LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities



Similar documents
CD i -STREETS- Detail #

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

Close-Out Documents... 9

5. MAJOR STREET CONSTRUCTION The B-Permit B-Permit Description and Purpose

CONFORMITY WITH PLANS; DRAINAGE.

For a building with a crawl space, see Figure

GUIDE FOR ACCOMMODATING UTILITIES WITHIN RIGHT-OF-WAY FOR COUNTIES & SMALL CITIES IN KANSAS

Corridor Goals and Objectives

FIBER-OPTIC CABLE PLAN CHECK

Developing Street Standards That Allow Flexibility

Bond Release Process for New Subdivision Developments in Fairfax County

SECTION 6: TRANSPORTATION

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FM 969 CORRIDOR. APPENDIX c

agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.

Please Refer to Attached Sample Form

City of Hilshire Village Pine Creek Ln Reconstruction

The Need for Traffic Incident Management

Questions Regarding Proposed Utility Undergrounding in Kensington

FILE NO.: Z LOCATION: Located on the Northeast and Southeast corners of West 12 th Street and Dennison Street

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Please Refer to Attached Sample Form


LAND USE CODE CHAPTER GENERAL REGULATIONS

SITE IMPROVEMENT PLANS CHECKLIST

2010 Utility Bill Comparisons for Selected U.S. Cities

CHAPTER 10 - PERMIT PROCEDURES AND BONDING REQUIREMENTS

City of Douglas Commercial Building Permit Site Application

Permit No. Permit Fee: $ Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: Address:

Topic 2 11/28/2012 Blocks & Street Network

Guidelines for Fiber Optic Cable Permits

The 2002 Development Regulations. The City of Sugar Hill, Georgia

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT Revised

Goals & Objectives. Chapter 9. Transportation

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING STANDARD FEE LIST (updated 10/3/2015)

TITLE VIII ST. ROBERT CODE OF ORDINANCES INFRASTRUCTURE DEVELOPMENT REGULATIONS OF THE CITY OF ST. ROBERT, MISSOURI

Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012

CITY OF WEST PALM BEACH ZONING BOARD OF APPEALS Meeting Date: February 6, 2014 Zoning Board of Appeals Case No. 3302

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP)

Public Utility Easements: Traps That Can Create Major Problems By Jerry Moran

Underground Commercial Electric Service

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Developer s/consultants Field Services Guidelines

Chapter 22. Lump Sum Project Guidelines

Staff Report General Development Plan/Master Plan Aldermanic District: 1 County Commission District: 2 MPC File No PLAN February 23, 2016

Chapter 2 PLAN AND PLAT REVIEW PROCESS

Assessing Paved Trails for Compliance with Standards and Best Practices

Chapter 162 SHADE TREE COMMISSION

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

SHALLOW UTILITIES JOINT PROVISIONING GUIDELINES SCOPE

Engineering Major Service Actual Budget Projected Request Executive Adopted

SCOPE OF WORK PROVISIONS FOR ELECTRICIAN: MAINTENANCE ELECTRICIAN ORANGE COUNTY

Considering UNDERGROUND. tampaelectric.com

INFRASTRUCTURE POLICIES

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

ORDINANCE CODES FOR PARKING TICKETS

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

General Obligation Bond Projects FYE

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SANITARY SEWER SPECIFICATIONS

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

ARTICLE VIII. - RIGHT-OF-WAY CONSTRUCTION AND ADMINISTRATION

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

CITY OF FARMERSVILLE, TEXAS

IH-635 MANAGED LANES PROJECT, SEG. 3.2

LS 2540 SEWER LATERALS AND INSPECTION TEES

SEWER LINE EXTENSION DESIGN CHECKLIST

New Commercial Service Application

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

WSSC is replacing the water mains in your neighborhood. Here s what you need to know.

