Improving ERP Estimating
|
|
|
- Elfrieda Jenkins
- 9 years ago
- Views:
Transcription
1 Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Improving ERP Estimating in the Department of Defense Dr. Wilson Rosa Max Hodal (Wyle) Brian Kolstad (MCR) Travis Packard Capt Charles Silvanic David Cashin (NCCA) Mike Tran (NCCA) Noel Bishop p( (DASA-CE) June 11, 2010 Approved for Public Release ( ) 1
2 Overview Overview I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2
3 Overview: What is an ERP? Enterprise Resource Planning (ERP) software An enterprise software application that t Has a single, integrated database Integrates multiple business functions across an organization onto a single computer system that serves everyone s needs Eases the exchange of data and facilitates communication among departments Each module works separately performing specific data-processing Typically y enabled by Commercial-Off-The-Shelf (COTS) Software (SW) I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3
4 COTS vs. Custom Overview: ERP vs. Traditional SW Organizational design vs. System design Interconnected Systems vs. Standalone Systems Life ecyce Cycle Differences ee Concept Refinement Concept Decision A B C Technology Development System Development & Demonstration Initial Operational Capbility (IOC) Production & Deployment Full Operational Capbility (FOC) Operations & Support Pre-Systems Acquisition Systems Acquisition Sustainment Pre-Initiation A B C Software & Systems Integration Selection, Project Prep & Blueprinting Configuration & Report, Interface, Conversion, Extension (RICE) Development Transition & Cutover FDDR Go Live Ltd. Deplt /OT&E IOC FOC Sustainment & Roll Out Pre-Systems Acquisition iti Systems Acquisition iti Sustainment t FDDR I n t e g r i t y - S e r v i c e - E x c e l l e n c e 4
5 ERP Investment Cost Allocation Management 9% Interim Logistics Support 28% Development 38% Deployment 18% Procurement 7% MIL-STD-881 AIS WBS Reference: Management (Government Only)= Program Management (PM), Systems Engineering (SE), Change Management (CM) Development = Prime Mission i Product, Contractor t SE/PM/CM, DT&E, Training i Development, Data, Other Deployment = Site Activation, User Training, Data Migration, Management/Engineering Support Interim Logistics Support = system operations, help desk, system/database administration, deployment hardware software refresh I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5
6 Cost Body of Knowledge Main Challenges with ERP Estimating Unfamiliar with Cost and Schedule Drivers Limited ERP Cost Research Few white papers found on cost drivers but none provide supporting data Policy and Guidance Limited data to support Program Decision reviews and Weapon Systems Reform Act of 2009 I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6
7 Cost Improvement Initiative I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7
8 Recent Developments First-Ever MIL-STD-881 Work Breakdown Structure, Data Dictionary, and Software Resource Data Report for ERP Adopted in recent Cost and Schedule Data Report Plans (CDSR) -- GFEBS, GCSS-Army, ECSS, DEAMS, GCSS-MC, and NAVY ERP ERP Cost Database AFCAA in conjunction with NCCA and DASA-CE have collected empirical cost, schedule, and technical data on 18 ERP programs ERP Cost Toolkit (Sep 10) Empirically-based cost estimating metrics and benchmarks ERP Cost Handbook (Nov 10) Standards, guidelines and rules of thumb for estimating ERP ERP Cost Risk and Uncertainty Metrics (Aug 10) I n t e g r i t y - S e r v i c e - E x c e l l e n c e 8
9 Acronym AIS Automated Information System BY09 Base Year 2009 CM Change Management COOP Continuity of Operations COTS Commercial Off The Shelf DASA CE Deputy Assistant Secretary of the Army (Cost and Economics) DEAMS Defense Enterprise Accounting Management System DISA Defense Information Systems Agency DT&E Development Test and Evaluation ECSS Expeditionary Combat Support System ERP Enterprise Resource Planning FDDR Full Deployment Decision Review FFRDC Fd Federally Funded dresearch and Development tcenter FOC Full Operational Capability GCSS Army Global Combat Support System Army GCSS MC Global Combat Support System Marine Corps Go Live Also referred as FOC HW Hardware IOC Initial Operational Capability MAIS Major Automated Information System MS Milestone PMP Prime Mission Product LRE Latest Revised Estimate NCCA Naval Center for Cost Analysis OEM OT&E PM PMO RICE SE SE/PM SRDR SW T&E WBS Original Equipment Manufacturer Operational Test & Evaluation Program Management Program Management Office (Government) Report, Interface, Conversion, Extension Systems Engineering Systems Engineering / Program Management Software Resources Data Report Software Test and Evaluation Work Breakdown Structure I n t e g r i t y - S e r v i c e - E x c e l l e n c e 9
