OmegaPS Users Conference 2012. A DND Perspective for Equipment Acquisition Projects By: Pierre Demers (pierre.demers@forces.gc.ca)



Similar documents
DRMIS Master Data Guidelines For Army Fleets

F-35 Joint Strike Fighter Autonomic Logistics Supply Chain

Army Supply Chain: Delivering the Future to the Warfighter

THE BENEFITS. Facts/Figures

IBM Maximo for Aviation

Implement RAMIS MDAT application software through which Master Data can be cleaned up and verified, and then managed on a continuous basis.

Benefits gained from using new maintenance concepts and international logistics standards

Sikorsky Contractor Logistics Support Pioneering solutions for UH-72A Lakota life cycle management

IHS Haystack Gold The leading parts and logistics management system.

Flexible, Life-Cycle Support for Unique Mission Requirements

Project driven supply chain in complex MRO services Oracle e-business suite

Industry Engagement: Canada s Military Procurement System Canadian Association of Defence and Security Industries (CADSI)

Kobren LL Best Practice F35 JSF Part Sixteen

Sikorsky Aerospace Services A new world of support

Interos Corporate Capabilities

Applying Open Standards for PLM System Interoperability

Eurostep and John Stark Associates Technology White Paper

Logistics Modernization Program Integrating Product Data from the Top Floor to the Shop Floor

Chapter 2. The Development of Enterprise Resource Planning Systems

NAVAL SEA SYSTEMS COMMAND STRATEGIC BUSINESS PLAN

DEFENCE INSTRUCTIONS (GENERAL)

GLOBAL SERVICES FOR DEFENCE & AEROSPACE SECURE TODAY AND PREPARE FOR TOMORROW

Enterprise Services for Defense Transformation

ENTERPRISE ASSET MANAGEMENT (EAM) The Devil is in the Details CASE STUDY

Improving ERP Estimating

Rotorcraft Health Management System (RHMS)

Software Safety Strategy for US Navy Gun System Acquisition Programs

MSD Supply Chain Programme Strategy Workshop

PM-LAV Product Data Management Technical Information Architecture. Robert Missig Portal Dynamics, Inc.

UNITED STATES AIR FORCE. Air Force Product Support Enterprise Vision

Maximo Asset Management for the aerospace and defense industry.

Load Building and Route Scheduling

the the gear that keeps the supply chain running

Strategic Data Governance

Interrelationship with other "Ability Engineering" and Logistics Groups

World Class Windturbine Maintenance Project

Copyright , Pricedex Software Inc. All Rights Reserved

Auditing Capital Projects and Project Controls. March 2013

The e-supply Chain of the Future in the Automotive Industry

Why is Master Data Management getting both Business and IT Attention in Today s Challenging Economic Environment?

Presentation: Cloud reigns over (SPIR) spread-sheets

SMART SUSTAINMENT. Redefining Smart Sustainment Solutions

C-130 Fleet Management

Improvements Needed for Awarding Service Contracts at Naval Special Warfare Command

<Insert Picture Here> Master Data Management

Plexus Planning. Plexus - Mastering Complex Aerospace and Defense Supply Chains

Model, Analyze and Optimize the Supply Chain

Context and Background 5. The Equipment Budget 5. Summary of equipment spending plans 7. Sector analysis where does the money go? 9.

SeaPort-e Contract N D-7950

MARKETING INFORMATION SYSTEMS AND THE SALES ORDER PROCESS

BAE Systems Military Air Solutions

Business Intelligence Maturity In Australia

Model Based Management of Configurations of a Complex Systems: Common Submarine Combat System

SAP Supply Chain Management Elinor Castell Solution Owner Transportation, SAP SE

White Paper March Government performance management Set goals, drive accountability and improve outcomes

Master Data Management (MDM) in the Sales & Marketing Office

Managing Open Source Code Best Practices

Information Technology Solutions at Work

ReMilNet Service Experience Overview

Is the Cost of Reliability, Maintainability, and Availability Affordable for Software Intensive Systems?