PLANNING DIVISION STAFF REPORT February 23, Summary. Background Information PREPARED FOR THE PLAN COMMISSION. Legistar File ID # 36810

City of Valdosta Land Development Regulations. Table of Contents

Detection of Contact Voltage in Electric Distribution Systems

Transcription:

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities American Public Works Association Utilities & Public Right of Way Committee February 29, 2000

Table o of Contents Index...Page 2 Introduction 3 Research Analysis..4 Common Factors 7 Challenges to Regulatory Agencies and Right-of-Way Users 8 City of Austin Standard Drawings Typical Front Lot Utility Assignments Drawing 000-8(A), Page 1 of 2..9 Typical Front Lot Utility Assignments Drawing 000-8(A), Page 2 of 2.. 9 Typical Utility Assignment Details (TV, W, WW) Drawing 000-8(B) Page 1 of 3...10 Typical Utility Assignment Details (AT Inlet) Drawing 000-8(B) Page 2 of 3..11 Typical Utility Assignment Details (Elec, Tel, Gas) Drawing 000-8(B) Page 3 of 3.12 Typical Rear Lot Utility Assignments Drawing 000-8, Page 1 of 2...13 Typical Rear Lot Utility Assignments Drawing 000-8, Page 1 of 2...14 City of Cincinnati Standard Drawings Typical Section of Utility Assignments for Subdivisions and Developments 15 The Cincinnati Gas & Electric Co., 4-Wat Joint Trench, Drawing 12635-85 16 City of Phoenix Standard Drawings Document Cover.17 Typical Section for a 16 Easement 18 Typical Section for a 16 Alley...18 Typical Section for a Major Street Drawing A1.19 Typical Section for a Collector Street, Residential, Drawing C2...19 Typical Section for a Local Street, Commercial, Drawing L1...20 Accommodation of Utility Plant Within Public Rights-of-Way of Urban Streets and Highways Document Cover.. 21 Resource List for Location of Utilities In Public Rights-of-Way....22 Location of Utilities in Public Rights-of-Way Page 2 of 22

** Introduction ** Ever since the first underground utilities were conceived the designers and planners of these facilities struggled with thought of where should we put these things. The simplest solution was the most direct route between point A and point B, a straight line. Our forefathers in utility planning had no idea what demands would be placed on public streets by growth underground utility industry as illustrated in this famous APWA photo. In every city from Main to California planners and engineers is still struggling with the issue of where to put all these pipes and cables. What is the best Location of Utilities in Public Rights-of-Way? The American Public Works Association formed the Utilities and Public Right-of-Way (UPROW) Committee to address a number of utility and aright-of-way related issues. This committee put together a group of individuals that represent each area of the utility industry, from public agencies to gas, electric, telephone companies, etc. The task for this group is to come up with solutions of recommendations to the utility and right-of-way issues that concerns you the reader. There are many documents available from various groups including the Federal Government, cities, utility associations and others. All of these documents have good examples of what works for their area of expertise. In some cases good examples that work for one area of the country may not work so well in others. This may be due to climate or terrain. The UPROW subcommittee has reviewed many documents and has prepared this report to bring forward the examples of what works in various regions and cities across the United States. Location of Utilities in Public Rights-of-Way Page 3 of 22

** Research Analysis ** During our research on Location of Utilities in Public Rights-of-Way, we learned that many communities have established and successfully used location guidelines for utilities in their streets. This report will overview the writers research material and highlight some examples of those guidelines and, hopefully, provide you with some ideas for your community. STANDARD UTILITY LOCATIONS FOR THE CITY OF PHOENIX A study committee formed in 1970 by the City Engineer of Phoenix prepared this document. The committee included representatives from all utilities, the County and State Highway Departments, all affected city departments and the Home Builders Association of Central Arizona. The committee agreed that adjustments or deviations from the standards for individual special cases should be made through mutual agreement among utilities concerned with the approval of the city engineer. They provided for ongoing review by an advisory committee to the city engineer to make recommendations on adjustments or changes. Over the years there have been minor adjustments or deviations in special conditions. However, the first major change since 1970 is in review now by the advisory committee. Obviously, the standards apply primarily to new streets in new developments. However, in those cases where replacement or new construction is needed in the older parts of the city within existing rights-of-way, the standards have been adhered to wherever practical. This report will provide you four examples out of 18 standards: Major street 100 R/W, 16 median, 2-34 roadways Collector street 60 R/W, 40 paved roadway Local street 50 R/W, 36 paved roadway Twelve-foot easement MODEL STANDARD LOCATIONS FOR UTILITIES IN PUBLIC RIGHTS-OF- WAY The document Model Standard Locations for Utilities in Public Rights-of-Way was prepared by the Uniform Practices Committee of the Southern California Chapter of APWA. This document was originally published in 1968 after more than a year of study and then updated in 1976 to include new concepts and abutting easements. Input in developing this document was provided through a committee that included all major utilities, city, county, and state agencies. This document was developed with the intent to cover new construction of or within public street and alley rights-of-way and for local distribution facilities only. However, it does include comments on four special cases: Location of Utilities in Public Rights-of-Way Page 4 of 22

