NEW FLIGHT PLAN IMPLEMENTATION/ IMPLEMENTACION DEL NUEVO FORMULARUIO PLAN DE VUELO



Similar documents
NEW FLIGHT PLAN IMPLEMENTATION/ IMPLEMENTACION DEL NUEVO FORMULARIO DE PLAN DE VUELO

Regional References on solution/ mitigation of FPL problems. (Presented by Secretariat) EXECUTIVE SUMMARY

Your Global Solution For Medical Flights Caribbean, Americas and Transatlantic

NFPL IMPLEMENTATION ATS OPERATIONAL ASPECTS

Overview of CAAM-HP and its Achievements

REGISTRATION POLICY Version 1.1 5/2/2016. Summary

Installing New Software Using the Online Installer (Backup and Restore Required)

Achieve Universal primary education

REPORT OF THE KNOWLEDGE TRANSFER NETWORK*

Encuesta de Expectativas Económicas al Panel de Analistas Privados

CDM Loan Scheme DNA Help Desk CDM Help Desk

STATUS OF WWW IMPLEMENTATION AND OPERATIONS. Availability of SYNOP, TEMP, CLIMAT and CLIMAT TEMP reports at MTN centres

Implementation of performance-based navigation (PBN) in the SAM Region FOLLOW-UP ON ACTIVITIES OF THE PBN OPERATIONAL IMPLEMENTATION PROJECT

The Berkeley Group LLC

Dial , when prompted to enter calling number, enter American Samoa Number can be dialed directly Angola 0199

UNITED KINGDOM/ BRITISH PASSPORT SERVICE for Adults Ages 16 & Over

CAR/SAM REGIONAL PLANNING AND IMPLEMENTATION GROUP (GREPECAS)

GREPECAS Project G3. Implementation of the Quality Management System in AIM units. (Presented by the Secretariat) SUMMARY

A financial plan that s right for you. NAABA General Meeting March 20, 2014

Recognition of Judgments 2016

Accreditation of International Medical Schools: An Update from FAIMER and CAAM-HP. FSMB Web Seminar Series June 18, 2009

Cooperation Agreements for SAR Service and COSPAS-SARSAT STATUS OF SAR AGREEMENTS IN THE NAM/CAR/SAM REGIONS. (Presented by the Secretariat) Summary

Fig 1.1: GDP at Constant 2006 Prices: 2011

Supporting Small Island Developing States: Scholarship Program to strengthen capacity in the water sector. Prof. Maria D.

TRAINING AND CERTIFICATION PROGRAM FOR DRUG AND VIOLENCE PREVENTION, TREATMENT AND REHABILIATION AND REHABILIATION

FedEx Ship Manager Software Quick Reference Guide

Preparing Tomorrow's Teachers with Web 2.0 Tools and 21st Century Skills 1

Goal 4. Reduce child mortality

Obtaining Finance in Latin America and the Caribbean 1

ARGE Styrian Voip Business Park Gleisdorf Tel: office@styrian-voip.at

Fall 2015 International Student Enrollment

Evolution of EU exports and imports of goods with CELAC, (in billion)

ICAO State Safety Programme (SSP) Introduction

Project G3: Development of quality specifications applicable to the AIM digital environment (SAM) (Presented by the Secretariat) Summary

Preventing through education

OUTLINE OF SUBJECT DIVISION TABLES. Organization of American States (OAS)

Received by NSD/FARA Registration Unit 06/25/2012 3:30:37 PM

Implementation of the Quality Management System in AIM units PROJECT G3 IMPLEMENTATION OF THE QUALITY MANAGEMENT SYSTEM IN AIM UNITS

Update of the NOTAM Contingency Plan. (Presented by the Secretariat) Summary

Follow-up to the activities of Project D2 - Ground-ground and air-ground applications in the SAM Region. (Presented by the Coordinator) SUMMARY

THE UNIVERSITY OF THE WEST INDIES OPEN CAMPUS

10th ANIVERSARY SULAMERICA INVESTIMENTOS

REPORT ON THE MEETINGS CONVENED. Biennium [Covering the period 1 January 2006 to 31 December 2007]

UNIDAD DE PROTECCIÓN A LA CAPA DE OZONO - MÉXICO

Lean Experience and Operational Excelence Graña y Montero

HPN Product Tools. Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.

