ViZion Installation Guide



Similar documents
OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

IPX AUTOMATIC IP NETWORK LOSS BACKUP A/B SWITCH INSTRUCTION BOOK IB

OPL BASIC. Dosing System for Professional Laundry machines. Contents


TDAS G5-DB Hardware User s Manual

SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY

PROXIMITY CARD READERS C-10, C-20, C60, C70

Color Mark Sensor with Red or Green LED E3S-VS

maxon motor maxon motor control EPOS Positioning Controller Cable Starting Set Edition June 2006 part number Positioning Controller

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

2 Mega-Pixel PoE Plus Speed Dome Internet Camera ICA-HM620. Quick Installation Guide

RI-215A Operator s Manual. Part Number: RK Revision 0 Released: 10/3/05

PRODUCTIVITY THROUGH INNOVATION 600 CONTROL DIRECT DRIVE TECHNICAL/OPERATION MANUAL

QUICK INSTALLATION. MSX-E1516 Ethernet digital I/O system /2014

ECR Shelf System Installation Guide Centralized Rack Mount Call Recording

SCREENLOGIC INTERFACE WIRELESS CONNECTION KIT

8 Channel Status Input Panel model SIP-8

Advantium 2 Plus Alarm

Mobile Satellite Solutions. A WiWorld Partner SATELLITE TV ANTENNA CONTROLLER RFM-1000/1100 TECHNICAL MANUAL STOW SEARCH


NELSON VOLTAGE MONITOR INSTALLATION & PROGRAMMING MANUAL

IMMS-CCC. IMMS-CCC Hardwire Central Interface. Installation Instructions

User Manual. ATX12V / EPS12V Power Supply TG-I460R (460W+460W) TG-I550R (550W+550W) Switching Power Supply User Manual

Product Specification instalert Rapid Messenger Variable Message Sign

Model SRMD Setra Remote Monitoring Display

QUICK REFERENCE MANUAL

Communication with BushingGard using computer USB port

ipdatatel Wi-Fi BAT Installation and Configuration Guide

Shunt lock function 3066

PRELIMINARY MANUAL STAGE COLOR 48. Preliminary User Guide. Official version will follow soon on: TABLE OF CONTENTS

Model 201 Wiegand Touchpad Reader Installation Guide

How to Install a Motherboard

TrueAlarm Fire Alarm Systems

OPERATING INSTRUCTIONS Model ST-888 DTMF ANI/ENI Display Decoder

AC-115 Compact Networked Single Door Controller. Installation and User Manual

LMU Hardware and Installation Guide

SERVICE MANUAL FOR 12 VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOF TOP UNITS ONLY

Actiontec Router Troubleshooting

=============================== WARNING

INSTALLATION INSTRUCTIONS

Datasheet of the Easy Servo Motor ES-MH Series

Digital Keypad Use s Manual

HG600/HG800. Hydro-Power Unit. Installation and Operation Guide

HONEYWELL COMMERCIAL FIRE/BURG PANEL UL LISTING REQUIREMENTS (Compiled from VistaFBPT Installation Instructions V1 Rev A 11/12)

Manual for Fire Suppression & Methane Detection System

5-port / 8-port 10/100BaseTX Industrial Ethernet Switch User Manual

LED red (-): Measuring value < lower tolerance threshold LED red (+): Measuring value > upper tolerance threshold. Page 1/6

Vision Engravers and Routers PRE-Installation Guide Vision Engraving & Routing Systems

EMBEDDED ACCESS CONTROL Hardware Installation Guide

Power Supply and Cabling Options. SmartTrak 100/101/140

Animated Lighting Software Overview

The $25 Son of a cheap timer This is not suitable for a beginner. You must have soldering skills in order to build this kit.

Copyrights 2010 Victron Energy B.V. All Rights Reserved

SENSORS. Miniature Sensors - S3Z. Advanced line of miniature Asian style of photoelectric sensors mm background suppression

Making a DB to RJ45 adapter.