Frontage roads on major streets Expanded industrial access alleys Side hill street locations with improved property on one side Abutting public rights-of-way for bicycle ore equestrian use or transportation corridors The document Model Standard Locations for Utilities in Public Rights-of-Way has been widely distributed to chapter members and was offered nationally several years ago. A few examples are: Case III 60 maximum right-of-way Case IV, 20 alley Concept for a common utility structure TYPICAL RIGHT-OF-WAY AND FRONT LOT UTILITY ASSIGNMENTS CITY OF AUSTIN Seven standards adopted in 1989 by the City of Austin Department of Public Works and Transportation. This document was last updated and approved in July 1997, and is now undergoing revision. These drawings include: Typical locations and depths for all distribution utilities and city facilities Modified APWA standard color codes TV, water and wastewater locations Rear lot easement utility locations and depths TYPICAL UTILITY LOCATIONS CITY OF CINCINNATI These drawings and details were prepared jointly between the City of Cincinnati and the local utility companies. They were originally prepared in 1992 and made generic in 1997. These drawings include: Typical and alternate locations and minimum depths for utilities, sanitary and storm sewers Location of Utilities in Public Rights-of-Way Page 5 of 22

Public streets and utility easements Details for a 4-way joint trench or crossover conduit for gas, electric, telephone and TV Joint trench detail outside PROW These standards are still being used in new developments and reconstructed streets. ACCOMMODATION OF UTILITY PLANT WITHIN THE RIGHTS-OF-WAY OF URBAN STREETS AND HIGHWAYS, Manual of Improved Practice This document was a joint publication of APWA and ASCE published in 1974 and based upon a companion report, APWA Special Report No. 44 completed in 1973. It replaced the Manual of Practice No. 14 of the ASCE Urban Planning and Development Division. It was a product of on-site studies by six field investigators of practices and standards in 40 communities in the United States and Canada, and a mail survey of 500 local agencies of which 222 submitted replies. FHWA, 39 local agencies, seven states, and 15 utility companies sponsored the study and the manual. The American Right-of-Way Association, several utility associations, and the Associated General Contractors also provided cooperation and assistance. The manual includes location standards of eight cities in the United States and Canada, including 25 typical layouts. There is a very complete discussion (39 pages) of location considerations, constraints, and economic analyses of location alternates. In its time this document was the most comprehensive publication that addresses urban street utility usage of public right-of-way. Some highlights of this publication that are worth considering: CHAPTER 2 Planning and Records CHAPTER 10 Location Considerations and Constraints TABLE 1 General Location Considerations for Placing Utilities in Streets and Rights-of-way. FIGURE 2 through 15 All of these detailed drawings are worth looking consideration. Location of Utilities in Public Rights-of-Way Page 6 of 22

** Common Factors of Location Assignments ** During the course of analyzing the research material the committee noticed several common factors that appear to be used in the decisions to set the location standards in the different communities that are represented in this report. They are as follows: Mainline sewers were generally located in the center of the right-of-way. High maintenance utilities such as gas mains and water mains were generally located outside the roadway pavements. If they need to be in the roadway area they are located in the curb lane. This is probably to limit the impact on vehicular traffic. Transmission facilities that are not usually tapped and require a higher degree of protection and are therefore designed to be deeper than distribution facilities. Street drainage intake structures are located in the roadway immediately adjoin the curb. Street lighting and traffic control facilities are generally located in the sidewalk area immediately behind the road curb of improved streets. In unimproved streets they are generally further away from the road pavement. Underground telephone, electric, and cable are generally located near the right-ofway line. If they need to be in the roadway area they are located in the curb lane. This is probably to limit the impact on vehicular traffic. Location of Utilities in Public Rights-of-Way Page 7 of 22