Health Care Expenditure and Financing in Latin America and the Caribbean [Fact sheet]

To contact Dell Technical Support electronically, you can access the following websites:

WHO-AIMS WHO-AIMS: REPORT ON MENTAL HEALTH SYSTEMS

Business Phone. Product solutions. Key features

Senate Committee: Education and Employment. QUESTION ON NOTICE Budget Estimates

UNHCR, United Nations High Commissioner for Refugees

States Parties to the 1951 Convention relating to the Status of Refugees and the 1967 Protocol

DEADLINE: 01 April 2015, 4:30PM (AST) CARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE

Copyright TeachMe.com 4ea67 1

SUBCOMMITTEE ON PLANNING AND PROGRAMMING OF THE EXECUTIVE COMMITTEE

REQUEST FOR PROPOSAL FOR CAROSAI WEBSITE DEVELOPMENT

TRANSITION TO THE NEW ORGANISATION OF GREPECAS. (Presented by the Secretariat)

Estimation of PPPs for non-benchmark economies for the 2005 ICP round

Public Sector Enterprises (Combined Use of IPSAS and IFRS) Marcia Maurer August 2, 2013

ECCAIRS 5 Instalación

THE UNIVERSITY OF THE WEST INDIES OPEN CAMPUS ADVERTISEMENT

RIGGING CONDITIONS AND PROCEDURES

BREA. PO Box 955 Exton, PA ECONOMIC CONTRIBUTION OF CRUISE TOURISM TO THE DESTINATION ECONOMIES

STUDENT STATISTICS 2012/2013

Avoiding Crime in Latin America and the Caribbean 1

Global Dialing Comment. Telephone Type. AT&T Direct Number. Access Type. Dial-In Number. Country. Albania Toll-Free

CHILD CARE 2016 SUMMER CREDENTIAL COURSES NEW YORK

Special Edition ANALYSIS OF HEALTH SECTOR REFORMS. Region of the Americas. No. 12

Outsource International Ltd

How To Know If An Ipod Is Compatible With An Ipo Or Ipo (Sanyo)

New Server Installation. Revisión: 13/10/2014

How To Get A Venezuela Business Visa

Brand Development and Packaging Workshop/Webinar

BALANCE DUE 10/25/2007 $ STATEMENT DATE BALANCE DUE $ PLEASE DETACH AND RETURN TOP PORTION WITH YOUR PAYMENT

Requirements to obtain a Mexico Charter Blanket Permit FOR CARGO, AIR AMBULANCE OR PASSENGER

Table 1. Growth of Latin American and Caribbean Medical Schools

CARIBBEAN DISASTER EMERGENCY MANAGEMENT AGENCY (CDEMA)

Adobe Creative Cloud Availability

CKLN Regional Collaboration & Capacity Building A Summary

How To Write A Report On A Drug Company

Computer Audit :: 19/02/ :04:10. Vista General. Workstation, Server, SQL Server, Primary Domain Controller

RISC Processor Simulator (SRC) INEL 4215: Computer Architecture and Organization September 22, 2004

Education 1994 London School of Economics and Political Science. Ph.D. in International Relations.

