MICROHYDRO IN CAPINTALAN (A CASE STUDY)



Similar documents
S.1 Introduction to the Case Study on Micro-Hydro Power Plants

PROPOSAL COMMUNITY MANAGED MICRO HYDRO POWER PLANT WOLOFEO COMMUNITY, MAUMERE, FLORES, INDONESIA

Micro-Hydro. Module Introduction. Tokyo Electric Power Co. (TEPCO)

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

What are the Benefits?

MICRO-HYDRO POWER. Technical

Is a community based micro-hydro ELEctrification SCHEME. suitable for your village?

FIXED CHARGE: This is a cost that goes towards making the service available, including

From Students to Social Entrepreneurs in Ifugao, Philippines. Diane Tamir, Mahmoud Kabalan, Jordan Ermilio, Pritpal Singh, and James Klingler

Pico Power: A Boon for Rural Electrification

A Green Sector Overview

KIANG OMBEJM HYBRID ENERGY KIOSK

Micro-hydro applications in rural areas

The World Bank FPD Note No. 6 April 1994

Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid

RE Practices in Pakistan Micro Hydro Community-managed micro-hydro projects in Northern Pakistan by Aga Khan Rural Support Programme (AKRSP)

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada

Blackfeet Nation Energy Organization Development

A FULL BLOWN FEASIBILITY STUDY REPORT

MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid

Clean Development Mechanism Project Opportunities in Indonesia

Hydropower. Corps Hydro Plants Non-Federal Plants

CHAPTER 3 RESEARCH DESIGN

A least-cost electrification proposal for Kisiizi, Uganda Sten Bergman Sr. Energy Specialist, The World Bank

COMMON EQUIPMENT FAILURES AND CAUSES. How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler.

Current Statistics Northern Tier Pennsylvania. Number of Jobs 5,700 94,600 Average Earnings Average industry earnings per worker includes benefits

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

EQUIPMENT BREAKDOWN FOR GUARANTEE GOLD HOMEOWNERS

UNIT 1 GCSE PHYSICS 2011 FXA Transferring Electrical Energy APPLIANCE USEFUL ENERGY NON-USEFUL ENERGY

NATIONAL POLICY FOR OFF-GRID HYDRO POWER GENERATION

Providing affordable solar systems in Northern Tanzania

Electricity Terminology. Simplifying energy management

Tanzania Traditional Energy Development and Environment Organisation (TaTEDO) Business plan

Guidance on Proper Use of EXTENSION CORDS, POWER STRIPS & SURGE PROTECTORS

Solar Irrigation in Bangladesh

Trimming Trees Near Electric Lines. Understanding Niagara Mohawk s Role and Responsibilities

Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks.

Managing Water in the West. Arrowrock Dam: A Century of Service

Sample Micro Hydro Initial Report

Micro- Hydropower. Systems. A Buyer s Guide

CHALLENGES OF SOLAR PV FOR REMOTE ELECTRIFICATION IN GHANA

Introduction From DEC s President and CEO

Ladies and Gentlemen,

A kilowatt-hour (kwh) is a unit for measuring energy. It is, as its name suggests, one kilowatt of power used over a period of one hour.

GRID CONNECTION Introduction Technical The grid Electricity production

IESO Supply Deliverability Guidelines

National Electric Power Regulatory Authority

Power transformers. Phase shifting transformers Reliable and efficient power flow control

The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.

AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System

Federal Wage System Job Grading Standards for Electric Power Controlling, Table of Contents

Uses of Community-Based Management System (CBMS) In the Province of Camarines Norte

ALUMINUM ELECTRICAL WIRING

Macro- and Micro-Hydropower: An Option for Socioeconomic Development. Case Study Agbokim Waterfalls, Cross River State, Nigeria.