BETTER BUYING POWER 2.0 INITIATIVES DESCRIPTIONS

ACS-1803 Introduction to Information Systems. Enterprise Information Systems. Lecture Outline 6

SECRETARY OF THE NAVY SAFETY EXCELLENCE AWARDS

Integrating Oracle E-Business Suite with Oracle Utilities Work Order Management System

Today, the Cisco Enterprise B2B team has created automated and standardized processes in the following areas:

How To Implement Itil V3

Network Systems Integration

Strategic Design. To learn more about the Naval Facilities Engineering Command, please visit us at and

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 9 R-1 Line #139

Accenture Federal Services. Federal Solutions for Asset Lifecycle Management

Product Strategy Update OTM Users Conference 2015

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

Headquarters U.S. Air Force. Building CERs & SERs for Enterprise Resource Planning (ERP)

INTELLIGENCE AND HOMELAND DEFENSE INSIGHT

Quick Facts. Global Footprint VERTICAL INDUSTRY FOCUS 220+ TEAM 24/7. Services.

Service Lifecycle Management Solutions

Program Life Cycle Cost Driver Model (LCCDM) Daniel W. Miles, General Physics, June 2008

Oracle Business Intelligence Enterprise Edition (OBIEE) Presented by: Rapidflow Apps Inc.

Supply Chain Transformation Through AIT Convergent Technologies

Strategic Sourcing & B2B E Commerce Solutions for ASEAN Purchasing Professionals. Bill Kohnen

JOINT STRIKE FIGHTER PHM VISION

DODIG July 18, Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets

Five steps to a successful material handling CMMS implementation

National Defense Industrial Association Systems Engineering Division Task Group Report Top Five Systems Engineering Issues

Data Quality Where did it all go wrong? Ed Wrazen, Trillium Software

Dissertation. How to implement Asset Management Control in a non-profit maintenance organization, on a cost effective manner

SUPPLY CHAIN SERVICES

PSM Guidebook April 2011

Transcription:

OmegaPS Users Conference 2012 A DND Perspective for Equipment Acquisition Projects By: Pierre Demers (pierre.demers@forces.gc.ca)

Overview 1: Intro Speaker s background Presentation goals 2: DND acquisitions Major Crown Projects (MCPs) 3: In Service Support Contract Framework (ISSCF) 4: ERP & EIE 5: Design for Supportability challenges Navy, Army and Air Force lessons 6 Final Thoughts

1: Introduction

Speakers Background Pierre Demers Systems engineer CF DND Naval projects VICTORIAL Class submarines HALIFAX Class Joint Support Ship (JSS) Canadian Surface Combatant (CSC) Performance-Based Accountability (PBA) Implementation of ISSCF ILS, ISS, Supportability ERP & EIE

Goals of the Presentation Goal#1: Provide a Better Understanding of DND Acquisition Projects and LSA Needs Goal#2: Discuss DND Acquisition Policy and its impact on LSA Needs Goal#3: Review Projects OmegaPS and Supportability Practices

2: DND Acquisition Major Crown Projects (MCPs)

Major Crown Projects (MCPs): Equipment Acquisition Supports the Canada First Defence Strategy Air 6 x MCPs: aircraft, helo, jets (3 at implementation) Land 3 x MCPs (1 at implementation) Sea 3 x MCPs (comply with National Shipbuilding Policy Strategy) Others DND Projects 1000+ equipment acquisition projects 1000+ service projects

3: In Service Support Contract Framework (ISSCF)

The Reality Industry objective: seeks Profit DND objective: seeks Effectiveness at an Affordable Cost Constraints: DND to focus on operations Technology complexity and growth The Challenge How do we design a support solution which will achieved both objectives simultaneously rather than one at the expense of the other? DND strategy: ISSCF

In-Service Support Contracting Framework (ISSCF) Established in 2006 for all new fleets Enhance Availability, reduce sustainment costs ISSCF key principles: ISS contract with original supplier Single Point of Accountability Use Performance metrics Long-Term (20+ yrs) Incentivized Fixed Price (unit/usage)