10 Performance Tracker Performance Tracker I n t e g r i t y - S e r v i c e - E x c e l l e n c e 10
11 Performance Tracker Schedule Growth Actual schedule ranges between 110% and 240% of initial (Milestone B) schedule duration Extends standing army costs (a significant cost) 5 ERP programs I n t e g r i t y - S e r v i c e - E x c e l l e n c e 11
12 Based on data from 7 ERP Programs Performance Tracker Requirements Growth Growth is measured as percent difference between predicted and actual number of RICE Objects Projects Mean Median Low High Growth in RICE Object Count % 20.0% -13.7% 361.4% I n t e g r i t y - S e r v i c e - E x c e l l e n c e 12
13 Performance Tracker Historic ERP Cost Growth Actual/LRE vs. Baseline, Cost Growth Projects Sample Size (Number of Programs) Low Bound Mean High Bound Completed 3 8.4% 96.2% 187.8% Ongoing* 4* 117.6% 229.5% 411.3% Combined 7 8.4% 172.4% 411.3% 1 Investment Phase: Program Insertion through Go-Live *Historical schedule/cost growth beyond 5 year point I n t e g r i t y - S e r v i c e - E x c e l l e n c e 13
14 Contribution to Cost Growth *Contribution to Cost Growth by Variance Category Misc. 0% Quantity 10% Engineering 9% Schedule 25% Estimating 56% *Investment Phase Only: Program Insertion through Go-Live I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15
15 Reasons for Cost Growth 1. Estimation: A lack of understanding of the new technology and business environment led to the use of obsolete cost models ( s) and dubious estimating methods 2. Schedule: limited budgets have forced decision makers to extend the period of performance of Level of Effort related tasks Civilian, Contractor, and Military FTEs 3. Engineering: i Inexperience with Oracle/SAP Customization ti has led to underestimation of requirements. Difficulty changing business processes to match ERP processes 4. Quantity: war-fighter need has led some program offices to reassess user and implementation requirements I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15
16 Major Costs Major Costs I n t e g r i t y - S e r v i c e - E x c e l l e n c e 16
17 Major Costs: Background The primary purpose p of any metrics provided is to give the estimator insight into reasonable bounds and benchmarks for program size and cost. The benchmarks in this presentation should not be used for a primary estimating methodology!!! I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17
18 Major Costs: ERP Work Breakdown Structure WBS ID Level 1 Level 2 Level 3 Level 4 Level Automated Information System (AIS) 1.1 Automated Information System Prime Mission Product Release/Increment X Custom Application Software 1..n Enterprise Service Element t1..n Enterprise Information System 1..n External System Interface Development 1..n System Level Integration 1.2 System Engineering 1.3 Program Management Acquisition Logistics 1.5 System Test and Evaluation Development Test and Evaluation Operational Test and Evaluation Training/Data 1.10 Operational/Site Activation 1.10.X Site Type 1 N 1.10.X.1 Deployment Software and Hardware 1.10.X.2 Site Activation 1.10.X.3 User Training 1.10.X.4 Data Migration 1.10.X.5 Management/Engineering Support 1.10.X.6 Interim Logistics Support 110X X.6.1 Systems Engineering/Program Management 1.10.X.6.2 System Operations / Sustaining Engineering 1.10.X.6.3 Help Desk 1.10.X.6.4 System Database Administration 1.10.X.6.5 Deployment Hardware/Software Refresh 1.10.X.6.6 Software Maintenance, 1.10.X.6.7 Follow on Training 1.10.X Accreditation / Independent Verification and Validation Unpublished MIL-STD-881 References (Final Review Stage): [1] Appendix TBD: Automated Information System Work Breakdown Structure and Definition [2] APPENDIX I: COMMON ELEMENTS WORK BREAKDOWN STRUCTURE AND DEFINITIONS I n t e g r i t y - S e r v i c e - E x c e l l e n c e 18
19 Practical Cost Metrics: Mapped to ERP WBS Practical Cost Metrics Development Productivity ($/RICE) Size (RICE Objects) Size (External System Interfaces) Size (Business Processes) Program Office Staff (FTE/yr or $/yr) Duration (Years) Procurement / Deployment User Count Migrated Legacy Systems Servers (UNIX and Windows Servers) Operating Locations Training/Test Events Interim Logistics Support / Operations and Sustainment PMO Staff (% Ramp-Down after FOC) Contractor Staff (% Ramp-Down after FOC) Help Desk (Users/FTE) Software License Fees ($/User) System/Database Administration Staff (FTE/Servers) Follow on Training Factor (% of User Training Cost) ERP WBS Reference Development WBS 1.1.3, (contractor only), 1.5.1, WBS 1.1.3, (contractor only), 1.5.1, WBS WBS WBS (government only) WBS (government only) Procurement / Deployment WBS 1.10.X.1.1 (deployment Software) WBS 1.10.X.4 WBS 1.10.X.1.2 (deployment hardware) WBS 1.10.X.5 WBS 1.10.X.3 Operations and Sustainment WBS 1.10.X.6.1 (WBS 2.1 after FOC) WBS 1.10.X.6.6 (WBS 2.6 after FOC) WBS 1.10.X.6.3 (WBS 2.3 after FOC) WBS 1.10.X.6.5 (WBS 2.5 after FOC) WBS 1.10.X.6.4 (WBS 2.4 after FOC) WBS 1.10.X.6.7 (WBS 2.7 after FOC) Note: Interim Logistics Support (WBS 1.10.X.6) is renamed to Operations and Support (WBS 2.X) after FOC I n t e g r i t y - S e r v i c e - E x c e l l e n c e 19