FORMACIÓN E-LEARNING DE MICROSOFT

2Q13 Latin America Mobile Operator Forecast,

NEBO SCHOOL DISTRICT Programs and Information WINTER 2007

Latin America - Digital Media and Pay TV Market

José Luis Giménez Rigol

El modelo estratégico de los canales de. contacto con el cliente dentro de los objetivos. de calidad y rentabilidad

The Erasmus Mundus Programme: an introduction

An Update on Foreign Account Tax Compliance Act (FATCA) July 11, 2014 A. F. FERGUSON & CO. A member firm of the PwC network

Transcription:

NEW FLIGHT PLN IMPLEMENTTION/ IMPLEMENTION DEL NUEVO FORMULRUIO PLN DE VUELO R REGION SYSTEM IMPT SUMMRY TBLE / TBL RESUMEN DE IMPTO EN LOS SISTEMS PR L REGION R Seguimiento / Follow-up: March 20 ppendix / péndice Ongoing ompliance with NFPL dates En umplimiento con la fecha de NFPL On-going with delays on some regional NFPL dates En con retraso en algunas fechas regionales de NFPL Will not comply with NFPL Date of 15 Nov 20 No cumplirá con la fecha del NFPL del 15 de nov 20 State / utomated utomatizado * REGION R / R REGION spectos de Publicaciones ctual Bahamas PP/TWR SR-8 uba uraçao / urazao : FDP- Displays- simulator FTN/IS terminal / TWR FDP de simulador : FDP de terminal FTN/IS : FDP-Displays FTN/IS terminal / TWR FDP de simulador : FDP de terminal FTN/IS ORLE Raytheon Raytheon En En I for pril I en abril No I May-ugust / mayo-agosto onvertor- June onvertidor - junio 30 May 30 de mayo New System under study (IO TB) Nuevo bajo estudio (IO TB) oordination with programmers / oordinación con programadores oordination with coordinaciones con oordination with coordinaciones con MHS available by May MHS disponible en mayo No information has been received No se ha recibido información Test bed available for testing from 1 July but operationally in the enter in September / Plataforma de pruebas disponible para hacer pruebas desde el 1 de pero operacionalmente en el entro en septiembre ruba B PP/TWR FDP THLES En No I vailable from 25 Sep 20 desde 25 sept 20 New FDP Project started on 25 Jan, 20 and delivery date is 25 Sep, 20. El Nuevo proyecto FDP comenzó el 25 de enero de 20 y la fecha de entrega es el 25 de sept de 20-1 -

State / utomated utomatizado * REGION R / R REGION spectos de Publicaciones ctual FTN System Manual- pril Manual - abril Dominican Republic / República Dominicana Haiti / Haití Jamaica ayman Islands / Islas aimanes México / Mexico B : FDP-Displays FTN/IS terminal / TWR: FDP- : FDP- terminal FTN/IS FTN System FTN TWR: FDP : FDP MHS/FTN TWR: FDP FTN terminal TWR: FDP- Displays-Simulator / TWR: FDP- - Simuladores : FDP- Displays- Simulator / : FDP- - Simuladores Thales Thales DP En ugust agosto No I No I (planned for June) / NO I (planeado para junio) No I (planned onvertor- pril / onvertidor - abril From 30 pr 20 Desde 30 abr 20 June ugust Junio - agosto oordination with Manufacturer: Implementation delayed / coordinaciones con Implementación retrasada on-time / en tiempo Manual operations Operaciones manuales Raytheon onvertor- Tender process Raytheon ugust for pril) / June onwards Tender process agosto opperchase THLES THLES FTN/IS terminal SENEM TWR: FDP - SELE En May- June Mayo-junio May- June mayo-junio May- June mayo-junio En NO I (planeado para abril) No I (I planned for June) / NO I (planeado para junio) I No I (Planned for May) / onvertidor de junio en adelante Upgrade - May Upgrade - mayo vailable vailable vailable vailable from 1 July desde 1 de On schedule / en tiempo: Operational by May 20 / Operacional en mayo 20 En New Flight Plan Format software installed in Simulator and test bed / Software para el Nuevo Formulario de Plan de Vuelo instalado en el simulador y en la plataforma de prueba New FTN template for FPL Nueva plantilla FTN para FPL On-going En Planning for an MHS system Pleaneando un sistema MHS T System operation in July de operación T en - 2 -