Fleet Support Concepts Traditional OWSM ISSCF Several legacy fleets All new fleets Hundreds of support contracts per fleet Component level (e.g. brakes) Time and materials 1-5 support contracts per fleet Major system level (e.g. Power Pack) Performance-based, incentived, fixed price, Cost + Agree mark up 1 support contract per fleet Platform level (e.g. complete WS) Performance-based, incentivized, fixed price Term = 1 year Term = 5+ years Term = 20+ years 11

4: Enterprise Resource Planning (ERP) And Electronic Information Exchange (EIE)

Interface with Industry SAP Web Portal Solution DND ERP: DRMIS: A SAP EIE Integrated Approach Web Services SAP Environ. Health & Safety SAP Quality Management SAP xmds Mobile SAP Plant Maintenance SAP Work Force Management SAP Production Planning SAP DFPS SAP Materials Management SAP SAP SAP Asset Accounting SAP DIMP Configuration Management SAP Business Intelligence SAP Project Systems SAP Financials SAP Controlling OmegaPS Supportability Deployable Capability

DND ERP: DRMIS DND ERP: Navy: since 2003 Army: since 2010 Air Force: next 12-24 months DND ERP: formally introduced a Supportability Analysis solution (BI extracts coupled with OmegaPS)

Electronic Information Exchange (EIE) Capability to exchange info between DND & Industry EIE Collaborative Environment (CE): Website / portal exchange files, e-meeting (WEBEX) Electronic Data Exchange (EDE) To enable performance-based ISS contracts Exchange data (maintenance, sparing) B2B (system-to-system) Large volume, automatic, real-time

5: Design for Supportability

The Dilemma with LSA? Who is using OMEGA PS for DND projects? Who has the skill sets in DND projects to use OMEGA PS? What tools are presently used to interrogate LSAR data in DND?

LSA Challenges Challenge is no one understands how everything is linked together (reqts, design, development, delivery, upkeep) EBS LSAR maintenance plans, maintenance reports, STE,training etc manuals (maintenance tasks) & spares Integrated approach: ILS & SE (to influence dsg) With limited skill sets in DND, LSA process & LSAR are not fully understood and utilized

Logistics Data Delivery for Projects Logistics data delivery has evolved The requirement for Commercial Off The Shelf components has introduced new challenges Logistics data is now provided from commercial vendors, some with little or no military ILS experience Data from multiple vendors is integrated by prime contractor for delivery into DND ERP LSA data translated into performance metrics

Data Management at DND Need contracted support to bring data to the level required to sustain weapon systems during their service life Navy: Fleet Data Management (FDM) Army: Central Data Management (CDM) Air Force: by OEM (fleet-by-fleet) Note: Need the right data, right format, right time, right person

DND Supportability Data Reqts ERN essential key to all technical objects, DND ERP and OmegaPS Equipment Family Tree critical tool for both Configuration Management and Analysis inconsistencies will result in flawed data collection Need data analyst to manage/clear structure & data Master Part List (MPL) SAP feature for Config Mngt representing Allowed Structure Vs Actual, down to Equipment level Mainly used by Air Force, SUBSAFE (certification reqts) FMEA: A critical starting point during design (SE & ILS integrated processes) needed to conduct RCMA, MTA (during acquisition phase) Needed to conduct R&M and failure analysis (during the ISS phase)

DND Supportability Data Reqts (cont) LORA Performed routinely during the acquisition phase Define 1 st, 2 nd, 3rd HALIFAX Class HALMOR initiative: to reduce maintenance load on Ship s Staff Using OmegaPS to capture failure code and for data loading into DND ERP Next step: conduct R&M analysis (Analyzer, DND ERP, other tools) MTA Maintenance Task Analysis (output) routinely done in Acquisition Maintenance Planning strategies Time-based Conditioned-based SWP scheduling / packaging Maintenance management (ship and fleet levels) Initial Provisioning & sparing (output) Legacy methodology: required spares Material Identification process

Navy LSA & OmegaPS Lessons Learned

Navy Supportability Reqts: Legacy Fleets HALIFAX Class HALMOAR HCM FELEX OmegaPS for: Data Verification and Validation (V&V) For Initial Data Load into DND ERP For Config Mngt (each ship, submarine) For Engineering Change