20 Major Costs Major Cost Drivers: Development I n t e g r i t y - S e r v i c e - E x c e l l e n c e 20
21 Major Costs: Development Training Development 7% Development Test and Evaluation 26% Prime Mission Product 41% Contractor PM/SE/CM 26% Average Low High Stdev Prime Mission Product 41% 25% 60% 11% Contractor PM/SE/CM 26% 9% 51% 15% Development Test and Evaluation 26% 9% 43% 11% Training Development 7% 3% 16% 4% I n t e g r i t y - S e r v i c e - E x c e l l e n c e 21
22 Major Costs: Development Number of RICE Objects Includes Reports, Interfaces, Conversions, Extensions, Workflows, Bolt-On, and Patches Standard ERP Sizing metric Number of Business Processes and Sub-Processes Available early in the acquisition process Metric for complexity and size or as a crosscheck Number of Requirements Metric to determine size or as a crosscheck Number of External Interfaces Metric to determine complexity and size Drives complexity of ERP Development Training Includes Training Development Initial Training costs accounted for in Deployment I n t e g r i t y - S e r v i c e - E x c e l l e n c e 22
23 Major Costs: Development Mean Median Low High StDev $ per RICE Object (PMP Only) $143K $120K $9K $690K $170K $ per RICE Object (Development*) $400K $255K $20K $1,318K $377K *Development = Prime Mission Product, Contractor SE/PM/CM, DT&E, Training Development, Data, Other I n t e g r i t y - S e r v i c e - E x c e l l e n c e 23
24 Major Costs: Development Mean Median Low High StDev $ per RICE Object (PMP Only) $143K $120K $9K $690K $170K I n t e g r i t y - S e r v i c e - E x c e l l e n c e 24
25 Major Costs: Development Mean Median Low High StDev Hours per RICE Object (PMP Only) , Hours per RICE Object (Development*) 2,350 2, ,250 1,950 *Development = Prime Mission Product, Contractor SE/PM/CM, DT&E, Training Development, Data, Other I n t e g r i t y - S e r v i c e - E x c e l l e n c e 25
26 Major Costs: Development Government SE/PM (a.k.a PMO) Combination of civilian, military, and support contractors: PM, Systems Engineering, Change Management, and Support Does not include Prime Contractor SE/PM I n t e g r i t y - S e r v i c e - E x c e l l e n c e 26
27 SIZE METRICS Major Costs: Development Small ERP Programs Medium ERP Programs Large ERP Programs Sample Defined Defined Range Average Sample Range Average Sample Defined Average Range Number of RICE Objects Number of Business Processes Number of Business Sub Processes Number of Requirements Number of External Interfaces ,000 1, ,001+ 6, Number of Migrated Legacy Systems I n t e g r i t y - S e r v i c e - E x c e l l e n c e 27
28 Major Costs Major Costs: Procurement and Deployment I n t e g r i t y - S e r v i c e - E x c e l l e n c e 28
29 Major Costs: Procurement/Deployment Operational Test & Evaluation 7% Data Migration 13% Deployment Software and Hardware 43% user Training 24% Site Activation 13% Average Low High Stdev Deployment Software and Hardware 43% 9% 64% 30% Site Activation 13% 9% 16% 4% User Training 25% 15% 41% 15% Data Migration 13% 3% 31% 16% Operational Test & Evaluation 7% 3% 11% 4% I n t e g r i t y - S e r v i c e - E x c e l l e n c e 29
30 Major Costs: Procurement/Deployment Procurement/Deployment includes: HW purchases, HW upgrades, COTS SW, User Licenses, Rollout, Initial Training, i OT&E and applicable change management Includes Data Migration / Cleansing if migration is done on-site Should not include Hardware Refresh (but frequently does) User License Data com/corporate/pricing/technology price list pdf Discounts from the OEM (from Supply Management Office or other resources) are frequently available and may be applicable to license refresh rates in O&S I n t e g r i t y - S e r v i c e - E x c e l l e n c e 30
31 User Count Major Costs: Procurement/Deployment Includes Users and SW Maintainers Useful to calculate COTS licenses, servers, storage space, and size Migrated Legacy Systems provide insight into complexity and scope of the ERP, and is especially helpful in estimating data conversion, data cleansing, and data migration Servers Useful to calculate storage space and amount of data transfers anticipated i t I n t e g r i t y - S e r v i c e - E x c e l l e n c e 31
