ENVIRONMENTAL TEST REPORT



Similar documents
AMDx4 INTERFACE CONTROL PANEL FOR AUTOMATIC SOFTENERS AM/D METER

Calibration of Dallas sensors

ECP 208. Cold Rooms Controllers USER S MANUAL

- 1 - StruxureWare TM for Data Centers ETL CMDB Integration. Software Integration Service. 1.0 Executive Summary. 2.0 Features & Benefits

GLOBALG.A.P RISK ASSESSMENT ON SOCIAL PRACTICE (GRASP)

DEDICATED TO EMBEDDED SOLUTIONS

OVERVIEW OF STANDARD 7E & STANDARD 20

Course Structure 2015/2016

Test report. The above described product sample is tested to measure his power performance

RAPPORTO DI PROVA TEST REPORT

ELENCO PROVE ACCREDITATE - CATEGORIA: 0

DETERMINATION OF THE HEAT STORAGE CAPACITY OF PCM AND PCM-OBJECTS AS A FUNCTION OF TEMPERATURE. E. Günther, S. Hiebler, H. Mehling

S-SERIES COMBINE CALIBRATION GUIDE CLICK THE ARROW TO GET STARTED

STANDARD OPERATIVE PROCEDURE. Notification of the establishments that export quick-frozen vegetables from Third Countries to Italy

BGP index: an approach to the certification of building global performance

How To Find A Sweet Spot Operating Temperature For A Data Center

CALEFFI. Compact automatic flow rate regulator with polymer cartridge. 127 series 01166/09 GB

Check-list for auditors. Audit visit at candidate registered laboratories

Regulations for certification of quality management systems

R&D Support Services. Ad Astra Rocket Company

The politics of water management: bathing waters in Italy

mail: polimi.it

ENERGY DISPERSION MEASURING INSTRUMENTS % 100 % 100 % 100 % 100 % 100 % 100 % HIGH PRECISION WIRELESS HEAT FLOW METER

Cryogenic Performance of Millitech Model FBI-22 Waveguide Isolator.

Satellite Meeting "Conservation and preservation of library material in a cultural-heritage oriented context" 31 August - 1 September 2009 Rome, Italy

CSZ s EZ-View Software

INVITATION TO EXPRESS INTEREST FOR THE ACQUISITION OF THE REAL ESTATE OWNED BY EUR S.PA.

MINISTRY OF SCIENCE TECHNOLOGY AND SPACE OF THE STATE OF ISRAEL ITALIAN REPUBLIC

theory FTHPL, T-RATED

WEBLAB - SCHEDA DOCUMENTO N 230

STERILE FILTER UNIT MODEL 1200 COD

Dinamica dell Electron Cloud: Calcolo dei Coefficienti della Mappa

BOARD-LEVEL TEST PROCEDURE GYROSCOPE SUSPENSION SYSTEM (GSS) HV AMPLIFIER AND BRIDGE (HVA) ASSEMBLY. GP-B Procedure P0829 Rev A

ISO/IEC QUALITY MANUAL

1756 ControlLogix Chassis Specifications

Stefano Colafranceschi

TEMON 8-C. Doc. N MO-0370-ING TEMPERATURE MONITOR DEVICE TYPE TEMON 8-C OPERATION MANUAL. Microener - Copyright 2010 FW 2.2 Date Rev.

DOCUMENT TYPES AND NAMING CONVENTIONS

May 19, Please direct questions to Mr. Colin Young of the Third Judicial Circuit at (808) or

AEHR TEST SYSTEMS. Worldwide Leader in Burn-in and Test Equipment


Question Shall the Tender include installation of the central server application on a redundant server?

Instruction Manual Differential Pressure Transmitter

AAV003-10E Current Sensor

Espotel Test Laboratory Services. November 20, 2014

Duke University Health System

Contract for Capital Purchase N [reference of the COMPANY]

TAS (Tecnosoft Alarm System)

CSE 265: System and Network Administration

- FHIC12 Flue gas denitrification (DeNOx)

Document A312 TM SURETY. (Name, legal status and principal place of business)

Foglio di Istruzioni Owner s Manual. Autofocus module GR0650. GR0650 Rev

Energy Efficiency. Energy Efficient Water Heating: Purchasing a new electric water heater. Hot water use has a significant impact on your bill.

OVERVIEW AUTOMATION SERVICES

Data warehouse Architectures and processes

RFID Lab Testing, research and development activities in the field of RFID application in business

Argonne s vehicle systems research Future

FEDERATION EUROPEENNE DE LA MANUTENTION Product Group. industrial trucks. A brief guide for identification of noncompliant

IL NUCLEARE IN ITALIA: SI RIPARTE?