DND: LSA Terminology Challenges LSA terminology: -LCN DND terminology: -ERN -Navy -CF Legacy equip Use OmegaPS: -data conditioning -data loading ERP (SAP) Terminology: -FLOC -EMR -MMR

Navy: Assessing LSA deliverables Using OmegaPS Analyzer For Compliance: logistics products: Sparing Analysis Model (select spares, quantities) LSAR LORA RCMA FMECA For Design Reviews requires: Close liaison with LCMMs (SE & ILS) Analytical capability (need skills set) Adequate Software tools (licensing, s/w access) Depend internal and external SMEs (sub-contractors)

Navy Projects Use of OmegaPS (functions) LSA data and reports review and acceptance Data quality, mapping and loading Data Verification: meet naval operations (end-users) Data Validation Initial data load (in ERP) Master data upkeep Change Management Synchronize ILS data Naval Maintenance Effectiveness Review (NMER)

Navy Projects Use of OmegaPS (by phase) Definition Phase Define concept of support (who, what, when) Use OmegaPS, Analyzer for What-If analysis Define supportability and LSA reqts Implementation Phase Initial Provisioning process (sparing) LSA tasks & sub-tasks (FMEA, LORA, RCMA, MTL) Equip Config Mngt (by DND and by Contractor) Impact of DND ERP: maintenance, sparing/supply chain, others ISS Phase NMER LSAR data upkeep Equip Config Mngt Life Cycle Cost (LCC): living document

Army LSA & OmegaPS Lessons Learned

Army LSA challenges Large numbers of variants among vehicle fleets and land assets Possible duplication, data inefficiencies (LSAR, DND ERP, others) DND requires detailed LSAR: DND needs MSI repair instructions: ex: SEV containers Unclear reqts, subject to interpretation (conflict) Potential contract arising costs IPR issues DND requires breakdown of major components (BOM) to conduct field repairs (deployed) Ability to contract for 3 rd party support Army requires an Initial Data Load tool Army needs to have a tool to interrogate LSA data during the acquisition and ISS phases

Army LSA challenges Con t Material Identification & Cataloging Process Incomplete NSN, cage\mpn Discrepancies between Contractor bid submission package (evaluation process) and final deliverables received by DND Requirements interpretations Unclear requirements (DND limited ILS/LSA skill set) Arising/growth Clear definitions of terms MSI (Maintenance Significant Item): LRU/SRU Critical equipment / maintenance / spares

Air force LSA & OmegaPS Lessons Learned

Air ISSCF Fleets: LSA reqts Overview DND ERP not rolled-out to Air Force Air worthiness reqts Limited use of OmegaPS & Analyzer PD phase Limited project staff ILS/LSA skill set Have detailed R&M reqts (comply regulations, DTA) Implementation phase OEM provided LSA/LSAR & aircraft certification OEM infrastructure: warehouses, staff, expertise ISS Phase OEM to upkeep LSAR & certification data DND ERP: transaction tool, not an LSA tool!

6: Final Thought

EVOLUTIONARY APPROACH

The Future: PROGNOSTICS

The Future: CBM & PHM OPERATIONAL BENEFITS Improved System Capabilities Higher Platform Availability Improved System Design (Reliability and Maintainability) Reduced Aborted or Incomplete Missions Less Preventive Maintenance Reduced Corrective Maintenance Predictable Remaining Useful Life (RUL) Lower Total Ownership Costs / LCC Reduced Logistics Footprint

PHM Enabler Health Usage Monitoring Systems (HUMS) COTS technologies Ex: Commercial automobile industry DND Weapon systems Requirements Limited DND HUMS expertise & usage

The Future: Availability Modeling Use OmegaPS Analyzer for: Modeling fleet size Validate availability (uptime) For support performance-based contracts (ISSCF)

Fleet Management Warfighters (end-users) are interested in Fleet Management Army: tracking Vehicle off Road (VOR) Air Force: Yearly Flying Rate (YFR) Navy: high readiness ships (naval operations)

Questions