32 Major Costs: Procurement/Deployment Operating Locations are a cost driver for ERPs, specifically for Deployment labor, Deployment schedule, training, site activation costs, and travel costs. Note: Due to lack of consistent reporting and varying definitions of Locations, they were not included in this set of metrics Could mean central server locations (including COOP) Could mean bases (or other equivalent) where the ERP is used (Preferred) Site Activation Varies by program and number of operating locations Typically does not require much HW, but is labor-intensive OT&E Data is incomplete or not broken out to specify OT&E I n t e g r i t y - S e r v i c e - E x c e l l e n c e 32
33 Major Costs: Procurement/Deployment SIZE METRICS Small ERP Programs Medium ERP Programs Large ERP Programs Sample Defined Average Sample Defined Defined Average Sample Range Range Range Average Number of RICE Objects ,050 Number of Et External Interfaces User Count 6 0 5,000 1,890 4 Number of Servers 5,001 15,000 10, , , I n t e g r i t y - S e r v i c e - E x c e l l e n c e 33
34 Major Costs Major Costs: Operations and Sustainment I n t e g r i t y - S e r v i c e - E x c e l l e n c e 34
35 Major Costs: O&S Hardware/Software Refresh 5% Follow on Training 2% Software Maintenance 8% Accreditation and IV&V 1% System Database Administration 18% Systems Engineering & Program Management 32% Help Desk 9% System Operations 25% * I n t e g r i t y - S e r v i c e - E x c e l l e n c e 35
36 Government SE/PM Staffing Ramp-Down (Post-FOC) Average of 4 programs is around 50% Major Costs: O&S The two programs that kept a higher percentage of staff post- FOC had higher RICE Object counts I n t e g r i t y - S e r v i c e - E x c e l l e n c e 36
37 Major Costs: O&S Recurring COTS License Fees Typically represented as an annual cost based on a percentage (around 20% 30% annually) of the initial purchase cost Initial Purchase Cost price lists list.pdf Discounts on Initial Purchase of COTS may be applicable to license refresh rates in O&S I n t e g r i t y - S e r v i c e - E x c e l l e n c e 37
38 Summary Summary I n t e g r i t y - S e r v i c e - E x c e l l e n c e 38
39 Schedule growth drives a large portion of cost growth Summary Some of the largest costs in the program are PMO/FMO and System Integrator staffing ( Standing Army costs) Schedule growth has relatively small effect on PMP cost, but the standing army must be kept, greatly increasing the below-the-line costs RICE is a reasonable estimator, if uncertainty is included Very wide variations around the mean The bulk of the costs are in Development and Deployment; Procurement plays a small role DISA / Mega-Center / Database Maintenance costs figure primarily in O&S, and make up a substantial portion of O&S costs O&S Metrics are evolving as ERPs enter that t life cycle phase and generate data I n t e g r i t y - S e r v i c e - E x c e l l e n c e 39
40 Questions? I n t e g r i t y - S e r v i c e - E x c e l l e n c e 40
Headquarters U.S. Air Force. Building CERs & SERs for Enterprise Resource Planning (ERP)
Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Building CERs & SERs for Enterprise Resource Planning (ERP) Programs Dr. Wilson Rosa, Travis Packard, Abishek Krupanand,
GAO MAJOR AUTOMATED INFORMATION SYSTEMS. Selected Defense Programs Need to Implement Key Acquisition Practices
GAO United States Government Accountability Office Report to Congressional Addressees March 2013 MAJOR AUTOMATED INFORMATION SYSTEMS Selected Defense Programs Need to Implement Key Acquisition Practices
Enterprise Resource Planning Systems Schedule Delays and Reengineering Weaknesses Increase Risks to DoD's Auditability Goals
Report No. DODIG-2012-111 July 13, 2012 Enterprise Resource Planning Systems Schedule Delays and Reengineering Weaknesses Increase Risks to DoD's Auditability Goals Additional Copies To obtain additional
Status of Enterprise Resource Planning Systems Cost, Schedule, and Management Actions Taken to Address Prior Recommendations
Report No. DODIG-2013-111 I nspec tor Ge ne ral Department of Defense AUGUST 1, 2013 Status of Enterprise Resource Planning Systems Cost, Schedule, and Management Actions Taken to Address Prior s I N T
Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
Commercial Software Licensing
Commercial Software Licensing CHAPTER 11: Software Prepared by DoD ESI January 2013 Chapter Overview The government uses three primary agreement types for services: Fixed Price (FP). T&M (Time and Materials).