State / utomated utomatizado * REGION R / R REGION spectos de Publicaciones ctual : FDP- Displays- Simulator / - Simuladores : FDP- nguilla FTN terminal ntigua and Barbuda / ntigua y Barbuda Barbados British Virgin Islands / Islas Vírgenes Británicas France (Martinique- Guadaloupe) / Francia (Martinica y Guadalupe) SELE vailable from 1 July desde 1 de On-going / En FTN/IS terminal OMSOFT/ IDS October ontract to be signed in pril / October No I En TWR/PP: FDP FTN terminal TWR/PP: FPL strip manager FTN terminal GENERPL (Guadeloupe, Martinique) Guadeloupe, Martinique ayenne ( FPL and IS) T System ayenne System FTN/IS terminal / GENERPL (Guadalupe, Martinica) Guadeloupe, Martinica ayenne ( FPL y IS) T ayenne FTN/IS terminal SR-8 TOM/ Diversified Integrated Sciences orporation France Manufacturer / de Francia SIGM system / de SIGM O dacel system (urora, for DS- PDL) / O dacel sistema (urora, para DS- PDL) / - Plan to disseminate poster, filer, etc. / En plan para diseminar poster, filer No I to be through PIRO No I a ser PIRO No I - Not operational / No operacional October October On-going / En onvertor provided by Tobago onvertidor proporcionado por On-going / EN No I June- July / Junio- Internal system that generates automatically FPL, via files from French companies (irfrance and ir araïbe). Upgrade done by us (SN/G) Delivery of version PLN20 Jun 20. Upgrade done by our central technical service in Toulouse, France. Upgrade for May 20. Upgrade done by dacel via a contract./ Mejora para mayo 20 Mejora hecha por dacel via un contrato T System operation in July de operación T en No information available No hay información dispobible - 3 -

Grenada State / utomated utomatizado * REGION R / R REGION spectos de Publicaciones ctual TWR/PP: FPL strip manager FTN terminal Montserrat FTN terminal Saint Kitts and Nevis / San Kitts y Nevis Saint Lucia / Santa Lucía Saint Vincent and the Grenadines San Vicente y las Granadinas FTN terminal FTN terminal FTN terminal P FTN: FTN terminal used as backup of Sigma./ P FTN: FTN terminal usada como respaldo de Sigma. TOM/ Diversified Integrated Sciences orporation (DIS) June 20 / junio 20 No I coordinated with E / No I coordinada con E No I to be through PIRO / No I a ser PIRO No I to be through PIRO No I a ser PIRO No I to be through PIRO No I a ser PIRO No I to be through PIRO No I a ser PIRO July / Delivery of version PLN20 May 20. Upgrade done by our central technical service in Toulouse, France / Entrega de la version PLN20 mayo 20. Mejora hecha por la central técnica de servicio en Toulousse, Francia. Manufacturer indicated that NFPL dates will be accomplished / El fabricante indicó que se cumplirá en las fechas del NFPL - 4 -

State / United States s Unidos utomated utomatizado * REGION R / R REGION spectos de Publicaciones ctual Turks and aicos Islands / Islas Turcas y aicos US Virgin Islands/ Islas Virgenes s Unidos Sint Maarten / San Martin Netherlands / Países Bajos Bes Islands D RT: FDP- Displays - FTN/IS terminal- Simulator / Simulador de terminal-rt: FDP- - FTN/IS T System FTN / T FTN RT: FDP- Displays - FTN/IS terminal- Simulator RT: FDP- - Simulador de terminal FTN/IS TWR/PP: FDP- Displays TWR/PP: FDP- FTN/MHS terminal Several / varios Stonefield Several / varios SR- pril for operational staff and July for in depth training / abril para el personal operacional y para capacitación a fondo September septiembre No I- planned for June. Progress given by Website / No I planeada para junio. El progreso se publicará en la página web No I ongoing / No I En May-July mayo- ugust / agosto, ERM /hosts systems being updated/ ERM y hosts estan actualizándose oordination with manufacturer for test dates oordinación con el fabricante para fechas de pruebas : PJIE has just signed a contract for the Raytheon uto track II upgrade and is awaiting their schedule for implementation / PJIE acaba de firmar contrato para la mejora del Raytheon uto track II y está esperando el programa para la implementación Implementation Planning by to be informed by March / La planeación de la implementación sera informada por en marzo Manual Operations / Operaciones manuals oordinating with F oordinando con F Same as United States Igual que s Unidos No information / No hay información No information / No hay información OESN -Simulator / Simulador FTN-MHS System / FTN-MHS INDR OESN To be upgraded in 20? / Para hacer la mejora en 20? - 5 -

