1 QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 7 Page: 1 of 57 This document contains proprietary information and is not lo be distributed to or copted for a third party without the express written permission of Veridiam, Inc This document is lo be returned or destroyed upon request of Veridiam Inc.
2 TITLE DATE Chief Executive Officer Vice President, Quality Engineering and Management Representative /o Director, Human Resources Director, Operations, El Cajon WZ-7//O hief Financial Officer / Regulatory Compliance Manager Director, Operations, Oceanside Page: 2 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
3 TABLE OF CONTENTS 1. DOCUMENT REVISION HISTORY 5 2. INTRODUCTION Purpose Scope 7 Figure 1: Sequence and Interaction of the QMS 8 3. Terms and Definitions 9 4. QUALITY MANAGEMENT SYSTEM General Requirements Documentation Requirements MANAGEMENT RESPONSIBILITY Management Commitment Customer Focus Quality Policy Quality Planning and Evaluation Responsibility, Authority and Communication Management Review Resource Management Provision of Resources Human Resources Infrastructure Work Environment Product Realization Planning of Product Realization Customer-related Processes Design Purchasing Production Provision Control of Monitoring and Measuring Devices MEASUREMENT, ANALYSIS AND IMPROVEMENT General Monitoring and Measurement Control of Nonconforming Product Analysis of Data Improvement 47 Page: 3 of 57 This document conlains proprietary information and is not to be distributed to or copied for a third party without the express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
4 APPENDIX A: QMS Support and Implementation 50 APPENDIX B: Structure of Documentation Used in QMS 51 APPENDIX C: Veridiam Organizationai Chart 53 APPENDIX D: Veridiam Functional Organization and Responsibilites 54 Page: 4 of 57 This document contains proprietary information and is not to be distributed to or copied for a third party without!he express written permission o( Veridiam, Inc. This document is lo be returned or destroyed upon request of Veridiam Inc.
5 DOCUMENT REVISION HISTORY Page: 5 of 57 permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Vendiam Inc.
6 1. INTRODUCTION 1.1 Purpose This document has been prepared to describe the Quality management system in place at Veridiam. It provides policy and guidelines for all processes related to product provided by Veridiam to its customers This "Quality Management System Manual" is the top level of a multi-tiered structure, and is organized along the lines of ISO 9001, AS9100, ISO and NQA-1. While this Quality Management Systems Manual is referred to as the "Quality Manual", the details for implementation of policies and guidelines are provided in lower tiered documents such as procedures and work instructions Separate documents, QM-1 Supplement and QM-2 Supplement, list each lower tiered documents associated with the applicable sections of this Quality Manual. These supplemental documents may be revised independently of this Quality Manual Page: 6 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
7 1.2 Scope The scope of the work performed at Veridiam is fabrication and assembly of specialty alloys that serve the medical, aerospace, commercial and nuclear industries Veridiam's Quality management system encompasses several regulatory requirements and standards that include: a. ISO 9001:2008: "Quality Management System Requirements," b. CAN/CSA ISO 13485:2003: "Medical Devices - Quality Management Systems - Requirements for Regulatory Purposes," c. AS 9100C: "Quality Systems-Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing." d. 10CFR 50, Appendix B: "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," e. ASME NQA-1: 2008: "Quality Assurance Requirements for Nuclear Facility Applications," f. 10CFR21: 2005: "Reporting of Defects and Noncompliance' g. Ordinance No. 169, Ministerial Ordinance on Standards for Manufacturing Control and Quality Control for Medical Devices and In-vitro Diagnostic Reagents Exclusion: Veridiam's Quality Management System does not address the Design requirements (reference AS9100, ISO 9001, ISO and 10CFR50 Appendix B) Not Applicable: The following are not performed at Veridiam and are not applicable to the Quality management system: a. Test Control b. Installation and Servicing activities c. Sterilization d. Agents, distributor and consignee requirements e. Control of service operations Page: 7 of 57 This document contains proprietary information and is not!o be distributed to or copied for a third party without the express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
8 Figure 1: The Sequence and Interaction of the Quality Management System Processes Support Processes o o 3 En o c (/) o CD CD _Q C Core Processes i CO Q) 3 (D 3 Marketing Sales 72 Planning of Product Reaction 7.1 Purchasing 7 A A-A K 03 O o' Production "Verification 7.4.3; Handling, Storage, S Shipping "Performance data maintained Page: 8 of 57 permission of Veridiam, Inc This document is to be returned or destroyed upon request of Veridiam Inc
9 Terms and definitions 3.1 Throughout the text of this Quality Manual, terms and definitions given in ISO 9000 apply. 3.2 Special Requirements: those requirements identified by the customer or determined by the organization to have high risks to being achieved. Such requirements are typically subject to the risk management process. 3.3 Critical items: Items that have a significant effect on the product realization and use of the product, including safety, performance, fit, function, producibifity, service life all which may require specific actions to ensure they are adequately managed. 3.4 Key Characteristic: An attribute or feature whose variation has a significant effort on product fit. form, function, performance, service life oi producibility, that requires specific actions for the purpose of controlling variation. 3.5 Medical Device: Any instrument, apparatus, implement, machine, appliance, implant intended to be used alone or in combination, for human beings for one or more of the following purposes: a. diagnosis, prevention, monitoring, treatment or alleviation of disease, b. diagnosis, monitoring, treatment, alleviation of or compensation of an injury, c. investigation, replacement, modification, or support of the anatomy of a physiological process, d. supporting or sustaining life, e. control of conception, f. disinfection of medical devices, and, g. providing information for medical purposes by means of in vitro examination of specimens derived from the human body. 3.6 Advisory Notice: A notice issued by the organization subsequent to the delivery of a medical device. An advisory notice provides information regarding the use or modification of the medical device, the return of the medical device to the organization, or the destruction of the medical device. Page: 9 of 57 This document contains proprietary information and is nol to be distributed to or copied for a third party without the express written permission of Vendiam. Inc This document is to be returned or destroyed upon request of Veridiam Inc.