ort Office of the Inspector General Department of Defense YEAR 2000 COMPLIANCE OF THE STANDARD ARMY MAINTENANCE SYSTEM-REHOST Report Number 99-165
it ort YEAR 2000 COMPLIANCE OF THE STANDARD ARMY MAINTENANCE SYSTEM-REHOST Report Number 99-165 May 24, 1999 Office of the Inspector General Department of Defense Additional Copies To obtain additional
Army Supply Chain: Delivering the Future to the Warfighter
Army Supply Chain: Delivering the Future to the Warfighter Logistics Supporting Activity Life Cycle Logistics Tools Workshop 8 March 2010 Army Transformation Demands SC Transformation Seven years of conflict
How To Get A Production Line Of A Cloud Based System To Work For A Military
Global Combat Support System- Marine Corps (GCSS-MC) Program Overview and Status Andrew Dwyer, PM GCSS-MC 1 May 2012 Agenda Bottom Line Up Front GCSS-MC Program Overview Increment 1 Concept of Employment
How To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
Developing Work Breakdown Structures
Developing Work Breakdown Structures International Cost Estimating & Analysis Association June 2014 Neil F. Albert MCR, LLC [email protected] 703-506-4600 2014 MCR, LLC Distribution prohibited without express
How To Implement Itil V3
2009 NMCI Conference: Implementing ITIL Session 1: ITSM Process ITSM COE Agenda Background ITSM Overview ITIL and Service Delivery Adopting ITIL to NGEN SE&I Activities 2 Background Develop Government
Joint Operational Medicine Information Systems Program
COL John R. Bailey, Deputy Program Manager 2015 Defense Health Information Technology Symposium Joint Operational Medicine Information Systems Program 1 DHA Vision A joint, integrated, premier system of
SPAWAR HQ ARCHITECTURE AND HUMAN SYSTEMS GROUP Human-Systems Integration/Systems Engineering Support Performance Work Statement
SPAWAR HQ ARCHITECTURE AND HUMAN SYSTEMS GROUP Human-Systems Integration/Systems Engineering Support Performance Work Statement 1.0 INTRODUCTION The Department of the Navy Space and Naval Warfare Systems
DEFENSE CONTRACT MANAGEMENT AGENCY PROCUREMENT, DEFENSE WIDE Fiscal Year (FY) 2002 Amended President's Budget
PROCUREMENT, DEFENSE WIDE Fiscal Year (FY) 2002 Amended President's Budget EXHIBIT TITLE PAGE Purpose and Scope/Justification of Funds 2 P-1 Summary 6 P-1C Comparison Report 7 PB-1 Summary of FY 2002-2003
INFLUENCING AND OPTIMIZING BUDGETS AND SPENDING
INFLUENCING AND OPTIMIZING BUDGETS AND SPENDING By: Major General (MG) Karen Dyson & Morteza Anvari Major General Karen E. Dyson serves as the Director of the Army Budget in the Office of the Assistant
SENTINEL AUDIT V: STATUS OF
SENTINEL AUDIT V: STATUS OF THE FEDERAL BUREAU OF INVESTIGATION S CASE MANAGEMENT SYSTEM U.S. Department of Justice Office of the Inspector General Audit Division Audit Report 10-03 November 2009 Redacted
How To Develop A Data Center Cost Model
Considerations in Data Center Migration Life Cycle Cost Estimating A Joint Information Environment (JIE) Perspective Dennis J. McKeon June 2015 Approved for Public Release; Distribution Unlimited 15-1446.
Total Cost of Ownership
Protecting America's Pensions Office of Information Technology IT Investment Owner's Guide to Total Cost of Ownership Version 1.0 Last Updated Date: January 25, 2011 Revision History Document Version Release
Information Technology
May 7, 2002 Information Technology Defense Hotline Allegations on the Procurement of a Facilities Maintenance Management System (D-2002-086) Department of Defense Office of the Inspector General Quality
Project Management Planning
The Project Plan Template The Project Plan The project plan forms the basis for all management efforts associated with the project. A project plan template is included in this document. The information
Executive Branch IT Reorganization Project Plan
Office of Information Resource Management Executive Branch Project Plan Work Program Funded by for IT Appropriations Reorganization 2007, 2009 and Five Small Projects Date: August 2009 Version: 1.3 Revision
UNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014
FD-101. Electronic Commodity Ordering System (ECOS) & Web Based Supply Chain Management (WBSCM) Todd Griffith FDD Systems Branch May 2008
FD-101 Electronic Commodity Ordering System (ECOS) & Web Based Supply Chain Management (WBSCM) Todd Griffith FDD Systems Branch May 2008 Overview ECOS Update 2007 Accomplishments 2008 Accomplishments &
Using Parametric Software Estimates During Program Support Reviews
Using Parametric Software Estimates During Program Support Reviews Version 1.0 Chris Miller Office of the Deputy Director, Software Engineering and System Assurance SYSTEMS & SOFTWARE ENGINEERING Office
Report No. D2008-041 January 14, 2008. Management of the General Fund Enterprise Business System
Report No. D2008-041 January 14, 2008 Management of the General Fund Enterprise Business System Additional Copies To obtain additional copies of this report, visit the Web site of the Department of Defense
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704
Additional Copies To obtain additional copies of this report, visit the Web site of the Department of Defense Inspector General at http://www.dodig.mil/audit/reports or contact the Secondary Reports Distribution
Information Technology
September 11, 2002 Information Technology The Defense Advanced Research Projects Agency s Transition of Advanced Information Technology Programs (D-2002-146) Department of Defense Office of the Inspector
Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.
INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing
PHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
Introduction. Background. Army Enterprise Resource Planning (ERP) Services Request for Information
Introduction This is a (RFI), as defined in Federal Acquisition Regulation (FAR) 15.201(e). Small Businesses are strongly encouraged to submit responses to this RFI. This is not a request for proposal,
WORKFORCE COMPOSITION CPR. Verification and Validation Summit 2010
WORKFORCE COMPOSITION CPR PEO IEW&S Organizational Assessment VCSA Brief Date 2010 October 13, 2010 This briefing is UNCLASSIFIED/FOUO PREDECISIONAL LIMITED DISTRIBUTION AS OF: 11 Sep 2010 Verification
SECTION I PROJECT SUMMARY (TRW)
AS OF OCTOBER 11, 2010 SECTION I PROJECT SUMMARY (TRW) Table I Project Summary Agency/Department Information TRW Information Executive Sponsor: Cynthia Lorenzo Received Date: Project Director: Tom McCullion
PHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The Planning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
Department of Defense MANUAL
Department of Defense MANUAL NUMBER 5000.69 July 30, 2014 USD(AT&L) SUBJECT: Joint Services Weapon Safety Review (JSWSR) Process References: See Enclosure 1 1. PURPOSE. In accordance with the authority
MHS Health Information Technology Transformation March 1, 2016
MHS Health Information Technology Transformation March 1, 2016 Colonel Richard Chip Terry Acting Military Health System Chief Information Officer Defense Health Agency Conflict of Interest Richard N. Terry,
GENERAL RECORDS SCHEDULE 3.1: General Technology Management Records
GENERAL RECORDS SCHEDULE 3.1: General Technology Management Records This schedule covers records created and maintained by Federal agencies related to the general management of technology. It includes
DoD Software Assurance (SwA) Overview
DoD Software Assurance (SwA) Overview Tom Hurt Office of the Deputy Assistant Secretary of Defense for Systems Engineering NDIA Program Protection Summit / Workshop McLean, VA May 19, 2014 May 19, 2014
OmegaPS Users Conference 2012. A DND Perspective for Equipment Acquisition Projects By: Pierre Demers ([email protected])
OmegaPS Users Conference 2012 A DND Perspective for Equipment Acquisition Projects By: Pierre Demers ([email protected]) Overview 1: Intro Speaker s background Presentation goals 2: DND acquisitions
Department of Defense INSTRUCTION. SUBJECT: Information Assurance (IA) in the Defense Acquisition System
Department of Defense INSTRUCTION NUMBER 8580.1 July 9, 2004 SUBJECT: Information Assurance (IA) in the Defense Acquisition System ASD(NII) References: (a) Chapter 25 of title 40, United States Code (b)
System/Data Requirements Definition Analysis and Design
EXECUTIVE SUMMARY This document provides an overview of the Systems Development Life-Cycle (SDLC) process of the U.S. House of Representatives. The SDLC process consists of seven tailored phases that help
raytek, Inc. Background Information and Capabilities
C raytek, Inc. Background Information and Capabilities About Us Craytek, Inc. was established in 2001 Incorporated in the state of Virginia 8a Certified through the SBA in June 2005 Certified Economically
Space and Naval Warfare Systems Center Atlantic
Space and Naval Warfare Systems Center Atlantic Business and Force Support Portfolio Industry Opportunities SSC Atlantic Small Business and Industry Outreach Initiative Gulf Coast Government Contractor
UNCLASSIFIED. UNCLASSIFIED Defense Information Systems Agency Page 1 of 9 R-1 Line #131
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Defense Information s Agency : March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 5: Development & Demonstration (SDD) COST
WBS Development: Rules, Aberrations, and MIL-STD-881C Implementation Challenges
Development: Rules, Aberrations, and MIL-STD-881C Implementation Challenges M. Michael Metcalf, Technomics Inc. SCEA/ISPA 2012 Sponsor: Mr. Mike Augustus, DCARC Some material was taken from DCARC training
SAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT
Applications Development Project Sample WBS Management and support Provide project management Provide quality control Conduct meetings and reviews Materials and supplies Travel and living costs Miscellaneous
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
Planning an ERP Implementation Project @ Small and Medium Enterprises
Planning an ERP Implementation Project @ Small and Medium Enterprises 27 th Regional WIRC Conference 31 August 2012 Table of Contents What is an SME and ERP Why an ERP for the SME segment Assessing the
Enterprise Resource Planning (ERP) Program: Overview and Status Update
Enterprise Resource Planning (ERP) Program: Overview and Status Update Human Resources (HR), Finance & Property Services (FPS), and Information Technology (IT) Departments For the Council Committee of
Company A Project Plan
Company A Project Plan Project Name: Close Optimization Project Example Prepared By: David Done - Project Manager Title: John Doe -Project Manager Date: March 17, 2011 Project Plan Approval Signatures