State / Belize / Belice utomated utomatizado * REGION R / R REGION spectos de Publicaciones ctual TWR/PP: FDP- Displays TWR/PP: FDP- INDR No I onvertor-july / onvertidor onverter to be used manufactured by OESN / onvertidor a ser usado fabricado por OESN FTN/IS terminal OESN Jul -Sept hanges coordinated through OESN/ ambios coordinados por OESN osta Rica : FDP-Displays INDR I I Publicada onvertor-july / onvertidor onverter to be used manufactured by OESN / onvertidor a ser usado fabricado por OESN hanges coordinated through OESN/ ambios coordinados por OESN FTN/IS terminal OESN Jul -Sept TWR/PP: FDP- Displays MSLP Northorn Trumman onvertor-july / onvertidor onverter to be used manufactured by OESN / onvertidor a ser usado fabricado por OESN oordinated by EP y assisted by OESN/ oordinado por EP y asistido por OESN El Salvador TWR/PP: FDP- Displays MSSS INDR I / I Publicada Not used / No se utilize oordinated by OESN/ oordinado con OESN FTN/IS terminal OESN Jul -Sept Guatemala TWR/PP: FDP- Displays INDR FTN/IS terminal No I onvertor-july / onvertidor onverter to be used manufactured by OESN / onvertidor a ser usado fabricado por OESN OESN Jul -Sept hanges coordinated through OESN/ ambios coordinados por OESN Honduras TWR/PP: FDP- Displays INDR FTN/IS terminal No I onvertor-july / onvertidor onverter to be used manufactured by OESN / onvertidor a ser usado fabricado por OESN OESN Jul -Sept hanges coordinated through OESN/ ambios coordinados por OESN Nicaragua TWR/PP: FDP- Displays INDR To be upgrade in 20 / Mejora sera hecha en 20 hanges coordinated through OESN/ ambios coordinados por OESN - 6 -

State / utomated utomatizado * REGION R / R REGION spectos de Publicaciones ctual FTN/IS terminal OESN VIN-T LIDO FLIGHT LUFTHNS Procedimiento de cargar diferente información de equipos y capacidades en los diferentes tipos de aeronaves según las certificaciones otorgadas por la autoridad de aviación. También se ve afectado la elaboración de los planes de vuelo por parte del Despachador de vuelos. / Different loading procedure information assets and capabilities in different types of aircraft according to the certificates issued by aviation authorities. lso affected the development of flight plans by the flight dispatcher. N/ May re being tested in test environment. Proposed implementation date, pril 16, 20 / Se están haciendo pruebas en ambiente de test. Fecha de implementación propuesta 16 de abril 20 oordination with OESN / oordinación con OESN EROMEIO Hewlet Packard (HP) HP In OPS Manual / En OPS Manual N/ Jun On-going / En *: : s que cuentan con sistemas automatizados (Procesamiento de planes de vuelo, FTN y datos radar)/ States that have automated systems (Flight Plan Processor, FTN and Radar Data) B: s que cuentan con sistemas automatizados (Procesamiento de planes de vuelo solamente)/ States that have automated systems (Flight Plan Processor only) : s que cuentan con sistemas automatizados (FTN solamente)/ States that have automated systems (FTN only) D: s que no poseen sistemas automatizados TM / States that do not have TM automated systems TWR: Torre, PP: proximación, : ontrol en Ruta, RT: ir Traffic ontrol enters - 7 -