10 3.7. Responsible Engineering Manager: Also known as the "Management Representative". 3.8 Marketing Authorization Holder: Also known as the "Customer". QUALITY MANAGEMENT SYSTEM 4.1 General Requirements Veridiam has established, documented, implemented, and continues to maintain a Quality management system (QMS). The effectiveness of the QMS is maintained in accordance with International Standards and other documents that are shown in the Scope section of this Quality Manual Application and responsibility for QMS processes: The CEO is responsible for overall implementation of the QMS at Veridiam. Responsibilities of individual managers and their departments for implementing and supporting QMS processes are shown in Appendix A, QMS Support and Implementation Veridiam's guality management system also addresses customer and applicable regulatory quality management system requirements. Veridiam performs the following: a. determines the processes needed for the quality management system and their application throughout the organization, b. determines the sequence and interaction of these processes as seen in Figure 1, The Sequence and Interaction of the Quality Management System Processes, c. determines criteria and methods needed to ensure that both the operation and control of these processes are effective, d. ensures the availability of resources and information necessary to support the operation and monitoring of these processes, Page: 10 of 57 permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc
11 e. monitors, measures and analyzes these processes, f. implements actions necessary to achieve planned results, continual improvement, and maintain the effectiveness of these processes, g. when Veridiam chooses to outsource any process that affects product conformity to requirements, the organization ensures control over such processes, and h. the type and extent of control of outsourced processes are identified within the supplier management systems and contractual agreements. NOTE 1: Processes needed for the Quality management system referred to above include processes for management activities, provision of resources, product realization, measurement, analysis and improvement. NOTE 2: An outsourced process is a process that the organization needs for its quality management system and which the organization chooses to have performed by an external party. NOTE 3: Ensuring control over outsourced processes does not absolve Veridiam of the responsibility of conformity to all customer, statutory and regulatory requirements. The type and extent of control applied to outsourced processes can be influenced by factors such as: a. the potential impact of the outsourced process on the organization's capability to provide product that conforms to requirements, b. the degree to which the control for the processes is shared, c. the capability of achieving the necessary control through the application of purchasing processes. Page: 11 of 57 This document contains proprietary information and is no! to oe distributed to or copied for a third party without the express written permission of Veridiam. Inc Thts document is to be returned or destroyed upon request of Veridiam Inc
12 4.2 Documentation Requirements Activities affecting quality of product and compliance to the quality management system are prescribed by and performed in accordance with documents such as instructions, procedures, drawings, etc. These documents are commensurate in detail with the complexity of the activity and the degree of control required, and include: a. documented statements of a quality policy and quality objectives, b. a quality manual, c. documented procedures and records as required by International Standards and customer requirements, d. documents, including records determined by the organization to be necessary to ensure the effective planning, operation and control of its processes, e. quality system requirements imposed by applicable regulatory authorities, f. when International Standards, regulatory and customer requirements specifies that a requirement, procedure, activity or special arrangement be documented, it is implemented and maintained. g. for each type or model of medical device, Veridiam establishes and maintains a file either containing or identifying documents defining product specifications and Quality management system requirements. These documents define the complete manufacturing process. NOTE 1; Where the term "documented procedure" appears in this Quality Manual, the procedure is established, documented, implemented and maintained. NOTE 2: A single document may address the requirements for one or more procedures. A requirement for a documented procedure may be covered by more than one document. NOTE 3: Veridiam determines the form and medium best suited to documentation requirements. Page: 12 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
13 4.2.2 Quality Manual: Veridiam has established and maintains a Quality Manual that includes: a. the scope of the Quality management system, including details of and justification for any exclusion and/or nonapplication, b. the documented procedures established for the Quality management system, or reference to them, and c. a description of the interaction between the processes of the Quality management system. This is accomplished within each section of this manual, Separate documents, QM-1 Supplement and QM-2 Supplement, list applicable procedures that support the Quality Manual and the quality management system processes Control of Documents: Documents required by the quality management system are controlled in the following manner: a. approve documents for adequacy prior to issue, b. review, update, and as necessary, re-approve documents, c. ensure that changes and the current revision status of documents are identified, d. ensure that relevant versions of applicable documents are available at points of use, e. ensure that documents remain legible and readily identifiable, f. ensure that documents of external origin determined by the organization to be necessary for the planning and operation of the quality management system are identified and their distribution controlled, g. identify and maintain status of controlled documents, to ensure that changes and the current revision status of documents are identified, h. prevent the unintended use of obsolete documents, and to apply suitable identification to them if they are retained for any purpose, Page: 13 of 57 permission of Veridiam, inc. This document is to be returned or destroyed upon request of Veridiam Inc.
