ELECTRICAL CONTRACTORS, SUPPLIERS AND DISTRICT ENGINEERING, CONSTRUCTION & OPERATIONS PERSONNEL



Similar documents
Section 2 General Requirements

Section 5 Meters and Service Entrance Equipment

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

Electric Service Guide for Commercial Construction

City of Riverside Building & Safety Division Phone: (951)

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3

REQUEST FOR ELECTRIC SERVICE Commercial

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

Electrical. This section applies to the design and installation of building power distribution systems.

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

BUILDING PERMIT SPECIFICATIONS

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

ELECTRIC SERVICE GUIDELINES (For Indiana)

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

Home Inspection Report

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Bold items are particular to the City of Euless

County of Riverside Building and Safety Department

Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION SECURITY SYSTEMS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Applying For New or Revised Electric Service

Electrical Service Guidelines

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

Vision Home Inspection

Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

SERVICE - GENERAL Residential, Commercial, Industrial

Underground Commercial Electric Service

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Electrical Contractors. and the. New Jersey. Rehabilitation Code

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

We look forward to serving you!

Electric Service Guide for Residential Construction

How To Plan Out An Array Of Solar Panels

How To Get A Power Line Extension

ELECTRIC SERVICE HANDBOOK

Request for Proposals for Photovoltaic System Installation

Requirements for Electrical Installations

Mobile Home Pre-Inspection Checklist

PRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

Key Concepts Of Distributed Generation

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Single Family Residential Basement Finish

RESIDENTIAL WINDOW REPLACEMENT

CARROLL COUNTY ELECTRICAL DEPARTMENT SERVICE POLICIES. EFFECTIVE MARCH 1, 1995 Revised 1/01/2013

ELECTRIC SERVICE HANDBOOK General Information Residential Service Portable/Standby Generators Temporary Service Commercial Service Metering

Solar Panel Installations

Crawford Inspection Services C.C.B. #

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

NTUA GUIDELINES FOR DESIGNING AN ELECTRICAL POWER DISTRIBUTION SYSTEM FOR NEW DEVELOPMENTS

How To Install An Overhead Sewer

Building Code Inspections and Fees

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

Top Commercial / Residential Electrical Requirements *

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Step 1: Application Instructions

MOBILE HOME SERVICE REQUIREMENTS GAS

Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM

Please check with your local inspection authority for any additional requirements before installation.

City of St. Charles Basement Finish or Remodel

Inspection Tech. (330) Inspected By: Aaron Westerburg

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

BUILDING SAFETY UNIT

Current as of 11/10/08 1 of 1

Policy and Guidelines for Electric Service

Contractors Guide Central Inverter System Installation

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

Questions and Answers for Heating and A/C Contractors

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL

Please Refer to Attached Sample Form

IRRIGATION PUMPING Table of Contents - Section 900

Please Refer to Attached Sample Form

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST

Inspection Item COMMENTS

Guidance Notes FSR 2014

SECTION 807 PUMP STATION REHABILITATION

CAL FIRE/San Luis Obispo County Fire Fire Prevention Bureau

GENERAL ELECTRICAL REQUIREMENTS

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

Transcription:

January 2, 2014 ATTENTION: SUBJECT: ELECTRICAL CONTRACTORS, SUPPLIERS AND DISTRICT ENGINEERING, CONSTRUCTION & OPERATIONS PERSONNEL Electrical Service Manual (ESR) Several revisions have been made to the ESR since the last publication. Please find enclosed the revised documentation to be inserted in your manual. Current revisions are shown in red with a black vertical bar on the left border. A brief description of the revisions are as follows: Section 2. General Requirements Pages 2-17 and 2-18 Variance Request form revised Section 4. Underground Service Pages 4-41 and 4-42 revised. Page 4.41 provides more detailed requirements for a Vault Room. Page 4-42 specifies 20 of excess conductor required to comply with Figure 4-21. Section 5. s and Service Entrance Equipment Page 5-15 provides more detail for required door hardware required for Rooms. Section 6. Generation Interconnection Pages 6-16 revised to provide more detailed informaion regarding the visible-open lockable disconnect switch requirement. All requirements are effective immediately. In order for you to have the most current information available for reference please update your assigned ESR manual with the enclosed pages without delay. NO. 45

Section 2. General Requirements V. FORM 2-1 VARIANCE ROUTING PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY INTERNAL VARIANCE APPLICATION ROUTING (Signatures, Approval / Denial to be noted on Actual Variance Form) Route To: Mailstop: 1. 2. Designer / Engineer / Engineering Services Everett / Regional / Distribution Engineer Svcs. Mgr: 3. OC / HL Construction Superintendent: 4. OM Dept. Superintendent: 5. EB Reading Manager: 6. 02 Standards: Routing: Everett / Regional / Engineering Services; Route to appropriate Mgr. and to Construction Superintendent-OPS for review. South County Engineering route to Distribution Services Manager and to Construction Superintendent-HL for review. Other Regional Engineering offices, route to appropriate Distribution Services Manager. Additionally, all variances will be reviewed and approved / denied by the District s Standards Department. Departments unaffected by the variance may be omitted from this routing list. Standards will be the final reviewer of the Variance Request and send a copy of the approved or denied Variance to the appropriate engineer or manager to notify the requestor. Standards will file the original variance request and send a copy to the originator. New: 10/90 Revised: 06/15/2013 Page 2-17 Rev. 12/24/2013

