COMPETENCY ANALYSIS PROFILE Rodworker 452A (All unshaded skill sets must be demonstrated/ completed) PROTECT SELF AND OTHERS Wear personal protective (PPE) Lift and Apply housekeeping rules Interpret warning signs, labels and symbols Report hazards to supervisory and safety personnel U0911.0 U0911.01 U0911.02 U0911.03 U0911.04 U0911.05 Maintain safety devices and Respond to emergency situations Operate construction Maintain construction Inspect platforms, ladders and working surfaces U0911.06 U0911.07 U0911.08 U0911.09 U0911.10 Install and secure platforms, ladders and working surfaces Maintain platforms, ladders and working surfaces Prevent fires Communicate with co-workers in the workplace Stress tendons U U0911.11 U0911.12 U0911.13 U0911.14 U0911.15 PLAN, PREPARE AND SET UP FOR JOB Read and interpret drawings and specifications Plan tasks Determine installation procedures and sequences Set up Unload, sort/shake out and stage inventory U0912.0 U0912.01 U0912.02 U0912.03 U0912.04 U0912.05 Set up manual and power bending Operate manual and power bending U0912.06 U0912.07 1
OPERATE AND MAINTAIN HAND, POWER TOOLS AND AERIAL WORK PLATFORMS Identify hand Select hand Use hand Maintain hand Identify power U0913.0 U0913.01 U0913.02 U0913.03 U0913.04 U0913.05 Select power Operate power Maintain power Identify oxygen Select oxygen and fuel gas U09130.06 U0913.07 U0913.08 U0913.09 U0913.10 Set up and adjust oxygen and fuel gas Operate oxygen Maintain oxygen Identify posttensioning Select posttensioning Set up and adjust U0913.11 U0913.12 U0913.13 U0913.14 U0913.15 Operate posttensioning Maintain posttensioning Identify aerial Select aerial work platforms U0913.16 U0913.17 U0913.18 U0913.19 U0913.20 Set up aerial work platforms Operate aerial Maintain aerial U0913.21 U0913.22 U0913.23 2
RIG AND HOIST MATERIALS AND EQUIPMENT Perform rigging and hoisting calculations Select slings Assemble slings Inspect and maintain slings Select rigging U0914.0 U0914.01 U0914.02 U0914.03 U0914.04 U0914.05 Assemble rigging Inspect and maintain rigging Select hoisting Assemble hoisting Inspect and maintain hoisting Reeve or lace blocks U0914.06 U0914.07 U0914.08 U0914.09 U0914.10 Tie and render Splice fibre rope knots, hitches and bends Establish hand, voice and radio communications with co-workers and operators U0914.11 U0914.12 U0914.13 U0914.14 3
PLACE REINFORCING MATERIALS Identify Select Sort Identify bar supports U0915.0 U0915.01 U0915.02 U0915.03 U0915.04 U0915.05 Select bar supports Install bar supports Install for beams, columns and walls for slab for footings U0915.06 U0915.07 U0915.08 U0915.09 U0915.10 Pre-assemble bar columns, beams, walls, cages and components Splice bars Hoist bar assemblies Place bar assemblies Position welded wire fabric Secure welded wire fabric U0915.11 U0915.12 U0915.13 U0915.14 U0915.15 inspection of U0915.16 U0915.17 PLACE POST- TENSIONING AND BAR TENDONS Perform preinstallation procedure and layout Order work site and for tendon placing Install bearing plates and bursting steel Install tendon and sheathing supports, chairs, sheathing and couplers Install bonded cables in sheathing U0916.0 U0916.01 U0916.02 U0916.03 U0916.04 U0916.05 Install unbonded cables on supports Assemble dead-end anchors inspection of posttensioning U0916.06 U0916.07 U0916.08 4
STRESS AND GROUT POST- TENSIONING AND BAR TENDONS Interpret engineering instructions for bar and cable stressing and cable stress sequence Order work site and for tendon stressing and grouting Install anchor head and wedges and stressing plates Select stressing jacks and hydraulic pumps Position stressing jacks and hydraulic pumps U0917.0 U0917.01 U0917.02 U9197.03 U0917.04 U0917.05 Apply stress to and bar tendons Crop cables to specified strand projection length Perform pregrouting grouting U0917.06 U0917.07 U0917.08 U0917.09 5