14 i. ensure that changes to documents are reviewed and approved either by the original approving function or another designated function which has access to pertinent background information upon which to base its decisions, j. defines the period for which at least one copy of obsolete controlled documents is retained. This period ensures that documents to which medical devices have been manufactured and tested are available for at least the lifetime of the medical device as defined by Veridiam, but not less than the retention period of any resulting record, or as specified by relevant regulatory requirements, k. personnel have access to QMS documentation and are aware of relevant procedures, and I. customer and/or regulatory authority representatives have access to non-proprietary QMS documentation. NOTE: Records are a special type of document and are controlled in accordance with section Control of Records: Records established to provide evidence of conformity to requirements and of the effective operation of the quality management system are controlled. A documented procedure defines the controls needed for the identification, storage, protection, retrieval, retention and disposition of records. Controls include: a. records remain legible, readily identifiable and retrievable b. records are retained for a period of time at least equivalent to the lifetime of the medical device as defined by Veridiam, but not less than two years from the date of product release by Veridiam or as specified by relevant regulatory requirements, and c. records are available for review by customers and regulatory authorities in requirements. accordance with contract or regulatory Page: 14 of 57 This document contains proprietary information and is not to be distributed to or copied for a third party without the eipress written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
15 MANAGEMENT RESPONSIBILITY 5.1 Management Commitment Top management provides evidence of its commitment to the development and implementation of the Quality management system and continually improving its effectiveness by: a. Communicating to Veridiam employees the importance of meeting customer as well as statutory and regulatory requirements, b. establishing the quality policy, c. establishing quality objectives, d. conducting management reviews, e. ensuring the availability of resources, and f. ensuring that those responsible for verifying quality have sufficient authority, direct access to management, organizational freedom, and the access to work to perform their function. Note: In some cases, the "customer" may be referred to as the "marketing authorization holder and other bodies receiving the products" A description of the functional organizations and their responsibilities are depicted in Appendix D. 5.2 Customer Focus Top management ensures that customer requirements are determined and are met with a goal of enhancing customer satisfaction Top management ensures product conformity and on-time delivery performance are measured and that appropriate action is taken if planned results are not, or will not be achieved. Page: 15 of 57 This document contains proprietary information and is not to be distributed to or copied tor a third party without the express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
16 5.3 Quality Policy Veridiam has an established Quality Policy. Top management ensures that the quality policy: a. is appropriate to the purpose of Veridiam, b. includes a commitment to comply with requirements, c. includes a commitment to continually improve and maintain the effectiveness of the quality management system, d. provides a framework for establishing and reviewing quality objectives, e. communicated and understood within Veridiam, f. is reviewed for continuing suitability, and g. is based on customer focus The Veridiam Quality Policy is as follows: We are committed to total customer satisfaction through compliance to requirements, maintenance of the quality management system and continuous improvement of our processes, products and services. Page: 16 of 57 This document contains proprietary information and is not to be distributed to or copied for a third party without Ihe express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
17 5.4 Quality Planning and Evaluation Quality Objectives: Top management ensures that quality objectives, including those needed to meet requirements for product, are established at relevant functions and levels within Veridiam. The quality objectives are measurable and consistent with the quality policy Quality Management System Planning: Top management ensures that: a. planning of the quality management system is carried out to meet the requirements of the quality objectives and the general requirements to establish, document and maintain the quality management system, b. the integrity of the quality management system is maintained when changes to the quality management system are planned and implemented, and c. actions are taken to implement improvements to the quality management system as soon as practical. 5.5 Responsibility, Authority and Communication Responsibility and authority: Top management ensures that responsibilities and authorities are defined, documented and communicated within the organization Top management establishes the interrelation of all personnel who manage, perform and verify work affecting quality, and ensures the independence and authority necessary to perform these tasks. Page: 17 of 57 This document contains proprietary information and is not lo be distributed to or copied for a third party without the express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
18 5.5.2 Management representative: Top management appoints a member of the organization's management who, irrespective of other responsibilities has the responsibility and authority that includes: a. ensuring that processes needed for the quality management system are established implemented and maintained, b. reporting to top management on the performance of the Quality management system and any need for improvement, c. ensuring the promotion of awareness of regulatory and customer requirements throughout Veridiam, d. promoting awareness among Veridiam employees of the Quality Policy and the requirement for customer focus in all activities, e. has organizational freedom and unrestrictive access to top management to management, and resolve matters pertaining to quality f. serves as the Veridiam point of contact when liaison with external parties on matters relating to the quality management system is required Internal communication: Management ensures that appropriate communication processes are established. The organization ensures that communication takes place regarding the effectiveness of the quality management system by one or more of the following means: a. format periodic reviews of the quality management system, b. communication of quality objectives and the status of their implementation in distributed reports, c. periodic all-employee meetings held by top management, and d. periodic meetings between department managers and the employees in their departments. Page: 18 of 57 This document conlains proprietary information and is not to be distributed to or copied for a third party without the express written permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc
19 5.6 Management Review General: Top management reviews Veridiam's quality management system in accordance with documented procedures. Management reviews: a. are performed at planned intervals to ensure its continuing suitability, adequacy and effectiveness, b. assess opportunities for improvement and the need for changes to the quality management system, including the quality policy and quality objectives, and. c. are documented in management review presentations and minutes, including actions to be taken Review input to management review includes information from: a. results of audits, b. customer feedback, c. process performance and product conformity, d. status of preventive and corrective actions, e. follow-up actions from previous management reviews, f. changes that could affect the quality management system, g. recommendations for improvement, and h. new or revised regulatory requirements Review output from the management review includes any decision and actions related to: a. improvements needed to maintain the effectiveness of the quality management system and its processes, b. improvement of product related to customer requirements, and, c. resource needs. Page: 19 of 57 This document contains proprietary information ana is nol to be distributed to or copied for a ttiird party without the express wrilten permission of Veridram, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
20 RESOURCE MANAGEMENT 6.1 Provision of Resources Management determines and provides the resources needed: a. to implement the Quality management system and to continually improve and maintain its effectiveness, b. to meet regulatory and customer requirements, c. to achieve Veridiam business and quality objectives, and d. to enhance customer satisfaction by meeting or exceeding customer expectations. 6.2 Human Resources General: Personnel who perform work affecting conformity to product requirements are competent on the basis of appropriate education, training, skills and experience. NOTE: Conformity to product requirements can be affected directly or indirectly by personnel performing any task within the quality management system Competence, Training and Awareness. The organization: a. determines the necessary competence for personnel performing work affecting conformity to product quality, b. where applicable, assesses the competence of employees and provides training or other takes other actions to achieve the necessary competence, c. evaluates the effectiveness of the actions taken to establish and maintain employee competence, d. ensures that personnel are aware of the relevance and importance of their activities and how they contribute to the achievement of the quality objectives, e. generates and maintains appropriate records of education, training, skills and experience, and f. establishes documented procedures for identifying training needs based on regional or national regulations if required. Page: 20 of 57 This document contains proprietary information and is not lo be distributed to or copied for a third party without the express written permission of Veridiam, Inc This document is to be returned or destroyed upon request of Veridiam Inc.