A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

MANUAL ON MICRO HYDRO DEVELOPMENT. Prepared for: NGO Capacity Building for Poverty-reducing Sustainable Energy Solutions in South Asia Project INFORSE

Series and Parallel Circuits

STUDY GUIDE: ELECTRICITY AND MAGNETISM

WHAT TO DO IF THE LIGHTS GO OUT. PUBLIC SERVICE COMPANY OF OKLAHOMA

DECREE. on Promulgation of Law on Energy saving. To promulgate Law on Energy saving, No 1136-XIV, as of July 13, 2000.

Renewable Energy Research

SECTOR ASSESSMENT (SUMMARY): ENERGY

PEND OREILLE COUNTY PUD. Quality Service at Low Cost RATES FOR ELECTRIC SERVICE

Understanding Residential Electricity and Natural Gas Bills and Prices in Edmonton

The Leader in Wind Energy

HYDROMATRIX Jebel Aulia - Sudan

RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION

OREGON ELECTRICAL LAWS OREGON REVISED STATUTE 479

Electricity Rates Forecasting:

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

FACT SHEET. NEM fast facts:

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

BY GREEN KNOWLEDGE INSTITUTE (GKI)

Indonesian Microhydro Power Development

The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022.

Renewable Energy and Energy Efficiency for Tribal Community and Project Development. Basic Energy and Market Terms

Nellis Solar Array II. Owned by NV Energy Operational late Renewable Energy

WATER LEAKS AND DAMAGE

TruPower-Portable-500W. Solar Starter kit

A Documentation of the 10-Point Checklist for Making San Francisco, Camotes Resilient to Disasters. Sasakawa Award Nomination Submission

Technology Brief. Hydro Energy. Harnessing. for Off-grid Rural Electrification. Table 1 PHILIPPINE HYDROPOWER POTENTIAL

Solar and Wind Energy for Greenhouses. A.J. Both 1 and Tom Manning 2

Table 2.1: Component construction costs of some representative MHPs Present Value (10%) Unit cost, $ Project Civil Gen. Equip.

Concept for a DC low voltage house

ELECTRIC INSTANTANEOUS WATER HEATER

Electrical Design TABLE OF CONTENTS FOREWORD BASIC ELEMENTS OF ELECTRICITY... 2 Electricity works much like water Ohm s Law

Components. Transformers

Transcription:

Tano and the micro-hydroelectric power plant By Shubert L. Ciencia SINCE CHILDHOOD, TANO MINDANAO HAD NOT EXPERIENCED the comfort of electrical power wired in the house. He didn t earn much as a vegetable farmer and couldn t afford a generator. His wife and eight children had to make do with kerosene lamps at night and a battery-poweredtransistor radio for entertainment. That was before the Dragonfly came to Capintalan in Carranglan, Nueva Ecija in the heart of the Caraballo mountain ranges in 1998. The Dragonfly is a micro-hydroelectric project that was conceived by the Philippine Rural Reconstruction Movement (PRRM) with the people of Capintalan in response to their wish for electricity to extend their productive hours. Renewable energy The project was inspired by PRRM s successful water-based renewable energy program in the province of Ifugao the Kimkimmit or Firefly that was first tested in 1992 that has been adopted as the province s strategy for its rural electrification program. It was chosen as one of the recipients of the Ashden for Sustainable Energy in 2004. Capintalan s hydro plant is named Dragonfly because it is a scaled up model of Ifugao s Firefly. The Firefly was primarily for charging batteries that were used for lighting a single bulb in a household, while the Dragonfly was designed to provide electricity directly to consumers. Both belong to the microhydroelectric category that can generate a maximum of 100 kilowatts. Mountain streams A mini-hydroelectric plant can generate between 101 kilowatts and 10 megawatts (MW), while a mega-hydroelectric plant can generate more than 10 MW. The Dragonfly generates power that comes from mountain streams through run-off-of-the river technology. By tapping small irrigation, water is diverted through a tank to a power pipe that runs a miniturbine that in turn drives a generator to produce electricity. Components Its key components are the following: 1. Weir or water intake structure, which diverts water from the stream to the head race or power canal; 2. Irrigation head race or power canal, which brings the diverted water to the forebay tank;