Section 2. General Requirements W. FORM 2-2 VARIANCE APPLICATION PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY VARIANCE APPLICATION FOR DEVIATION FROM STANDARD SERVICE REQUIREMENTS Date: / / Service Address: Customer: Address: Phone: ( ) Eng./Architect: Contractor: Electrician: Phone: ( ) Phone: ( ) Phone: ( ) Type of Service: O.H. U.G. Voltage Load Prints Available: Yes No Estimated Date of Service / / Other Approvals Required: City County Labor & Industries Requested Date Variance Application Reply Is Needed: / / (Adequate time for internal processing (10 day minimum) must be allowed) Variance Requested: (include specific ESR reference(s) that cannot be complied with and reason for request). Reason for Request: Sketch: (attach other documents as necessary) Complete all Variance information in full and submit with a copy of the appropriate New Service Questionnaire. Variances must be approved by all Managers and departments affected by requested Variance, including deviation from Electrical Codes, Standards and Electrical Service Requirements or Variance will be denied. Variance Request Reviewed and Approved by: Customer/Distribution Designer/Engr: Date: / / Regional/Distribution Engr. Mgr. Date: / / Construction Superintendent: Date: / / Dep t. Superintendent: Date: / / System Planning & Protection Eng: Date: / / System Planning & Protection Mgr.: Date: / / Reading Mgr.: Date: / / Other (Identify ): Date: / / Standards: Date: / / Variance Request Approved: Yes No Requesting Customer Notified By: Date: / / Conditional on performing The following requirement (s): File: ADM 3.2-ESR Rev. 12/24/2013 New: 10/90 Page 2-18 Revised: 06/15/2013 01/02/2014

Section 4. Underground Service O. VAULT ROOMS Customer-furnished transformer vault rooms shall be submitted to and approved by the District prior to construction, in full compliance with NEC Article 450.41 through 450.48, for each individual installation and in accordance with the minimum requirements listed below: 1. The size of the transformer(s) shall determine the size of the vault, size of oil entrapment sill or sump, access size and amount of ventilation required. 2. A floor drain or sump shall be provided if there is a possibility of water entering the vault. Such drainage shall be located so that oil spillage cannot enter it. 3. The vault walls, floor and ceiling shall be solid concrete. 4. The room shall be illuminated by permanent fixture(s) with a switch inside next to the latch side of the door, with a minimum of 10 foot candles per square foot. A power outlet shall also be provided in the room. 5. Permanent transformer lifting eyes in the ceiling shall be provided. 6. 3-hour fire door(s) shall be provided in accordance with NEC 450.43 and a heavy duty panic bar exit device (Precision No. 4R0FL5103-603, 703A or 808A trim) and heavy duty automatic door closure (Stanley No. D-4550- Std.) shall be installed on the door(s). Key boxes and/or other panic bar and automatic door closures from alternate manufacturers are not acceptable. The door shall open towards egress of the room. During the construction phase, the panic bar exit device shall be equipped with a BEST Access Systems construction core on the outside of the door. When the vault room is ready to be energized, the District will furnish and change the construction core out to a District's "P" tumbler series which will then accept only the District's master "P" series key. The locking system shall limit access to qualified District employees only and not allow access to unqualified individuals (WAC 296-307- 36230). For lock, automatic closure and exit bar device information contact: Contract Hardware, Inc Attention: Lynne Hufstedler 12100 NE 195th St. Suite 250 Bothell, WA 98011 Phone: 1-206-298-4770 Fax: 1-206-298-4777 7. The owner and his/her agents and/or the homeowners association of the building shall be responsible to install, retain and maintain the District's required BEST knobset, panic bar exit device and automatic door closure for the life of the service to the premises or the electrical service to the building will be subject to disconnection. Should any maintenance or replacement of this customer owned equipment be necessary an authorized District employee shall assist the customer with the work. New: 10/90 Revised: 01/02/2014 06/15/2013 Page 4-41