FITNESS FACILITY WIRING SPECIFICATIONS. NETPULSE Inc rd Street San Francisco, CA Phone:

* DISCLAIMER: Contents. How to Use This Guide: COMMERCIAL INSTALL GUIDE 2

ScreenLogic Wireless Connection Kit. Installation Guide. pool/spa control system

LevelOne IFE Port PoE + 1-Port TP Industrial Fast Ethernet Switch User Manual

MODEL 5010 DUAL CHANNEL SMOKE/FIRE DETECTION MODULE

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930

Streaming Potential System (SPT1000, SPD1000)

Precision Clocks When you absolutely can't afford a time shift Installation and Operation Manual

ER-1 Emergency Response System INSTALLATION & PROGRAMMING GUIDE

Name: Bicycle Cellphone Charger Circuit Assembly Manual Device: Nokia/Blackberry List of Components:

Digi-Motor Installation Guide

AR-721U/721K/661U User s Guide

Model 5511 Filler Controller User s Manual Version 1.1 October 2011

Technical data. General specifications. Indicators/operating means. 30 Hz Multiplex operation 30 Hz / n, n = number of sensors, n 5

PART 8: FIELD WIRING. n WARNING NOTICE. Boiler Manual

PTU Series Transducer Digital Display Indicator User s Manual

Draper Low Voltage, Remote Control, Serial and Network Wiring Guide

LocoNet, the Digitrax Difference

Hydra Super-S Combo. 4-Bay RAID Storage Enclosure (3.5 SATA HDD) User Manual July 29, v1.3

GSM HOME SECURITY SYSTEM

CoolWave r 2 Phase Control Board and Cable Replacement Kits

IP DSLAM IDL Quick Installation Guide

USB to RS-422/485 Serial Adapter

Neo-Neon. LED Vision Mesh Screen Operation Manual. LED Vision Mesh Screen. Neo-Neon International Ltd He Shan Decorative Lighting Company Limited

AUTOMATIC TRANSFER SWITCH CONTROL UNIT OPERATOR S MANUAL

Fire Pump Controllers Remote Alarm Panels

Servo Info and Centering

Installation Fleet Tracker (SBC3)

Installation & Operations Manual. VoIP Interface 2100-VOIPLC VoIPLC

Datasheet of the Easy Servo Motor ES-M Series

Combi B Alarm box. Mounting instructions

Roadstar Installation Instruction Manual

USER MANUAL ESP. Enhanced Steering Performance. R-Net

HAM841K ALARM CONTROL PANEL FOR COMMERCIAL AND RESIDENTIAL SECURITY SYSTEMS

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

Master Time Clock MTC-200 MTC-400 MTC-600. Users Manual

8 coil stator 11 coil stator

Vertical Phone System Upgrades Scope of Work

REGTRONIC OPERATING INSTRUCTIONS

GPS NTP Time Server for Intranet Networks DIN RAIL Version

USER MANUAL. Model U ForeFront Alarm Card SALES OFFICE (301) TECHNICAL SUPPORT (301) An ISO-9001 Certified Company

Installation Instructions

Transcription:

ViZion Installation Guide v2.0 1 ViZion Installation Guide Table of Contents Inventory Hardware Setup Understanding Synchronization Cable Begin by taking an inventory of the required equipment DR Unit Acquisition PC Inventory: DR Unit 1. Identify DR Unit. DR Unit will be shipped as indicated in Figure 1.0. Each box contains (1) complete DR Unit to coordinate with either a wall or table Bucky. Therefore, if both a wall and table Bucky will be assembled, there will be 2 boxes shipped, (1) DR unit for each Bucky assembly. Figure 1.0 2. Open the box(es)

ViZion Installation Guide v2.0 2 3. Verify contents of box(es) Notice each box will contain 3 sub-boxes upon opening. See Figure 1.1 below. 3 1 2 Figure 1.1 Panel Power Supply Synchronization Cables DR Unit Panel Power Supply for Panel (Black) Power Supply Cables for Panel Network Cable (White) Sync Cables (Grey) Power Supply Cable Samsung CD (Manufacturers Guide) 4. Familiarize yourself with the equipment and supplies in each box. 1 Panel

ViZion Installation Guide v2.0 3 Figure 1.2 - DR Panel 2 Power Supply Figure 1.3 - Panel Power Supply plus Power Supply Cables This black box is the power supply for the panel and its associated power supply cables arrive already attached. 3 Synchronization Cables

ViZion Installation Guide v2.0 4 Figure 1.4 Synchronization Cables, Network Cable, Power Supply Cable plus CD Network Cable (Ethernet CAT5 Cable) WHITE Figure 1.5 Synchronization Cable GREY Figure 1.6 Power Supply Cable (for black power supply box) BLACK Figure 1.7 IMPORTANT NOTE: The Power Supply Cable in Box #3 has a Euro plug, as shown in Figure 1.7. A U.S. Standard Power Supply Cable for the Power Supply will be included in your shipment.