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview

Solar Thermal Power System for ISRU Applications Field Deployment and Operation at Mauna Kea, HI

OPERATIONAL STANDARD

Manual Code VR

Electrical tests on PCB insulation materials and investigation of influence of solder fillets geometry on partial discharge

How To Build A T7 Rack For Information Technology

Data Warehouse: Introduction

Penetration tests according to the ISO 11140

Giordano Cattani Curriculum Vitae

Stove-boiler for solid fuels KW Directions for use and assembling

2 in1 SOL ARTUBE SIMPLE. FLEXIBLE. FAST. SPECIFICALLY TO BE USED TO INSTALL FLOW & RETURN PIPES FROM SOLAR PANEL TO STORAGE TANK

FREEZE Canopy. Canopy lighting. QCS Quick-Connection-System. Daylight. Neutral White. Fresh Meat. Packed Meat

Power Rating Simulation of the new QNS connector generation

Clinic Washer-Disinfectors. Washer-Disinfector Line

Specification N : NPS - 63/8. Underground Power Cable Covers

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Document A312 TM SURETY. (Name, legal status and principal place of business)

CURRICULUM VITAE DI FEDERICO LUCHI

Street lighting luminaire BABEL. Registered model - Design Massimo Sacconi. NERO e GRIGIO per marchi piccoli. (ha il filo ingrossato)

EQUIPMENT CALIBRATION/MAINTENANCE

Air Conditioning, Comfort and Energy in India s Commercial Building Sector

Please take note that only the document on paper support shall be considered as the authentic ACAE Certificate of conformity.

PD 100A. Printing data system

Transcription:

INFN - Roma doc: UG crate FM - ESS date: 9/12/08 pag: 1 /12 ENVRPT33_S3019R-UG crate FM_ESS- date: December 09, 2008 Prot: 001-09/SERMS signature test report prepared by: test report controlled by: 09/12/08 data 09/12/08 data Ing. Serena Borsini Test responsible Ing. Stefano Lucidi QA manager approved by: 09/12/08 Prof.ssa Bruna Bertucci Data Lab. Responsible change record date change description revision 09/12/2008 first issue A01

INFN - Roma doc: UG crate FM - ESS date: 9/12/08 pag: 2 /12 REPRODUCTION OF THIS REPORT Reproduction or duplication of any portion of this report is expressively forbidden, except by those contractors receiving it directly from authorized data interchange offices or the originator, for their internal use or the use of they subcontractors. Reproduction or display of all or any portion of this material for any sales, advertising or publicity purposes is prohibited. DESCRIPTION This document is generated by the S.E.R.M.S. Laboratory and reports on the setup, the operation and the results of the test performed on the customer Device Under Test (D.U.T.); several sections compose this report: all of them have been integrated and adapted to the specific tests performed on the D.U.T.

INFN - Roma doc: UG crate FM - ESS date: 9/12/08 pag: 3 /12 GENERAL INFORMATION... 4 APPLICABLE LAWS AND RULES... 5 TEST SUMMARY... 6 TEST RESULTS... 7 REMARKS... 7 TEST DIARY... 8 TEST SET-UP... 8 TEST GRAPHS... 9

INFN - Roma doc: UG crate FM - ESS date: 9/12/08 pag: 4 /12 Job Number: S3019R GENERAL INFORMATION Test performed on: UG crate FM Contractor: INFN - Roma Contractor responsible: B.Borgia Test responsible: Two subjects - INFN Roma and S.E.R.M.S. - have participated to this test. The applicable procedure has been written by INFN Roma (B.Borgia) UG electronics FM Crate Thermal Stress and Thermal- Vacuum Test Procedure.doc. Roles and responsibilities of the participating subjects are defined as follow: - Test conduction has been responsibility of INFN Roma. The test procedure as well as its modifications have been issued by INFN Roma. INFN Roma personnel unit at SERMS has contributed to the setup. - All the recorded data from the electronics functional test, switch-on/switch-off operations and monitoring are under responsibility of INFN Roma. Personnel units from INFN Roma have contributed to the disassembly phases. - SERMS has been responsible for the test facility and the measurement hardware (thermal chamber, thermal sensors, data acquisition chain) and has insured a continuous monitoring of the test execution. - SERMS has been responsible of the environmental parameters along the whole test. Recorded data have been handled only by SERMS qualified personnel. The SERMS project manager responsible for the test has been Ing. Serena Borsini.