21 6.2.3 Veridiam ensures that ail employees receive initial and periodic training in quality management system procedures applicable to their job function. 6.3 Infrastructure Veridiam determines, provides, and maintains the infrastructure needed to achieve conformity to product requirements. Infrastructure includes, as applicable: a. buildings, workspace and associated utilities, b. process equipment (both hardware and software), c. supporting services {such as transport, communication or information systems), and d. pest control (such as insects or rodents) is provided on an as-needed basis in manufacturing and administrative areas Documented procedures outline requirements for maintenance activities, including their frequency, when such activities or lack thereof can affect product quality Hardware and software suitable for minimizing variation while ensuring product conformity is provided and maintained. A preventive maintenance program is implemented to assure that equipment performs reliably within design parameters. Software quality assurance procedures ensure that software is protected from modification without proper authorization and testing Records of maintenance activities and results are maintained. Page: 21 of 57 This document contains proprietary information and is not to be distributed to or copied (or a thud party without the express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
22 6.4 Work Environment Veridiam determines the requirements for, and manages the work environment needed to achieve conformity to product requirements Veridiam maintains a safe and efficient work environment for its employees. The following requirements apply: a. documented requirements for health, cleanliness and clothing of personnel if contact between such personnel and the product or work environment could adversely affect the quality of the product, b. where the work environment conditions can have an adverse effect on product quality, Veridiam has established documented requirements for the work environment conditions and documented procedures or work instructions to monitor and control these work environment conditions. Factors to be considered include temperature, humidity, lighting, cleanliness, protection from electrostatic discharge, etc., c. all personnel who are required to work temporarily under special environmental conditions within the work environment are appropriately trained trained person, or supervised by a d. if appropriate, special arrangements are established and documented for the control of contaminated or potentially contaminated product in order to prevent contamination of other product, the work environment, or personnel, and e. all necessary actions are taken to minimize the use and generation of hazardous materials and to ensure full compliance with applicable environmental regulations. NOTE: The term "work environment" relates to those conditions under which work is performed including physical, environmental and other factors such as noise, temperature, humidity, lighting or weather. Page: 22 of 57 This document contains proprietary information and is not lo be distributed to or copied for a third party without Ihe express written permission of Veridiam. Inc. This document is to be returned or destroyed upon request o( Veridiam Inc
23 6.4.4 Safety Program. Veridiam has made appropriate provisions for the safety of its employees through: a. actively managing the work environment in order to provide a safe, efficient work place that maximizes employee effectiveness, and b. a plant-wide safety program that focuses on such factors as safety guarding, fire hazards, trip hazards, and electrical safety has been established. When required, special safety programs (e.g., overhead lifting safety and forklift safety) are implemented and managed. Product Realization 7.1 Planning of Product Realization: Veridiam plans and develops the processes needed for the manufacture of product in accordance with documented procedures. Planning of product realization is consistent with the requirements of the other processes of the quality management system. The organization determines as appropriate: a. quality objectives and requirements for the product (see Note 1), b. the need to establish processes, documents, and provide resources specific to the product, c. required verification, validation, monitoring, inspection and test activities specific to the product and the criteria for product acceptance, d. records needed to provide evidence that the realization processes and resulting product meet requirements, e. configuration management appropriate to the product, f. resources to support the use and maintenance of the product (as applicable), g. cleanliness to specified levels and the removal of process agents, and, h. regulatory requirements for the product (as applicable). Page: 23 of 57 permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
24 NOTE 1: Quality objectives and requirements for the product include consideration of aspects such as: product and personnel safety reliability, availability and maintainability producibility and inspectability suitability of parts and materials used in the product selection and development of embedded software, and recycling or final disposal of the product at the end of its life NOTE 2: A document specifying the processes of the quality management system {including the product realization processes) and the resources to be applied to a specific product, project or contract can be referred to as a "quality plan." Project Management: As appropriate to the organization and the product, Veridiam plans and manages product realization in a structured and controlled manner to meet requirements at acceptable risk. This is accomplished within known resource and schedule constraints Risk Management: Veridiam has established processes for managing risk to the achievement of applicable requirements. Risk management includes: a. assignment of responsibilities for risk management, b. definition of risk criteria (e.g., likelihood, consequences, risk acceptance), c. identification, assessment and communication of risks throughout product realization, d. identification, implementation and management of actions to mitigate risks that exceed the defined risk acceptance criteria, e. acceptance of risks remaining after implementation of mitigating actions, f. additional assessments when requirements change, and g. documentation of assessments NOTE: Documented risk analyses are performed for product as required by International Standards or specific customer requirements. Page: 24 of 57 This document contains proprietary information and is not to be distributed to or copied tor a third party without the express written permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