** Challenges to Regulatory Agencies and Right-of-Way Users ** ISSUES THAT CHALLENGE THE CONCEPT OF ASSIGNED LOCATIONS FOR UTILITIES IN PUBLIC RIGHTS-OF-WAY Existing older streets where utilities were installed prior to adoption of planned guidelines. Also presence of encroachments such as basements, building vaults sidewalk elevators, etc. Limitation of non-roadway (parkway) areas because of roadway widening requirements and heavy build out to the right-of-way line. New commercial or industrial development requiring more or enlarged utility facilities. Space requirements for drainage structures, streetlights, traffic signals, fire hydrants, and other city facilities. Need for physical and safe access for maintenance, repair, or enlargement of existing facilities. Public or customer demand for new or expanded utility facilities to cope with high-tech growth. Public demand for street trees, consequent size and root growth, and bus shelters. Maintaining replacement space for the future. Pipeline replacements are difficult to accomplish while trying to maintain services. A new pipeline generally must be built before the old line can be taken out of service. Possibly the most significant challenge to right-of-way location assignments has been the effect of utility deregulation. How much right-of-way space can be devoted to support a single industry group? Location of Utilities in Public Rights-of-Way Page 8 of 22

Location of Utilities in Public Rights-of-Way Page 9 of 22

Location of Utilities in Public Rights-of-Way Page 11 of 22

Location of Utilities in Public Rights-of-Way Page 12 of 22

Location of Utilities in Public Rights-of-Way Page 13 of 22

Location of Utilities in Public Rights-of-Way Page 14 of 22

Location of Utilities in Public Rights-of-Way Page 15 of 22

Location of Utilities in Public Rights-of-Way Page 16 of 22

Location of Utilities in Public Rights-of-Way Page 17 of 22

Location of Utilities in Public Rights-of-Way Page 18 of 22

Location of Utilities in Public Rights-of-Way Page 19 of 22

Location of Utilities in Public Rights-of-Way Page 20 of 22

Location of Utilities in Public Rights-of-Way Page 21 of 22

** Resource List for Location of Utilities In Public Rights-of-Way ** Standard Utility Locations for the City of Phoenix Steve Rivas, Utility Coordinator, City of Phoenix, 602-262-4971 200 West Washington Street, 7 th Floor, Phoenix, AZ 85003-1611 Model Standard Locations for Utilities in Prow Jerry Ellison, City of Los Angeles, Engineering, 213-847-2018 650 South Spring Street, Room 400, Los Angeles, CA 90014 - OR Hal Harris, Principal Consultant, Boyle Engineering Corporation, 949-476-3343 1501 Quail Street, Newport Beach, CA 92660-2726 Typical Right-of-Way and Front Lot Utility Assignments for City of Austin, Texas Henry Casas, City of Austin, 512-505-5611 Department of Public Works and Transportation, P.O. Box 1088 Austin, TX 78767-8839 Typical Utility Locations for the City of Cincinnati, Ohio Walt Pegram, Engineering/Construction Management, 513-352-3480 City Hall, Room 410, 801 Plum Street, Cincinnati, OH 45202-1927 Accommodation of Utility Plant Within the Rights-of-Way of Urban Streets and Highways, Manual of Improved Practice (ASCE Manual No. 14) 1974 ASCE Linda Hall Library, 800-662-1545 1801 Alexander Bell Drive, Reston, VA 20191-4400 OR APWA Publications, 816-472-6100 or 800-595-APWA 2345 Grand Boulevard, Suite 500, Kansas City, MO 64108 Location of Utilities in Public Rights-of-Way Page 22 of 22