INFN - Roma doc: UG crate FM - ESS date: 9/12/08 pag: 5 /12 APPLICABLE LAWS AND RULES CUSTOMER TEST PROCEDURE UG electronics FM Crate Thermal Stress and Thermal-Vacuum Test Procedure.doc http://ams.cern.ch/ams/electronics/subd/qa/ D.L. 19 settembre 1994, n.626 Attuazione delle direttive 89/391/CEE, 89/654/CEE, 89/655/CEE, 89/656/CEE, 90/269/CEE, 90/270/CEE, 90/394/CEE e 90/679/CEE riguardanti il miglioramento della sicurezza e della salute dei lavoratori sul luogo di lavoro, e successive modifiche; MIL-HDBK-831 23 Aprii 1999 Preparation of Test Reports (guidance only); UNI 10653 November 1997 Quality product technical documentation (guidance only) ; UNI CEI EN45001 general criterion for test laboratory operation; UNI CEI 70001 norm certificate test laboratory terms and definitions; UNI CEI 70011 guide for test result presentation;

doc: UG crate QM ESS date: 29/02/08 pag: 6 /12 TEST SUMMARY The thermal profile of the test is schematically presented in Figure 1. It derives from the approved reference profile on the AMS procedure: UG electronics FM Crate Thermal Stress and Thermal-Vacuum Test Procedure.doc http://ams.cern.ch/ams/electronics/subd/qa/ and the related modifications issued by B.Borgia & G.Ambrosi. The thermal test consists in: 10 thermal cycles according to figure 1 5 thermal cycles according to figure 1 that have to be performed after the vibration test. FIGURE 1 TEST TEMPERATURE PROFILE The cycle temperature values are listed in the following table. Non-operating phase 80 C -40 C Operating phase 50 C -20 C

doc: UG crate QM ESS date: 29/02/08 pag: 7 /12 TEST RESULTS The UG crate flight model has been tested at S.E.R.M.S. in the ESS thermal chamber during the period April 28 th May 3 rd 2008. The environmental parameters in the thermal chamber matched the customer requests and were continuously recorded. The test has been performed according to the test profile shown in the previous section of this report. INFN experts have attended the test and operated the electronics during the switch-on/switch-off and functional test phases. The Functional test report has been issued by INFN (INFN Roma AMS 07/08). No thermal sensors have been installed on the UG crate. Only the temperature inside the thermal chamber has been continuously monitored and recorded using the PT100 sensor of the chamber. All the commitments of S.E.R.M.S. with the customer have been fulfilled and the test can be declared successfully completed for what concerns the items under S.E.R.M.S. responsibility. All the functional test on the equipment are reported on the following customer document: UG Crate FM acceptance test, AMS Roma 02/08 (5/5/2008) REMARKS REMARK #1 During the last cycle of the ESS test done before the vibration test (from cold operational temperature to hot non operational temperature), to avoid the night shift, the crate has been maintained at ambient temperature (20 C) for all the night (from 22:30 to 06:00 of the next morning). The decision has been made according with INFN personnel. During this period the chamber temperature has been continuously monitored. REMARK #2 During the first cycle of the ESS test done after the vibration test (from hot operational temperature to cold non operational temperature), to avoid night shifts during the whole test, the crate has been maintained at ambient temperature (20 C) for two hours (from 00:00 to 02:00). The decision has been made according with INFN personnel. During this period the chamber temperature has been continuously monitored.

doc: UG crate QM ESS date: 29/02/08 pag: 8 /12 TEST DIARY DUT incoming: april 24, 2008; First test Set-Up: april 28, 2008; First thermal test (before vibration): april 28, 2008 april 30, 2008. Disassembly: april 30, 2008. Second test Set-Up: may 02, 2008; Second thermal test (after vibration): may 02, 2008 may 03, 2008. Disassembly: may 03, 2008. TEST SET-UP The UG crate has been tested in the thermal chamber placed on the plate without any fixture. During the set up phase the main activities performed have been: unpackage and cleaning of the crate (both internally and externally) positioning of the hardware needed to test UG crate functionality cabling of the crate The hardware needed to test crate functionality have been placed outside the thermal chamber. Figure 2 UG crate FM placed inside the thermal chamber ready for the test.

doc: UG crate QM ESS date: 29/02/08 pag: 9 /12 TEST GRAPHS The temperature of the chamber has been continuously monitored and recorded during the test. The UG crate temperature has not been monitored. In this section, the graph summarizing the temporal evolution of the chamber temperature during the whole test period is reported. Hereby the S.E.R.M.S. guarantees that: - the handling of the test data has been done only by qualified members of the S.E.R.M.S staff. - the graph presented in this report is a truthful representation of the recorded data and has been solely produced by the S.E.R.M.S. engineer in charge of the test. The complete set of recorded data and more detailed graphs relative to specific measurements can be provided on request.

Laboratorio per lo Studio degli doc: UG crate FM ESS date: 09/12/08 pag: 10 /12 FIGURE 3 THERMAL TEST BEFORE VIBRATIONS. TEMPERATURE PROFILE OF THE CHAMBER.

Laboratorio per lo Studio degli doc: UG crate FM ESS date: 09/12/08 pag: 11 /12 FIGURE 4 THERMAL TEST AFTER VIBRATIONS. TEMPERATURE PROFILE OF THE CHAMBER.

Effetti delle Radiazioni sui Materiali doc: UG crate FM ESS date: 09/12/08 pag: 12 /12 END OF DOCUMENT