25 7.1.4 The output of planning for product realization are in a form suitable forveridiam's method of operations, as applicable: a. sequence of manufacturing operations (traveler), b. a bill of material, c. the establishment of process controls and development of control plans where key characteristics have been identified by the customer, d. the identification of in-process verification points when adequate verification at a later stage of realization, of conformance cannot be performed e. the provision for tooling and measuring equipment so that variable measurements can be taken whenever possible, (particularly for key characteristics identified customer), by the f. identification of special processes and related qualification requirements, g. a means to record completion of manufacturing operations, and to collect data, and, h. requirements for product certification. 7.2 Customer-Related Processes Determination of requirements related to the product: Veridiam reviews the requirements related to the product in accordance with documented procedures. These reviews are conducted prior to the commitment to supply a product to the customer, including: a. requirements specified by the customer, including product requirements and the requirements for delivery, and postdelivery activities, b. requirements not stated by the customer but necessary for specified or intended use (where known), c. statutory and regulatory requirements applicable to the product, Page: 25 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
26 d. any additional requirements considered necessary, and e. internally-generated requirements are determined and can be met. NOTE: Post delivery activities include actions under warranty provisions or contractual obligations Review of requirements related to the product: Veridiam performs reviews prior to the commitment to supply a product to the customer (e.g. acceptance of contracts or orders, acceptance of changes to contracts or orders) and ensures that: a. product requirements are defined and documented, b. contract or order requirements differing from those previously expressed are resolved, c. the organization has the ability to meet the defined requirements, d. special requirements of the product are determined, and e. risks (e.g., new technology, short delivery time scale) have been identified and evaluated Where the customer provides no documented statement of requirement, the customer requirements are confirmed by Veridiam before acceptance Where product requirements are changed, Veridiam ensures that relevant documents are amended and that relevant personnel are made aware of the changed requirements Records of the results of the review and actions arising from the review are documented and maintained. NOTE; In some situations such as Internet sales, a forma! review is impractical for each order. The review may cover relevant product information such as catalogs or advertising material. Page: 26 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam me
27 7.2.5 Customer Communication and Satisfaction: Veridiam determines and implements effective arrangements for communicating with customers. These activities include: a product information, b inquiries, contracts or order handling, including amendments, c customer feedback, including customer complaints, and d. advisory notices As one of the measurements of the performance of the Quality management system, the organization monitors and reports information relating to customer perception as to whether Veridiam has met customer requirements, and has taken appropriate actions. 7.3 Design and Development This section is excluded as Veridiam neither designs nor develops products as defined in International Standards or customer requirements. All product manufactured by Veridiam is to customer design and specifications. 7.4 Purchasing Purchasing process: Veridiam has established documented procedures to ensure that purchased product conform to specified purchase requirements. The type and extent of control applied to the supplier and the purchased product is dependant upon the effect of the purchased product on subsequent product realization or the final product. Supplier controls include: a. evaluation and selection of suppliers in accordance with their ability to supply product or meet requirements. In some cases, suppliers must meet specific quality management system requirements. b. criteria for selection, evaluation and re-evaluation of suppliers is established in documented procedures. c. the maintenance of an Approved Supplier List (ASL) that includes approval status and the scope of the approval (typically by commodity or service), Page: 27 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
28 d. the periodic review of supplier performance. The results of these reviews are used as a basis for establishing the levels of control needed to ensure conformity to product or service requirements, e. necessary actions to be taken when dealing with suppliers who do not meet requirements is defined, f. when required, Veridiam and its suppliers use customerapproved special process sources, g. the process, responsibilities and authority for supplier evaluation and approval, changes of approval, and the status and conditions for controlled use of suppliers is defined, h. the risk and mitigation actions for use of suppliers are determined, and i. records of the results of supplier selection and evaluation are documented as well as any necessary actions arising from the evaluations. NOTE 1: Veridiam is responsible for the conformity of all products purchased from suppliers, including product from sources directed by the customer. NOTE 2: One factor that can be used during supplier selection and evaluation is supplier quality data obtained from objective and reliable external sources (such as an accredited quality management system, certification bodies or government or customer approvals). Use of this data represents one component of Veridiam's supplier control process. The organization remains responsible for the verification of purchased product to ensure that it meets specified purchase requirements Purchasing information: purchasing information describes the product or service to be purchased, including where appropriate: a. requirements for approval of product, procedures, processes and equipment, b. requirements for qualification of personnel, c. quality management system requirements, Page: 28 of 57 This document contains proprietary information and is not to be distributed to or copied (or a third party without the express written permission of Veridiam, Inc This document is to be returned or destroyed upon request of Veridiam Inc.