3. Forebay tank, where the diverted water is accumulated before it pours down the penstock pipe; 4. Downhill penstock pipe, which leads the water to the turbine; 5. Powerhouse, which houses the turbine-generator assembly and the electro-mechanical controls that stabilize the power supply; 6. Transmission lines that deliver electricity from the powerhouse to the consumers. For this purpose, the Capintalan United Upland Tribal Association (Cuuta) was organized in January 1999. Work started in September of that year, after a financial grant worth P610,815 was obtained mainly from the British Embassy. A counterpart fund came from the Carranglan municipal government. PRRM provided technical support and project supervision while each of the projected 120 household beneficiaries provided four days of labor. Headwaters From the start, it was a difficult project. Construction materials like sand, gravel and cement had to be hauled across the rough mountain terrain to a stream that is part of the Diaman or Talavera River headwaters. Rains hampered construction work. When the installation site s owner revoked his prior permission to construct, the project had to be relocated. In 2000, the diversion weir, the power canal, the forebay tank, the penstock, the powerhouse and the transmission lines were all completed. But when they turned the switch on, the Dragonfly generated no electricity. PRRM contracted a consultant to evaluate the project. The latter recommended relocating some of the civil work components. Relocation, he estimated, would cost almost a million pesos. Because the project funds had been used up, PRRM was almost ready to give up. The Dragonfly was stuck. Para-electrician team That was when Tano decided to do something about it. Tano, who did not finish high school, enrolled in a short course on electronics in the nearby town of Muñoz. With this background and his willingness to learn, he earned a slot on the Dragonfly s para-electrician team that was sent to a mechanical- and electrical-training course at the Polytechnic University of the Philippines in Manila. Tano patiently tended to the seemingly dead Dragonfly. He helped in rebuilding the intake weir and the power canal that were damaged by erosion and in relocating the penstock pipe so it can generate more water power to turn the water turbines.

Plant comes to life He spent days redesigning the turbine, adjusting the nuts and bolts, studying the wiring, trying to make it compatible with the requirements of the British made generator. There must be enough water power to turn the turbine, and the turbine blades must be designed for maximum efficiency. Finally, in December 2002, his efforts bore fruit the Dragonfly came to life, generating just enough electricity for the powerhouse s lone light bulb. For Tano and Cuuta, it was enough. They knew they could make the Dragonfly work. To raise more funds, each household belonging to Cuuta first gave P50 to enable Tano to tinker with the components some more, then contributed another P100 each to complete the remaining civil works, refit the power generator and install nine additional transformers. Let there be light In January 2003, Purok Sentro of Barangay Capintalan lit up. The Dragonfly was generating an average of 220 volts for each of the 50 households. Inspired by this development, Cuuta charted its future. It reorganized itself into the Capintalan Micro-hydroelectric Consumers Association (Camheca). It assumed supervision of the project, the collection of monthly dues from Dragonfly consumers, the formulation of additional policies and overall project implementation. Volunteer labor In 2004, Camheca members again each contributed P100 and three sessions of voluntary labor for project improvements. The forebay tank was relocated to a higher elevation, the penstock was lengthened and 60 meters of the power canal were reinforced with concrete to increase water pressure. These improvements produced enough additional electricity to expand the Dragonfly s service area to Sitio Boundary and increase the number of consumers to 150 households. To reach the additional consumers, Camheca convinced the local electric cooperative, which was not yet operational at that time, to allow the use of the latter s power lines. The Dragonfly is now operating almost 24 hours a day, serving the increased demand of 150 households. In 2005, perhaps due to wear and tear, the Dragonfly s 35 KVA power generator broke down. A replacement was donated by a Capintalan resident. It broke down, too. The barangay government then donated its 60 KVA generator. Refitted and installed, it generated enough reliable electricity for the households in its service area.