4. Objective. To provide guidelines for IS requirements and LCM support under NMCI.
d. To apply basic policy and principles of computer hardware and software management as they relate to Information Management and Information Technology (IMIT) and Information Systems (IS) associated with
Best Practices for the Acquisition of COTS-Based Software Systems (CBSS): Experiences from the Space Systems Domain
GSAW 2004 Best Practices for the Acquisition of COTS-Based Software Systems (CBSS): Experiences from the Space Systems Domain Richard J. Adams and Suellen Eslinger Software Acquisition and Process Office
Review of the Total Information Technology Operations Cost for the Pentagon Reservation and National Capital Region
Review of the Total Information Technology Operations Cost for the Pentagon Reservation and National Capital Region Response to the Deputy Secretary of Defense (DSD) Memo subject Review of the Total Costs
FOCUS IT CORP. Company Profile & Service Offering
FOCUS IT CORP Company Profile & Service Offering 1 Our Company FOCUS IT (formerly Focus IT Co. Ltd.) was formed in 2009 as a Partnership. It has undergone a change in its incorporation in 2010 to a Corporation
Selected Acquisition Report (SAR)
Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-537 NAS As of December 31, 2011 Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Program Information 3 Responsible
Software Cost Estimation Metrics Manual for Defense Systems
Software Cost Estimation Metrics Manual for Defense Systems Brad Clark USC Ray Madachy Naval Postgraduate School 29 th International Forum on COCOMO and Systems/Software Cost Modeling October 22, 2014
DEPARTMENT OF VETERANS AFFAIRS VA DIRECTIVE 6517 CLOUD COMPUTING SERVICES
DEPARTMENT OF VETERANS AFFAIRS VA DIRECTIVE 6517 Washington, DC 20420 Transmittal Sheet February 28, 2012 CLOUD COMPUTING SERVICES 1. REASON FOR ISSUE: This Directive establishes the Department of Veterans
Earned Value Management for Enterprise Resource Planning Implementations
Earned Value Management for Enterprise Resource Planning Implementations Venu Kotamraju Abstract ERP implementations are a special breed of projects. They are often characterized by aggressive timelines,
Attachment 7 Requirements Traceability Matrix (RTM) ATMS RFP. New York State Department of Transportation Advanced Traffic Management System
Attachment 7 Requirements Traceability Matrix (RTM) ATMS RFP New York State Department of Transportation Advanced Traffic Management System i 1. INTRODUCTION This Requirements Traceability Matrix (RTM)
Maximizing the Utility of Your Tool Set for Project Support
2013 NASA Cost Analysis Symposium Maximizing the Utility of Your Tool Set for Project Support Bob Sefcik, Glenn Research Center Tom Parkey, Glenn Research Center August 28, 2013 www.nasa.gov Glenn Research
Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment
Inspector General U.S. Department of Defense Report No. DODIG 2015 008 OCTOBER 23, 2014 Followup Audit: Enterprise Blood Management System Not Ready for Full Deployment INTEGRITY EFFICIENCY ACCOUNTABILITY
Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report
Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance
Appeals Case Management System Project. Scope Management Plan. November 20, 2014
Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF
VoteCal Statewide Voter Registration System Project. Master Project Management Plan. Version 1.2
VoteCal Statewide Voter Registration System Project Master Project Management Plan Version 1.2 October 2010 October 2010 i REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF CHANGES 0.1 3/12/2009
Washington, DC 20024. Contract period: 04.16.2013 to 04.15.2018 North Star Group, LLC. 600 Maryland Ave SW, Suite 860E
Contract Vehicle Schedule 874 Mission Oriented Business Integrated Services (MOBIS) Contract #: GS10F0205U For more information on ordering from Federal Supply Schedules click on the FSS Schedules button
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
System (of Systems) Acquisition Maturity Models and Management Tools
System (of Systems) Acquisition Maturity Models and Management Tools Brian J. Sauser, Ph.D. Jose Ramirez-Marquez, Ph.D. Stevens Institute of School of Systems and Enterprise Readiness Level (TRL) System
ERA System Development Statement of Objectives
ATTACHMENT 1 STATEMENT OF OBJECTIVES NARA Electronic Records Archives (ERA) ERA System Development Statement of Objectives 1.0 Purpose of the Statement of Objectives (SOO) This Statement of Objectives
Best Practices for Consolidation Projects
Best Practices for Consolidation Projects Lynne Glickman Solution Architect Hewlett-Packard 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without
SECTION I PROJECT SUMMARY (TRW)
SECTION I PROJECT SUMMARY (TRW) Table I Summary Agency/Department Information TRW Information Executive Sponsor: Cynthia Lorenzo Received Date: Managers: Ron McCranie/Andy Loveland Status Meeting Date:
CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION
CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION J-3 CJCSI 3155.01A DISTRIBUTION: A, B, C GLOBAL COMMAND AND CONTROL SYSTEM-JOINT (GCCS-J) OPERATIONAL FRAMEWORK POLICY References: a. DoD Directive (DoDD)
Information Technology (IT) Investment Management Insight Policy for Acquisition
MEMORANDUM FOR SECRETARIES OF THE MILITARY DEPARTMENTS CHAIRMAN OF THE JOINT CHIEFS OF STAFF UNDER SECRETARIES OF DEFENSE DIRECTOR, DEFENSE RESEARCH AND ENGINEERING ASSISTANT SECRETARIES OF DEFENSE GENERAL
Report of Audit OFFICE OF INSPECTOR GENERAL. Information Technology Infrastructure Project Management A-07-02. Tammy Rapp Auditor-in-Charge
OFFICE OF INSPECTOR GENERAL Report of Audit Information Technology Infrastructure Project Management A-07-02 Tammy Rapp Auditor-in-Charge FARM CREDIT ADMINISTRATION Memorandum Office of Inspector General
How To Manage A Help Desk Ticket In An Ipa.Org (Sdfie) Help Desk
SDSFIE Support Task Order SDSFIE Help Desk Manual for the Army Corps of Engineers, Army Geospatial Center Contract No. W9132V-08-D-0004/0019 September 18, 2012 Developed by: Geographic Information Services,
Acquisition Decision Memorandum for the Defense Integrated Military Human Resources System
Report No. D-2010-041 February 5, 2010 Acquisition Decision Memorandum for the Defense Integrated Military Human Resources System SPECIAL WARNING This report contains DoD Planning, Programming, and Budget
Information Resource Management Directive 5000.05 USAP Information Security Architecture
The National Science Foundation Polar Programs United States Antarctic Program Information Resource Management Directive 5000.05 USAP Information Security Architecture Organizational Function Information
SERVICES WORK ORDER. Effective date of this Work Order: Work Order Number:
SERVICES WORK ORDER This Services Work Order ( Work Order or SOW ) is subject to all terms and conditions of the Software Services Agreement between Infor (US), Inc. ( Infor ) and ( Licensee ) with an
Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger
DODIG-2012-051 February 13, 2012 Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger Additional Copies
IBM Maximo for Aviation
IBM Maximo for Aviation Services & Capabilities January 2016 www.dtec.com 2107 Wilson Blvd., Ste. 100, Arlington, VA, 22201 703.524.3309 About DIT Distributed Information Technologies (DIT) is a professional
UNITED STATES PATENT AND TRADEMARK OFFICE. AGENCY ADMINISTRATIVE ORDER 212-04 Agency Administrative Order Series. Secure Baseline Attachment
UNITED STATES PATENT AND TRADEMARK OFFICE AGENCY ADMINISTRATIVE ORDER 212-04 Agency Administrative Order Series Secure Baseline Attachment Date of Issuance: Effective Date: TABLE OF CONTENTS I. Purpose
Applying CMMI SM In Information Technology Organizations SEPG 2003
Applying CMMI SM In Information Technology Organizations Mark Servello, Vice President Jim Gibson, Senior Consultant ChangeBridge, Incorporated Page 1 Portions Copyright 2002 Carnegie Mellon University
Project Management Planning
Develop Project Tasks One of the most important parts of a project planning process is the definition of activities that will be undertaken as part of the project. Activity sequencing involves dividing
Forecast to Industry 2015 External Contracting Opportunities
Forecast to Industry 2015 External Contracting Opportunities Mr. Douglas W. Packard Director, Procurement Services Directorate 2 November 2015 UNCLASSIFIED 109 103 ENCORE III Navy Maintenance Database
PERFORMANCE WORK STATEMENT. for. United States Air Forces in Europe (USAFE)/ Air Forces Africa (AFAFRICA)
PERFORMANCE WORK STATEMENT for United States Air Forces in Europe (USAFE)/ Air Forces Africa (AFAFRICA) Communications Directorate (A6) Task Management Tool (TMT) Support 1 TABLE OF CONTENTS Contract Number
The Information Technology Program Manager s Dilemma
The Information Technology Program Manager s Dilemma Rapidly Evolving Technology and Stagnant Processes Kathy Peake 26 Since inception, the Department of Defense s development of acquisition policies and
Information Technology Cost Containment / Reduction Plan
Sacramento County Information Technology Cost Containment / Reduction Plan November 2008 Executive Summary The IT community worked together in November to understand our IT costs and structure. The team
2.3. Performs inventories and ensures timely correction of discrepancies. Inspects and evaluates inventory management activities.
VERIFICATION OF MILITARY EXPERIENCE AND TRAINING 1. LAST NAME - FIRST NAME - MIDDLE NAME 2. PAY GRADE 3. YEAR(S) IN SERVICE PEELE KEVIN W E-7 19 4. MILITARY SERVICE AND COMPONENT 5. DATE OF INFORMATION
How To Improve The Defense Communications System
Briefing to the AFCEA International Cyber Symposium 26 June 2013 Lt Gen Ronnie D. Hawkins, Jr. Director, Defense Information Systems Agency 1 1 UNCLASSIFIED Organizational Changes Command Staff Financial
PM-LAV Product Data Management Technical Information Architecture. Robert Missig Portal Dynamics, Inc.
PM-LAV Product Data Management Technical Information Architecture Robert Missig Portal Dynamics, Inc. Portal Dynamics (PD) is Service Disabled, Veteran-owned, Small Business Founded in 2000 Offices in