29 d. the identification and revision status of specifications, drawings, process requirements, inspection/verification instructions and other relevant data, e. requirements for test, inspection, verification (including production process verification), f. use of statistical techniques for product acceptance, related instructions for acceptance by the organization and applicable critical items including key characteristics, g. requirements for test specimens for inspection/verification, investigation or auditing, h. requirements for the need of the supplier to: notify Veridiam of nonconforming product, obtain approval of nonconforming product disposition notify Veridiam of organizational changes such as product/process changes, changes of suppliers, changes of manufacturing facility move, and flow down to the supply chain applicable requirements including customer requirements, i. record retention requirements, and j. the right of access by Veridiam, its customers and regulatory agencies to applicable areas of all facilities, at any level of the supply chain involved in the order and to all applicable records Verification of purchased product: Veridiam has established and implemented systems for inspection and/or other activities necessary to ensure that product meets specified requirements These systems include as applicable: a. obtaining objective evidence of the quality of the material from suppliers (e.g., accompanying documentation, certification of conformity, test reports, statistical records, process control data), b. inspection and/or audit at supplier's premises, c. review of the required documentation, d. inspection of materials upon receipt, e. delegation of verification to the supplier, or supplier certification, Page: 29 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
30 f. purchased material is not used or processed until it has been verified as conforming to specified requirements unless it is conditionally released under positive recall procedures, g. where Veridiam utilizes test reports to verify purchased material, the data in those reports is acceptable per applicable specifications. Veridiam periodically validates test reports for raw material, h. where Veridiam delegates verification activities to a supplier, the requirements for delegation are defined and a register of delegations maintained, i. where Veridiam or its customer intends to perform verification at the supplier's premises, Veridiam states the intended verification arrangements and method of product release in the purchasing information, j. where specified in the contract, the customer or the customer's representative is afforded the right to verify at the supplier's premises and Veridiam's premises that subcontracted product conforms to specified requirements, k. verification by the customer is not used by Veridiam as evidence of effective control of quality by the supplier and does not absolve Veridiam or the supplier of the responsibility to provide acceptable product, nor does it preclude subsequent rejection by the customer, I. where purchased product is released for production use pending completion of all required verification activities, the product is identified and recorded to allow recall and replacement if the product is later found nonconforming, and m. records of al! verification activities are maintained Veridiam ensures the adequacy of specified purchase requirements prior to their communication to the supplier To the extent required for traceability, Veridiam maintains relevant purchasing information and records. Page: 30 of 57 This document contains proprietary information and is not to be distributed to or copied for a third party without the express wnlten permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
31 7.5 Production Provision Control of production provision: Veridiam plans and carries out production provision under controlled conditions. Processes are performed under controlled conditions, so that quality is achieved and maintained by those responsible for performing work. Controlled conditions include, as applicable: a. the availability of information that describes the characteristics of the product, b. the availability of documented procedures, documented requirements, written work instructions and reference materials and reference measurement procedures as necessary, c. the use of approved processes, equipment, tools, programs, and materials, d. the availability of monitoring and measuring devices or equipment, e. the implementation of monitoring and measurement plans, f. the implementation of product release, delivery and postdelivery activities, g. the implementation of defined operations for labeling and packaging, h. accountability for all product during manufacture (e.g., parts quantities, split orders, nonconforming product}, i. evidence that all fabrication and inspection operations have been completed as planned or as otherwise documented and authorized, j. provision for the prevention, detection, and removal of foreign material, k. monitoring and control of utilities and supplies such as water, compressed air, electricity and chemical products to the extent they affect product quality, I. criteria for workmanship, which shall be stipulated in the clearest practical manner (e.g., written standards, representative samples or illustrations), and m. assignment of fabrication and inspection duties to qualified individuals. Page: 31 of 57 permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc.
32 7.5.2 Validation of processes for production: Veridiam validates processes for production where the resulting output cannot be verified through subsequent monitoring and measurement, and as a consequence, deficiencies become apparent only after the product is in use. These processes are often referred to as "special processes." Validation demonstrates the ability of these processes to achieve planned results by: a. defined criteria for review and approval of processes. b. approval of equipment and qualification of personnel. c. use of specified methods and procedures, d. requirements for records, and e. revalidation as needed Control of Manufacturing Process Changes are handled as follows: a. the organization identifies and obtains acceptance of changes that require customer and/or regulatory authority approval in accordance with contract or regulatory requirements, b. changes affecting processes, manufacturing equipment, tools and programs are documented. Procedures are available to control their implementation, c. Persons authorized to approve changes to manufacturing processes are identified, and d. the results of changes to manufacturing processes are assessed to confirm that the desired effect has been achieved without adverse effects to product quality. Page: 32 of 57 permission of Veridiam. Inc. This document is to be returned or destroyed upon request of Veridiam Inc
33 Control of manufacturing equipment, tools and computer programs is handled as follows: a. manufacturing equipment, tools and programs is safeguarded from deterioration at all times, validated prior to use, and maintained and inspected periodically according to documented procedures, and b. validation prior to manufacturing use includes verification of the first article produced to the design data/specification Control of Production specific requirements for cleanliness and contamination control-veridiam establishes documented requirements for cleanliness of product if: a. product is cleaned by the organization prior to sterilization and/or its use, or, b. product is supplied non-sterile to be subjected to a cleaning process prior to sterilization and/or its use, or, c. product is supplied to be used non-sterile and its cleanliness is of significance in use, or, d- process agents are to be removed from product during manufacture Installation, servicing and particular requirements for sterile medical devices per ISO are not applicable, as Veridiam does not produce product requiring installation, servicing or sterilization The organization establishes and maintains a record for each batch of medical devices that provides traceability and identifies the amount manufactured and amount approved for distribution. Batch or lot records are verified and approved. A batch can be a single medical device. Page: 33 of 57 This document contains proprietary information and is not to be distributed to or copied for a third patty without the express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Veridiam Inc
34 7.5.3 Identification and Traceability: As appropriate, the organization identifies product status by suitable methods throughout product realization. The organization has established procedures for product identification that includes: a. travelers, tags or other documents are maintained to ensure product status through manufacture, inspection and other measuring and monitoring activities, b. status identification of product is maintained throughout product realization and storage of the product to ensure that only product that has passed the required inspections and test (or released under an authorized concession) is dispatched and used, c. controls for the identification is maintained throughout the product life, d. the establishment of documented procedures to ensure that medical devices and other products returned to Veridiam are identified and distinguished from conforming product, e. the establishment of documented procedures for traceability. Such procedures define the extent of product traceability and the records required, f. for a given product, a sequential record of its manufacturing is retrievable, g. for an assembly, the identity of its components and those of the next higher assembly to be traced, h. provisions for the recording of the unique identification of the product including heat lot and other lot numbers, and i. identify the amount manufactured and approved for distribution or sale. NOTE: Configuration management at Veridiam is a means by which identification and traceability can be maintained. Page: 34 of 57 permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Vendiam Inc.
