:

General Information SUPPLIER QUALITY SYSTEM AUDIT CHECKLIST Vendor Code: Phone Fax: Vendor Name: Vendor Address: Completed by: Title: Signature: Date: Management Name: Title: Products/Services Description Description Quality System Compliance To ISO9001:2000 AS9100 Appendix QG Other: Main Customer Customer Product/Service Quality Key Personnel Name Title Education/Experience Previous Surveys/Approvals Company Date Level Comments CC-09-03, REV. NEW 1

1. Is there an up-to-date Quality Manual? 2. Are there Quality Procedures/Work Instructions? 3. Is there quality planning/program for each product/order? 4. Is there a process to assure all personnel are aware of the procedures? 5. Do customers have access to quality management system documentation? 6. Are the documents required by the quality management system controlled? 7. Are documents changes coordinated with the customer? 8. Is there a procedure to define the method for controlling records? 9. Are records available for review by customers? 10. Is there a configuration management process in place? (see ISO10007 for guidance) 11. Is there a documented quality policy? 12. Is the responsibility and authority of the quality parties defined? 13. Are there quality reviews at management level? 14. Does the management representative have the freedom/responsibility to resolve matters pertaining to quality? 15. Is there a plan for training/certification of employees and is it implemented? 16. Are the actual training/certifications made documented? 17. Is each new order reviewed? 18. Is each change to an order reviewed? 19. Are there development and testing procedures? 20. Are there up-to-date development planning documents? 21. Is there a requirements specification for each order? 22. Do the development documents undergo a process of review and approval prior to their release? 23. Are Design Reviews conducted and documented? 24. Are the development products undergoing test and validation? 25. Are changes documented and approved? 26. Are key characteristics identified per design or contract requirements? 27. Is all pertinent data that is required to allow the product to be identified, manufactured, inspected, used and maintained defined? (ie, drawings, part lists, specs, etc.) 28. Are docs/drawings reviewed and approved by authorized parties prior their release? 29. Is there an up-to-date list of docs/drawings revision? 30. Are obsolete docs/drawings removed? 31. Are docs/drawings changes reviewed and approved by the same parties who approved the original ones? 32. Is there a process of assessment/certification of new suppliers? 33. Does the process define actions to take when dealing with suppliers that do not meet the requirements? 34. Is there a method to assure that the suppliers and their sub-tire suppliers are using approved special process sources? 35. Is there a process of suppliers performance assessment? 36. Are records of the performance assessments available for review? CC-09-03, REV. NEW 2

37. Is there an up-to-date list of certified suppliers (ASL)? 38. Does the function that has the responsibility for approving supplier quality systems also have the authority to disapprove those suppliers? 39. Are docs/drawings (specs and quality requirements) attached to each order? 40. May the customer/representative of the customer perform inspection at the suppliers (and sub-tiers) premises 41. Do purchase orders to your subcontractors define all processing and testing requirements? 42. Are suppliers required to submit objective evidence of the quality of the product (e.g., COC, test reports, etc) 43. Is there an incoming inspection activity to review the required documentation or inspect the product upon receipt? 44. Is there a program whereby verification of the product is delegated to the supplier? 45. Is there a mechanism for service to delivered products 46. Are process controls and control plans in place where key characteristics have been identified? 47. Are the latest possible in-process verification points been identified? 48. Are variable measurements taken, particularly for key characteristics? 49. Are production and service provisions carried out under controlled conditions? And do the controlled conditions include: A. Accountability for all products during manufacture? B. Evidence that all manufacturing and inspection operations have been completed? C. FOD prevention, detection and removed? D. Monitoring and control of utilities and supplier such as water, compressed air electricity and chemical product to the extent that they affect product quality? E. Are there clear and concise work instructions? 50. Does production documentation contain the following: A. drawings, parts list, process flow charts, etc. B. A list of specific or non-specific tools and numerical control machines programs and instructions? 51. Are the persons authorized to approve changes to production processes identified? 52. Does the supplier identify and obtain acceptance of changes that require customer approval? 53. Are changes that affect processes, production equipment, tools and programs documented? 54. Are the changes to production processes assessed to confirm that the desired effect has been achieved without adversely effecting product quality? 55. Are production equipment, tools and programs validated prior to use? 56. Are there procedures requiring the production equipment, tools and programs to be inspected periodically? CC-09-03, REV. NEW 3

57. Are First Article inspections completed prior to production to validate the design data/specification? 58. Where servicing is a specified requirement, does the services operation provide for: A. method of collecting and analyzing in-service date B. a process for handling problems identified after delivery, (investigating, reporting, service information. C. control and updating technical documents D. approval, control and use of repair schemes E. process for off-site work, (at customer s facility). 59. Is there a configuration management system to identify any differences between the actual configuration and the agreed configuration? 60. Is there a process for controlling acceptance authority media, e.g., stamps, electronic signatures, etc. 61. Is there a unique identification for each product unit (catalog number/serial number) 62. Is there a Traceability report for the items in each product unit (As Planned/As Build) 63. Are there procedure for handling customer property 64. Is there an up-to-date list of customer property 65. Is the entrance/exit from storage areas controlled 66. Is the packaging done in accordance to defined requirements/packaging specs 67. Are delivered products accompanied by the docs required by customer 68. Is the calibration method compliant with ISO-10012? 69. Are there instructions for calibration/maintenance for each type of M&TE tool? 70. Is there an up-to-date list of M & TE tools and their calibration history? 71. Is there a periodical calibration plan and is it implemented (recall) 72. Is an up-to-date calibration tag attached to each M&TE tool? 73. Is there a plan for conducting internal quality audits and is it implemented? 74. Is an audit report submitted for each audit, including required corrective actions? 75. Is there follow-up on open corrective actions? 76. Is there a process for monitoring and controlling identified key characteristics? 77. Is there a process for documenting the measurement requirements for product or service acceptance? 78. Are there sampling inspections made and according to which standard? 79. Is there an SPC plan for processes and is it implemented 80. Is there a positive recall system for product that is released prior to completion of all required measurement and monitoring activities? CC-09-03, REV. NEW 4

81. Is measurement requirements for product/service acceptance documented and does it include: A. Criteria for acceptance/rejection B. Where in the sequence measurement and test operations are performed? C. a record of the measurement results D. type of measurement instruments required and use instructions 82. Do records provide evidence that the product meets the defined requirements? 83. Does the supplier perform First Article Inspections to include the inspection, verification and documentation of a representative item from the first production run of a new part? 84. Does the documented procedure define the responsibility for review and the authority for dispositioning nonconforming product? 85. Is there a process for approving the personnel to make decisions regarding disposition of nonconforming product? 86. Is there a process of disposition of nonconforming material, with the participation of all involved parties (MRB board) 87. Is the customer approving nonconforming material dispositions (if contractually required) 88. Is nonconforming material identified by "Nonconforming Material" tag 89. Is nonconforming material passed to segregated storage (MRB) 90. Is there an up-to-date list of nonconforming material in the MRB segregation area 91. Is there a mechanism for handling customer complaints 92. Is there a mechanism for handling nonconforming product 93. Is analysis Performed to identify root causes of problems/failures 94. Is there action initiated to prevent recurrence of problems/failures 95. Are problems/failures brought to management attention 96. Is there a process for flowing down the corrective action requirement to a supplier when it is determined that the supplier is responsible? 97. Is there a process for actions to be taken when timely or effective corrective actions are not achieved? CC-09-03, REV. NEW 5