Appliances, computers The improved supply enabled Camheca s members to enjoy the comforts of home appliances like television, VCD players and electric fans. Some members even sneaked in prohibited items like washing machines, flat irons, rice cookers and water heaters. The Capintalan National High School s connection to the Dragonfly grid made the use of computers possible for its students. The service area further expanded into Sitio Nursery. With 60 bags of cement donated by Triccord, the pathway to the Dragonfly site was improved. The usual bayanihan system, which saw the Dragonfly through in its direst moments, prevailed. In 2006, however, the local electric cooperative took back its transmission lines from Camheca, reducing the latter s service area to 104 households. The household voltage was also becoming unacceptably low due to the increasing use of household appliances, especially prohibited ones (i.e. washing machines, flat irons, water heaters and rice cookers). In December 2007, a 60-KVA generator donated to the barangay by the Carranglan municipal government was refitted and installed. As a result, Camheca s coverage expanded to 148 households, including the elementary school. The Dragonfly s voltage output was back to a stable 220 volts. Extended study hours Looking back, Camheca members gratefully acknowledge the benefits that they now enjoy from the project. They are most thankful for the extended study hours of their children. Communication has been made more accessible by rechargeable mobile phones. Public utility vehicles now make regular nighttime stops in Capintalan to pick up passengers. Camheca s street lights have made it safe for them to do so. month. For night lighting alone, household energy consumption has decreased from P600 to P100 per Self-sustaining A self-sustaining project, the Dragonfly is managed and operated by Camheca s board of directors. The maintenance team includes Tano who has been designated the power master. The monthly P100 contribution of members covers maintenance costs and the honoraria of Tano, the barangay electrician, the collector, the bookkeeper, the power canal maintenance team and the board of directors and its officers. Challenges There are problems of course. The system is often overloaded because the turbines designed for 35 KVA operation could not keep up with the often increasing demand that peaks at 75 KVA, resulting in power supply fluctuations or brownouts.

The power generator is designed for 60 KVA power production. System voltage is low at the periphery of the service area during peak hours. Camheca is aware of its limited technical capacity on the electro-mechanical, organizational and financial management aspects. To generate more power, the Dragonfly needs additional water flowing from a higher source. Some pieces of equipment need to be upgraded or replaced. Camheca is looking at the possibility of a power storage mechanism. It also plans to cover 10 more households in Sitio Pandayan and later, 57 households in Sitio Dalton and another 30 in Sitio Boundary. It s another regular working day for Tano. He ticks off the required materials for upgrading: a new 35 or 75 KVA power generator, step-up and step-down transformers, a thousand meters of aluminum wire and another 6,700 meters of cable wire for transmission, a cut-out fuse, a gate valve controller and a circuit breaker. He politely excuses himself as he leaves a group of visitors and returns to the Dragonfly s nest.

Capintalan Micro-hydroelectric Power Plant Case Brief shubert l. ciencia, branch manager prrm nueva ecija The Dragonfly is a micro-hydroelectric project that was conceived by the Philippine Rural Reconstruction Movement (PRRM) with the people of Capintalan in Carranglan, Nueva Ecija in the heart of the Caraballo mountain ranges in 1998 in response to their wish for electricity to extend their productive hours. Renewable energy The project was inspired by PRRM s successful water-based renewable energy program in the province of Ifugao the Kimkimmit or Firefly that was first tested in 1992 that has been adopted as the province s strategy for its rural electrification program. It was chosen as one of the recipients of the Ashden for Sustainable Energy in 2004. Capintalan s hydro plant is named Dragonfly because it is a scaled up model of Ifugao s Firefly. The Firefly was primarily for charging batteries that were used for lighting a single bulb in a household, while the Dragonfly was designed to provide electricity directly to consumers. Both belong to the microhydroelectric category that can generate a maximum of 100 kilowatts. Mountain streams A mini-hydroelectric plant can generate between 101 kilowatts and 10 megawatts (MW), while a mega-hydroelectric plant can generate more than 10 MW. The Dragonfly generates power that comes from mountain streams through run-off-of-the river technology. By tapping small irrigation, water is diverted through a tank to a power pipe that runs a miniturbine that in turn drives a generator to produce electricity. Components Its key components are the following: 1. Weir or water intake structure, which diverts water from the stream to the head race or power canal; 2. Irrigation head race or power canal, which brings the diverted water to the forebay tank; 3. Forebay tank, where the diverted water is accumulated before it pours down the penstock pipe; 4. Downhill penstock pipe, which leads the water to the turbine; 5. Powerhouse, which houses the turbine-generator assembly and the electro-mechanical controls