Section 4. Underground Service 8. The District shall furnish and install a sign on the exterior door stating "Electrical Vault Room". In multiple unit complexes, the customer shall provide building identification signage. 9. It is the customer s responsibility to insulate transformer vault rooms so that sound or transmitted vibration to other areas of the building are minimal. Transformer vault rooms must meet or exceed requirements of the applicable laws and noise ordinances of the Washington Administrative Code. 10. Foreign pipes and ducts shall not enter or pass through transformer vaults (NEC 450-47). P. MAINTENANCE Maintenance of District-Owned Underground Service Conductors: The District will not charge for normal maintenance of underground service. If a fault occurs in a conductor as a result of improper backfill or dig-in damage caused by a customer or contractor, charges for repair will be determined by the District s Claims Department and billed to the responsible party. Q. INCREASING CAPACITY - EXISTING VAULT LOCATION 1. When adding secondary feeds to an existing energized padmount transformer, secondary handhole or pedestal, stop outside the vault and provide 20' of excess conductor and a work hole 3 foot wide x 3 foot deep x 4 foot back from vault for District personnel to penetrate the vault, extend the conductors and/or conduit(s) and make the connections. 2. Any costs associated with damage and repair to the existing primary, secondary(s) or ground wires are the responsibility of the customer/contractor. 3. Under no circumstance shall the Customer penetrate the wall of an existing energized vault with either conduit or conductor. Only District personnel are authorized to penetrate into an existing energized vault. 4. Contact engineering to determine which corner of an existing vault is available for the service to enter. Typical Existing Energized Vault FIGURE 4-21 20' Excess Secondary Conductor Coiled at Vault Entrance (15' min. required inside vault ) Final Grade 24'' Min. DO NOT PENETRATE New: 10/90 Revised: 12/24/2013 06/15/2013 Page 4-42 3' 3' 4' When Conduit is used, stop it here 4' from the Vault No bell end on conduit(s) DO NOT ENTER ELECTRIC Secondary Top Knockouts Primary Bottom Knockouts NOTE: The Customer Shall Notify Utilities Underground Location Center by calling 811 or 1-800-424-5555 48 Hours not less than two business days or more than ten business days before the commencement of excavation or trenching to allow for the location of existing underground utilities by their representatives (RCW 19.122.030). Contact the appropriate utility if conflicts occur.

Section 5. s and Service Entrance Equipment E. METER ROOMS 1. A minimum of seven or more metered services are required before a meter room will be allowed. At least seven active meters must be set and the required lockset must be installed BEFORE the building will be energized. 2. Permanent labeling of service identification is required. Refer to Section 2-E and 5-E. 3. When a metering room is requested, a floor plan shall be submitted to the District for approval in the design stage and prior to any construction or wiring (WAC 296-46B-230). 4. The meter room shall be dedicated and secured for electrical equipment and never used for storage. 5. The meter room shall not be installed above or below the ground level of the building and shall be accessible through a single exterior door on the exterior lines of the building. 6. Safe access must be provided to the exterior door without having to enter or go through such areas as parking garages, hallways, breezeways, stairways or other such interior building lines. 7. The only access to the Room shall be from the exterior ground level lines of the building via a minimum 2 8" x 6 8" solid core door installed with a heavy duty BEST knobset (Series #83K7D4D_ 626 SPN, or Series #93K7D15D _ 626LM) from BEST Access Systems. The use of a key box is not acceptable. In the event a panic bar device and/or a door closure is installed a heavy duty panic bar exit device (Precision No. 4R0FL5103-603, 703A or 808A trim) and heavy duty automatic door closure (Stanley No. D-4550- Std.) is required. Panic bar and automatic door closures from alternate manufacturers are not acceptable.the locking system shall be furnished and keyed with an "SP" tumbler series core which will accept the District's master key. The locking system shall not allow common access to unauthorized individuals. For lock information contact: Contract Hardware, Inc Attention: Lynne Hufstedler 12100 NE 195th St. Suite 250 Bothell, WA 98011 Phone: 1-206-298-4770 Ext.109 Fax: 1-206-298-4777 8. The owner and his/her agents and/or the homeowners association of the building shall be responsible to install, retain and maintain the District's required BEST knobset and passage key system for the life of the service to the premises or the electrical service to the building will be subject to disconnection. 9. The customer/owner shall furnish and install and maintain a permanent sign on the exterior door stating "Electrical Room" and provide building identification in multiple unit complexes. New: 10/90 Revised: 01/02/2014 06/15/2013 Page 5-15

Section 6. Generation Interconnection G. Solar Net Generation: Installation of Solar Generation Production ing must comply with the requirements in the District's Electrical Service Requirements Manual (ESR) as well as the requirements of the local electrical jurisdiction and the State of Washington. s shall be permanently labeled "Production " and "Net " in compliance with ESR 5.F. Service Identification/ Labeling. Preferred location of meters shall be adjoining as shown on the figure below when possible. If adjoining meter locations are not possible meters shall be in clear view with unobstructed safe access of each other. Contact the District's Energy Services Department for further information. Typical net metered solar installation 1Ø 25 kw or Less Solar Panels UL 1741 DC to AC Inverter DC - AC ~ 120/240 Production Generation 15 Max See Note 1. Preferred Adjoining Locations PUD Revenue Net Customer Service Panel 15 Max See Note 1. UL 1741 DC to AC Inverter DC - ~ 120/240 AC Production Generation Preferred Adjoining Locations PUD Revenue Net Customer Service Panel Notes: 1. Preferred location for District revenue meter is within 15 of production meter. Greater distances may be acceptable with prior District approval before installation. 2. Production meter is for the Washington State Renewable Energy Production Incentive. 3. A visible-open lockable disconnect switch is required for all systems 25kW and greater. This switch must be accessible at all times to District personnel. Single-phase 120/240 volt systems under 25kW metered with a self-contained meter do not require a visible disconnect switch. Electrical Service Requirement New: 10/94 Revised: 01/02/2014 10/09/2009 Page 6-16