35 Particular requirements for active implantable medical devices and implantable medical devices are: a. in defining the records required for traceability, Veridiam includes records of all components, materials and work environment conditions, if these could cause the medical device not to satisfy its specified requirements, and b. requirements in ISO pertaining to agents and distributors and consignees do not apply, as Veridiam does not have agents, distributors or consignees for implantable medical devices Customer property: Veridiam exercises care with customer property while it is under the organization's control or being used by the organization. Veridiam: a. identifies, verifies, protects and safeguards customer property provided for use or incorporation into the product. b. if any customer property is lost, damaged or otherwise found to be unsuitable for use, the organization reports the conditions to the customer, and records are maintained. NOTE: Customer property can include intellectual property and personal data. Page: 35 of 57 This doaiment contains proprietary information and is not to be distributed to or copied for a third party without the express written permission of Veridiam, Inc. This document is to be returned or destroyed upon request of Vendiam Inc
Quality Management System Manual
Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic
More informationSUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
More informationQuality Management Systems Manual
Washington Division Quality Management Systems Manual ISO 13485:2003 DOCUMENT NUMBER 01-QM-MED REVISION LEVEL 01 PAGE 1 of 40 This manual describes the quality management systems structure at GM Nameplate
More informationCartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
More informationAEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised
More informationTable of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
More informationQUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
More informationALL PRODUCTS MFG & SUPPLY
ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY
More informationKaras Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,
More informationQuality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents
More informationISO 9001:2008 Audit Checklist
g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation
More informationTurbo Resources International Quality Procedure
TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE
More informationRevision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval
Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer
More informationISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
More informationQuality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents
More informationQUALITY MANUAL ISO 9001. Quality Management System
Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval
More informationUncontrolled Document
SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT
More informationISO 9001:2000 Gap Analysis Checklist
ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system
More informationAS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
More informationQUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171
More informationFINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A
FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision
More informationISO 9001:2008 Quality Management System Requirements (Third Revision)
ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management
More informationQUALITY MANAGEMENT SYSTEM Corporate
Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality
More informationCENTRIS CONSULTING. Quality Control Manual
CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,
More informationQuality Management System Manual QM-QUA-001
Quality Management System Manual QM-QUA-001 Nelson-Miller Inc. 2800 Casitas Avenue Los Angeles, Ca 90039 P a g e 2 Revision Date Description of the Change N/C 10/10/79 Initial release of documented inspection
More informationQUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents
Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality
More informationISO 9001:2008 QUALITY MANUAL. Revision B
ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,
More informationISO-9001:2000 Quality Management Systems
ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT
More informationAS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626
AS 9100 Rev C Quality Management System Manual B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626 Doc. No. AS9100C Rev E Effective Date: 01 JAN 2013 Page 2 of 45 CONTROLLED
More informationMicro Plastics, Inc. Quality Manual
ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company
More informationED FAGAN INC. QUALITY SYSTEM MANUAL
ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY
More informationISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR
Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:
More informationAVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
More informationCamar Aircraft Products Co. QUALITY MANUAL Revision D
QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)
More informationRev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368
Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies
More informationONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
More information14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
More informationSpecialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual
Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.
More informationISO 9001 Quality Systems Manual
ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best
More informationISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION
INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page
More informationFMC Technologies Measurement Solutions Inc.
Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...
More informationSupplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)
Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers
More informationThis Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
More informationQuality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011
Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial
More informationQuality Management System General
Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in
More informationVigilant Security Services UK Ltd Quality Manual
Quality Manual Date: 11 th March, 2014 Issue: 5 Review Date: 10 th March 2015 VSS-COM-PRO-001 SCOPE This Quality Manual specifies the requirements for the Quality Management System of Vigilant Security
More informationQUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
More informationQuality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page
Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have
More informationDisclosure to Promote the Right To Information
इ टरन ट म नक Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information
More informationINTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy
More informationRow Manufacturing Inc. Quality Manual ISO 9001:2008
Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More informationControl No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22
ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality
More informationQUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL
PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS
More informationEagle Machining, Inc. Quality Management System
Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014
More informationThe President of Inductors Inc. is the senior executive responsible for operations.
Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom
More informationQuality Management System Manual
Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:
More informationQuality Management System
LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority
More informationISO 9001:2015 Internal Audit Checklist
Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence
More informationSurgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
More informationNORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008
WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,
More informationQuality Systems Manual
Hardy Machine & Design, Inc. Quality Systems Manual Meeting ISO9001:2008 Requirements Ankur Goel August 21, 2015 Quality Systems Manual Hardy Machine & Design Rev. 015 Page 2 AS 9100 Quality Management
More informationInternal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context
More informationFree Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com
RCGLOBAL.COM Free Download ISO/TS 16949:2009 Requirements Checklist 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL(Canada), for internal use only. Page 1 of 57 Review performed
More informationContents. Management Policy Manual SEM USA Page 2 of 12
SEM USA Page 2 of 12 Contents 1. The Schneider Electric Motion USA Management Policy... 3 2. PROCESS INTERACTION... 4 3. COMPANY OBJECTIVES:... 5 4. MANAGEMENT SYSTEM... 6 4.1. General Requirements...