that stabilize the power supply; 6. Transmission lines that deliver electricity from the powerhouse to the consumers. For this purpose, the Capintalan United Upland Tribal Association (Cuuta) was organized in January 1999. Work started in September of that year, after a financial grant worth P610,815 was obtained mainly from the British Embassy. A counterpart fund came from the Carranglan municipal government. PRRM provided technical support and project supervision while each of the projected 120 household beneficiaries provided four days of labor. Headwaters In 2000, the diversion weir, the power canal, the forebay tank, the penstock, the powerhouse and the transmission lines were all completed. But when they turned the switch on, the Dragonfly generated no electricity. PRRM contracted a consultant to evaluate the project. The latter recommended relocating some of the civil work components. Relocation, he estimated, would cost almost a million pesos. Because the project funds had been used up, PRRM was almost ready to give up. The Dragonfly was stuck. Para-electrician team That was when Tano Mindanao decided to do something about it. Tano, who did not finish high school, enrolled in a short course on electronics in the nearby town of Muñoz. With this background and his willingness to learn, he earned a slot on the Dragonfly s para-electrician team that was sent to a mechanical- and electrical-training course at the Polytechnic University of the Philippines in Manila. Tano patiently tended to the seemingly dead Dragonfly. He helped in rebuilding the intake weir and the power canal that were damaged by erosion and in relocating the penstock pipe so it can generate more water power to turn the water turbines. Plant comes to life In December 2002, his efforts bore fruit the Dragonfly came to life, generating just enough electricity for the powerhouse s lone light bulb. For Tano and Cuuta, it was enough. They knew they could make the Dragonfly work. To raise more funds, each household belonging to Cuuta first gave P50 to enable Tano to tinker with the components some more, then contributed another P100 each to complete the remaining civil works, refit the power generator and install nine additional transformers. In January 2003, Purok Sentro of Barangay Capintalan lit up. The Dragonfly was generating an average of 220 volts for each of the 50 households.

Inspired by this development, Cuuta charted its future. It reorganized itself into the Capintalan Micro-hydroelectric Consumers Association (Camheca). It assumed supervision of the project, the collection of monthly dues from Dragonfly consumers, the formulation of additional policies and overall project implementation. Volunteer labor In 2004, Camheca members again each contributed P100 and three sessions of voluntary labor for project improvements. The forebay tank was relocated to a higher elevation, the penstock was lengthened and 60 meters of the power canal were reinforced with concrete to increase water pressure. These improvements produced enough additional electricity to expand the Dragonfly s service area to Sitio Boundary and increase the number of consumers to 150 households. To reach the additional consumers, Camheca convinced the local electric cooperative, which was not yet operational at that time, to allow the use of the latter s power lines. The Dragonfly is now operating almost 24 hours a day, serving the increased demand of 150 households. In 2005, perhaps due to wear and tear, the Dragonfly s 35 KVA power generator broke down. A replacement was donated by a Capintalan resident. It broke down, too. The barangay government then donated its 60 KVA generator. Refitted and installed, it generated enough reliable electricity for the households in its service area. Appliances, computers The improved supply enabled Camheca s members to enjoy the comforts of home appliances like television, VCD players and electric fans. Some members even sneaked in prohibited items like washing machines, flat irons, rice cookers and water heaters. The Capintalan National High School s connection to the Dragonfly grid made the use of computers possible for its students. The service area further expanded into Sitio Nursery. With 60 bags of cement donated by Triccord, the pathway to the Dragonfly site was improved. The usual bayanihan system, which saw the Dragonfly through in its direst moments, prevailed. In 2006, however, the local electric cooperative took back its transmission lines from Camheca, reducing the latter s service area to 104 households. The household voltage was also becoming unacceptably low due to the increasing use of household appliances, especially prohibited ones (i.e. washing machines, flat irons, water heaters and rice cookers). In December 2007, a 60-KVA generator donated to the barangay by the Carranglan municipal government was refitted and installed. As a result, Camheca s coverage expanded to 148 households, including the elementary school. The Dragonfly s voltage output was back to a stable 220 volts. Extended study hours