ViZion Installation Guide v2.0 5 Samsung CD (included for your reference only no need for installation) Figure 1.8 NOTE: Figure 1.9 is the underside of the panel. Notice the (4) mounting holes for bolting purposes. If your setup requires the panel to be mounted to an enclosure, we recommend mounting the panel BEFORE running the cables. Figure 1.9 Inventory: Acquisition PC 1. Check to make sure you have the Acquisition PC and its power supply.

ViZion Installation Guide v2.0 6 Hardware Setup 1. Organize your Hardware. DR Unit Acquisition PC Figure 2.0 2. Plug in the Synchronization Cable (Shown in Figure 2.1) Figure 2.1 3. CHECK THE POWER SUPPLY INPUT VOLTAGE SELECTOR BEFORE PROCEEDING! You may need to switch it from 230 VAC to 115VAC operation, as

ViZion Installation Guide v2.0 7 shown in Figure 2.2. Figure 2.2 4. Plug in the two power supply connections (Shown in Figure 2.3) Once the 230VAC/115VAC switch has been checked and the two power supplies have been plugged in, you may TURN ON the power supply. Figure 2.3

ViZion Installation Guide v2.0 8 5. Connect the DR Unit and the Acquisition PC together, directly, using a single network cable. (Figure 2.4) Network Cable >> Connects DR Unit to Acquisition APC Figure 2.4 Please continue to the next section titled Understanding the Synchronization Cable. Understanding the Synchronization Cable

ViZion Installation Guide v2.0 9 *ONLY QUALIFIED SERVICE PERSONNEL SHOULD ATTEMPT THESE STEPS* The Synchronization Cable connects the Generator to the Panel for the purpose of communication, sending signals to the panel for what function(s) to perform and when. The Synchronization Cable is necessary to: 1. Prepare the panel for exposure 2. Create a mechanism for actual exposure to be delayed. 1. 1 Please review the available synchronization cable (signal wires) as shown in Figure 3.0 and the referenced descriptions in Table 3.0 to become familiar with their orientation and description. Figure 3.0 Table 3.0 PIPIN No. PIN Description 1 SPARE (Brown) 2 SPARE (Yellow) 3 READY DONE (Green) 4 READY DONE COM (Blue) 5 READY IN (Black) 6 CANCEL IN (White) 7 12-24 VDC (Red) 2

ViZion Installation Guide v2.0 10 2. Make the appropriate connections from the synchronization cable to the generator s Bucky interface, as shown in Table 3.1 and as indicated in Figure 3.1- Connection Diagram below. Signal Label Cable Color Input/Output READY IN 12V ~ 24 VDC RED INPUT READY IN READY IN BLACK INPUT READY DONE READY DONE GREEN OUTPUT READY DONE READY DONE COM BLUE OUTPUT Table 3.1 Generator Power Supply of Detector VCC (12V~24VDC) 12V~24VDC TLP180 READY IN IN SIGNAL READY IN Bucky Start (example) VCC (12V~24VDC) GND READY DONE Stabilization Time (0.7 sec ~ 0.9 sec) RELAY READY DONE SIGNAL Bucky Ready (example) GND READY DONE COM TRIGGER CONNECTOR Figure 3.1 Connection Diagram 3

ViZion Installation Guide v2.0 11 Review Figure 3.2 Signal Timing Diagram below, noting that via the standard Bucky interface, the Detector will induce a delay during EXPOSE, before allowing the x-ray tube to fire. This delay is typically lasts between ½ second to 1 second. THIS DELAY IS NEEDED TO ALLOW THE DETECTOR TO BECOME READY. READY IN (GENERATOR to DETECTOR) Stabilization Time (0.7 sec ~ 0.9 sec) READY DONE (DETECTOR to GENERATOR T1 T2 Figure 3.2 Signal Timing Diagram Where: T1 = Offset stabilization time (0.7 ~ 0.9 sec) before X-ray exposure * Detector controls T1 time T2 = Integration time of detector varies 0sec ~ 20min Expose relay switch ON time (Integration Time) and X-ray exposure time MUST be the same. Please refer to the ViZion Install Verification Guide to confirm successful installation as well as noting the most common installation issues and providing troubleshooting techniques. Once the installation has been verified using the ViZion Install Verification Guide, please proceed to calibration. For instructions on how to calibrate your ViZion DR, please refer to the ViZion Calibration Guide.