More informationQuality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
More informationCompany Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
More informationThe Prophotonix (UK) Ltd Quality manual
The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: info@prophotonix.com Page
More informationQuality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
More informationRevision 06. July 2011. Doug Carlberg, President & CEO
M2 GLOBAL TECHNOLOGY, LTD. Quality Management System Quality Manual Revision 06 July 2011 Approved by: Doug Carlberg, President & CEO Table of Contents Paragraph Title Page 0 Introduction to M2 Global
More informationQUALITY MANUAL ISO 9001:2015
Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to
More informationSargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
More informationDNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
More informationQUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 EFFECTIVE DATE: 11 SEPTEMBER 2015 REV O
IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 Introduction Value Plastics, Inc., dba Nordson MEDICAL created a Quality Management System (QMS) to document the company s best business
More informationQuality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.
ALABAMA RESEARCH & DEVELOPMENT This complies with the Requirements of ISO 9001:2008. Prepared By: Phyllis Olsen Release Date: 03/19/09 Quality Policy & Objectives s quality policy is to achieve sustained,
More informationQuality Systems Manual
Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02
More informationMossfiel Electrical & Safety Management Pty Ltd
ISO 9001:2008 QUALITY MANAGEMENT PLAN Be warned. Any reproduction of this quality management system or associated documents without the express permission of the company and
More informationQuality Management System and Procedures
Commercial HVAC/R Coils & Protective Coatings Quality Management System and Procedures Rahn Industries, Inc. Quality Assurance Manual Version 3.0 www.rahnindustries.com 1-800-421-7070 Commitment to Quality
More informationCorrespondence between ISO 13485:2003 and the US Quality System Regulation
Correspondence between ISO 13485:2003 and the US Quality System Regulation Correspondence between ISO 13485:2003 and the US Quality System Regulation 1 Scope 1.1 General This International Standard specifies
More informationQUALITY MANAGEMENT SYSTEM (QMS) MANUAL
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL This document and the data contained herein are the property of ISOLINK, and shall not, without prior written permission, be reproduced or used for any unintended
More informationHow To Manage A Quality Management System
Quality Management System Requirements for the Suppliers Of Arçelik A.Ş. Rev : 0.1 Date of issue : September 2005-1/23- -2/23- 0. INTRODUCTION... 5 0.1. GENERAL... 5 1. SCOPE... 5 1.1. GENERAL... 5 1.2.
More informationExample of a food company quality
Appendix A manual Example of a food company quality Contents Date: 13/03/95 RME-QLMN-OO Page 1 of 3 Section Title ISO 9001 reference 01 In trod uction 02 Purpose 03 Scope 04 Definitions 05 Management responsibility
More informationUNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
More informationQuality Assurance System Manual
The online version of this procedure is official. Therefore, all printed versions of this document are unofficial copies. St. Louis Public Schools Quality Assurance System Manual 801 North 11 th Street
More informationRockwell Automation Quality Management System
Rockwell Automation Quality Management System Our Quality Policy Rockwell Automation is committed to a global quality system focused on customer solutions. We achieve this through superior products and
More informationDEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation
Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard
More informationQuality Management System Manual
Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years
More informationQuality System Manual
Quality System Manual Joe Coatter 9/23/15 President - Joe Coatter Date Bill Gareis ISO/TS Management Representative - Bill Gareis 9/23/15 Date Revision Status: Revision # 7 (9-23-15) QUA-0003 4.2.2 SECTION
More informationISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic
More informationQuality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.
This complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.0 2011-04 Prepared By: Phyllis Olsen Release Date: 10/28/15 Certificate No: CERT-08776-2006-AQ-HOU-RvA
More informationQuality Management System Manual ISO9001:2008
Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1
More information0. 0 TABLE OF CONTENTS
QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2
More informationMEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL
United States Department of Agriculture Marketing and Regulatory Programs Agricultural Marketing Service Livestock and Seed Program Meat Grading & Certification Branch MGC Instruction 800 May 9, 2005 Page
More informationQuality Management System Policy Manual
Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality
More informationGOOD DISTRIBUTION PRACTICE FOR MEDICAL DEVICES (GDPMD)
MEDICAL DEVICE CONTROL DIVISION Ministry of Health, Malaysia Regulatory Requirements for Medical Device Safety & Performance GOOD DISTRIBUTION PRACTICE FOR MEDICAL DEVICES (GDPMD) DRAFT DRAFT 1 September
More informationRevision: X Date of Issue: January 28 th, 2014 Approved by: Greg Vassmer Management Representative PURPOSE OF THE QUALITY POLICY MANUAL
Page 1 of 51 PURPOSE OF THE QUALITY POLICY MANUAL This manual is issued to describe the Quality Assurance System to be employed by Trostel, Ltd. This manual and the systems and processes it describes will
More informationCUSTOMER SPECIFIC REQUIREMENTS
CUSTOMER SPECIFIC REQUIREMENTS For Use With ISO 9001:2008 & ISO/TS 16949:2009 Page 1 SYSTEMS POLICY MANUAL CONTENTS Revision History Approval Document Distribution and Control General Application Background
More information