Looking back, Camheca members gratefully acknowledge the benefits that they now enjoy from the project. They are most thankful for the extended study hours of their children. Communication has been made more accessible by rechargeable mobile phones. Public utility vehicles now make regular nighttime stops in Capintalan to pick up passengers. Camheca s street lights have made it safe for them to do so. month. For night lighting alone, household energy consumption has decreased from P600 to P100 per Status after PRRM s Turn-over dojoe s. flores Capintalan, gateway to Cagayan valley Capintalan is the northern most barangay going to Cagayan Valley located in the second class municipality of Carranglan, Nueva Ecija. Nestled at the heart of the Caraballo mountain ranges and bounded on the north by Santa Fe, Nueva Vizcaya, the first municipality of Region 2. Seventy percent (70%) of the more than 5,000 population from 250 households are migrant Kalanguya tribe from the Cordillera region. Ilocanos and Tagalogs composed the remaining 30% of the population. Vegetable gardening is the primary source of income of the people of Barangay Capintalan which they sell in stores dotting the stretch of the highway or in nearby San Jose City about an hour s drive from the barangay. Ancestral Domain Claim by the Community Brgy. Capintalan, Carranglan, Nueva Ecija, the site of the micro-hydro generation project is currently on the process of claiming its ancestral domain claim through the Certificate of Ancestral Domain Title (CADT). It covers 3,447.98 has. or practically the whole barangay inhabited by Kalanguya Indigenous peoples which came from the Cordilleras. This struggle by the Kalanguyas to rightfully own their ancestral lands is a positive development to the sustainability of the micro-hydro project which is dependent to water supply coming from its natural sources. And as with the practice and tradition of the Kalanguya Indigenous people, they have imposed a communal regulation banning all kinds of resource extraction in the source of water supplying the micrhydro especially slash and burn method (kaingin) of farming. Micro-hydro technology expansion and replication The micro-hydro technology has expanded its coverage from 148 households in 2007 to 160 households as of last count. And through Tano Mindanao, the barangay and project electrician, the technology has replicated in two other sitios. One is privately owned servicing direct electricity to 4

households and another one in Sitio Lukto with 24 household beneficiaries now in the process of installation. Community ownership and empowerment As a self-sustaining and well managed project, Camheca through its board of directors and staff, is generating an average of Php 15,000.00 monthly income from fees from its members. It is enough to cover maintenance costs of the micro-hydro power plant and honoraria to the resident electrician, bookkeeper, collector, maintenance crew and board members. Since 2002, it has installed the 4 th power generator last August. All accessed by the consumers association from the barangay council, municipal government and private individual and institution. The bayanihan system of rendering free labor during the regular maintenance activities as well as sharing their resources when some parts of the power plant break down and has to be replaced are being practiced. This year, Camheca has encountered one of the most challenging and tempting offers which came before them. The Chairman of the board of directors was offered by one of the officers of the provincial electric cooperative serving the area to take over the operations of the micro-hydro project. Included in the monetary package is the promised of absorbing them as employees. This was turned down by the board of directors, staff and the general membership. The micro-hydro electric consumer s cooperative with the barangay electrician at the helm is now restoring one of the damaged turbine-generators to serve as a back-up machine in case it breaks down due to the wear and tear. Stabilizing the power supply Power supply fluctuation remains to be a perennial problem encountered by the micro-hydro maintenance team because of the increasing number of households using prohibited energy consuming appliances. But this could be remedied if a power storage mechanism called Electronic Load Controller (ELC) will be installed and doing away with the present manual monitoring and regulating the power supply.